This Addendum No. 1, issued July 22, 2026, by Kendra C. Thompson Architects for the State of Michigan Department of Technology, Management & Budget (DTMB), pertains to the Traverse City State Office Building Bathroom and Plumbing Upgrade Project located at 701 S. Elmwood, Traverse City, Michigan. The project scope encompasses bathroom renovations, plumbing sanitary and water piping replacement, and associated plumbing, mechanical, and electrical improvements. A mandatory pre-bid conference was held on July 20, 2026, at 11:00 a.m., with attendance required for bid consideration. Key clarifications include corrections to door frame types and details on Drawing Sheet A101, construction protection responsibilities, preliminary construction phasing allowing simultaneous work on floors 1-4 with owner-vacated wings, and demolition requirements for all existing features to achieve design intent. The addendum also clarifies revised plumbing and mechanical drawings and fire alarm panel location. Bids are due Wednesday, August 5, 2026, at 2:00 p.m. Eastern Time via electronic submission through the SIGMA VSS website, with a single PDF package not exceeding 25.0 MB.

Contract requirements include submission of bid forms from the Project Manual, a 5% bid bond, performance and payment bonds for bids exceeding $50,000, and a $100,000 provisional contingency allowance in the base bid. Substantial completion is required within 280 calendar days from the Notice-to-Proceed or by June 22, 2027, with liquidated damages of $1,000 per calendar day for delays. A 10% preference applies to Qualified Disabled Veteran-Owned Companies with appropriate documentation. At least 50% of all working employees must be Michigan residents, and prevailing wage rates are required with certified payroll submitted directly to the Department of Labor and Economic Opportunity. Progress payments are processed no more than once per month. Award will be made to the responsive and responsible best value bidder as recommended by Kendra Thompson Architects. The contract documents include comprehensive architectural, plumbing, mechanical, and fire protection drawings across multiple levels, with multiple alternates available for contractor discretion subject to owner approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

803 cherry street manistee, mi 49660 ■ t: 231.723.4195 ■ thompson.kendra@sbcglobal.net ■ www.kendrathompson-architects.com kendra c.

THOMPSON

architects, p.c.

ADDENDUM NO. 1

TRAVERSE CITY STATE OFFICE BUILDING DATE: 7/22/2026

BATHROOM & PLUMBING UPGRADE PROJECT SOM: File #171/23085.RLO 701 S. ELMWOOD TRAVERSE CITY, MI KTA: Job #216007B

The following items are changes, additions, deletions and/or clarifications of the drawings and specifications, and shall be included in the Bid Proposal. All of items will be a part of the Construction Documents. Acknowledge receipt of this Addendum in the appropriate space on the Bid Proposal form. Failure to do so may result in disqualification of the bid.

Item No. 1: Pre-Bid Meeting:

A mandatory Pre-Bid Conference was held on July 20, 2026, at 11:00 a.m. Refer to attached Meeting

Agenda and Attendance Record.

Item No. 2: Clarification: Door Schedule, Frame Types – Refer to Drawing Sheet A101

Clarification: Doors indicated to have HM frames are manufactured access door units. Typical man doors are to be wood frames as indicated to match existing installed conditions.

Item No. 3: Revise and Add: Door Schedule, Details – Refer to Drawing Sheet A101

Revise and Add: Door details were incorrectly identified, and additional jamb and head details have been added to reflect the design intent. Refer to revised drawing Sheet A101.

Item No. 4: Clarification: Construction Protection

Clarification: Contractor responsible for providing adequate protection of existing materials during construction, including but not limited to temporary floor protection. Owner will make available elevator wall protection pads for Contractor use when transporting materials.

Item No. 5: Clarification: Construction Phasing

Clarification: Preliminary construction phasing is as outlined below, subject to final review at Pre- Construction Meeting.

1. Owner intends to vacate north (or south) wings of building for contractor use in simultaneous work occurring on Floors 1-4.

2. Upon completion of north (or south) wing, Owner will vacate the remaining wing for contractor use.

3. Alternate #1 – Ground Floor Staff Shower Room #008 may be phased per Contractor’s discretion upon approval and coordination with Owner.

4. Alternate #2 – Ground Floor, North Wing work may be phased per Contractor’s discretion upon approval and coordination with Owner and DHHS. This work area will be vacated however the DHHS office areas will remain actively in operation. Contractor shall plan to complete work of this area in a timely manner so as to minimize DHHS disruption.

Item No. 6: Clarification: Demolition – Refer to Drawing Sheets A204, A205, A206, A208, A209, A211, A212, A214 and A215.

Clarification: Contractor responsible for removal of all existing features, whether specifically identified on drawings or not, as required to complete project in accordance with design intent outlined. Existing terrazzo threshold(s) and other thresholds shall be removed and surface(s) prepped appropriately to allow for smooth transition of flooring surfaces.

803 cherry street manistee, mi 49660 ■ t: 231.723.4195 ■ thompson.kendra@sbcglobal.net ■ www.kendrathompson-architects.com

Addendum No. 1 TC SOB Bath & Plmb’g Project 7/22/2026

Item No. 7: Clarification: Plumbing and Mechanical Drawings

Clarification: Refer to revised Plumbing and Mechanical drawings reissued to clarify keyed notes.

Refer to drawings Sheets FP200, FP201, FP202, P100, PD200, PD201, PD202, P200, P201, P202, P203, P204, P205, P206, P207, P300, P301, P302, M100, MD200, MD201, MD202, M200, M201, M202, M203, M204, M205, M206, M207, M300, M301 and M302.

Item No. 8: Clarification: Fire Alarm Panel – Reference Drawing Sheet E201 Clarification: Honeywell main fire alarm panel is location on north wall of Lobby #100.

END OF ADDENDUM NO. 1

Attachment: Pre-Bid Meeting Agenda Pre-Bid Attendance Record

Drawing Sheets A101, FP200, FP201, FP202, P100, PD200, PD201, PD202, P200, P201, P202, P203, P204, P205, P206, P207, P300, P301, P302, M100, MD200, MD201, MD202, M200, M201, M202, M203, M204, M205, M206, M207, M300, M301 and M302.

Pre-Bid Agenda 751/23085.RLO

Mandatory Pre-Bid Meeting Agenda Department of Natural Resources

Traverse City State Office Building Bathroom & Plumbing Upgrade Project

751/23085.RLO

July 20, 2026, at 11:00 am

1. Introductions:

Ronda Osga – DTMB / Design and Construction Division / Project Director Brian Guigue – DTMB / Design and Construction Division / Field Representative Luke Krzeminski – DTMB / Building Operations / West Zone Facilities Supervisor Paul Charles – DTMB / Building Operations / Facilities Supervisor Kendra Thompson – Kendra Thompson Associates / Project Manager

2. This is a Mandatory Pre-Bid Meeting; you should confirm your attendance is recorded to ensure your bid is considered. You must sign under the same name as the company submitting the bid. An individual is only permitted to represent one bidder at a mandatory Pre-Bid Conference.

3. Project Description:

Bathroom renovations, plumbing sanitary and water piping replacement, and associated plumbing, mechanical and electrical improvements as related to the bathroom renovations.

4. Bids are due Wednesday, August 5, 2026, at 2:00 PM Eastern Time via electronic submission through the SIGMA VSS website at:

https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

Please package your bid submittal into a single PDF document, or at least as few separate documents as possible, per the 25.0 MB maximum file size limitation.

This will facilitate the bids processing and minimize chances of errors

If you experience issues or have questions regarding your electronic submission, bidders must contact the SIGMA Help Desk for assistance. Bidders can contact the Help Desk by calling 888-734-9749 or emailing sigma-procurement-helpdesk@michigan.gov or sigma-vendor@michigan.gov

Please notify the Office of Design and Construction (DCD) if you are having SIGMA VSS issues. Include your SIGMA ticket number in an email to our contract specialists, Anne Watros (watrosa@michigan.gov) and Don Klein (kleind4@michigan.gov). You may be asked to email your bid package. Emailed submissions require DCD approval and will be handled on a case-by-case basis.

Approved emailed submissions MUST be received prior to the 2:00 p.m. deadline to be considered responsive and responsible.

5. Bids must be submitted on the Bid Summary form enclosed within the Project Manual. The bid must also include forms within the Project Manual including:

https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:sigma-procurement-helpdesk@michigan.gov mailto:sigma-procurement-helpdesk@michigan.gov mailto:sigma-vendor@michigan.gov mailto:watrosa@michigan.gov mailto:kleind4@michigan.gov

• Qualified Disabled Veteran (QDV) Business Representation

• Certification of a Michigan Based Business

• Responsibility Certification

• Bid Schedule (include Schedule of Alternates)

• Bid Security in the amount of 5% of the Base Bid Price,

• Performance and Payment Bonds (To be submitted by Successful Contractor)

• State Project Registration (SPR) LEO Wage and Hour

6. A Performance Bond and a Payment Bond are required for bids in excess of $50,000.00. A five percent (5%) Bid Bond is required with all your bid submittals.

7. Allowances should be included in the base bid (See Sect 0100, Article 10).

Allowances. $100,000 Provisional Contingency Allowance (Bid Schedule form).

8. Time of Completion and Liquidated Damages: Work of all trades as specified in the Contract Documents must be completed 280 calendar days from the Notice-to-Proceed or by June 22, 2027 based on the Notice-to-Proceed except for minor replacement, correction, or adjustment items which do not interfere with the complete operation and utilization of all parts of the Contract Work. This Contract Time is of the essence and liquidated damages for each Calendar Day that expires after this Substantial Completion of the entire Work must be in the amount of $1,000.00. (See Section 00500, Article 4).

9. A 10% preference will be given in the award of this project to Qualified Disabled

Veteran Owned Companies in accordance with Public Act 22 of 2010 (See Section 00100, Article14.1.2). To be considered, a bidder must include with their bid a DD214 Proof of Service and Discharge, a Veterans Administration Rating decision letter, proof of disability (if the disability is not included on the DD 214) and appropriate legal documents setting forth the 51% natural persons QDV Ownership.

