This document is an addendum to a state and local contract opportunity for the renovation of the Leesburg ESP building for the Florida Army National Guard. The project involves renovations to a 13,000 square foot building, including exterior repairs, code compliance upgrades, and interior improvements to the mechanical, electrical, plumbing, and finishes. Several alternate bid items are included, such as ballistic doors, vault upgrades, lighting system improvements, reinforced grass parking, a site sign, and an armory building upper roof system replacement. The bid opening date has been rescheduled to September 7, 2023 due to the potential impact of Tropical Storm/Hurricane Idalia.
The estimated cost of construction is $2,500,000. The contractor is responsible for obtaining a building permit from the local authority, while the State Fire Marshal has jurisdiction over fire safety standards. The contractor must meet requirements of the Florida Building Code, State Fire Marshal, local Authorities Having Jurisdiction, and any other necessary permits and fees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Army National Guard
Construction & Facility Management Office
ISSUED ADDENDUM
Rev. 11/2018
Date August 23, 2023
ADDENDUM Number 1
Project Number and Name 218036 Leesburg ESP Renovation
Invitation to Bid Date July 20, 2023
Number of Attachments 1
Bid Opening Date and Time August 31, 2023 (2 PM – St. Augustine)
From: Department of Military Affairs, CFMO Contracting Office
This addendum and the listed attachments forms a part of the contract documents and modifies the original bidding documents. Acknowledgement of this addendum in Exhibit 4 - Bid Proposal form is required.
Concerns with this addendum should be addressed to:
ng.fl.flarng.list.cfmo-contracting@army.mil
Questions (Q) / Answers (A)
Q1. In the right of way on the existing concrete sidewalk near the north-east corner of the Storage Building shown on sheet C101, there is a note stating, “Sanitary Sewer Manhole”, but the piping listed is for storm water. Please advise.
A1. We are not sure if the manhole should be relabeled or not. There are a lot of utility lines in Meadow St., but we have never been able to obtain any as-built plans from Leesburg. This manhole doesn't affect the Armory site at all and is outside of the project limits, so we recommend it be left as is.
Q2. Sheet C102 provides a detailed elevation to install the TrueGrid Root Permeable Paver System for ABI #4. However, sheet C101 does not show a precise location. Are we to utilize this permeable paver system throughout the grass area or in certain areas?
Please clarify with a revised drawing.
A2. See attached addendum sketch showing the approximate area of 14,400sf for the True Grid system. This area is approximate and should be field verified by the contractor.
Q3. According to section B-21 subsection letter “C” of the Non-Technical Specifications, the project duration calls out for 480 calendar days. This project is similar in scope based on our previous project however the duration was shorter. Please advise.
A3. The project duration has been revised. The number of calendar days from Notice to Proceed to Substantial Completion is 300 days. The number of calendar days from Substantial Completion to Final Completion is 30 days. Total duration from Notice to Proceed to Final Completion is 330 calendar days.
Q4. According to the demolition plan shown on sheet D100, we are to provide a new sprinkler system riser, however, note number five (5) states to remove and salvage the existing Wood Flooring and Base and leave the concrete slab clean. Should this note be changed to note number twenty-five (25)? Please advise.
A4. Note #5 is correct as stated. The intent is to remove the wood flooring in this area and salvage it for reuse to patch in other areas. The new riser room will have a concrete slab for the finished floor. Scope of work is that the contractor is to remove the wood flooring where the new Fire Riser Room will be (Room #118). The contractor will also remove and replace the existing concrete floor in the area and install a new fire riser.
We’ve added keynote #25 for the cross-hatched area to indicate the concrete is being removed in addition to part of the wood flooring. We’ve added a note to sheet A202 where the enlarged riser room floor plan is shown. The note reads, “Add new 4” concrete slab”. The new concrete slab is to be sealed, but no other finish material is needed within the riser room.
Q5. Sheet FP-101 shows the new Fire Sprinkler Riser piping coming into the Armory Building. The fire line appears to turn vertically ninety degrees. Is this piping supposed to represent the overhead sprinkler main line? Please advise.
A5. Bid as per drawings. As per sheet note 4 , FP-101 "ROUTE 6 INCH FIRE MAIN
ABOVE GROUND AT BUILDING CORNER, ALONG RAMP AND INTO FIRE RISER
ROOM AS SHOWN. COORDINATE WITH EXISTING FIELD CONDITIONS FOR
EXACT ROUTE." Piping shown on FP-101 is schematic representation of route for 6-inch fire main into fire riser room with continuation into overhead sprinkler system.
Overhead sprinkler system routing and design to be performed by selected fire protection contractor in accordance with 61G15-32.
Q6. Note number twenty (20) on sheet D100 states to remove existing wood flooring and base however, we are to re-use the existing wood flooring. What is the purpose of removing this flooring? Please advise.
A6. The wood flooring in this area is both rotting and the sleepers beneath the floor are also in bad shape as is evident by the warped floor. The removal area is diagrammatic to show the approximate area of repair. It will not be a perfect straight line of flooring removal. The Contractor is to remove wood flooring to expose what is needing repair below the finish floor. Removal and replacement are to be “toothed” into the existing floor pattern.
Q7. Will we be responsible for site security since the facility will be under active operations during the renovation?
A7. The existing site security is to be maintained. The contractor is responsible for security of the site and their own equipment. The access onto the site and off the site will be maintained as it is currently by the user. The Contractor to ensure site and buildings are secured at the end of each day.”
