This document is an Addendum No. 1 issued by the Town of Bristol, Rhode Island, for the Gibson Road Shoreline Improvements project (Bid #1063). The addendum modifies several key bid details, including extending the bid due date from April 16th to April 23rd, 2025, at 12:00 PM, and shifting the deadline for questions and comments to April 16th, 2025. The anticipated project timeline has also been adjusted, with the award date moved to April 28th, 2025, and the construction start date pushed to May 12th, 2025.
The addendum clarifies that no bid bonds are required for this project, though a performance bond will be necessary. Bidders are instructed to use the original bid form and to submit any questions via email to specified contacts. The document emphasizes that failure to acknowledge the addendum on the Attachment A–Bid Form may result in bid rejection. The addendum provides critical updates to the bidding process while maintaining the overall structure and requirements of the original bid documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21187.01 Gibson Drawings_IFB Set_040125.pdf | ||
| 21187.01 Gibson Contract Documents_IFB Set_040125.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF BRISTOL, RI
GIBSON ROAD SHORELINE IMPROVEMENTS
BID #1063
Gibson Road Shoreline Improvements Addendum No. 1 Pare Project No. 21187.01 Page 1 of 1
ADDENDUM NO. 1
April 7, 2025
TO ALL CONTRACTORS ESTIMATING:
Bidders are hereby informed that the bid form for the above-mentioned contract has been modified, corrected, and/or supplemented as follows and that Addendum No.1 becomes part of the Contract Documents and consists of Items 1.1 through 1.4.
CONTRACT DOCUMENTS
1.1 BID DUE DATE
a) The bid due date has been changed from Wednesday, April 16th, 2025 at 12:00 PM to
Wednesday, April 23rd, 2025 at 12:00 PM.
1.2 INSTRUCTIONS TO BIDDERS – QUESTIONS AND COMMENTS
a) The deadline for questions and comments has been changed from April 9th, 2025 at 12:00
PM to Wednesday, April 16th, 2025 at 12:00PM.
b) Email questions to etanner@bristolri.gov and CC: gmarsili@bristolri.gov, bdutra@parecorp.com.
1.3 BID FORM – ANTICIPATED SCHEDULE
a) The Anticipated Award Date has been changed from April 21st, 2025 to April 28th, 2025.
b) The Anticipated Start of Construction Date has been changed from May 5th, 2025 to May
12th, 2025.
c) All other dates will remain the same.
d) The bid form will not be reissued. Bidders are advised to submit the same bid form supplied in the initial bid.
QUESTIONS
All questions shall be submitted in writing per the Contract Documents. Clarifications to questions that have been asked are as follows:
1.4 Q1: Are bid bonds required?
A1: No bid bonds are required for this project however a performance bond is required.
Receipt of this Addendum must be acknowledged by inserting its number and date on Attachment A–Bid Form. Failure to acknowledge any and all addenda in the above specified bid form may be cause for rejection of the bids by the Owner on the grounds that it is not responsive.
This Addendum consists of one (1) page and no attachments.
END OF ADDENDUM NO. 1