10. Progress payments will be processed not more than once per month.

11. Award of Contract: Awarded to the responsive and responsible best value bidder as recommended by Kendra Thompson Architects (Section 00100, Article14.1.1).

12. At least 50% of all working employees must be Michigan residents.

13. Prevailing Wage Rates are required for this project. Certified payroll to be submitted directly to the Department of Labor and Economic Opportunity via the online submission process. Certified payroll is not to be submitted to DTMB at any time. (See Section 00700 General Conditions – Article 7.14).

14. Superintendent of the project shall have the authority of the construction company to make on site decisions. On site presence is required whenever work is occurring even if it is a sub-contractor (See Section 00700 General Conditions

– Article 4.2).

15. Site Walk-Through and Bidder Questions: A site walk-through will take place after this meeting. If you have questions concerning bid submittal or terms and conditions of the contract agreement, please submit them by Monday, July 27, 2026, at 5:00 pm ET by e-mail to:

Kendra Thompson thompson.kendra@sbcglobal.net

(231) 723-4195 office

(231) 510-5012 mobile

2x4 WOOD NAILER

WOOD FRAME BY

DOOR TYPE - REFER

TO DOOR SCHEDULE

1x4 WOOD CASING - CUSTOM

5/8" GYP. BRD.

3-1/2" METAL STUDS @ 16" O.C.

DOOR MANUFACTURER

5/8" GYP. BRD.

31 2

5 8

5 8

SHIM

1x4 WOOD CASING - CUSTOM

WOOD DOOR STOP

2" 5

8"5 8"

2x4 WOOD NAILER

WOOD FRAME BY

DOOR TYPE - REFER

TO DOOR SCHEDULE

5/8" GYP. BRD.

3-1/2" METAL STUDS @ 16" O.C.

DOOR MANUFACTURER

5/8" GYP. BRD.

PROFILE TO MATCH EXIST'G.

WOOD DOOR STOP

SHIM

PROFILE TO MATCH EXIST'G.

PROFILE TO MATCH EXIST'G.

1x4 WOOD CASING - CUSTOM

(45 d. MITER TO JAMB CASING)

SOUND ATTENUATION BLANKET

SOUND ATTENUATION BLANKET

SEE

SCHEDULE

S

EE

S C H

ED

U

LE

BA

SEE

SCHED.

S

EE

S C H

ED

PREFAB ACCESS

PANEL W/INTREGAL

FRAME & SCREW

KEY LOCK

2"

SEE

2"

S

EE

S C

H

ED

U

LE

" SCHEDULE

TYPICAL MATERIAL/THRESHOLD TRANSITIONS

DOOR (WHERE APPLICABLE)

ADA METAL TRANSITION STRIP

SEALED CONCRETE

CARPET TO HARD TILE TRANSITION CARPET TO SEALED CONC. TRANSITION

HARD TILE TO HARD TILE TRANSITION

CARPET AS SPECIFIED

CENTERLINE OF DOOR LEAF

HARD TILE AS SPECIFIED

CENTERLINE OF DOOR LEAF

CARPET AS SPECIFIED

CENTERLINE OF DOOR LEAF DOOR (WHERE APPLICABLE)

ADA METAL TRANSITION STRIP

CERAMIC TILE AS SPECIFIED

DOOR (WHERE APPLICABLE)

FLUSH METAL TRANSITION STRIP

HARD TILE AS SPECIFIED

3 8

EQ. EQ.

EQ. EQ. EQ. EQ.

3 8 " 3 8

"5/8" GYP. BRD.

1/2" FURR'G.

EXIST'G. C.M.U.

EXIST'G. C.M.U.

TO REMAIN

ACCESS PANEL -

SEE DOOR SCHEDULE

1 8

" V

.I.

F.

1 8 " V

.I.

F.

FINISH C.M.U. @

OPN'G. SMOOTH

5/8" GYP. BRD.

1/2" FURR'G.

EXIST'G. C.M.U.

BY ACCESS DOOR

MANUFACTURER

ACCESS PANEL -

SEE DOOR SCHEDULE

8"6" V.I.F.

8" V.I.F.

FINISH C.M.U. @

OPN'G. SMOOTH

STEEL FRAME

5/8" GYP. BRD.

3-1/2" METAL STUDS @ 16" O.C.

EXPOSED CONSTRUCTION

31 2

5 8

METAL STUD

@ JAMB & SILL

ACCESS PANEL -

SEE DOOR SCHEDULE

EXPOSED CONSTR.

FRAMED METAL

STUD OPEN'G.

5/8" GYP. BRD.

3-1/2" METAL STUDS @ 16" O.C.

EXPOSED CONSTRUCTION

2" 5

8"

EXPOSED CONSTR.

FRAMED METAL

STUD OPEN'G.

BY ACCESS DOOR

MANUFACTURER

ACCESS PANEL -

SEE DOOR SCHEDULE

STEEL FRAME DR. SCHEDULES

C op yr ig ht

Ke nd ra C

. T ho m ps on A rc hi te ct s, P

.C

UPGRADE PROJECT FOR:

MICHIGAN

MI FILE NO. 171/23058.RLO

STATE OF

OFFICE BLDG.

701 S. ELMWOOD - TRAVERSE CITY, MI

BATHROOM & PLUMBING

kendra c.

architects, p.c.

THOMPSON

803 Cherry Street Manistee, MI 49660 tel: 231.723.4195 thompson.kendra@sbcglobal.net www.kendrathompson-architects.com

A101

DRAWING TITLE

KCT PROJECT NO.DRAWN

KCT

REVIEWED

KCT

DATE

SCALE

AS NOTED

DRAWING NO.

SEAL

SHEET NO.

NO. REVISIONS / SUBMISSIONS DATE

PROJECT NAME

ROOM FINISH &

1 FACILITY ASSESSMENT/SD CONCEPTS 6/6/2025

2 SD REV. #01 6/25/2025

3 SD REV. #02 7/16/2025

4 DD 7/30/2025

5 CD - 50% REVIEW SET: VOID 8/27/2025

6 DESIGN DEVELOPMENT SET 9/24/2025

7 CD - 50% REVIEW SET 4/29/2026

8 CD - 90% REVIEW SET 6/5/2026

9 BCC PLAN REVIEW SET 6/17/2026

10 BID SET 6/26/2026

11 ADDENDUM NO. 1 7/22/2026

JUNE 2025

KT-216007C

DOOR TYPES:

SCALE: 3" = 1'-0"

JAMB1

A101 SCALE: 3" = 1'-0"

HEAD2

A101

FRAME TYPES:

FRAME

TYPEMAT. GLASS

DOOR

LOCATIOND

O O

R N

O

DOOR SCHEDULE

TYPE

DETAIL

MAT. GLASS HEAD JAMB SILL HARDW. RATING REMARKS

A - HMWD

B HMHM

B - HMHM

- HMWD -

A - 1 HMWD -

B - HMHM -

B

SIZE

A - 1 HMWD -

A - 1 HMWD

FIRE

LO

C A

TI

O N

LE

V

EL

-G

3'-0" x 6'-8" x 1 3/4"

3'-0" x 6'-8" x 1 3/4"

3'-0" x 6'-8" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

18" x 32"

24" x 24"

3'-0" x 6'-8" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

A 1 -A

HMWD

- HMWD

A

-SMOKE-

2/A101 1/A101

ROOM FINISH SCHEDULE

026 STORAGE

UTR

STORAGE

STORAGE

OFFICE

CORRIDOR

STAFF SHOWER RM

CORRIDOR139

R O

O M

N O

NAME

STAIR #1S-1

ROOM

EXIST'G. TO REMAIN @4" VINYL @ RENOV.

BASE MT'L

WALL FLOOR

MT'L MT'L

WALL CL'G

REMARKS

UTR

UTR

UTR

WORK AREA

UTR

148 STORAGE

GYP. BOARD, PAINT

150 JANITOR CLOSET

6" H.T., COVED

EXIST'G. CONSTR. @

LO

C A

TI

O N

EXIST'G. EXPOSED,

HT-1

SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

EXIST'G. TERRAZZO

SCOPE IS LIMITED TO INFILL @ EXIST'G. TOIL RM DOOR ONLY

LE

V

EL

-1

LE

V

EL

-2

LE

V

EL

-3

152 WORK AREA

LE

V

EL

-4

026A STORAGE #026

025A UTR #025

STAFF SHOWER #008008A

145A

151A

143A UTR #143

UTR #145

WORK AREA #151

151B

142A

152A

140A UTR #140

UTR #142

152B

18" x 32"

24" x 24"

LE

V

EL

-1

LE

V

EL

-2

LE

V

EL

-3

330A OFFICE#330

LE

V

EL

-4

LE

V

EL

-G

EXIST'G. TERRAZZO EXIST'G. TO REMAIN

PAINT

4" VINYL @ NEW WALL

AREA ONLY

EXIST'G. EXPOSED/G.B.

@ NEW WALL ONLY, PAINT SCOPE IS LIMITED TO NEW G.B. WALL/DOOR & PAINTING OF ENTIRE AREA

EXIST'G. GLAZED CMU

TO REMAIN

EXIST'G. 2'X2' ACT

TO REMAIN

EXIST'G. VINYL W.B.

TO REMAIN

EXIST'G. CARPET TILES

TO REMAIN

2'X2' ACT-1/GYP. BD.

BLKHD, PAINT6" H.T., COVED HT-1

2'X2' ACT-1/GYP. BD.

BLKHD, PAINT

027 STAFF HALL CPT-1 2'X2' ACT-1/GYP. BD.

BLKHD, PAINT

4" VINYL - MATCH

EXIST'G, PAINT GYP. BOARD, PAINT

STAFF BREAK AREA035 GYP. BOARD, PAINT EXIST'G. 2'X2' ACT

TO REMAIN

4" VINYL @ RENOV.