Q8. Are there any badging requirements when arriving onsite to perform work?
A8. No, there are no badge requirements. Contractor to maintain a daily log of personnel onsite.
Q9. At the Pre-Bid Site Visit on August 2nd, 2023, it was stated that the project has the necessary funds to commence this project. If the base bid is over the specified budget found in Exhibit 1, will this project request additional funding or be re-designed for pricing?
A9. The Department will review all of the bid packages and funding availability in accordance with F.A.C. 60D-5.007 and 60D-5.0071
Q10. Sheet C102 (Note: Per A/E, this is on Sheet C101) shows six (6) existing HVAC Condensers pads with bollards and parking curbs in front of the Storage Building. Per notes 1, 2 & 4 on sheet M-103, we are supposed to remove the existing condensers, concrete pads, and refrigerant lines and replace all components as new. Are we to clear and grub the existing conditions from the edge of the storage building towards the Armory Building? If not, please provide limits for clear and grub activities.
A10. Note #2 on M-103 states, “evaluate existing condenser pads…”. If they are damaged, clear and grub in the immediate area. If they are found to be in good condition, they can be reused. Most of the area between the Storage Building and the Armory Building will be cleared and grubbed with the site work for the True grid system.
(See Below Attachment #1)
Q11. At the Pre-Bid Site Visit on August 2nd, 2023, the existing offices and drill hall had existing window blinds over the existing windows, however there were no designations in the demolition notes shown on sheet D100. Are we to remove these windows blinds in the demolition phase? If so, could we receive a revised D100 drawing.
A11. Please remove all window blinds and replace them with new ones. See Window Blind Note on A100.
Q12. Are we responsible for removing, storing, and re-installing all Owner Furnished Items (i.e., Artwork, Pictures, Display Boards, Kitchen Equipment, Furniture, etc.)?
A12. Users to remove all personal and work related items (equipment, flags and/or items not permanently mounted to walls). Contractor to remove/relocate furniture or items as necessary for work, to include equipment with utility connections. To clarify, In order to remove the existing kitchen flooring and install new kitchen flooring (quarry tile) the kitchen equipment will have to be removed and then reinstalled after the floors and ceiling work are completed. The contractor will be responsible for removing, storing, and then reinstalling the kitchen equipment. The equipment can probably be stored in the storage building on site.
Q13. At the Pre-Bid Site Visit on August 2nd, 2023, the existing interior walls appear to be constructed out of masonry. Is it the intention to demo the existing masonry wall and put a new Metal Framing, Drywall, and Insulation assembly for the new walls including patching of walls? If so, new walls may not line up properly. Please advise.
A13. This will need to be addressed case-by-case for some areas. Walls may not line up exactly in some areas. Where a wall is shown diagrammatically to align, every effort should be made to match existing field conditions so that walls do align.
Q14. Note number 3 on sheet FP-101 states that we need to provide a sprinkler system above the existing Vault meeting the specified .15 GPM/SF coverage. Are we to run the sprinkler piping inside the vault?
A14. Yes, the fire sprinkler system is to be installed above and inside the vault area.”
Q15. The exterior elevations shown on sheets A301 & A302 call out stucco at all sides of the Armory building. Are we required to apply a new layer of stucco and use the paint colors associated on both sheets? Please confirm.
A15. Contractor is to patch and repair the existing stucco as required. The intent is to show that this is a stucco wall. Field verifies if there are areas that need to be repaired.
Once repaired, then paint with the colors indicated. It is not the intent to apply a new layer of stucco.
Q16. Some of the pictures shown on sheet A600 show damaged glass block. During the Pre-Bid Site Visit on August 2nd, 2023, we came across more damaged glass block.
Are we to remove and replace with new glass block or not? Please advise.
A16. The pictures on A600 only show a typical condition. They don’t represent every broken glass block. Contractors are to field verify the glass block areas and replace any damaged blocks found with new blocks to match.
Q17. According to sheet FP-101, the Armory building will be under a fire suppression system, however will the Storage Building receive a fire suppression system? If so, please provide a new drawing with the design criteria.
A17. The fire suppression system is only for the Armory Building. The Storage building will not be fire sprinkled.
Q18. The roofing details shown on sheet A501 refer to the Lower Roof System, however there are no details shown for the elliptical roof. Please advise what is underneath the existing elliptical roof.
A18. We do not have any drawings or existing information regarding the construction of this existing roof. For the purposes of this Alternate (Add Alternate #6) provide pricing to remove the existing roof materials down to the existing decking. Reinstall new underlayment, new flashings, new roof materials, etc. to replace what is being removed.
Assume details will be similar to details being used for lower roof and all work to be done using manufacturer's recommendations for their products.
Q19. According to section 074100 of the project specifications, the acceptable manufacturer is Petersen Aluminum for the Metal Standing Seam Roofing. Our Subcontractor called Petersen and they informed our Subcontractor that they do not make a radius roof system however Imetco can provide the radius roof per our Subcontractor. Please advise.
A19. That is an acceptable system. The selected contractor will be required to provide documentation that the system meets or exceeds all the specified requirements of this section and that both the upper roof (Alternate #6) and the lower roof have matching products.
Q20. Will additional purlins and/or trusses be required to meet the new windload criteria for the elliptical roof system?
