22-00654-00-RS_Addendum_01.pdf
PDF 2 MB Posted
- Solicitation number
- FY2025-ITB-113
- Issued by
- Champaign County, Illinois
About this file
This document is a Summary of Quantities sheet for the Springfield Avenue Resurfacing project in Illinois, prepared by Fehr Graham Engineering & Environmental. The summary details a comprehensive road reconstruction project spanning Springfield Avenue from Coler Avenue to McCullough Street, with 49 distinct line items covering various construction and infrastructure improvements. Key quantities include 370 SQ LYD for sodding, 1,386 SQ YD for aggregate base course, 338 tons of hot mix asphalt surface course, 38 SQ YD of Portland cement concrete pavement, and numerous other materials and services related to roadway, sidewalk, storm sewer, and street light reconstruction.
The document provides a detailed breakdown of both material quantities and specific infrastructure elements, including structural components like box culvert construction, concrete structures, and underground conduit installations. The project includes precise measurements for items such as pavement removal, electrical work, lighting installations, and structural repairs. An additional section of the document shows existing storm sewer structure details and invert elevations, indicating a technically comprehensive approach to the road resurfacing project. The summary sheet is dated and appears to be part of the bidding and contract documentation process, with specific engineering and design specifications clearly outlined.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheets and Views 05 Summary of Quantities
File details come from the government source that posted it. Updated .