AREA ONLY SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

4" WOOD - MATCH

EXIST'G, PAINT

CPT-1 @ RENOV. AREA;

EXIST'G CPT OTHERWISE

LOBBY100

4" WOOD - MATCH

EXIST'G, PAINT

GYP. BD. BLKHD, PAINT;

EXIST'G. ACT TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINTEXIST'G. CARPET TILES

TO REMAIN

EXIST'G. 2'X2' ACT

TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

6" H.T., COVED HT-1

6" H.T., COVED HT-1 2'X2' ACT-1/GYP. BD.

BLKHD, PAINT

CPT-1 GYP. BD. BLKHD,

PAINT

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINT

6" H.T., COVED HT-1

6" H.T., COVED HT-1 2'X2' ACT-1

2'X2' ACT-1

2'X2' ACT-1

CPT-1 GYP. BD. BLKHD,

PAINT

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINT

GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET RENOV. CLOSET SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

4" VINYL @ RENOV. EXIST'G. CONSTR. @ GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET/OFFICE

EA

S T

W

IN

G N O

R

TH

W

IN

G

MEETING ROOM122

EXIST'G. TO REMAIN @4" VINYL @ RENOV. EXIST'G. CONSTR. @ GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET RENOV. CLOSET SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

CORRIDOR138

6" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINTEXIST'G. CARPET TILES

TO REMAIN

EXIST'G. 2'X2' ACT

TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

S O

U

TH

W

IN

G

248 STORAGE

250 JANITOR CLOSET

LOBBY200

4" WOOD - MATCH

EXIST'G, PAINT

GYP. BD. BLKHD, PAINT;

EXIST'G. ACT TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

4" VINYL @ RENOV. EXIST'G. CONSTR. @ GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET/OFFICE

EA

S T

W

IN

G

UTR

STORAGE

STORAGE

OFFICE

CORRIDOR239

EXIST'G. TO REMAIN @4" VINYL @ RENOV.

UTR

UTR

WORK AREA

UTR

EXIST'G. CONSTR. @

252 WORK AREA

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINTEXIST'G. CARPET TILES

TO REMAIN

EXIST'G. 2'X2' ACT

TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

6" H.T., COVED HT-1

6" H.T., COVED HT-1 2'X2' ACT-1/GYP. BD.

BLKHD, PAINT

GYP. BD. BLKHD,

PAINT

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINT

6" H.T., COVED HT-1

6" H.T., COVED HT-1 2'X2' ACT-1

2'X2' ACT-1

2'X2' ACT-1

GYP. BD. BLKHD,

PAINT

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINT

GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET RENOV. CLOSET SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

N O

R

TH

W

IN

G

OFFICE222

EXIST'G. TO REMAIN @4" VINYL @ RENOV. EXIST'G. CONSTR. @ GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET RENOV. CLOSET SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

CORRIDOR238

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINTEXIST'G. CARPET TILES

TO REMAIN

EXIST'G. 2'X2' ACT

TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

S O

U

TH

W

IN

G

348 STORAGE

350 JANITOR CLOSET

LOBBY300

4" WOOD - MATCH

EXIST'G, PAINT

CPT-1 @ RENOV. AREA;

EXIST'G CPT OTHERWISE

GYP. BD. BLKHD, PAINT;

EXIST'G. ACT TO REMAIN

SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

4" VINYL @ RENOV. EXIST'G. CONSTR. @ GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET/OFFICE EA

S T

W

IN

G

OFFICE330

GYP. BD/PLAST.,

PAINT

4" WOOD - MATCH

EXIST'G, PAINT EXIST'G. CPT TO REMAIN

RECONFIGURE 2'X2' ACT CEIL'G NEAR DOOR #334A TO MATCH EXIST'G.;

OFFICE331

PAINT ENTIRE EXIST'G. EAST & NORTH WALL AREAS

4" WOOD - MATCH

EXIST'G, PAINT

EXIST'G. CARPET TILES

TO REMAIN

EXIST'G. CARPET TILES

TO REMAIN

GYP. BOARD @ RENOV.

WALLS, PAINT

EXIST'G. ACT TO

REMAIN, PAINT SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

MEETING ROOM334

4" WOOD - MATCH

EXIST'G, PAINT

GYP. BOARD @ RENOV.

AREA, PAINT SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.GYP. BD. BLKHD, PAINT;

EXIST'G. ACT TO REMAIN

UTR

STORAGE

STORAGE

OFFICE

CORRIDOR339

EXIST'G. TO REMAIN @4" VINYL @ RENOV.

UTR

UTR

WORK AREA

UTR

EXIST'G. CONSTR. @

352 WORK AREA

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINTEXIST'G. CARPET TILES

TO REMAIN

EXIST'G. 2'X2' ACT

TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

6" H.T., COVED HT-1

6" H.T., COVED HT-1 2'X2' ACT-1/GYP. BD.

BLKHD, PAINT

GYP. BD. BLKHD,

PAINT

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINT

6" H.T., COVED HT-1

6" H.T., COVED HT-1 2'X2' ACT-1

2'X2' ACT-1

2'X2' ACT-1

GYP. BD. BLKHD,

PAINT

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINT

GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET RENOV. CLOSET SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

N O

R

TH

W

IN

G

OFFICE322

EXIST'G. TO REMAIN @4" VINYL @ RENOV. EXIST'G. CONSTR. @ GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET RENOV. CLOSET SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

CORRIDOR338

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINTEXIST'G. CARPET TILES

TO REMAIN

EXIST'G. 2'X2' ACT

TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

S O

U

TH

W

IN

G

LOBBY400

4" WOOD @ WORK

AREA-MATCH EXIST'G.

EXIST'G. CARPET

TO REMAIN

REALIGN EXIST'G. ACT

@ WORK AREA

GYP. BD. @ WORK AREA,

PAINT - MATCH EXIST'G.

EA

S T

UTR

STORAGE

STORAGE

OFFICE

CORRIDOR439

EXIST'G. TO REMAIN @4" VINYL @ RENOV.

UTR

UTR

WORK AREA

UTR

EXIST'G. CONSTR. @

452 WORK AREA

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINTEXIST'G. CARPET TILES

TO REMAIN

EXIST'G. 2'X2' ACT

TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

6" H.T., COVED HT-1

6" H.T., COVED HT-1 2'X2' ACT-1/GYP. BD.

BLKHD, PAINT

GYP. BD. BLKHD,

PAINT

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINT

6" H.T., COVED HT-1

6" H.T., COVED HT-1 2'X2' ACT-1

2'X2' ACT-1

2'X2' ACT-1

GYP. BD. BLKHD,

PAINT

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINT

GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET RENOV. CLOSET SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

N O

R

TH

W

IN

G

MEETING422

EXIST'G. TO REMAIN @4" VINYL @ RENOV. EXIST'G. CONSTR. @ GYP. BD/PLAST @ RENOV.

CLOS. WALLS, PAINT RENOV. CLOS., PAINTCLOSET RENOV. CLOSET SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

CORRIDOR438

4" WOOD - MATCH

EXIST'G, PAINT GYP. BD/PLAST., PAINTEXIST'G. CARPET TILES

TO REMAIN

EXIST'G. 2'X2' ACT

TO REMAIN SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

S O

U

TH

W

IN

G

SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.

- 1 -

- - SMOKE

SMOKE

SMOKE

HMHM -- 5- - SMOKE

SMOKE

SMOKE-

SMOKE

SMOKE

B HMHM

B - HMHM

- HMWD -

A - 1 HMWD -

B - HMHM -

B

A - 1 HMWD -

A - 1 HMWD

3'-0" x 7'-0" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

18" x 32"

24" x 24"

3'-0" x 6'-8" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

A

245A

251A

243A UTR #243

UTR #245

251B

242A

252A

240A UTR #240

UTR #242

252B

18" x 32"

24" x 24"

- - SMOKE

SMOKE

SMOKE

HMHM -- 5- - SMOKE

SMOKE

SMOKE-

SMOKE

SMOKE

B

HMHM

B - HMHM

- HMWD -

A - 1 HMWD -

B - HMHM -

B

A - 1 HMWD - -

A - 1 HMWD -

3'-0" x 7'-0" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

18" x 32"

24" x 24"

3'-0" x 6'-8" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

A

345A

351A

343A UTR #343

UTR #345

351B

342A

352A

340A UTR #340

UTR #342

352B

18" x 32"

24" x 24"

- - SMOKE

SMOKE

SMOKE

HMHM -- 5- - SMOKE

SMOKE

SMOKE-

SMOKE

SMOKE

A -3'-0" x 6'-8" x 1 3/4" 1 HMWD - 4348A STORAGE #348

- HMWD - -3'-0" x 6'-8" x 1 3/4" A 21 SMOKE

B HMHM

B - HMHM

- HMWD -

A - 1 HMWD -

B - HMHM -

B

A - 1 HMWD - -

A - 1 HMWD -

3'-0" x 7'-0" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

18" x 32"

24" x 24"

3'-0" x 6'-8" x 1 3/4"

3'-0" x 7'-0" x 1 3/4"

A

445A

451A

443A UTR #443

UTR #445

451B

442A

452A

440A UTR #440

UTR#442

452B

18" x 32"

24" x 24"

- - SMOKE

SMOKE

SMOKE

HMHM -- 5- - SMOKE

SMOKE

SMOKE-

SMOKE

SMOKE

4/A101 3/A101

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

CPT-1

WORK AREA #151

WORK AREA #152

WORK AREA #152

WORK AREA #251

WORK AREA #251

WORK AREA #252

WORK AREA #252

WORK AREA #351

WORK AREA #351

WORK AREA #352

WORK AREA #352

WORK AREA #451

WORK AREA #451

WORK AREA #452

WORK AREA #452

GYP. BOARD, PAINT

GYP. BOARD, PAINT SOLID SURF. WINDOW SILL

GYP. BOARD, PAINTCPT-1 @ RENOV. AREA;

EXIST'G CPT OTHERWISE

EXIST'G. EXIST'G. SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.EXIST'G. TO REMAIN-

CONC. PATCH @ DEMO.