A20. We don’t believe any new purlins or trusses will be required to meet new wind load requirements. The finished roof material is only to replace the finished material from the deck up and the existing roof supports are to remain intact.
Q21. According to sheet A201, the vault upgrade shall be a modular panel system but does not indicate if we are required to provide additional beams for support. Are there any as-builts for the vault available?
A21. The is no information for the existing vault. The vault will be a self-supporting and self-contained panel system that should not require any additional support beams.
Q22. During our Pre-Bid Site Visit on August 2nd & 9th, 2023, there is a missing section of guardrail and handrail at the existing stairs on the north elevation of sheet A301. Are we required to install new guardrail and handrail so we will be in code compliance with the AHJ? If so, can we utilize a removable guardrail system on concrete landing.
A22. The missing guardrail system does not need to be replaced. This is considered a loading dock area and will not require a guardrail along the edge of the dock. The dock area is acceptable as shown.
Q23. According to the existing conditions at the kitchen from the pre-bid site visit on August 9th, 2023, the existing ceiling is comprised of drywall however, we need to install a new fire sprinkler system per sheet FP-101. On sheet D100, the kitchen shall have the existing HVAC ductwork and flooring be removed based on the demolition notes. Please advise.
A23. In Kitchen Room #116, the existing gypsum board ceiling will need to be removed to perform the fire sprinkler work and HVAC work. Add note #44 to sheet D100 stating that the existing gypsum board ceiling it to be removed. On drawing A203 add a new ceiling grid for Room #116 that will be a 2’x4’ acoustical grid ceiling with vinyl coated ceiling tiles. On drawing A500, a new grid will be shown on ceiling plan to indicate the 2’x4’ vinyl coated ceiling tiles.
Q24. Are we required to utilize the existing Fire Alarm Subcontractor?
A24. Contractors are not required to use the existing Fire Alarm Subcontractor. All new work shall be compatible with the existing fire alarm system.
END OF ADDENDUM #1
sheet no.
project no.
by date
N O R
TH
w w w .s os ar ch ite ct .c om so sa so sa rc hi te ct
.c om e as t f or t k in g st re et su ite oc al a, flo rid a, p:
(3
) 6
-0 f:
(3
) 6
-0 flo rid a lic en se
: a a2 project no.
by date
SG
A N
E W
P R
O
JE
C T
F O
R
LEE
SBU
RG
ES
P R
ENO
VAT
ION
W
ME
AD
OW
ST
REE
T, L
EES
BU
RG
, FL
OR
IDA
748co py rig ht
P R
O
JE
C T
SITE PLAN
C101
ROLANDO SOSA, ARCHITECT
FL LICENSE: AR 96264
This electronically signed and sealed document is only valid for a one time use of this project in one location for permitting. Copies of this document are not considered signed and sealed.
Authentication code and signature must be verified.
02.28.22
100% BID FINAL DOCUMENTS
ATTACHMENT #1
AutoCAD SHX Text 3rd STREET
AutoCAD SHX Text
MEADOW STREET
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text
STORM
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
STORM
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
STORM
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
TRANSFORMER PAD
AutoCAD SHX Text
CENTURYLINK
AutoCAD SHX Text
CABINET
AutoCAD SHX Text
CABINET
AutoCAD SHX Text
EMBARQ
AutoCAD SHX Text
(RIGHT-OF-WAY WIDTH VARIES)
AutoCAD SHX Text
(RIGHT-OF-WAY WIDTH VARIES)
AutoCAD SHX Text
GRATE INLET
AutoCAD SHX Text
GRATE ELEV.= 70.08
AutoCAD SHX Text
APPROXIMATE RIGHT-OF-WAY LINE
AutoCAD SHX Text
APPROXIMATE LEASE AREA BOUNDARY
AutoCAD SHX Text
APPROXIMATE LEASE AREA BOUNDARY
AutoCAD SHX Text
APPROXIMATE LEASE AREA BOUNDARY
AutoCAD SHX Text
APPROXIMATE LEASE AREA BOUNDARY
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONCRETE RAMP
AutoCAD SHX Text
2' CONCRETE CURB AND GUTTER
AutoCAD SHX Text
2' CONCRETE CURB AND GUTTER
AutoCAD SHX Text
2' CONCRETE CURB AND GUTTER
AutoCAD SHX Text
CONCRETE DRIVE
AutoCAD SHX Text 92.2'
AutoCAD SHX Text 92.2'
AutoCAD SHX Text 52.3'
AutoCAD SHX Text 52.3'
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
STORAGE BUILDING
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text A/C
AutoCAD SHX Text
12"PALM
AutoCAD SHX Text
10"PALM
AutoCAD SHX Text
20"PALM
AutoCAD SHX Text
14"PALM
AutoCAD SHX Text
10"PALM
AutoCAD SHX Text
12"PALM
AutoCAD SHX Text
18"OAK
AutoCAD SHX Text
22"OAK
AutoCAD SHX Text
28"OAK
AutoCAD SHX Text
10"SHADE
AutoCAD SHX Text
12"SHADE
AutoCAD SHX Text
16"SHADE
AutoCAD SHX Text
2-10"SHADE
AutoCAD SHX Text
42"OAK
AutoCAD SHX Text
30"OAK
AutoCAD SHX Text
CONC.