EXIST'G. TO REMAIN-

PATCH @ DEMO AREA

GYP. BOARD, PAINT

GYP. BOARD, PAINT

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

EXIST'G. EXIST'G. SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.EXIST'G. TO REMAIN-

CONC. PATCH @ DEMO.

EXIST'G. TO REMAIN-

PATCH @ DEMO AREA

EXIST'G. EXIST'G. SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.EXIST'G. TO REMAIN-

CONC. PATCH @ DEMO.

EXIST'G. TO REMAIN-

PATCH @ DEMO AREA

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

CPT-1 @ RENOV. AREA;

EXIST'G CPT OTHERWISE GYP. BOARD, PAINT

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

GYP. BOARD, PAINT

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

SOLID SURF. WINDOW SILL

CPT-1

CPT-1

EXIST'G. EXIST'G. EXIST'G.EXIST'G.

GYP. BOARD, PAINT

EXIST'G. EXIST'G. SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.EXIST'G. TO REMAIN-

CONC. PATCH @ DEMO.

EXIST'G. TO REMAIN-

PATCH @ DEMO AREA

CPT-1

EXIST'G. EXIST'G. SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.EXIST'G. TO REMAIN-

CONC. PATCH @ DEMO.

EXIST'G. TO REMAIN-

PATCH @ DEMO AREA

EXIST'G. EXIST'G. SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.EXIST'G. TO REMAIN-

CONC. PATCH @ DEMO.

EXIST'G. TO REMAIN-

PATCH @ DEMO AREA

EXIST'G. EXIST'G. SCOPE IS LIMITED TO WORK AREA ONLY; PATCH/REPAIR TO MATCH EXIST'G.EXIST'G. TO REMAIN-

CONC. PATCH @ DEMO.

EXIST'G. TO REMAIN-

PATCH @ DEMO AREA

EXIST'G. TO REMAIN,

REWORK AS REQ'D.

PAINT ENTIRE EXIST'G. OFFICE NORTH WALL

PAINT ENTIRE EXIST'G. OFFICE NORTH WALL

EXIST'G. EXIST'G. EXIST'G. EXIST'G.

EXIST'G. EXIST'G. EXIST'G. EXIST'G.

EXIST'G. EXIST'G. EXIST'G. EXIST'G.

SCALE: 3" = 1'-0"

JAMB3

A101 SCALE: 3" = 1'-0"

HEAD4

A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

4/A101 3/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

2/A101 1/A101

4/A101 3/A101

4/A101 3/A101

4/A101 3/A101

4/A101 3/A101

4/A101 3/A101

4/A101 3/A101

2/A101 1/A101

SCALE: 3" = 1'-0"

JAMB5

A101 SCALE: 3" = 1'-0"

HEAD6

A101

6/A101 5/A101

6/A101 5/A101

6/A101 5/A101

6/A101 5/A101

6/A101 5/A101

6/A101 5/A101

6/A101 5/A101

6/A101 5/A101

1 2 3 4 5 6

7 8 9 10 11

12 13 14 15 16 17

D

E

F

G

C

B

A

EX

T'

G F

.P

EXT'G FIRE

PROTECTION

RISER UP

FROM OUT

OF TUNNEL

EXT'G FIRE PROTECTION LINE

FROM MECH/BOILER ROOM.

LOCATED ROUGHLY 60 FT

SOUTH (VERIFY IN FIELD).

1 2 3 4 5 6

7 8 9 10 11

12 13 14 15 16 17

D

E

F

G

C

B

A

BUILDING SUMMARY

AREA*

OCCUPANCY HAZARDS**

TOTAL AREA 3,543 SQ FT

* VERIFY ALL AREAS WITH FINAL ARCHITECTURAL DRAWINGS

** CONFIRM HAZARD CLASSIFICATIONS WITH NFPA 13

EXT'G FP

RISER

EXT'G FP

RISER

TOTAL AREA W/ ALT #1 & #2 3,827 SQ FT

SCOPE OF FIRE PROTECTION RE-WORK

ALTERNATE #1

SCOPE OF FIRE PROTECTION RE-WORK

ALTERNATE #2

REWORK THE EXISTING FIRE PROTECTION SPRINKLER SYSTEM AS DEFINED BY THE INTERNATIONAL BUILDING CODE AND NFPA NO. 13. INSTALL NEW SPRINKLER HEADS AND BRANCH PIPING. EXISTING MAINS AND BRANCHES SHALL BE USED TO MEET SPRINKLER REQUIREMENTS. NEW PIPING SHALL BE COPPER TYPE L WITH WROUGHT FITTINGS OR SCHEDULE 40 BLACK IRON WITH C1 SCREWED FITTINGS. SPRINKLER HEADS SHALL BE NOMINAL 1/2" BRONZE FINISH UPRIGHT IN EXPOSED AREAS AND (CHROME PLATED OR WHITE POLYESTER COATED) WITH ESCUTCHEON IN FINISHED AREAS. FUSIBLE SOLDER LINK TYPE RATED FOR SPECIFIC AREA HAZARD. PROVIDE SPRINKLER WRENCH AND (2) SPARE HEADS IN CABINET MOUNTED

IN MECHANICAL ROOM.

FIRE PROTECTION NOTES

THE FIRE PROTECTION SYSTEM IS UNDER THE GENERAL CONTRACT AND ALL SYSTEMS, EQUIPMENT, PIPING, SITE WORK, WATER STORAGE TANK ETC. ARE TO BE PROVIDED UNDER THE CONTRACT FOR A

COMPLETE FUNCTIONAL SYSTEM THAT PASSES ALL CODES AND OFS INSPECTIONS.

FP200

DRAWING TITLE

KCT PROJECT NO.DRAWN

EHT

REVIEWED

DAR

DATE

SCALE

AS NOTED

DRAWING NO.

SEAL

SHEET NO.

NO. REVISIONS / SUBMISSIONS DATE

PROJECT NAME

FIRE PROTECTION

OVERALL TUNNEL &

C op yr ig ht

Ke nd ra C

. T ho m ps on A rc hi te ct s, P

.C

UPGRADE PROJECT FOR:

MICHIGAN

MI FILE NO. 171/21349.GAG

STATE OF

OFFICE BLDG.

701 S. ELMWOOD - TRAVERSE CITY, MI

BATHROOM & PLUMBING

1 DESIGN DEVELOPMENT SET 9/24/2025

2 CD 50% REVIEW SET 4/29/2026

3 CD 90% REVIEW SET 6/5/2026

4 BCC PLAN REVIEW SET 6/17/2026

5 BID SET 6/26/2026

6 ADDENDUM #1 7/22/2026

SCALE: 1/8" = 1'-0"

FIRE PROTECTION OVERALL TUNNEL LEVEL

N JUNE 2026

KT-216007C

SCALE: 1/8" = 1'-0"

FIRE PROTECTION OVERALL GROUND LEVEL

N

GROUND LEVELS

kendra c.

architects, p.c.

THOMPSON

803 Cherry Street Manistee, MI 49660 tel: 231.723.4195 www.kendrathompson-architects.com

12 13 14 15 16 17

D

E

F

G

C

B

A

EXT'G FP

RISER

EXT'G FP

RISER

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

1 2 3 4 5 6

7 8 9 10 11

12 13 14 15 16 17

D

E

F

G

C

B

A

EXT'G FP

RISER

EXT'G FP

RISER

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

FP201

DRAWING TITLE

KCT PROJECT NO.DRAWN

EHT

REVIEWED

DAR

DATE

SCALE

AS NOTED

DRAWING NO.

SEAL

SHEET NO.

NO. REVISIONS / SUBMISSIONS DATE

PROJECT NAME

C op yr ig ht

Ke nd ra C

. T ho m ps on A rc hi te ct s, P

.C

UPGRADE PROJECT FOR:

MICHIGAN

MI FILE NO. 171/21349.GAG

STATE OF

OFFICE BLDG.

701 S. ELMWOOD - TRAVERSE CITY, MI

BATHROOM & PLUMBING

1 DESIGN DEVELOPMENT SET 9/24/2025

2 CD 50% REVIEW SET 4/29/2026

3 CD 90% REVIEW SET 6/5/2026

4 BCC PLAN REVIEW SET 6/17/2026

5 BID SET 6/26/2026

6 ADDENDUM #1 7/22/2026

SCALE: 1/8" = 1'-0"

FIRE PROTECTION OVERALL FLOOR LEVEL - 1

N JUNE 2026

KT-216007C

SCALE: 1/8" = 1'-0"

FIRE PROTECTION OVERALL FLOOR LEVEL - 2

N

FIRE PROTECTION

OVERALL FLOOR

LEVELS 1 & 2

kendra c.

architects, p.c.

THOMPSON

803 Cherry Street Manistee, MI 49660 tel: 231.723.4195

12 13 14 15 16 17

D

E

F

G

C

B

A

EXT'G FP

RISER

EXT'G FP

RISER SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

1 2 3 4 5 6

7 8 9 10 11

12 13 14 15 16 17

D

E

F

G

C

B

A

EXT'G FP

RISER

EXT'G FP

RISER

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

SCOPE OF FIRE PROTECTION

RE-WORK (TYP.)

FP202

DRAWING TITLE

KCT PROJECT NO.DRAWN

EHT

REVIEWED

DAR

DATE

SCALE

AS NOTED

DRAWING NO.

SEAL

SHEET NO.

NO. REVISIONS / SUBMISSIONS DATE

PROJECT NAME

C op yr ig ht

Ke nd ra C

. T ho m ps on A rc hi te ct s, P

.C

UPGRADE PROJECT FOR:

MICHIGAN

MI FILE NO. 171/21349.GAG

STATE OF

OFFICE BLDG.

701 S. ELMWOOD - TRAVERSE CITY, MI

BATHROOM & PLUMBING

1 DESIGN DEVELOPMENT SET 9/24/2025

2 CD 50% REVIEW SET 4/29/2026

3 CD 90% REVIEW SET 6/5/2026

4 BCC PLAN REVIEW SET 6/17/2026

5 BID SET 6/26/2026

6 ADDENDUM #1 7/22/2026

SCALE: 1/8" = 1'-0"

FIRE PROTECTION OVERALL FLOOR LEVEL - 3

N JUNE 2026

KT-216007C

SCALE: 1/8" = 1'-0"

FIRE PROTECTION OVERALL FLOOR LEVEL - 4

N

FIRE PROTECTION

OVERALL FLOOR

LEVELS 3 & 4

kendra c.

architects, p.c.

THOMPSON

803 Cherry Street Manistee, MI 49660 tel: 231.723.4195

SPECIAL NOTICE TO CONTRACTORS

1. IT IS REQUIRED THAT ALL CONTRACTORS BIDDING THIS PROJECT VISIT THE JOB SITE AND

VERIFY THE EXISTING CONDITIONS PRIOR TO SUBMITTING THEIR BID. CONTRACTORS ARE TO

CAREFULLY REVIEW ALL CONSTRUCTION DOCUMENTS AND NOTE ANY DISCREPANCIES

BETWEEN THE CONSTRUCTION DOCUMENTS AND THE CONDITIONS OBSERVED AT THE JOB

SITE PRIOR TO SUBMISSION OF ANY BID. THE BUILDING OWNER REPRESENTATIVE MAY BE

CONTACTED FOR ACCESS TO THE JOB SITE.

2. PRIOR TO CONSTRUCTION, CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE LOCATION

AND CONDITION OF THE FOLLOWING:

A. ALL POINTS OF CONNECTION TO BUILDING UTILITIES AND/OR SYSTEMS INCLUDING, BUT

NOT LIMITED TO, GAS, WATER, SEWER, VENT, ELECTRICAL, MECHANICAL SYSTEMS,

DUCTWORK, EXHAUST/OUTSIDE AIR, SECURITY, FIRE/LIFE SAFETY, DATA, AND PHONE.

B. ALL REQUIRED CONNECTIONS TO THE BUILDING STRUCTURE.

C. ALL REQUIRED BUILDING PENETRATIONS.

3. ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND THE CONDITIONS

OBSERVED SHALL BE BROUGHT TO THE ATTENTION, IN WRITING, TO THE ARCHITECT AND/OR

ENGINEER PRIOR TO PROCEEDING WITH CONSTRUCTION.

4. REFER TO THE CONSTRUCTION DOCUMENTS FOR ALL CONTACT INFORMATION.

PLUMBING DEMOLITION NOTES

1. FIXTURE, PIPING, ETC., TAGGED WITH A PRECEDING "EXT'G" OR "x" ARE EXISTING.

2. BEFORE COMMENCING WORK ENSURE DOMESTIC SERVICES ARE OFF, AND ELECTRICAL

POWER IS TURNED OFF TO THE EXISTING EQUIPMENT.

3. THE PLUMBING CONTRACTOR SHALL REMOVE ALL ITEMS INDICATED AND SHALL BE

RESPONSIBLE FOR THEIR DISPOSAL PER LOCAL, STATE AND FEDERAL REGULATIONS AND

PAY FOR ALL ASSOCIATED COSTS OF DISPOSAL.

4. THE PLUMBING CONTRACTOR SHALL COORDINATE WITH THE OWNER'S REPRESENTATIVE TO

DETERMINE IF ANY PARTS OR FIXTURES ARE DESIRED TO BE KEPT BY THE OWNER. THE

OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL. ANY ITEM NOT WISHED TO BE RETAINED,

SHALL BE DISPOSED OF AT THE RESPONSIBILITY OF THE PLUMBING CONTRACTOR.

5. ITEMS HATCHED SHALL BE PERMANENTLY REMOVED.

6. ITEMS CLOUDED SHALL BE TEMPORARILY REMOVED AND REUSED.

PLUMBING ABBREVIATIONS

AAV AIR ADMITTANCE VALVE

ADA AMERICAN DISABILITIES ACT

ADJ ADJUSTABLE

AF ABOVE ROUGH FLOOR

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AND AIR

CONDITIONING ENGINEERS

AV AIR VENT

ABV ABOVE

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BV BALANCING VALVE

CB CATCH BASIN

CF CUBIC FEET

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CS CIRCUIT SETTER

CW DOMESTIC COLD WATER

DN DOWN

DS DOWNSPOUT

DWV DRAIN/WASTE/VENT

EC ELECTRICAL CONTRACTOR

ELEC ELECTRICAL

EQUIP EQUIPMENT

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EX EXISTING (ALSO: "EXT'G", "x")

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FS FLOOR SINK

FSEC FOOD SERVICE EQUIPMENT CONTRACTOR

FV or VIF FIELD VERIFY or VERIFY IN FIELD

G GAS, NATURAL GAS OR LP AS NOTED

GAL GALLONS

GC GENERAL CONTRACTOR

GD GARBAGE DISPOSAL

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GT GREASE TRAP

HB HOSE BIBB

HW DOMESTIC HOT WATER

IE INVERT ELEVATION

KW KILOWATT

LAV LAVATORY

LBS POUNDS

LP LIQUID PROPANE

MBH THOUSAND BTU PER HOUR

MC MECHANICAL CONTRACTOR

MBC MICHIGAN BUILDING CODE

MMC MICHIGAN MECHANICAL CODE

MS MOP SINK

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION. LIFE SAFETY CODE

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NT NEUTRALIZATION TANK

OS OIL SEPARATOR

PRV PRESSURE REDUCING VALVE

RC RAIN CONDUCTOR

RD ROOF DRAIN

RI ROUGH-IN

RO ROUGH OPENING

RPZ REDUCED PRESSURE ZONE (BF

PREVENTER)

SAN SANITARY WASTE

SF SQUARE FEET

SK SINK

SPKR SPRINKLER

SS STAINLESS STEEL

ST STORM

TBD TO BE DETERMINED (DURING

CONSTRUCTION)

TD TRENCH DRAIN

TMV THERMOSTATIC MIXING VALVE

TO TOP OF...(DUCT, PIPE, ETC.)

T/P TEMPERATURE AND PRESSURE

TPV TRAP PRIMER VALVE

TYP TYPICAL

UR URINAL

UG UNDERGROUND

UL UNITED LABORATORIES TESTING

AGENCY

UW UNTREATED WATER

V VENT

VIF or FV VERIFY IN FIELD or FIELD VERIFY

VTR VENT THRU ROOF

WC WATER CLOSET

WCO WALL CLEAN OUT

WH WATER HEATER

PLUMBING SYMBOL LEGEND

CA

COND

DOMESTIC COLD WATER (CW) PIPING

DOMESTIC COLD WATER (CW) PIPING BELOW FLOOR

CW

DOMESTIC HOT WATER (HW) PIPING

M METER (GAS OR WATER)

GAS COCK

GAS SOLENOID VALVE

FLOW DIRECTION DESIGNATOR

DOMESTIC HOT WATER (HW) PIPING BELOW FLOOR

DOMESTIC TEMPERED WATER (TW) PIPING

DOMESTIC HOT WATER RECIRCULATED (HWR) PIPING

SANITARY WASTE/SEWER (SAN) PIPING

SANITARY WASTE/SEWER (SAN) PIPING BELOW FLOOR

STORM (ST) PIPING

STORM (ST) PIPING BELOW FLOOR

VENT (V) PIPING

CONDENSATE (COND) PIPING

GAS (G) PIPING

COMPRESSED AIR (CA) PIPING

PIPE DOWN

PIPE UP

PIPE BREAK (FOR CLARITY)

CAPPED PIPE

BALL VALVE, SHUT-OFF AND ISOLATION

UNION

STRAINER WITH BLOWDOWN

WALL CLEANOUT (WCO)

NEW-TO-EXISTING CONNECTION

CW

HW

HW

TW

HWR

G

SAN

SAN

ST

ST

VENT

CIRCUIT SETTER W/ TEST PORTS (CS)

STANDARD CHECK VALVE

BALANCING VALVE W/ SHUT-OFF ABILITY & TEST PORTS (BV)

PRESSURE REDUCING VALVE (PRV)

REDUCED PRESSURE ZONE ASSEMBLY (RPZ)

PUMP, PLAN VIEW

DOUBLE CHECK VALVE

P100

DRAWING TITLE

KCT PROJECT NO.DRAWN

EHT

REVIEWED

DAR

DATE

SCALE

AS NOTED

DRAWING NO.

SEAL

SHEET NO.

NO. REVISIONS / SUBMISSIONS DATE

PROJECT NAME

C op yr ig ht

Ke nd ra C

. T ho m ps on A rc hi te ct s, P

.C

UPGRADE PROJECT FOR:

MICHIGAN

MI FILE NO. 171/21349.GAG

STATE OF

OFFICE BLDG.

701 S. ELMWOOD - TRAVERSE CITY, MI

BATHROOM & PLUMBING

1 DESIGN DEVELOPMENT SET 9/24/2025

2 CD 50% REVIEW SET 4/29/2026

3 CD 90% REVIEW SET 6/5/2026

4 BCC PLAN REVIEW SET 6/17/2026

5 BID SET 6/26/2026

6 ADDENDUM #1 7/22/2026

JUNE 2026

KT-216007C

kendra c.

architects, p.c.

THOMPSON

803 Cherry Street Manistee, MI 49660 tel: 231.723.4195 thompson.kendra@sbcglobal.net www.kendrathompson-architects.com

PLUMBING

SYMBOL LEGEND &

ABBREVIATIONS

AutoCAD SHX Text G

12 13 14 15 16 17

D

E

F

G

C

B

A

TUNNEL

EXT'G 3" CW BACK TO

BOILER/MAINTENANCE BLDG

EXT'G HWS

EXT'G HWR

EXT'G F.P.