AutoCAD SHX Text A/C
AutoCAD SHX Text A/C
AutoCAD SHX Text A/C
AutoCAD SHX Text A/C
AutoCAD SHX Text A/C
AutoCAD SHX Text A/C
AutoCAD SHX Text
13"OAK
AutoCAD SHX Text
COVERED
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
COVERED
AutoCAD SHX Text
CONCRETE SIDEWALK
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text
TV
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text
IC
AutoCAD SHX Text W
AutoCAD SHX Text
WV
AutoCAD SHX Text S
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text T
AutoCAD SHX Text
IC
AutoCAD SHX Text F
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text
24"CEDAR
AutoCAD SHX Text
ROCK FEATURE WITH PLAQUE
AutoCAD SHX Text
6' CHAIN LINK AND BARBWIRE FENCE
AutoCAD SHX Text
6' CHAIN LINK FENCE
AutoCAD SHX Text 76.4'
AutoCAD SHX Text 78.7'
AutoCAD SHX Text 68.0'
AutoCAD SHX Text 18.6'
AutoCAD SHX Text 79.6'
AutoCAD SHX Text 59.3'
AutoCAD SHX Text 18.7'
AutoCAD SHX Text 18.7'
AutoCAD SHX Text 24.0'
AutoCAD SHX Text 6.0'
AutoCAD SHX Text 6.0'
AutoCAD SHX Text 2.2'
AutoCAD SHX Text 2.4'
AutoCAD SHX Text 4.6'
AutoCAD SHX Text 4.6'
AutoCAD SHX Text 4.6'
AutoCAD SHX Text 4.6'
AutoCAD SHX Text 37.3'
AutoCAD SHX Text
COVERED CONCRETE
AutoCAD SHX Text
CONCRETE CURBING
AutoCAD SHX Text
8"PALM
AutoCAD SHX Text
60"OAK
AutoCAD SHX Text
GATE
AutoCAD SHX Text
ALUMINUM FENCE
AutoCAD SHX Text
ALUMINUM FENCE
AutoCAD SHX Text
ARMORY BUILDING
AutoCAD SHX Text
DUMPSTER
AutoCAD SHX Text
PAD
AutoCAD SHX Text
GATE
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text A/C
AutoCAD SHX Text
DOCK
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
VINYL FENCE
AutoCAD SHX Text A/C
AutoCAD SHX Text
7"OAK
AutoCAD SHX Text
8"OAK
AutoCAD SHX Text
GATE
AutoCAD SHX Text
TRANSITION FROM CHAINLINK FENCE TO ALUMINUM FENCE
AutoCAD SHX Text
WOOD PRIVACY FENCE
AutoCAD SHX Text
WOOD PRIVACY FENCE
AutoCAD SHX Text A/C
AutoCAD SHX Text
INLET
AutoCAD SHX Text
GRATE
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
SLAB
AutoCAD SHX Text
CONC.
AutoCAD SHX Text A/C
AutoCAD SHX Text
GASLINE VALVE AND METER
AutoCAD SHX Text G
AutoCAD SHX Text
CONC.
AutoCAD SHX Text A/C
AutoCAD SHX Text
CONCRETE RAMP
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
ELECTRICAL TRANSFORMER PAD
AutoCAD SHX Text
ELECTRICAL EQUIPMENT
AutoCAD SHX Text
CONC.
AutoCAD SHX Text
HAZARDOUS MATERIAL BUILDING
AutoCAD SHX Text
GATE
AutoCAD SHX Text
36"RCP
AutoCAD SHX Text
36"RCP
AutoCAD SHX Text
36"RCP
AutoCAD SHX Text 24"x42"ERCP
AutoCAD SHX Text
36"RCP
AutoCAD SHX Text D
AutoCAD SHX Text
APPROXIMATE LOCATION OF EXISITNG TELEPHONE CONDUITS (NOT FIELD VERIFIED)
AutoCAD SHX Text
"NO ID."
AutoCAD SHX Text
"NO ID."
AutoCAD SHX Text N01°21'00"E 372.35'(D) N01°21'00"E 372.37'(F)
AutoCAD SHX Text S U B J E C T P R O P E R T Y PARCEL ID. No.: 1343950
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text S
AutoCAD SHX Text
24"STM
AutoCAD SHX Text
24"STM
AutoCAD SHX Text
STM
AutoCAD SHX Text
STM
AutoCAD SHX Text
GREASE TRAP
AutoCAD SHX Text S
AutoCAD SHX Text PARCEL ID. No.: 1087406
AutoCAD SHX Text
APPROXIMATE LOCATION OF WATER SERVICE (NOT FIELD VERIFIED)
AutoCAD SHX Text
APPROXIMATE LOCATION OF SANITARY SEWER (NOT FIELD VERIFIED)
AutoCAD SHX Text
APPROXIMATE LOCATION OF SANITARY SEWER (NOT FIELD VERIFIED)
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
LANDING
AutoCAD SHX Text
6" TAPPING SLEEVE AND VALVE (BY CITY)
AutoCAD SHX Text
PROPOSED 6" FIRE MAIN (DIRECTIONAL BORE)
AutoCAD SHX Text PROPOSED FIRELINE MASTER METER ASSEMBLY (PER DETAIL W-13) CHECK VALVE WITH FIRE DEPARTMENT CONNECTION (SEE SHEET C101)
AutoCAD SHX Text T.B.M. No. 2 ELEVATION=70.25
AutoCAD SHX Text T.B.M. No. 1 ELEVATION=75.05
AutoCAD SHX Text
SANITARY SEWER MANHOLE RIM ELEV.=73.03 NORTH INVERT (36")=67.52
AutoCAD SHX Text
SANITARY SEWER MANHOLE RIM ELEV.=74.14 SOUTH INVERT (36")=66.40
AutoCAD SHX Text F.F. = 76.0
AutoCAD SHX Text 72.67
AutoCAD SHX Text 71.4
AutoCAD SHX Text
130LF - 1.0% SLOPE
AutoCAD SHX Text 72.0
AutoCAD SHX Text 1.0%
AutoCAD SHX Text 0.5%
AutoCAD SHX Text 70.0
AutoCAD SHX Text
107LF - 1.3% SLOPE
AutoCAD SHX Text 72.0
AutoCAD SHX Text
78LF - 1.8% SLOPE
AutoCAD SHX Text 2.8%
AutoCAD SHX Text 4.1%
AutoCAD SHX Text 71.7
AutoCAD SHX Text 71.7
AutoCAD SHX Text 5.64%
AutoCAD SHX Text 3.22%
AutoCAD SHX Text 72.3
AutoCAD SHX Text 72.0
AutoCAD SHX Text 1.0%
AutoCAD SHX Text 72.3
AutoCAD SHX Text 71.7
AutoCAD SHX Text 1.0%
AutoCAD SHX Text 70.3
AutoCAD SHX Text 2.86%
AutoCAD SHX Text
PROPOSED 6"-45°BENDS
AutoCAD SHX Text 71.0
AutoCAD SHX Text 71.4
AutoCAD SHX Text 71.0
AutoCAD SHX Text
INVERTED CROWN
AutoCAD SHX Text
CROWN
AutoCAD SHX Text THE CONTRACTOR SHALL REMOVE AND REPLACE THE EXISTING SIDEWALK AS NEEDED FOR THE 6" FIRE LINE CONNECTION TO THE WATER MAIN. (SEE DETAIL ON C102)
AutoCAD SHX Text
PROPOSED SILT FENCE (TYPICAL)
AutoCAD SHX Text
PROPOSED FREESTANDING SITE SIGN
AutoCAD SHX Text TWO - 8'x20' TEMPORARY STORAGE CONTAINERS FOR USE DURING PROJECT CONSTRUCTION
AutoCAD SHX Text TEMPORARY SELF SUSTAINING BATHROOM LOCATION (BY G.C.) FOR USE DURING PROJECT CONSTRUCTION
AutoCAD SHX Text
PROPOSED BOLLARDS (SEE DETAIL ON SHEET C101)
AutoCAD SHX Text
TO BE REMOVED
AutoCAD SHX Text
NEW COMMUNICATION (LOCATION AS REQUIRED)
AutoCAD SHX Text 72.0
AutoCAD SHX Text 72.0
AutoCAD SHX Text 72.5
AutoCAD SHX Text 72.5
AutoCAD SHX Text 71.5
AutoCAD SHX Text 73.5
AutoCAD SHX Text 74.0
AutoCAD SHX Text 74.0
AutoCAD SHX Text 74.0
AutoCAD SHX Text 74.5
AutoCAD SHX Text 75.0
AutoCAD SHX Text
APPROXIMATE LOCATION OF BURIED ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RIGHT-OF-WAY LINE
AutoCAD SHX Text
RIGHT-OF-WAY LINE
AutoCAD SHX Text
FENCE LINE
AutoCAD SHX Text
6"WL
AutoCAD SHX Text
10"SAN
AutoCAD SHX Text
ABANDOND
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
CONDUITS
AutoCAD SHX Text
1"WL
AutoCAD SHX Text
36"RCP
AutoCAD SHX Text
46"COVER
AutoCAD SHX Text
36"COVER
AutoCAD SHX Text
36"COVER
AutoCAD SHX Text
30"COVER
AutoCAD SHX Text
PROP. 6"T.S.V.
AutoCAD SHX Text
PROPOSED 6" HDPE (SDR 11)
AutoCAD SHX Text
EXISTING PAVEMENT
AutoCAD SHX Text
ADJUST WATER LINE DEPTH
AutoCAD SHX Text
WATERMAIN DIRECTIONAL BORE
AutoCAD SHX Text DESCRIPTION: (PER OFFICIAL RECORDS BOOK 363, PAGE 839, (PER OFFICIAL RECORDS BOOK 363, PAGE 839, M.C.R.) BEGIN AT A POINT ON W. LINE OF 3rd ST., SAID POINT BEING 18 FT. N. OF N. LINE OF MEADOW ST., ACCORDING TO THE OFFICIAL PLAT OF CITY OF LEESBERG, FLORIDA, FILED JULY 17, 1912, AND RECORDED IN PLAT BOOK 2, PAGE 19, PUBLIC RECORDS OF LAKE COUNTY, FLORIDA, RUN THENCE N.88°39 MINUTES 00 SECONDS W. PARALLEL TO AND 33 FT. FROM CENTER LINE OF SAID MEADOW ST., 268.00 FT., THENCE N. 1°21 MINUTES 00 SECONDS E. 372.35 FT., TO THE S. BOUNDARY OF RIGHT OF WAY OF SEABOARD AIR LINE RAILROAD; THENCE S. 75° 28 MINUTES 50 SECONDS E. ALONG THE SAID RIGHT OF WAY 277.00 FT. TO W. LINE OF 3rd ST., THENCE S. 01° 39 MINUTES 40 SECONDS W. ALONG THE WE. LINE OF SAID 3rd ST., 309.20 FT. TO POB. CONTAINING 2.10 ACRES, MORE OR LESS.
AutoCAD SHX Text 1 inch = ft.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text BASIS OF BEARING ELEVATIONS BASED ON N.G.S. BENCHMARK U 57 (AK0016) ELEVATION= 77.75 N.A.V.D. 88
AutoCAD SHX Text
DIRECTIONAL BORE CROSS-SECTION HORIZONTAL SCALE =: 1'=20' VERTICAL SCALE: 1'=5'
AutoCAD SHX Text WATER MAIN INSTALLATION NOTES: 1. THE WORK WILL BE TO CONSTRUCT A FIRE WATER MAIN CONNECTION FROM THE WORK WILL BE TO CONSTRUCT A FIRE WATER MAIN CONNECTION FROM THE EXISTING LEESBURG WATER MAIN TO THE EXISTING NATIONAL GUARD ARMORY BUILDING. THE WATER MAIN WILL BE PERMITTED, CONSTRUCTED AND CLEARED FOR USE BEFORE IT IS CONNECTED TO THE ARMORY BUILDING. THE CONTRACTOR SHALL OBTAIN THE REQUIRED "RIGHT-OF-WAY UTILIZATION PERMIT" FROM THE CITY OF LEESBURG, COORDINATE AND PAY ALL CITY FEES FOR THE WATER MAIN INSTALLATION AND WATER MAIN TAP WITH THE CITY OF LEESBURG. THE CONTRACTOR SHALL DIG THE WET TAP SITE AND INSTALL THE CORRECT TAPPING SADDLE, THE CITY OF LEESBURG WILL DO A PSI TEST AND TAP THE MAIN. ALL OTHER WORK ASSOCAITED WITH THE WATER MAIN INSTALLATION WILL BE DONE BY THE CONTRACTOR. ALL DISTURBED AREAS WITHIN THE RIGHT-OF-WAY SHALL BE REPLACED OR REPAIRED INCLUDING BUT NOT LIMITED TO THE SIDEWALKS, GRASSED AREAS, AND THE ROADWAY. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL TESTING THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL TESTING (DENSITY, ETC.) TO INSURE CONFORMANCE WITH THE SPECIFICATIONS. 3. THE CONTRACTOR SHALL NOT SCALE DRAWINGS. ANY DISCREPANCIES OR THE CONTRACTOR SHALL NOT SCALE DRAWINGS. ANY DISCREPANCIES OR INFORMATION THAT CANNOT BE OBTAINED FROM DIMENSIONS OR DETAILS, MUST BE BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER, MOORHEAD ENGINEERING COMPANY (PHONE 732-4406). 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ANY AND ALL THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ANY AND ALL UTILITIES, SERVICES, UNDERGROUND AND OVERHEAD LINES, ETC. PRIOR TO BEGINNING WORK. THIS INCLUDES HIRING A PRIVATE UTILITY LOCATE COMPANY FOR LOCATING ANY ON-SITE UTILITIES. 5. ALL NON-CONDUCTIVE UNDERGROUND UTILITIES SHALL HAVE LOCATOR WIRE. ALL NON-CONDUCTIVE UNDERGROUND UTILITIES SHALL HAVE LOCATOR WIRE. 6. ALL UNDERGROUND UTILITIES SHALL BE INSPECTED PRIOR TO COVERING. ALL UNDERGROUND UTILITIES SHALL BE INSPECTED PRIOR TO COVERING. 7. ALL DISTURBED AREAS ON THE SITE OR RIGHT-OF-WAY WHICH ARE NOT ALL DISTURBED AREAS ON THE SITE OR RIGHT-OF-WAY WHICH ARE NOT PAVED OR CONCRETE SHALL BE SODDED (PER NOTE 8 ABOVE). 8. ALL CONSTRUCTION COVERED BY THESE PLANS SHALL COMPLY WITH THE ALL CONSTRUCTION COVERED BY THESE PLANS SHALL COMPLY WITH THE MATERIAL REQUIREMENTS AND QUALITY CONTROL STANDARDS CONTAINED IN THE LEESBURG DEVELOPMENT CODE. 9. ALL WATER MAINS AND APPURTENANCES SHALL BE DISINFECTED AND ALL WATER MAINS AND APPURTENANCES SHALL BE DISINFECTED AND BACTERIOLOGICALLY EVALUATED IN ACCORDANCE WITH RULE 62-555.340, F.A.C. 10. ALL WATER MAINS PIPES, INCLUDING FITTINGS, SHALL BE COLOR CODED OR ALL WATER MAINS PIPES, INCLUDING FITTINGS, SHALL BE COLOR CODED OR MARKED USING BLUE AS A PREDOMINATE COLOR. 11. THE UNDERGROUND PLASTIC PIPING (PVC) SHALL BE DR 18, SOLID-WALL THE UNDERGROUND PLASTIC PIPING (PVC) SHALL BE DR 18, SOLID-WALL BLUE PIPE WITH NSF-PW LOGO ON THE PIPE WITH THE EXCEPTION OF THE DIRECTIONAL BORE PIPING. 12. ALL POLYVINYL CHLORIDE (PVC) WATER MAINS SHALL BE PRESSURE AND ALL POLYVINYL CHLORIDE (PVC) WATER MAINS SHALL BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE WITH AWWA STANDARD C605 AS INCORPORATED INTO RULE 62-555.330, F.A.C. 13. ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL CONTAIN ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL CONTAIN NO MORE THAN 8.0% LEAD, AND ANY SOLDER OR FLUX USED IN THIS PROJECT WILL CONTAIN NO MORE THAN 0.2% LEAD. 14. THE MINIMUM DEPTH OF COVER OF THE WATER LINES IS 36" AND THE THE MINIMUM DEPTH OF COVER OF THE WATER LINES IS 36" AND THE MINIMUM SEPARATION FROM OTHER UTILITIES LINES SHALL BE IN ACCORDANCE WITH RULE 62-555.314, F.A.C., SEE THE SEPARATION DETAIL AND CHART ON THE PLANS. 15. THE WATER MAIN INSTALLATION WITHIN THE 3RD STREET RIGHT-OF-WAY THE WATER MAIN INSTALLATION WITHIN THE 3RD STREET RIGHT-OF-WAY SHALL BE DONE IN ACCORDANCE WITH THE ISSUED LEESBURG RIGHT-OF-WAY UTILITATION PERMIT. 16. TRAFFIC CONTROL SIGNAGE FOR THE WORK WITHIN THE 3RD STREET TRAFFIC CONTROL SIGNAGE FOR THE WORK WITHIN THE 3RD STREET RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH FDOT DESIGN INDEX NO. 601. 17. ALL PARKING BLOCKS LOCATED ALONG THE STORGE BUILDING SHALL BE ALL PARKING BLOCKS LOCATED ALONG THE STORGE BUILDING SHALL BE REMOVED AND STORED DURING THE REGRADING OF THE SITE AND REINSTALLED AFTER COMPLETION OF THE REGRADING WORK.
AutoCAD SHX Text SITE GRADING NOTES: 1. THIS WORK WILL CONSIST OF INSTALLING SILT FENCING, CLEARING AND THIS WORK WILL CONSIST OF INSTALLING SILT FENCING, CLEARING AND GRUBBING THE PROJECT AREA, PROVIDE ALL THE NECESSARY FILL MATERIAL (SEE NOTES 6 & 7) AND REGRADING THE INTERIOR AREA OF THE ARMORY SITE TO PROVIDE FOR BETTER SURFACE DRAINAGE AND AN IMPROVED GRASSED PARKING AREA. THE PROJECT AREA FOR THIS WORK IS HATCHED ON THE PLAN. UPON COMPLETION OF ALL THE WORK, ALL DISTURBED AREAS SHALL BE SODDED (SEE NOTE 8) AND ALL EXCESS DEBRII WILL BE DISPOSED OF OFF-SITE AND SILT FENCING WILL BE REMOVED. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL TESTING THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL TESTING (DENSITY, ETC.) TO INSURE CONFORMANCE WITH THE SPECIFICATIONS. 3. THE CONTRACTOR SHALL NOT SCALE DRAWINGS. ANY DISCREPANCIES OR THE CONTRACTOR SHALL NOT SCALE DRAWINGS. ANY DISCREPANCIES OR INFORMATION THAT CANNOT BE OBTAINED FROM DIMENSIONS OR DETAILS, MUST BE BROUGHT TO THE ATTENTION OF THE PROJECT ENGINEER, MOORHEAD ENGINEERING COMPANY (PHONE 732-4406). 4. THE CONTRACTOR SHALL HIRE A PRIVATE LOCATING COMPANY FOR LOCATING THE CONTRACTOR SHALL HIRE A PRIVATE LOCATING COMPANY FOR LOCATING ANY AND ALL UTILITIES, SERVICES (ON-SITE AND OFF-SITE), UNDERGROUND AND OVERHEAD LINES, ETC. PRIOR TO BEGINNING WORK. 5. ALL EROSION CONTROL/ SILT FENCING SHALL BE INSTALLED PRIOR TO ANY ALL EROSION CONTROL/ SILT FENCING SHALL BE INSTALLED PRIOR TO ANY ON-SITE CONSTRUCTION ACTIVITIES. 6. FILL MATERIAL SHALL BE FREE OF ORGANIC MATERIAL SUCH AS ROOTS AND FILL MATERIAL SHALL BE FREE OF ORGANIC MATERIAL SUCH AS ROOTS AND /OR VEGETATION AND SHALL BE SAND FILL WITH BETWEEN (3) THREE TO TWELVE (12) PERCENT BY DRY WEIGHT OF MATERIAL PASSING THE U.S. STANDARD NO. 200 SIEVE SIZE. 7. FILL SHALL BE PLACED IN LIFTS NOT THICKER THAN TWELVE (12) INCHES. FILL SHALL BE PLACED IN LIFTS NOT THICKER THAN TWELVE (12) INCHES. EACH LIFT IN THE PROPOSED PARKING AREA SHOULD BE COMPACTED TO AT LEAST NINETY-FIVE (95) PERCENT OF THE MAXIMUM DENSITY AS DETERMINE DBY THE MODIFIED PROCTOR TEST METHOD (ASTM D-1557) MAXIMUM DRY DENSITY VALUE. 8. ALL DISTURBED AREAS ON THE SITE SHALL BE SODDED. THE SOD SHALL ALL DISTURBED AREAS ON THE SITE SHALL BE SODDED. THE SOD SHALL CONSIST OF ARGENTINE BAHIA, FREE OF WEEDS & DISEASES. DO NOT USE ROLLED SOD WITH PLASTIC MESH. USE PALLETIZED SOD ONLY. 9. CONTRACTOR TO RELOCATE CONNEX AND JERSEY BARRIERS. CONTRACTOR TO RELOCATE CONNEX AND JERSEY BARRIERS. 10. CONTRACTOR SHALL MAINTAIN FENCING AND SITE SECURITY DURING FIRELINE CONTRACTOR SHALL MAINTAIN FENCING AND SITE SECURITY DURING FIRELINE INSTALL UNDER THE FENCE. 11. CONTRACTOR SHALL PROVIDE TEMPORARY LATRINE TRAILER.CONTRACTOR SHALL PROVIDE TEMPORARY LATRINE TRAILER.
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
= SILT FENCE LINE
AutoCAD SHX Text ALL RIGHTS RESERVED, THESE PLANS ARE PROTECTED BY COPYRIGHT LAWS. UNAUTHORIZED USE MAY RESULT IN LEGAL ACTION.
AutoCAD SHX Text C
AutoCAD SHX Text
OCALA, FLORIDA 34471
AutoCAD SHX Text
TELEPHONE (352) 732-4406
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
P.O. BOX 998 /305 S.E. 1ST. AVE.
AutoCAD SHX Text
SINCE 1884
AutoCAD SHX Text C
AutoCAD SHX Text
FAX (352) 867-0112
AutoCAD SHX Text
COMPANY
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text
MOORHEAD
AutoCAD SHX Text FL.REG. No.LB315
AutoCAD SHX Text FL.REG. No.CA315
AutoCAD SHX Text
LAND PLANNERS
AutoCAD SHX Text
LAND SURVEYORS
AutoCAD SHX Text
CONSULTING ENGINEERS
AutoCAD SHX Text
%%ODOUG IANNARELLI, PROFESSIONAL ENGINEER%%O
AutoCAD SHX Text
REGISTERED ENGINEER NO. 18340
AutoCAD SHX Text
STATE OF FLORIDA
AutoCAD SHX Text
EXISTING GRADE
AutoCAD SHX Text
%%UFABRIC SILT BARRIER
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
TOE OF
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
TOE-IN FLAP
AutoCAD SHX Text
TRENCH
AutoCAD SHX Text
BACKFILL
AutoCAD SHX Text
FABRIC
AutoCAD SHX Text 18"
AutoCAD SHX Text 3'
AutoCAD SHX Text
(FABRIC FENCE)
AutoCAD SHX Text
SILT BARRIER
AutoCAD SHX Text
= DESCRIBED MEASUREMENT
AutoCAD SHX Text (D)
AutoCAD SHX Text O.R.
AutoCAD SHX Text M.C.R.
AutoCAD SHX Text T.B.R.
AutoCAD SHX Text (F)
AutoCAD SHX Text
= FIELD MEASUREMENT
AutoCAD SHX Text
= OFFICIAL RECORDS
AutoCAD SHX Text
= MARION COUNTY RECORDS
AutoCAD SHX Text
= TEMPORARY BENCHMARK
AutoCAD SHX Text
= FOUND IRON ROD AND CAP
AutoCAD SHX Text
= SANITARY SEWER MANHOLE
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text
TV
AutoCAD SHX Text W
AutoCAD SHX Text
IC
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text
WV
AutoCAD SHX Text
= CABLE TV BOX
AutoCAD SHX Text
= SEWER CLEANOUT
AutoCAD SHX Text
= TELEPHONE BOX
AutoCAD SHX Text
= ELECTRICAL METER
AutoCAD SHX Text
= ELECTRICAL HANDHOLE
AutoCAD SHX Text
= BOLLARD
AutoCAD SHX Text
= FLAG POLE
AutoCAD SHX Text
= IRRIGATION CONTROL BOX
AutoCAD SHX Text
= WATER METER
AutoCAD SHX Text
= FIRE HYDRANT
AutoCAD SHX Text
= WATER VALVE
AutoCAD SHX Text
= WELL
AutoCAD SHX Text
%%ULEGEND
AutoCAD SHX Text M
AutoCAD SHX Text G
AutoCAD SHX Text D
AutoCAD SHX Text
(AS NOTED)
AutoCAD SHX Text
= LIGHT POLE
AutoCAD SHX Text
= STORM SEWER MANHOLE
AutoCAD SHX Text
= UNKNOWN MANHOLE
AutoCAD SHX Text
= GREASE TRAP MANHOLE
AutoCAD SHX Text
= SIGN
AutoCAD SHX Text
ELEVATION CONTOUR
AutoCAD SHX Text
= EXISTING GROUND
AutoCAD SHX Text
TO BE REGRADED
AutoCAD SHX Text
= DENOTES AREA
kbelter Line kbelter Line kbelter Line kbelter Line kbelter Line kbelter Line kbelter Line kbelter Line kbelter Line kbelter Line kbelter Line kbelter Text Box
TRUEGRID AREA
+/- 14,500SF OF AREA TO BE FIELD VERIFIED
File details come from the government source that posted it. Updated .