EXT'G

SAN

EXT'G CW UP

EXT'G CW, HW UP

TO REMAIN

EXT'G SAN RISER

EXT'G CW,

HW RISERS

EXT'G CW, HW MAINS

EXT'G SAN RISEREXT'G SAN RISER

EXT'G SAN RISEREXT'G CW UP

EXT'G

CW UP

EXT'G SAN TO

REMAIN

EXT'G

SAN

RISER

EXT'G STORM

EXT'G

SAN

EXT'G CW, HW UP

EXT'G CW, HW UP

EXT'G SAN RISER

EXT'G STORM

EXISTING STORM TO REMAIN.

CONTRACTOR TO VERIFY

STORM LINE IN FIELD (TYP).

EXT'G

C.O. (TYP.

OF 2)EXT'G SAN

EXT'G ST

EX

T'

G S

AN

EXT'G STORM DOWN

EXT'G

C.O. EXT'G SAN

EXT'G SAN

EXT'G ST

EXT'G

C.O.

EXT'G CW

EXT'G SAN

EXT'G CW

EXT'G SAN

EXT'G CW

EXT'G

C.O.

EX

T'

G C

W

EXT'G STORM RISER

EXT'G SAN RISER

EXT'G STORM RISER

EXT'G SAN RISER

EX

T'

G F

.P x8" SAN

MAIN BLDG

SEWER EXIT

DEMO EXT'G 8" SAN TO THIS

POINT (BUILDING OUTLET).

PREPARE TO TIE IN NEW

SAN TO EXT'G 8" SAN

EXISTING STORM TO REMAIN.

CONTRACTOR TO VERIFY

STORM LINE IN FIELD (TYP).

PD-1

EXISTING STORM TO REMAIN.

CONTRACTOR TO VERIFY

STORM LINE IN FIELD (TYP).

EXISTING STORM TO REMAIN.

CONTRACTOR TO VERIFY

STORM LINE IN FIELD (TYP).

EXT'G EWH

(TYP. OF 2)

EXT'G HHWS,

HHWR, & F.P.

RISERS TO

REMAIN

DEMO EXT'G 3" CW MAIN TO THIS

POINT. DEMO EXT'G SHUT-OFF VALVE

PD-1

PD-1

PD-1

PD-1

PD-1

PD-1

PD-1

PD-1

PD-1

PD-1

PD-1

1 2 3 4 5 6

7 8 9 10 11

12 13 14 15 16 17

D

E

F

G

C

B

A

18A

SHWR

U.T.R. U.T.R.

16 15

ELEV.

495028293031323334STAFF

WOMENS

MENS

39 38 37 36

43 1

MAINTENANCE SHOP

S-3

J.C.

STOR

STAIR #1

S-2 20

J.C.

CONFERENCE

xLAV xSH xWC xLAV's xSS xWC xWC''sxUR's xLAV's xS

EXT'G SAN RISER

EXT'G STORM RISER

EXT'G CW/HW RISER

EXT'G SAN RISER

EXT'G STORM RISER

EXT'G CW/HW RISER

xHB xHB xHB xHB xEWH xSS

ALTERNATE #1

SEE SHEET P200 AND P203

PD-3 PD-3

PD-3 PD-3

PD-3

THE CONTRACTOR SHALL VERIFY THE SANITARY, COLD WATER, AND HOT WATER

SERVICE LOCATIONS TO THESE BATHROOMS FROM THE TUNNEL BELOW.

BASE BID: TIE THE EXT'G FIXTURES TO THE NEW SANITARY, COLD WATER, AND

HOT WATER SERVICES IF ALT #2 IS NOT ACCEPTED. VERIFICATION IN FIELD IS

REQUIRED. IF ALT #2 IS ACCEPTED, NEW FIXTURES WILL BE REQUIRED, SEE

FIXTURE SCHEDULE FOR MORE INFORMATION.

ALTERNATE #2 SCOPE: DEMO AND

REMOVE ALL EXISTING FIXTURES, COLD

WATER, HOT WATER, VENTING, ETC.

PREPARE TO TIE NEW FIXTURES TO NEW

SERVICES. SEE SHEET P200 AND P203

FOR MORE INFORMATION

ALTERNATE #1 SCOPE: DEMO AND

REMOVE ALL EXISTING FIXTURES, COLD

WATER, HOT WATER, VENTING, ETC.

PREPARE TO TIE NEW FIXTURES TO NEW

SERVICES.

THE CONTRACTOR SHALL VERIFY THE SANITARY, COLD WATER, AND

HOT WATER SERVICE LOCATIONS TO THESE BATHROOMS FROM THE

TUNNEL BELOW.

BASE BID: TIE THE EXT'G FIXTURES TO THE NEW SANITARY, COLD

WATER, AND HOT WATER SERVICES IF ALT #2 IS NOT ACCEPTED.

VERIFICATION IN FIELD IS REQUIRED. IF ALT #2 IS ACCEPTED, NEW

FIXTURES WILL BE REQUIRED, SEE FIXTURE SCHEDULE FOR MORE

INFORMATION.

RE-LOCATE xWH CAREFULLY REMOVE AND

RE-LOCATE SINK TO NEW

COUNTER

CONTRACTOR SHALL INVESTIGATE

WHERE xHB IS FED FROM AS IT IS

NOT VISIBLE FROM TUNNEL BELOW.

(TYP. OF ALL HOSE BIBS)

PD-4

PD-4 CONTRACTOR SHALL INVESTIGATE

WHERE xHB IS FED FROM AS IT IS

NOT VISIBLE FROM TUNNEL BELOW.

(TYP. OF ALL HOSE BIBS)

PD-4

PD-4

THE CONTRACTOR SHALL INVESTIGATE THE EXT'G CW,

HW, SAN, & VENT LOCATION. DEMO THE EXISTING CW,

HW, SAN, VENTING. PREPARE TO TIE NEW 1" CW/HW

FROM BELOW TO THE xEWC AND TO THE xSS ON THIS

FLOOR. TIE NEW 3" SAN TO xSS FROM TUNNEL BELOW

TUNNEL SPACE:

1. DEMO AND REMOVE THE FOLLOWING:

1.1. EXT'G SANITARY LINES BACK TO THE EXT'G MAIN BUILDING SEWER OUTLET.

1.2. EXT'G VENTING LINES THROUGHOUT THE ENTIRE TUNNEL SPACE.

1.3. EXT'G COLD WATER LINES BACK TO THE EXISTING SHUT-OFF VALVE AS SHOWN ON

THE DRAWING. DEMO THE EXISTING SHUT-OFF VALVE AND PREPARE TO INSTALL

NEW 3" BALL VALVE.

1.4. EXT'G HOT WATER LINE BACK TO THE EXISTING WATER HEATERS. DEMO AND

REMOVE EXT'G WATER HEATERS.

2. EXISTING ITEMS THAT SHALL REMAIN: EXISTING STORM; EXISTING FIRE PROTECTION.

BATHROOM GROUPS & JANITOR CLOSET:

DEMO AND REMOVE EXISTING PLUMBING FIXTURES ALONG WITH ASSOCIATED HOT WATER,

COLD WATER LINES, VENTING, WALL SUPPORTS, ETC. SANITARY SHALL BE DEMO'D AND

CAPPED SO AS TO REMAIN FLUSH WITH FINISHED FLOOR.

CHASES:

1. DEMO AND REMOVE THE FOLLOWING EXISTING RISERS FROM TOP MOST FLOOR TO

TUNNEL SPACE BELOW: SANITARY, COLD WATER, HOT WATER, AND VENTING.

2. EXISTING STORM SHALL REMAIN; OTHER EXISTING RISERS NOT MENTIONED HERE BUT

FOUND IN CHASE TO REMAIN. CONTRACTOR SHALL VERIFY WITH THE ENGINEER IF ANY

QUESTIONS OR CONCERNS ARE FOUND BEFORE DEMOLITION WORK STARTS.

HOSE BIBS:

1. DEMO AND REMOVE ALL EXISTING COLD WATER PIPING LEADING FROM THE EXISTING

HOSE BIB BACK. INVESTIGATIVE DEMO WILL HAVE TO OCCUR; THE CONTRACTOR WILL

HAVE TO VERIFY IN FIELD WHERE THE COLD WATER LINE IS COMING FROM (TYP. FOR

ALL HOSE BIBS). DEMO TO THIS POINT SHOWN ON PLANS AND PREPARE TO TIE IN NEW

3/4" CW HERE (TYP. FOR ALL HOSE BIBS)

PD-1

PD-2

PD-3

PD-4

PLMG DEMOLITION KEYED NOTES PD-#

THE CONTRACTOR SHALL VERIFY ALL EXISTING SERVICES: SANITARY LINES, COLD/HOT WATER LINES, STORM LINES, AND VENTING PRIOR TO COMMENCING DEMOLITION WORK. THIS INCLUDES VERIFYING IN THE EXISTING TUNNEL, CEILING, AND CHASE SPACES. ANY QUESTIONS OR CONCERNS

REGARDING CONSTRUCTABILITY OF WORK SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT, OWNER, AND/OR ENGINEER (IN WRITING) BEFORE BIDDING THE PROJECT.

PD200

DRAWING TITLE

KCT PROJECT NO.DRAWN

EHT

REVIEWED

DAR

DATE

SCALE

AS NOTED

DRAWING NO.

SEAL

SHEET NO.

NO. REVISIONS / SUBMISSIONS DATE

PROJECT NAME

PLUMBING DEMO

OVERALL TUNNEL &

C op yr ig ht

Ke nd ra C

. T ho m ps on A rc hi te ct s, P

.C

UPGRADE PROJECT FOR:

MICHIGAN

MI FILE NO. 171/21349.GAG

STATE OF

OFFICE BLDG.

701 S. ELMWOOD - TRAVERSE CITY, MI

BATHROOM & PLUMBING

1 DESIGN DEVELOPMENT SET 9/24/2025

2 CD 50% REVIEW SET 4/29/2026

3 CD 90% REVIEW SET 6/5/2026

4 BCC PLAN REVIEW SET 6/17/2026

5 BID SET 6/26/2026

6 ADDENDUM #1 7/22/2026

SCALE: 1/8" = 1'-0"

PLUMBING DEMOLITION OVERALL TUNNEL LEVEL

N JUNE 2026

KT-216007C

SCALE: 1/8" = 1'-0"

PLUMBING DEMOLITION OVERALL GROUND LEVEL

N

GROUND LEVELS

kendra c.

architects, p.c.

THOMPSON

803 Cherry Street Manistee, MI 49660 tel: 231.723.4195

12 13 14 15 16 17

D

E

F

G

C

B

A

STOR.121

119 115

J.C.

127125

111 109

107 105 103 101

129 137

100B

STAFF

U.T.R.

100A

J.C.

I.T.

STO.

133 135 134

MENS

116104

136 128

106 108

126 124

U.T.R.

MEETING

WOM. COPY

UNISEX

STOR.

STO.STO.

ELEV.

xLAV xWC xWC xLAV xUR xSS xSS xWC xLAV xSS

PD-3

PD-3

PD-3

PD-3

PD-3

PD-2

PD-2

1 2 3 4 5 6

7 8 9 10 11

12 13 14 15 16 17

D

E

F

G

C

B

A

TRAVERSE CITY

217219

J.C.

209211

225 227

I.T.

229 237

ELEV.

U.T.R.

OFFICE

200A

J.C. STO.

235 234

228236

206 208

226 224

STAFF

U.T.R.

210 212

214 216

JC

220STAFFOFFICE WOMENS STOR. OFFICE

MENS

STO.STO.

xWC xLAV xSS xWC xLAV xUR xSS xSS DEMO EXT'G DOMESTIC SERVICES (CW, HW, DAN, VENT'G). PREPARE TO TIE NEW DOMESTIC

SERVICES TO EXT'G FIXTURE

PD-3

PD-3

PD-3

PD-3

PD-2

PD-2

PD-2

PD-3

TUNNEL SPACE:

1. DEMO AND REMOVE THE FOLLOWING:

1.1. EXT'G SANITARY LINES BACK TO THE EXT'G MAIN BUILDING SEWER OUTLET.

1.2. EXT'G VENTING LINES THROUGHOUT THE ENTIRE TUNNEL SPACE.

1.3. EXT'G COLD WATER LINES BACK TO THE EXISTING SHUT-OFF VALVE AS SHOWN ON

THE DRAWING. DEMO THE EXISTING SHUT-OFF VALVE AND PREPARE TO INSTALL

NEW 3" BALL VALVE.

1.4. EXT'G HOT WATER LINE BACK TO THE EXISTING WATER HEATERS. DEMO AND

REMOVE EXT'G WATER HEATERS.

2. EXISTING ITEMS THAT SHALL REMAIN: EXISTING STORM; EXISTING FIRE PROTECTION.

BATHROOM GROUPS & JANITOR CLOSET:

DEMO AND REMOVE EXISTING PLUMBING FIXTURES ALONG WITH ASSOCIATED HOT WATER,

COLD WATER LINES, VENTING, WALL SUPPORTS, ETC. SANITARY SHALL BE DEMO'D AND

CAPPED SO AS TO REMAIN FLUSH WITH FINISHED FLOOR.

CHASES:

1. DEMO AND REMOVE THE FOLLOWING EXISTING RISERS FROM TOP MOST FLOOR TO

TUNNEL SPACE BELOW: SANITARY, COLD WATER, HOT WATER, AND VENTING.

2. EXISTING STORM SHALL REMAIN; OTHER EXISTING RISERS NOT MENTIONED HERE BUT

FOUND IN CHASE TO REMAIN. CONTRACTOR SHALL VERIFY WITH THE ENGINEER IF ANY

QUESTIONS OR CONCERNS ARE FOUND BEFORE DEMOLITION WORK STARTS.

HOSE BIBS:

1. DEMO AND REMOVE ALL EXISTING COLD WATER PIPING LEADING FROM THE EXISTING

HOSE BIB BACK. INVESTIGATIVE DEMO WILL HAVE TO OCCUR; THE CONTRACTOR WILL

HAVE TO VERIFY IN FIELD WHERE THE COLD WATER LINE IS COMING FROM (TYP. FOR

ALL HOSE BIBS). DEMO TO THIS POINT SHOWN ON PLANS AND PREPARE TO TIE IN NEW

3/4" CW HERE (TYP. FOR ALL HOSE BIBS)

PD-1

PD-2

PD-3

PD-4

PLMG DEMOLITION KEYED NOTES PD-#

THE CONTRACTOR SHALL VERIFY ALL EXISTING SERVICES: SANITARY LINES, COLD/HOT WATER LINES, STORM LINES, AND VENTING PRIOR TO COMMENCING DEMOLITION WORK. THIS INCLUDES VERIFYING IN THE EXISTING TUNNEL, CEILING, AND CHASE SPACES. ANY QUESTIONS OR CONCERNS

REGARDING CONSTRUCTABILITY OF WORK SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT, OWNER, AND/OR ENGINEER (IN WRITING) BEFORE BIDDING THE PROJECT.

PD201

DRAWING TITLE

KCT PROJECT NO.DRAWN

EHT

REVIEWED

DAR

DATE

SCALE

AS NOTED

DRAWING NO.

SEAL

SHEET NO.

NO. REVISIONS / SUBMISSIONS DATE

PROJECT NAME

C op yr ig ht

Ke nd ra C

. T ho m ps on A rc hi te ct s, P

.C

UPGRADE PROJECT FOR:

MICHIGAN

MI FILE NO. 171/21349.GAG

STATE OF

OFFICE BLDG.

701 S. ELMWOOD - TRAVERSE CITY, MI

BATHROOM & PLUMBING

1 DESIGN DEVELOPMENT SET 9/24/2025

2 CD 50% REVIEW SET 4/29/2026

3 CD 90% REVIEW SET 6/5/2026

4 BCC PLAN REVIEW SET 6/17/2026

5 BID SET 6/26/2026

6 ADDENDUM #1 7/22/2026

SCALE: 1/8" = 1'-0"

PLUMBING DEMOLITION OVERALL FLOOR LEVEL - 1

N JUNE 2026

KT-216007C

SCALE: 1/8" = 1'-0"

PLUMBING DEMOLITION OVERALL FLOOR LEVEL - 2

N

PLUMBING DEMO

OVERALL FLOOR

LEVELS 1 & 2

kendra c.

architects, p.c.

THOMPSON

803 Cherry Street Manistee, MI 49660 tel: 231.723.4195

12 13 14 15 16 17

D

E

F

G

C

B

A

321 OFFICE

317319 315

WOMENS STOR. 323

311 309 307

305 303

STAFF

333 MTG. ROOM 332

OFFICE

300A

300 304

336 328 326

306 308 310

322324 OFFICE

314312 316

318301 302

U.T.R. U.T.R.

STO.

I.T.

J.C.

COPY MENS

ELEV.

xWC xLAV xSS xWC xLAV xUR xSS xSS DEMO xEWC AND

ASSOCIATED PIPING

BACK TO RISER

DEMO EXT'G PLMG FIXT'S

PD-3

PD-3

PD-3

PD-3

PD-3

PD-2

PD-2

EXT'G CW, HW, SAN, VENTING TO

BE DEMO'D AND REPLACED FOR

xSS. TIE NEW CW, HW, SAN, AND

VENTING SERVICES TO xSS.

1 2 3 4 5 6

7 8 9 10 11

12 13 14 15 16 17

D

E

F

G

C

B

A

419 415417

J.C.

MENS

405407409

MTG. RM. 427

402400401403

437429 400A

410408406404

426428 424

414412 416

COPY

MTG. RM. MENS

J.C.

U.T.R.

WOMENSCOPY

ELEV.

xWC's xLAV xSS xWC xLAV xSS xLAV xWC xLAV xWC

DEMO xEWC AND

PREPARE TO INSTALL

NEW EWC

PD-3

PD-3

PD-3

PD-3

PD-2

PD-2

PD-2

TUNNEL SPACE:

1. DEMO AND REMOVE THE FOLLOWING:

1.1. EXT'G SANITARY LINES BACK TO THE EXT'G MAIN BUILDING SEWER OUTLET.

1.2. EXT'G VENTING LINES THROUGHOUT THE ENTIRE TUNNEL SPACE.

1.3. EXT'G COLD WATER LINES BACK TO THE EXISTING SHUT-OFF VALVE AS SHOWN ON

THE DRAWING. DEMO THE EXISTING SHUT-OFF VALVE AND PREPARE TO INSTALL

NEW 3" BALL VALVE.

1.4. EXT'G HOT WATER LINE BACK TO THE EXISTING WATER HEATERS. DEMO AND

REMOVE EXT'G WATER HEATERS.

2. EXISTING ITEMS THAT SHALL REMAIN: EXISTING STORM; EXISTING FIRE PROTECTION.

BATHROOM GROUPS & JANITOR CLOSET:

DEMO AND REMOVE EXISTING PLUMBING FIXTURES ALONG WITH ASSOCIATED HOT WATER,

COLD WATER LINES, VENTING, WALL SUPPORTS, ETC. SANITARY SHALL BE DEMO'D AND

CAPPED SO AS TO REMAIN FLUSH WITH FINISHED FLOOR.

CHASES:

1. DEMO AND REMOVE THE FOLLOWING EXISTING RISERS FROM TOP MOST FLOOR TO

TUNNEL SPACE BELOW: SANITARY, COLD WATER, HOT WATER, AND VENTING.

2. EXISTING STORM SHALL REMAIN; OTHER EXISTING RISERS NOT MENTIONED HERE BUT

FOUND IN CHASE TO REMAIN. CONTRACTOR SHALL VERIFY WITH THE ENGINEER IF ANY

QUESTIONS OR CONCERNS ARE FOUND BEFORE DEMOLITION WORK STARTS.

HOSE BIBS:

1. DEMO AND REMOVE ALL EXISTING COLD WATER PIPING LEADING FROM THE EXISTING

HOSE BIB BACK. INVESTIGATIVE DEMO WILL HAVE TO OCCUR; THE CONTRACTOR WILL

HAVE TO VERIFY IN FIELD WHERE THE COLD WATER LINE IS COMING FROM (TYP. FOR

ALL HOSE BIBS). DEMO TO THIS POINT SHOWN ON PLANS AND PREPARE TO TIE IN NEW

3/4" CW HERE (TYP. FOR ALL HOSE BIBS)

PD-1

PD-2

PD-3

PD-4

PLMG DEMOLITION KEYED NOTES PD-#

THE CONTRACTOR SHALL VERIFY ALL EXISTING SERVICES: SANITARY LINES, COLD/HOT WATER LINES, STORM LINES, AND VENTING PRIOR TO COMMENCING DEMOLITION WORK. THIS INCLUDES VERIFYING IN THE EXISTING TUNNEL, CEILING, AND CHASE SPACES. ANY QUESTIONS OR CONCERNS

REGARDING CONSTRUCTABILITY OF WORK SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT, OWNER, AND/OR ENGINEER (IN WRITING) BEFORE BIDDING THE PROJECT.

PD202

DRAWING TITLE

KCT PROJECT NO.DRAWN

EHT

REVIEWED

DAR

DATE

SCALE

AS NOTED

DRAWING NO.

SEAL

SHEET NO.

NO. REVISIONS / SUBMISSIONS DATE

PROJECT NAME

C op yr ig ht

Ke nd ra C

. T ho m ps on A rc hi te ct s, P

.C

UPGRADE PROJECT FOR:

MICHIGAN

MI FILE NO. 171/21349.GAG

STATE OF

OFFICE BLDG.

701 S. ELMWOOD - TRAVERSE CITY, MI

BATHROOM & PLUMBING

1 DESIGN DEVELOPMENT SET 9/24/2025

2 CD 50% REVIEW SET 4/29/2026

3 CD 90% REVIEW SET 6/5/2026

4 BCC PLAN REVIEW SET 6/17/2026

5 BID SET 6/26/2026

6 ADDENDUM #1 7/22/2026

SCALE: 1/8" = 1'-0"

PLUMBING DEMOLITION OVERALL FLOOR LEVEL - 3

N JUNE 2026

KT-216007C

SCALE: 1/8" = 1'-0"

PLUMBING DEMOLITION OVERALL FLOOR LEVEL - 4

N

PLUMBING DEMO

OVERALL FLOOR

LEVELS 3 & 4

kendra c.

architects, p.c.

THOMPSON

803 Cherry Street Manistee, MI 49660 tel: 231.723.4195

12 13 14 15 16 17

D

E

F

G

C

B

A

EXT'G

SAN

EXT'G

SAN

EXT'G

SAN

EXT'G HWS

EXT'G HWR

EXT'G F.P.

EX

T'

G F

.P

TUNNEL

ELEV.

EWH-1

EWH-2

EX

T'

G

" C W

3" CW3" CW

2" C

W

3" SAN

4" S

AN

1- 1/

2" C

W

3/4" HWR3/4" HWR

C.O.

W

W

C.O.

C.O.

C.O.

W

S

S

S 2

S

EXT'G CW, HW UP

TO REMAIN

1- 1/

2" C

W

1-1/2" CW 1-1/2" CW

2" CW 2" CW

4" SAN 4" SAN

1- 1/

4" H

W

4" SAN4" SAN

4" S

AN

4" SAN

C.O.

C.O. 4" SAN 4" SAN 4" SAN6" SAN

4" S

AN

4"

S

AN

2" C

W

2" C

W

2" CW2" CW 2" CW

1-1/4" HW1-1/4" HW

2" H

W

3" CW2" CW

RP-1

2" HW2" HW

3/ 4"

H W

R

3/4" HWR 3/4" HWR

1-1/4" HW

1- 1/

4" H

W 3/

4" H

W R

2" H

W

1-1/4" HW

3/ 4"

H W

R

3/4" HWR 3/4" HWR

1-1/4" HW1-1/4" HW

6" SAN

8" WYE WHERE ALL

SANITARY LINES

MEET. TIE NEW 8"

SAN TO EXT'G 8" SAN

TIE NEW 3" CW TO NEW 3"

SHUT-OFF VALVE. TIE TO

EXT'G 3" CW LINE IN TUNNEL

EXT'G HWS,

HWR, & F.P.

RISERS TO

REMAIN

2" CW UP

1-1/4" HW UP

3/4" HWR DOWN

1-1/2" CW UP

1-1/4" HW UP

3/4" HWR

4" SAN RISER

3" V UP

3" SAN UP TO FD

(V.I.F.)

EXT'G ST DOWN BELOW

GRADE (V.I.F.) TO REMAIN

4" SAN RISER

3" V UP

1-1/2" CW UP

1-1/4" HW UP

3/4" HWR

2" CW UP

1-1/4" HW UP

3/4" HWR DOWN

3" V UP

4" SAN FROM ABOVE

3" VENT UP4" SAN FROM ABOVE

3" VENT UP

1" CW UP

1" HW UP

3/4" HWR

3" SAN RISER

3" V UP

TIE EXT'G SAN

TO NEW SAN TIE EXT'G

CW, HW TO

NEW MAINS

TIE NEW SAN

TO EXT'G SAN

(VERIFY SIZE

IN FIELD)

TIE NEW

CW/HW TO

UPPER

FIXTURES IF

ALT #1 IS

NOT

APPROVED

TIE NEW SAN

TO EXT'G SAN

(VERIFY SIZE

IN FIELD)

TIE NEW 4" SAN TO EXT'G

SAN (VERIFY SIZE IN FIELD)

THE CONTRACTOR SHALL VERIFY THE

SANITARY, COLD WATER, AND HOT

WATER SERVICES TO THE GROUND

FLOOR IN THIS AREA. TIE THE EXT'G

FIXTURES TO THE NEW SANITARY, COLD

WATER, AND HOT WATER SERVICES.

VERIFICATION IN FIELD IS REQUIRED.

1" CW

1" HW

3/4" HWR

2-1/2" CW

2-1/2" HW

TO WH'S

W

W

1 2 3 4 5 6

7 8 9 10 11

12 13 14 15 16 17

D

E

F

G

C

B

A

WC-1

S-1LAV-1

WC-1

LAV-1

SH-1

18A

U.T.R. U.T.R.

16 15

495028293031323334

37 36

43 1

MECHANICAL ROOM

MAINTENANCE SHOP

S-3

J.C.

TELE

STOR

STOR STOR

STAIR #1

S-2 20

J.C.

CONFERENCE

ELEV.

EXIST'G.EXIST'G.SHWR.

EXIST'G.

STOR.

NEW

U.T.R.

STAFF

RENOV'D

EXIST'G.

NEW

NEW

EXT'G STORM RISER

TO REMAIN TYP.

(VERIFY IN FIELD)

W

W

W

S1

S

S

S

S

EXT'G ST RISER TO REMAIN

4" SAN DOWN

4" SAN DOWN

EXT'G ST RISER TO REMAIN

CW, HW, SAN FED

FROM BELOW

(TYP. OF ALT #2)

HWR & HW DOWN

TO EWH'S

1-1/2" CW UP

1-1/4" HW UP

3/4" HWR UP

4" SAN RISER

3" V UP

2" CW UP

1-1/4" HW UP

3/4" HWR DOWN

3" V UP

2" CW UP

1-1/4" HW UP

3/4" HWR DOWN

3" V UP

1-1/2" CW UP

1-1/4" HW UP

3/4" HWR UP

4" SAN RISER

3" V UP

1" CW UP

1" HW UP

3/4" HWR DOWN

SERVICES FROM

TUNNEL BELOW

SERVICES FROM

TUNNEL BELOW

SERVICES FROM

TUNNEL BELOW

TIE THE EXT'G FIXTURES TO THE NEW SANITARY,

COLD WATER, AND HOT WATER SERVICES IN

TUNNEL. VERIFICATION IN FIELD IS REQUIRED.

IF ALT #1 IS ACCEPTED, NEW FIXTURES WILL BE

REQUIRED, SEE FIXTURE SCHEDULE FOR MORE

INFORMATION.

VERIFICATION IN FIELD IS REQUIRED.

RE-LOCATED EWH

3" SAN IN CEILING

ROUTE TO RISER S-1

3" SAN IN CEILING

ROUTE TO RISER S-1

INVESTIGATION IS

REQUIRED TO

DETERMINE IF THIS

SANITARY ROUTE IS

ACCEPTABLE AND

CONSTRUCTIBLE

INVESTIGATION IS

REQUIRED TO

DETERMINE IF THIS

SANITARY ROUTE IS

ACCEPTABLE AND

CONSTRUCTIBLE

3" V UP

3" V UP

W

W

CONTRACTOR TO VERIFY

EXT'G SERVICES IN THIS

LOCATION AND INCLUDE

NEW CW, HW, SAN, AND

VENTING FOR PLUMBING

FIXTURES

P200

DRAWING TITLE

KCT PROJECT NO.DRAWN

EHT

REVIEWED

DAR

DATE

SCALE

AS NOTED

DRAWING NO.

SEAL

SHEET NO.

NO. REVISIONS / SUBMISSIONS DATE

PROJECT NAME

PLUMBING

OVERALL TUNNEL &

C op yr ig ht

Ke nd ra C

. T ho m ps on A rc hi te ct s, P

.C

UPGRADE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .