This Addendum No. 1, issued May 18, 2021, by Kenosha County and InSite Consulting Architects, modifies the Request for Bid #2113 for glass damage repairs at the Kenosha County Courthouse Campus located at 912 56th Street, Kenosha, Wisconsin. The project encompasses three buildings: the Kenosha County Courthouse (KCC), Kenosha County Administration Building (KCAB), and Public Safety Building (PSB). The addendum omits Section 08 87 23 (Safety and Security Films) and Section 08 88 53 (Security Glazing) in their entirety and inserts new Section 08 71 00 (Door Hardware) specifications. The work includes replacement-in-kind of all damaged door and window framing, glazing, and associated hardware at the three campus locations. Hardware requirements include hinges, pulls, panic devices, closers, lock and latch sets, cylinders and keys, thresholds, and weatherstripping. Acceptable manufacturers are specified for hinges (Hager), locksets (Best), pulls (Reese Enterprises), panic devices (Von Duprin), closers (LCN), and weatherstripping/thresholds (Reese Enterprises, Zero International, Pemko Manufacturing, National Guard Products). A pre-bid walkthrough was conducted on May 13, 2021, with no written contractor questions submitted thereafter. The reissued drawings provide detailed specifications for three separate glass replacement schedules across the campus buildings.
The specifications require contractors to obtain single-source hardware, submit three copies of complete hardware schedules with product data, and provide a proposed keying schedule. All hinges on exterior doors must feature non-removable pins with stainless steel construction (B.H.M.A. 629 finish in satin), while interior hinges require satin chromium plating (B.H.M.A. 626 finish). Lock cylinders are to be supplied by the lockset manufacturer with removable core cylinders for all locks, and the Owner will provide master keying instructions and coordinate with the new Office Building project for grand-master key requirements. The contractor must master key all locks and furnish five master keys and three nickel silver change keys for each lock, with all keys stamped "DO NOT DUPLICATE." Installation requirements specify precise hardware locations, including locksets at 40 inches above finished floor, door pulls at 42 inches, and panic devices positioned accordingly. All work must comply with the State of Wisconsin Building Code, and contractors are responsible for field measurements, as-built documentation, temporary protection, and restoration of paving and landscaping to original condition upon project completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2113 Addendum 3.pdf | ||
| 2113 Specifications.pdf | ||
| 2113 Bid Documents.pdf | ||
| 2113 Addendum 2.pdf | ||
| 2113 Drawings.pdf | ||
| Vendor Responsibility Form Construction.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
May 18, 2021
Addendum No. 1
2021 Kenosha County Courthouse Campus Glass Damage Repairs
Request for Bid #2113
To: All Bidders
From: Kenosha County and InSite Consulting Architects
General:
1) None.
Contractor Questions:
1) There were no written questions submitted after the on‐site pre‐bid walk through on May 13, 2021.
Answer: NONE
Specifications:
1) Omit Section 08 87 23 – Safety and Security Films in its entirety.
2) Omit Section 08 88 53 – Security Glazing in its entirety.
3) Insert Section 08 71 00 – Door Hardware – Addendum No. 1 in its entirety, see attached.
Drawings:
1) Reissue all Drawings, see attached.
END OF ADDENDUM NO. 1
DIVISION 08 - OPENINGS
SECTION 08 71 00 – DOOR HARDWARE
ADDENDUM NO. 1
08 71 00.1
COPYRIGHT ICA
KENOSHA COUNTY
COURTHOUSE CAMPUS
GLASS DAMAGE REPAIRS
PART 1: GENERAL 1
1.1. RELATED DOCUMENTS 3
a. Applicable provisions of Division 1 shall govern work under this Section. 5
1.2. DESCRIPTION OF WORK 7
a. This section includes the following and as indicated in the hardware schedule at the end of this 9 section: 10
Hinges 11
Pulls 12
Panic Devices 13
Closers 14
Lock and latch sets 15
Lock cylinders and keys 16
Thresholds 17
Weatherstripping for exterior doors 18
b. Related Sections: 19
i. Division 8 Section 08 10 00 Doors and Frames 20
1.3. QUALITY ASSURANCE 22
a. Single Source Responsibility: Obtain each type of hardware from the same supplier. 24
1.4. SUBMITTALS 26
a. Submit three copies of complete and detailed hardware schedule. Include product data on all 28 hardware items being submitted. The submitted schedule shall use symbol/letter designations and 29 format shown on construction documents hardware schedule. 30
b. Submit three copies of proposed keying schedule indicating clearly how the Owner’s final 31 instructions on keying of locks has been fulfilled. 32
c. Submit sample of each item of finish hardware that differs from that specified. 33
d. Samples submitted may be used on the project and will be delivered to the building site where 34 comparison will be made with other hardware furnished 35
1.5. PRODUCT DELIVERY 37
a. Mark each item as to contents and location in the building for which it is intended. 39
b. Ship prepaid the hardware templates and/or physical hardware, as required, to metal door and 40 frame manufacturers and wood door manufacturers. 41
PART 2: PRODUCTS 43
2.1. FINISH HARDWARE SCHEDULE 45
a. Refer to notes on the drawings for hardware requirements. 47
2.2. ANCHORS AND FASTENERS 49
a. Furnish as required and of proper size for the purpose for which it is intended. 51
b. Anchors in solid material shall be with machine screws in expansion shields. Furnish toggle bolts 52 where walls are not solid material. 53
2.3. HINGES 55
a. Non-removable pins on exterior doors and interior locked doors swinging out. Furnish non-rising 57 pins on all other doors. 58
b. Stainless steel hinges on exterior doors swinging out and steel hinges for all other doors. 59
Exterior Hinge Finish: B.H.M.A. 629, stainless steel metal, satin (US32D). 60
08 71 00.2
Interior Hinge Finish: B.H.M.A. 626, satin chromium plated (US26D). 61
c. Number of Hinges: 62
i. Continuous, one per door 63
d. Acceptable Manufacturers: Hager. 64
e. Hinge types: Numbers are of Hager, unless otherwise specified. 65
TYPE DESCRIPTION MFR. NO. 67
H1 Anodized to match frame HAGER 780-157HD 69
2.4. LOCKSETS 71
a. Acceptable Manufacturers: Best 73
b. Reuse and install existing cylinders 74
2.5. LOCK CYLINDERS AND KEYING 76
a. Hardware supplier shall make arrangements for and meet with Owner to determine the various 78 keying requirements. 79
b. Owner will provide cylinders and keying for Project. 80
c. Provide new master key system for Project. 81
d. Master key all locks and cylinders. 82
e. Master key and grand-master key all locks and cylinders with the new Office Building project. 83
f. Furnish five master keys for each master keyed set and three nickel silver change keys for each 84 lock. 85
g. Coordinate the number of grand master keys to furnish with the new Office Building project. 86
h. Furnish five master keys for each master keyed set and three nickel silver change keys for each 87 lock. 88
i. Stamp "DO NOT DUPLICATE" on all keys. 89
j. Furnish visual key control for all cylinders. Stamp proper key symbol on the bow of each key and 90 on the face of the cylinder plug of each cylinder. 91
k. Cylinders shall be supplied by manufacturer of locksets. 92
l. Furnish manufacturer’s standard 6-pin tumbler cylinders. 93
m. Furnish removable core cylinders for all locks. Send control key where directed. Provide six extra 94 cores with keys. Master key extra cores. 95
n. Provide cylinders for Aluminum Entrance systems where scheduled: deadbolts. 96
o. Metals: Construct lock cylinder parts from brass or bronze, stainless steel, or nickel-silver. 97
Aluminum, zinc, or plastic parts are not acceptable. Exposed finish shall match lockset, deadbolt, 98 or exit device. 99
p. Deliver keys to the Owner. 100
2.6. Pulls 102
a. Door Pulls: Numbers are of Reese Enterprises, Inc. 104
TYPE DESCRIPTION MFR. NO. 106
P1 Rockwood BF157 1HD 108
(verify center to center) - Oil Rubbed Bronze 109
2.7. Panic Devices 114
TYPE DESCRIPTION MFR. NO. 117
PD1 Von Duprin - 33A 119
Anodized to match frame 120
08 71 00.3
2.8. Closers 125
a. Door Closers: Numbers are of LCN, Inc. 127
TYPE DESCRIPTION MFR. NO. 129
C1 LCN 4040XP SCUSH 131
Install with any necessary mounting plates 132
Bronze to match frames 133
2.9. WEATHERSTRIPPING 135
a. Provide only those units where resilient or flexible seal strip is easily replaceable and readily 137 available from stocks maintained by manufacturer. 138
b. Acceptable Manufacturers: Reese Enterprises, Inc; Zero International; Pemko Manufacturing Co., 139
Inc.; National Guard Products, Inc. 140
c. Weatherstrip sets: Numbers are of Reese Enterprises, Inc. 141
TYPE DESCRIPTION MFR. NO. 143
W1 Jamb and head weatherstrip 775A 145
Door bottom/shoe DB595AU 146
2.10. THRESHOLDS 148
a. Extruded aluminum extending to outside edge of door frames. 150
b. Acceptable Manufacturers: Reese Enterprises, Inc; Zero International; Pemko Manufacturing 151
Co.,Inc.; National Guard Products, Inc. 152
c. Threshold types: Numbers are of National Guard Products, Inc. 153
TYPE DESCRIPTION MFR. NO. 155
T1 Extruded aluminum, thermal break, 5” inches wide NGP 8425 157
PART 3: EXECUTION 159
3.1. INSTALLATION 161
a. Install all hardware in accordance with the Manufacturer's recommendations. 163
b. Drill and tap hollow metal doors and frames for surface applied hardware. 164
c. Remove all applied hardware until painting is completed, then reinstall. 165
d. Locate hardware as follows unless shown otherwise on the drawings: 166
i. Hinges: Continuous from frame head to meeting at threshold. 167
ii. Locksets: 40 inches above the finished floor to centerline of strike. 168
iii. Stops: Install on door if wall condition is not applicable. 169
iv. Flush Bolts: Edge mount. 170
v. Door Pulls: Center line 42 inches above finished floor. Center between door edge and 171 glazed opening or 5 inches from door edge if no glazing. 172
vi. Push/Pull Latch: Center latch 45 inches above floor with handle up on push side and down 173 on pull side. 174
vii. Deadlatches: Center line 48 inches above finished floor. If used in conjunction with a door 175 pull/push plate, mount deadlock center line 32 inches above finish floor. 176
e. Secure wool pile inserts in kerfs in door edges with white glue and small brads spaced 12 inches 177 on center. 178
f. Install electric strike and run wires concealed to location of owner supplied security access controls. 179
g. Install door weatherstripping continuous without coping at hardware. Mount hardware to be located 180
08 71 00.4 in the same location over the weatherstripping. 181
3.2. ADJUSTMENT 183
a. Adjust all operating hardware in accordance with manufacturer's recommendations. 185
b. Deliver to Owner all installation and adjustment tools and two copies of each installation sheet 186 furnished with hardware items. 187
END OF SECTION 08 71 00 190
A001
PROJECT LOCATION PLAN DIAGRAM
SCALE: 1" = 16'-0"
TITLE SHEET / CODE &
SHEET INDEX
A001
A001 TITLE SHEET / CODE & SHEET INDEX
A100A KCC SITE CONTEXT PLAN
A201A KCC SOUTH ELEVATION
A202A KCC WEST,EAST & NORTH ELEVATIONS
A203A KCC OPENING SCHEDULE
A100B KCAB SITE CONTEXT PLAN
A201B KCAB SOUTH ELEVATION
A202B KCAB EAST ELEVATION
A203B KCAB OPENING SCHEDULE
A100C PSB SITE CONTEXT PLAN
A201C PSB SOUTHWEST ELEVATION
A202C PSB SOUTHEAST ELEVATION
A203C PSB OPENING SCHEDULE
KENOSHA, WISCONSIN 53715
GENERAL PROJECT NOTES:
KENOSHA COUNTY COURTHOUSE
CAMPUS
GLASS DAMAGE REPAIRS
1. ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STATE OF WISCONSIN BUILDING
CODE LATEST EDITION.
2. CONTRACTOR(S) ARE RESPONSIBLE FOR VERIFICATION OF, AND COORDINATION WITH, ALL DIMENSIONS SHOWN ON THESE DRAWINGS RELATIVE TO EXISTING CONDITIONS PRIOR TO BEGINNING WORK. DO NOT
SCALE FROM DRAWINGS.
3. CONTRACTOR SHALL REPORT IMMEDIATELY TO THE ARCHITECT ANY DIMENSION(S) OR DISCREPANCIES VERBALLY, A WRITTEN REPORT SHOULD PROMPTLY FOLLOW. CONTRACTOR SHALL CEASE WORK IN THE
AFFECTED AREA UNTIL DIRECTED BY THE ARCHITECT.
4. THE CONTRACTOR SHALL PROVIDE ALL METHODS AND EQUIPMENT FOR PROTECTING THE BUILDING, ALL MATERIALS, AND PERSONNEL FROM FIRE OR OTHER DAMAGE PRIOR TO STARTING. THE CONTRACTOR
SHALL SUBMIT THE APPROVED METHODS AND EQUIPMENT IN WRITING FOR THE OWNER AND
ARCHITECT'S REVIEW PRIOR TO STARTING WORK.
5. THE CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND HEALTH LAWS AND REGULATIONS.
6. EXECUTION OF THE WORK WILL INVOLVE CONSIDERATION FOR ALLOWING THE OWNER TO CONTINUE THE OPERATION OF THE BUILDING AND THE BUSINESS IN THE FACILITY AND ADJACENT FACILITIES. PRIOR TO THE AWARD OF THE CONTRACT, THE CONSTRUCTION SCHEDULE PREPARED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE ARCHITECT AND SHALL BE COORDINATED WITH THE OWNER. OWNER'S APPROVAL OF THE PROPOSED SCHEDULE SHALL SUPERCEDE THE CONTRACT PROVIDED THE OVERALL TIME IS NOT
CHANGED.
7. THE CONTRACTOR SHALL REVIEW ALL EXISTING CONDITIONS TO DETERMINE ALL SERVICES (ELECTRICAL, MECHANICAL AND PLUMBING) AFFECTED BY THE REPAIR WORK. THE CONTRACTOR SHALL MAKE
NECESSARY TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SERVICES TO ALL AREAS OF THE BUILDING DIRECTLY AND INDIRECTLY AFFECTED BY THE WORK. THE CONTRACTOR SHALL SUBMIT
METHODS AND SCHEDULE OF CONNECTIONS TO THE OWNER FOR APPROVAL PRIOR TO BEGINNING
WORK.
8. AS THE WORK PROGRESSES, THE CONTRACTOR SHALL PRODUCE "AS-BUILT" DRAWINGS FOR THE INSTALLATION OF ALL REPAIR ITEMS UNDER THE CONTRACT. THE ARCHITECT WILL PROVIDE THE GENERAL CONTRACTOR WITH A SET OF REPRODUCIBLE PLANS FOR THIS PURPOSE. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE AS-BUILT DRAWINGS ACCORDING TO THE JOB PROGRESS. EACH PAY REQUEST SUBMITTED BY THE CONTRACTOR SHALL BE ACCOMPANIED BY A COPY OF THE UPDATED
AS-BUILT DRAWINGS.
9. THE CONTRACTOR SHALL CALL "DIGGER'S HOTLINE" AT 800-242-8511, 48 HOURS (EXCLUDING WEEKENDS AND/OR HOLIDAYS) PRIOR TO DIGGING ANY EXCAVATION. "DIGGER'S HOTLINE" WILL CONTACT UTILITY COMPANIES TO LOCATE AND MARK THEIR UNDERGROUND FACILITIES. NO SUCH WORK SHALL COMMENCE
PRIOR TO VERIFICATION THAT ALL UTILITIES HAVE RESPONDED.
10.PROTECT TREES, SHRUBS, LAWNS, AND OTHER FEATURES WITHIN PROJECT LIMITS. RESTORE DAMAGED
FEATURES TO ORIGINAL CONDITION.
11.THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY ENCLOSURES, SHORING, BRACING, SHEATHING, REQUIRED FOR THE SAFETY AND PROPER EXECUTION OF THE WORK.
SHEET INDEX:
N
KENOSHA COUNTY PUBLIC SAFETY BUILDING (PSB)
KENOSHA COUNTY ADMINISTRATION BUILDING (KCAB)
KENOSHA COUNTY COURTHOUSE (KCC)
STRUCTURAL DRAWINGS - N/A
CIVIL DRAWINGS - N/A
MECHANICAL DRAWINGS - N/A
ELECTRICAL DRAWINGS - N/A
PLUMBING DRAWINGS - N/A
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
COURTHOUSE CAMPUS
KENOSHA, WI
SH
ER
ID
AN
R O
AD
56TH STREET
TH
A
VE
N U
E
TH
A
VE
N U
E
PROJECT LOCATION MAP
SCALE : NONE
N
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
N
A202A
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
KCC SITE CONTEXT PLAN
A100A
A100A
KCC SITE CONTEXT PLAN
SCALE: 1/4" = 1'-0"
A201A
A202A
56TH STREET
SH
ER
ID
A
N R
O A
D
TH
A
VE
N U
E
N
KENOSHA COUNTY CAMPUS KEY PLAN
SCALE : NONE
KENOSHA COUNTY COURTHOUSE
(KCC)
(PSB)
(KCAB)
GENERAL PLAN NOTES
1. BID IS FOR REPLACEMENT-IN-KIND AT THE KCC, KCAB AND PSB
BUILDINGS OF ALL DAMAGED DOOR AND WINDOW FRAMING, GLAZING
AND ASSOCIATED HARDWARE AS NOTED.
2. REMOVE ALL PLYWOOD PROTECTION FROM WINDOWS AND DOORS
ASSUMED TO NOT BE DAMAGED. INSPECT ALL GLAZING AND FRAMES
FOR DAMAGE AND REPORT ANY DISCOVERED DAMAGE TO THE
ARCHITECT IMMEDIATELY
3. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL FIELD
MEASUREMENTS TO ORDER AND INSTALL ALL REQUIRED MATERIALS
AND SYSTEMS
4. THE COLOR,TINT, REFLECTANCE, COATINGS AND FINISH OF ALL
REPLACEMENT MATERIALS IS INTENDED TO MATCH THE ORIGINAL
BEING REPLACED U.N.O.
5. PHOTO DOCUMENT AND SUBMIT PICTURES AT FIRST DAY OF
MOBILIZATION OF ALL WORK AREAS AND ADJACENT CONDITIONS
6. PAVING AND LANDSCAPING AREAS USED BY CONTRACTOR SHALL BE
RESTORED TO AT MINIMUM ORGINAL CONDITION AT COMPLETION OF
PROJECT
7. PROVIDE FULLY TEMPERED SAFETY GLAZING AT ALL OPENINGS
WHERE REQUIRED BY CODE
8. SALVAGE ALL DOOR HARDWARE AS ASSUMED TO NOT BE DAMAGED
FOR RE-USE BY THE OWNER OR REINSTALLED. REPORT ANY
DISCOVERED DAMAGE TO THE ARCHITECT IMMEDIATELY
9. SHOP DRAWINGS FOR ALL DOORS AND FRAMES TO ADDRESS HOW
FIELD VERIFIED SIZES OF GLASS TO BE REUSED IN NEW OPENINGS
SPECIFIC RESTORATION KEY NOTES
1. REPLACE INSULATED GLAZING UNIT WITH TINT, REFLECTANCE AND
COATING TO MATCH EXISTING UNIT
2. REPLACE INSULATED SPANDREL GLAZING UNIT WITH TINT AND
CERAMIC FRIT COATING ON #3 TO MATCH COLOR OF EXISTING UNIT
3. REPLACE MONOLITHIC GLASS UNIT WITH CODE COMPLIANT SAFETY
GLASS UNIT WITH TINT TO MATCH EXISTING UNIT
4. PROVIDE NEW BRONZE ANODIZED DOOR AND SIDELITE FRAME.
REUSE ALL GLASS NOT INDICATED TO BE REPLACED.
5. PROVIDE NEW DARK BRONZE ANODIZED DOOR AND SIDELITE FRAME
BELOW THE TRANSOM LEVEL. REUSE ALL GLASS NOT INDICATED TO
BE REPLACED.
6. PROVIDE NEW DARK BRONZE ANODIZED DOOR FRAME INCLUDING
TRANSOM. SALVAGE AND REINSTALL THE METAL TRAMSOM
GRILL-WORK. REUSE ALL GLASS NOT INDICATED TO BE REPLACED.
7. REPLACE ALL DOOR HARDWARE EXCEPT: ELEC. STRIKES AND MAG
LOCKS, HANDICAP POWER OPERATORS AND CYLINDER KEYED
LOCKS. INSTALL NEW, AND REINSTALLED EXISTING HARDWARE TO
MATCH THE EXISTING CONFIGURATION AND FUNCTION INCLUDING
ANY ADA ACCESS OPERATOR AND ACCESS CONTROL. PROVIDE NEW
CONTINUOUS HINGES, CLOSER IF NO POWERED OPERATOR IS
PRESENT, THRESHOLD, PULL (U.N.O.) AND PANIC EXIT DEVICE AND
WEATHERSTRIPPING. REINSTALL ALL POWER OPERATORS, MAG
LOCK, CARD READER WIRING, ELECTRIC STRIKE AND KEYED
CYLINDER LOCKSETS.
8. REINSTALL EXISTING STAINLESS STEEL DOOR PULLS
9. REPLACE ANODIZED ALUMINUM TRIM DAMAGED BY IMPACT ON FULL
EXTENTS OF CANOPY ON THREE SIDES. INSPECT SUBSTRATE AND
CONFIRM THAT NO UNDERLYING DAMAGE EXISTS
10. REPLACE IMPACT DAMAGED ANODIZED ALUMINUM TRIM STILE IN
DOOR WITH MATCHING DARK BRONZE ANODIZED MATERIAL
11. INSPECT FRAME AND HARDWARE FOR DAMAGE. REPORT ANY
UNFORESEEN DAMAGE TO THE ARCHITECT IMMEDIATELY
12. VERIFY THAT GLASS IS UNDAMAGED AND RE-USABLE AFTER
PLYWOOD REMOVAL
13. REMOVE ALL TEMPORARY PLYWOOD AND FASTENERS AND FILL ALL
FASTENER HOLES IN METAL FRAMES WITH COLOR MATCHED
SEALANT OR APPROVED FILLER AT KCAB AND PSB (NOTE: THIS WORK
HAS BEEN DONE AT KCC)
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
AutoCAD SHX Text A101
A201A
FIRST FLOOR RENOVATION PLAN
SCALE: 1/4" = 1'-0"
A201A
KCC SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
KCC SOUTH ELEVATION
A201A
A201A
A A201A
A A201A
B A201A
B A201A
7 75
5 7
A120 A121 A122 A123 A124 A125
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
C A201A
C A201A
A301
A202A
KCC WEST (PARTIAL) ELEVATION
SCALE: 1/8" = 1'-0"
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
KCC WEST, EAST &
NORTH ELEVATIONS
A202A
A202A
KCC EAST ELEVATION
SCALE: 1/8" = 1'-0"
NOTE THAT THE FRAME AND THRESHOLD HAVE BEEN DISPLACED BY
IMPACT. CONFIRM SOUND STRUCTURE AT JAMBS AND SILL FOR ANCHORS
A130 A131
A140
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
GLASS
REPLACEMENT
SCHEDULE FOR
KENOSHA
COUNTY
COURTHOUSE
CAMPUS Updated: 5/18/2021
KCC
KENOSHA
COUNTY
COURT
HOUSE
LOCATION
OPENING
NUMBER GLASS
OPENING (D.L.O.)
DIMENSIONS
(Approx.Inches) V.I.F.
FRAME
TYPE
VISION/
SPANDREL NOTES
South - Entry A120 * RE-SET EXIST. Door Vision ADA Operator & CR Access Control South - Entry A121 * RE-SET EXIST. Sidelite Vision South - Entry A122 * RE-SET EXIST. Sidelite Vision South - Entry A123 * RE-SET EXIST. Door Vision South - Entry A124 * RE-SET EXIST. Sidelite Vision South - Entry A125 * RE-SET EXIST. Door Vision ADA Operator & CR Access Control
West - 1st A130 * RE-SET EXIST. Door Vision West - 1st A131 * RE-SET EXIST. Door Vision CR Access Control
East - LL A140 * RE-SET EXIST. Door Vision ADA Operator & CR Access Control
GLASS DAMAGE REPAIR - KENOSHA COUNTY COURTHOUSE - OPENING SCHEDULE
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
KCC OPENING SCHEDULE
A203A
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
A202B
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
A201B
KCAB SITE CONTEXT PLAN
A100B
56TH STREET
TH
A
VE
N U
E
N
A100B
KCAB SITE CONTEXT PLAN
SCALE: 1/4" = 1'-0"
KENOSHA COUNTY CAMPUS KEY PLAN
SCALE : NONE
KENOSHA COUNTY
ADMINISTRATION BUILDING
(KCAB)
(PSB)
(KCC)
A202B
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
GENERAL PLAN NOTES
1. BID IS FOR REPLACEMENT-IN-KIND AT THE KCC, KCAB AND PSB
BUILDINGS OF ALL DAMAGED DOOR AND WINDOW FRAMING, GLAZING
AND ASSOCIATED HARDWARE AS NOTED.
2. REMOVE ALL PLYWOOD PROTECTION FROM WINDOWS AND DOORS
ASSUMED TO NOT BE DAMAGED. INSPECT ALL GLAZING AND FRAMES
FOR DAMAGE AND REPORT ANY DISCOVERED DAMAGE TO THE
ARCHITECT IMMEDIATELY
3. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL FIELD
MEASUREMENTS TO ORDER AND INSTALL ALL REQUIRED MATERIALS
AND SYSTEMS
4. THE COLOR,TINT, REFLECTANCE, COATINGS AND FINISH OF ALL
REPLACEMENT MATERIALS IS INTENDED TO MATCH THE ORIGINAL
BEING REPLACED U.N.O.
5. PHOTO DOCUMENT AND SUBMIT PICTURES AT FIRST DAY OF
MOBILIZATION OF ALL WORK AREAS AND ADJACENT CONDITIONS
6. PAVING AND LANDSCAPING AREAS USED BY CONTRACTOR SHALL BE
RESTORED TO AT MINIMUM ORGINAL CONDITION AT COMPLETION OF
PROJECT
7. PROVIDE FULLY TEMPERED SAFETY GLAZING AT ALL OPENINGS
WHERE REQUIRED BY CODE
8. SALVAGE ALL DOOR HARDWARE AS ASSUMED TO NOT BE DAMAGED
FOR RE-USE BY THE OWNER OR REINSTALLED. REPORT ANY
DISCOVERED DAMAGE TO THE ARCHITECT IMMEDIATELY
9. SHOP DRAWINGS FOR ALL DOORS AND FRAMES TO ADDRESS HOW
FIELD VERIFIED SIZES OF GLASS TO BE REUSED IN NEW OPENINGS
SPECIFIC RESTORATION KEY NOTES
1. REPLACE INSULATED GLAZING UNIT WITH TINT, REFLECTANCE AND
COATING TO MATCH EXISTING UNIT
2. REPLACE INSULATED SPANDREL GLAZING UNIT WITH TINT AND
CERAMIC FRIT COATING ON #3 TO MATCH COLOR OF EXISTING UNIT
3. REPLACE MONOLITHIC GLASS UNIT WITH CODE COMPLIANT SAFETY
GLASS UNIT WITH TINT TO MATCH EXISTING UNIT
4. PROVIDE NEW BRONZE ANODIZED DOOR AND SIDELITE FRAME.
REUSE ALL GLASS NOT INDICATED TO BE REPLACED.
5. PROVIDE NEW DARK BRONZE ANODIZED DOOR AND SIDELITE FRAME
BELOW THE TRANSOM LEVEL. REUSE ALL GLASS NOT INDICATED TO
BE REPLACED.
6. PROVIDE NEW DARK BRONZE ANODIZED DOOR FRAME INCLUDING
TRANSOM. SALVAGE AND REINSTALL THE METAL TRAMSOM
GRILL-WORK. REUSE ALL GLASS NOT INDICATED TO BE REPLACED.
7. REPLACE ALL DOOR HARDWARE EXCEPT: ELEC. STRIKES AND MAG
LOCKS, HANDICAP POWER OPERATORS AND CYLINDER KEYED
LOCKS. INSTALL NEW, AND REINSTALLED EXISTING HARDWARE TO
MATCH THE EXISTING CONFIGURATION AND FUNCTION INCLUDING
ANY ADA ACCESS OPERATOR AND ACCESS CONTROL. PROVIDE NEW
CONTINUOUS HINGES, CLOSER IF NO POWERED OPERATOR IS
PRESENT, THRESHOLD, PULL (U.N.O.) AND PANIC EXIT DEVICE AND
WEATHERSTRIPPING. REINSTALL ALL POWER OPERATORS, MAG
LOCK, CARD READER WIRING, ELECTRIC STRIKE AND KEYED
CYLINDER LOCKSETS.
8. REINSTALL EXISTING STAINLESS STEEL DOOR PULLS
9. REPLACE ANODIZED ALUMINUM TRIM DAMAGED BY IMPACT ON FULL
EXTENTS OF CANOPY ON THREE SIDES. INSPECT SUBSTRATE AND
CONFIRM THAT NO UNDERLYING DAMAGE EXISTS
10. REPLACE IMPACT DAMAGED ANODIZED ALUMINUM TRIM STILE IN
DOOR WITH MATCHING DARK BRONZE ANODIZED MATERIAL
11. INSPECT FRAME AND HARDWARE FOR DAMAGE. REPORT ANY
UNFORESEEN DAMAGE TO THE ARCHITECT IMMEDIATELY
12. VERIFY THAT GLASS IS UNDAMAGED AND RE-USABLE AFTER
PLYWOOD REMOVAL
13. REMOVE ALL TEMPORARY PLYWOOD AND FASTENERS AND FILL ALL
FASTENER HOLES IN METAL FRAMES WITH COLOR MATCHED
SEALANT OR APPROVED FILLER AT KCAB AND PSB (NOTE: THIS WORK
HAS BEEN DONE AT KCC)
A201B
KCAB SOUTH ELEVATION
SCALE: 1/8" = 1'-0"
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
KCAB SOUTH ELEVATION
A201B
A201B
KCAB SOUTH ENTRY VIEW
SCALE: N.T.S.
A201B
A201B
KCAB SOUTH EAST VIEW
SCALE: N.T.S.
E A201B
E
A201B
A201B
KCAB SOUTH WEST VIEW
SCALE: N.T.S.
A A201B
A A201B
X A3xx
A201B
X A3xx
A201B
A201B
KCAB SOUTH WEST VIEW
SCALE: N.T.S.
A201B
KCAB SOUTH EAST VIEW
SCALE: N.T.S.
X A3xx
A201B
X A3xx
A201B
2 2 2
13 TYP.
13 TYP.
13 TYP.
13 TYP.
13 TYP.
13 TYP.
A201B
13 TYP.
13 TYP.
DAMAGE VIEW FROM INTERIOR
B101
B102 B103
B105
B151
B161
B162
B165
B163 B164
B167
B121 B122
B124
B141 B142 B143
B125 B126
B127 B128
B129 B130
B133
B132 B131
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
4 4 4
4 41 4 4
1 6
ENTRANCE GLASS HAS BEEN
REPLACED AND PLYWOOD
REMOVED.
ENTRANCE GLASS HAS BEEN
REPLACED AND PLYWOOD
REMOVED.
B106
111111
11 11 11 11
111111111111
11 11 1111
AutoCAD SHX Text A301
FIRST FLOOR RENOVATION PLAN
A202B
KCAB EAST ELEVATION
SCALE: 1/8" = 1'-0"
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
KCAB EAST ELEVATION
A202B
A202B
KCAB EAST (SOUTH) VIEW
SCALE: N.T.S.
X A3xx
A202B
A
A202B
A A202B
X A3xx
A202B
A202B
KCAB EAST (SOUTH) VIEW
SCALE: N.T.S.
B201 B202
B203 B204
B231
B230
B 225
B 224
B233
B232
B235
B234
B237
B236
B241
B240
B242
B244
B243
B245
B247
B246
A202B
KCAB EAST ENTRANCE
SCALE: N.T.S.
A202B
KCAB NORTH ENTRANCE
SCALE: N.T.S.
13 TYP.
A202B
KCAB EAST (NORTH) VIEW
SCALE: N.T.S.
A202B
3 SIM.
A202B
A202B
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
NO WORK HERE NO WORK HERENO WORK HERE
B 221
B 220
B 223
B 222
(N.I.C.) NO WORK HERE
AutoCAD SHX Text
AutoCAD SHX Text A.D.
AutoCAD SHX Text A301
GLASS DAMAGE REPAIR - KENOSHA COUNTY ADMINISTRATION BUILDING - OPENING SCHEDULE
REPLACEMENT
SCHEDULE FOR
KENOSHA
COUNTY
COURTHOUSE
CAMPUS Updated: 5/18/2021
KCAB
KENOSHA
COUNTY
ADMINIST
RATION
BUILDING
South - 2nd B101 1" IGU ~ 38 x 28 Win-Fix Spandrel
South -1st B102 1" IGU ~ 62 x 28 Win-Fix Spandrel
South -1st B103 1" IGU ~ 62 x 28 Win-Fix Spandrel
South -1st B105 1" IGU ~ 126 x 96 Win-Fix Vision
South -1st B106 1" IGU ~ 64 x 31 Transom Vision
South -1st B107 * RE-SET EXIST.
* RESET EXISTING GLASS IN NEW DOOR/
FRAMES
South -1st B108 (NOT USED)
South -1st B109 (NOT USED)
South -1st B121 1" IGU ~ 125 x 96 Win-Fix Vision South -1st B122 1" IGU ~ 61.5 x 28 Win-Fix Spandrel
South -1st B123 (NOT USED)
South -1st B124 1" IGU ~ 61.5 x 28 Win-Fix Spandrel
South - Entry B125 RE-SET EXIST. Sidelite
* RESET EXISTING GLASS IN NEW DOOR/
FRAME
South - Entry B126 RE-SET EXIST. Sidelite
* RESET EXISTING GLASS IN NEW DOOR/
FRAME
South - Entry B127 RE-SET EXIST. Sidelite
* RESET EXISTING GLASS IN NEW DOOR/
FRAME
South - Entry B128 1" IGU ~ 31 x 36 Sidelite Vision
South - Entry B129 * RE-SET EXIST. Door
* RESET EXISTING GLASS IN NEW DOOR/
FRAME
South - Entry B130 1" IGU ~ 29 x 33 Door Vision
South - Entry B131 * RE-SET EXIST. Door
* RESET EXISTING GLASS IN NEW DOOR/
FRAME
South - Entry B132 * RE-SET EXIST. Door
* RESET EXISTING GLASS IN NEW DOOR/
FRAME
South - Entry B133 * RE-SET EXIST. Transom
* RESET EXISTING GLASS IN NEW DOOR/
FRAME
South -1st B141 1" IGU ~ 62 x 29 Win-Fix Spandrel
South -1st B142 1" IGU ~ 125 x 96 Win-Fix Vision South -1st B143 1" IGU ~ 62 x 29 Win-Fix Spandrel
South -1st B144 1" IGU ~ 62 x 96 Win-Fix (NOT USED)
South - 2nd B151 1" IGU ~ 44 x 35 Win-Fix Spandrel
South -1st B161 1" IGU ~ 51 x 28 Win-Fix Spandrel
South -1st B162 1" IGU ~ 51 x 28 Win-Fix Spandrel
South -1st B163 1" IGU ~ 51 x 28 Win-Fix Spandrel
South -1st B164 1" IGU ~ 51 x 28 Win-Fix Spandrel
South -1st B165 1" IGU ~ 104 x 96 Win-Fix Vision South -1st B166 (NOT USED)
South -1st B167 1" IGU ~ 104 x 96 Win-Fix Vision South -1st B168 (NOT USED)
South -1st B168 (NOT USED)
East - 1st B201 1" IGU ~ 59 x 29 Win-Fix Spandrel
East - 1st B202 1" IGU ~ 120 x 96 Win-Fix Vision East - 1st B203 1" IGU ~ 59 x 29 Win-Fix Spandrel
East - 1st B204 1" IGU ~ 59 x 29 Win-Fix Spandrel
East -1st B220 (NOT USED)
East -1st B221 (NOT USED)
East -1st B222 (NOT USED)
East -1st B223 (NOT USED)
East -1st B224 (NOT USED)
East -1st B225 (NOT USED)
East -1st B230 (NOT USED)
East -1st B231 (NOT USED)
East -1st B232 (NOT USED)
East -1st B233 (NOT USED)
East -1st B234 (NOT USED)
East -1st B235 (NOT USED)
East -1st B236 (NOT USED)
East -1st B237 (NOT USED)
East -1st B240 (NOT USED)
East -1st B241 (NOT USED)
East -1st B242 (NOT USED)
East -1st B243 (NOT USED)
East -1st B244 (NOT USED)
East -1st B245 (NOT USED)
East -1st B246 (NOT USED)
East -1st B247 (NOT USED)
GLASS
REPLACEMENT
SCHEDULE FOR
KENOSHA
COUNTY
COURTHOUSE
CAMPUS Updated: 5/18/2021
KCAB
KENOSHA
COUNTY
ADMINIST
RATION
BUILDING
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
A203B
KCAB OPENING SCHEDULE
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
AutoCAD SHX Text A301
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
PSB SITE CONTEXT PLAN
A100C
N
A100C
PSB SITE CONTEXT PLAN
SCALE: 1/4" = 1'-0"
A201C
55TH STREET
TH
A
VE
N U
E
N
KENOSHA COUNTY CAMPUS KEY PLAN
SCALE : NONE
KENOSHA PUBLIC SAFETY BUILDING
(PSB)
(KCAB)
TH
A
VE
N U
E
A100C
PSB SITE CONTEXT VIEW
SCALE: NOT TO SCALE
A100C
(KCC)
A202C
A202C
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
GENERAL PLAN NOTES
1. BID IS FOR REPLACEMENT-IN-KIND AT THE KCC, KCAB AND PSB
BUILDINGS OF ALL DAMAGED DOOR AND WINDOW FRAMING, GLAZING
AND ASSOCIATED HARDWARE AS NOTED.
2. REMOVE ALL PLYWOOD PROTECTION FROM WINDOWS AND DOORS
ASSUMED TO NOT BE DAMAGED. INSPECT ALL GLAZING AND FRAMES
FOR DAMAGE AND REPORT ANY DISCOVERED DAMAGE TO THE
ARCHITECT IMMEDIATELY
3. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL FIELD
MEASUREMENTS TO ORDER AND INSTALL ALL REQUIRED MATERIALS
AND SYSTEMS
4. THE COLOR,TINT, REFLECTANCE, COATINGS AND FINISH OF ALL
REPLACEMENT MATERIALS IS INTENDED TO MATCH THE ORIGINAL
BEING REPLACED U.N.O.
5. PHOTO DOCUMENT AND SUBMIT PICTURES AT FIRST DAY OF
MOBILIZATION OF ALL WORK AREAS AND ADJACENT CONDITIONS
6. PAVING AND LANDSCAPING AREAS USED BY CONTRACTOR SHALL BE
RESTORED TO AT MINIMUM ORGINAL CONDITION AT COMPLETION OF
PROJECT
7. PROVIDE FULLY TEMPERED SAFETY GLAZING AT ALL OPENINGS
WHERE REQUIRED BY CODE
8. SALVAGE ALL DOOR HARDWARE AS ASSUMED TO NOT BE DAMAGED
FOR RE-USE BY THE OWNER OR REINSTALLED. REPORT ANY
DISCOVERED DAMAGE TO THE ARCHITECT IMMEDIATELY
9. SHOP DRAWINGS FOR ALL DOORS AND FRAMES TO ADDRESS HOW
FIELD VERIFIED SIZES OF GLASS TO BE REUSED IN NEW OPENINGS
SPECIFIC RESTORATION KEY NOTES
1. REPLACE INSULATED GLAZING UNIT WITH TINT, REFLECTANCE AND
COATING TO MATCH EXISTING UNIT
2. REPLACE INSULATED SPANDREL GLAZING UNIT WITH TINT AND
CERAMIC FRIT COATING ON #3 TO MATCH COLOR OF EXISTING UNIT
3. REPLACE MONOLITHIC GLASS UNIT WITH CODE COMPLIANT SAFETY
GLASS UNIT WITH TINT TO MATCH EXISTING UNIT
4. PROVIDE NEW BRONZE ANODIZED DOOR AND SIDELITE FRAME.
REUSE ALL GLASS NOT INDICATED TO BE REPLACED.
5. PROVIDE NEW DARK BRONZE ANODIZED DOOR AND SIDELITE FRAME
BELOW THE TRANSOM LEVEL. REUSE ALL GLASS NOT INDICATED TO
BE REPLACED.
6. PROVIDE NEW DARK BRONZE ANODIZED DOOR FRAME INCLUDING
TRANSOM. SALVAGE AND REINSTALL THE METAL TRAMSOM
GRILL-WORK. REUSE ALL GLASS NOT INDICATED TO BE REPLACED.
7. REPLACE ALL DOOR HARDWARE EXCEPT: ELEC. STRIKES AND MAG
LOCKS, HANDICAP POWER OPERATORS AND CYLINDER KEYED
LOCKS. INSTALL NEW, AND REINSTALLED EXISTING HARDWARE TO
MATCH THE EXISTING CONFIGURATION AND FUNCTION INCLUDING
ANY ADA ACCESS OPERATOR AND ACCESS CONTROL. PROVIDE NEW
CONTINUOUS HINGES, CLOSER IF NO POWERED OPERATOR IS
PRESENT, THRESHOLD, PULL (U.N.O.) AND PANIC EXIT DEVICE AND
WEATHERSTRIPPING. REINSTALL ALL POWER OPERATORS, MAG
LOCK, CARD READER WIRING, ELECTRIC STRIKE AND KEYED
CYLINDER LOCKSETS.
8. REINSTALL EXISTING STAINLESS STEEL DOOR PULLS
9. REPLACE ANODIZED ALUMINUM TRIM DAMAGED BY IMPACT ON FULL
EXTENTS OF CANOPY ON THREE SIDES. INSPECT SUBSTRATE AND
CONFIRM THAT NO UNDERLYING DAMAGE EXISTS
10. REPLACE IMPACT DAMAGED ANODIZED ALUMINUM TRIM STILE IN
DOOR WITH MATCHING DARK BRONZE ANODIZED MATERIAL
11. INSPECT FRAME AND HARDWARE FOR DAMAGE. REPORT ANY
UNFORESEEN DAMAGE TO THE ARCHITECT IMMEDIATELY
12. VERIFY THAT GLASS IS UNDAMAGED AND RE-USABLE AFTER
PLYWOOD REMOVAL
13. REMOVE ALL TEMPORARY PLYWOOD AND FASTENERS AND FILL ALL
FASTENER HOLES IN METAL FRAMES WITH COLOR MATCHED
SEALANT OR APPROVED FILLER AT KCAB AND PSB (NOTE: THIS WORK
HAS BEEN DONE AT KCC)
A201C
PSB PARTIAL SOUTH ELEVATION
SCALE: N.T.S.
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
PSB - SOUTHWEST
ELEVATION
A201C
A201C
PSB PARTIAL SOUTH PERSPECTIVE
SCALE: N.T.S.
13 TYP.
A201C
PSB INTERIOR OF S. ENTRANCE
SCALE: N.T.S.
C101 C111a C112
C113 C114a
C121 C111b
C114b C122
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
13 TYP.
AutoCAD SHX Text A301
A202C
PSB PARTIAL SOUTH ELEVATION
SCALE: N.T.S.
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
PSB - SOUTHEAST
ELEVATION
A202C
A202C
PSB PARTIAL SOUTH ELEVATION
SCALE: N.T.S.
X A3xx
A202C
A202C
PSB PARTIAL SOUTH (WEST) ELEVATION
SCALE: N.T.S.
X A3xx 2&3
A202C
13 TYP.
A202C
PSB PARTIAL NORTH ELEVATION (NOT SHOWN)
SCALE: N.T.S.
A202C
PSB PARTIAL WEST ELEVATION (NOT SHOWN)
SCALE: N.T.S.
13 TYP.
REMOVE
TEMPORARY
PLYWOOD
PROTECTION AND
RESTORE FRAMES
WITH COLOR
MATCHED FILLER AT
ENTRY DOOR
FRAME.
13 TYP.
REMOVE
TEMPORARY
PLYWOOD
PROTECTION AND
RESTORE FRAMES
WITH COLOR
MATCHED FILLER AT
ENTRY DOOR AND
SIDELITE FRAMES.
C201
C202
C203
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
C200
AutoCAD SHX Text A301
GLASS DAMAGE REPAIR - PUBLIC SAFETY BUILDING - OPENING SCHEDULE
REPLACEMENT
SCHEDULE FOR
KENOSHA
COUNTY
COURTHOUSE
CAMPUS Updated: 5/18/2021
PSB
KENOSHA
COUNTY
PUBLIC
SAFETY
BUILDING
South - 2nd C101 1" IGU ~ 38 x 68 Win-Fix
South - Entry C111a 1" IGU ~ 16 x 58 Sidelite South - Entry C111b 1" IGU ~ 16 x 29 Sidelite
South - Entry C112 1" IGU ~ 28 x 77 Door ADA Operator / CR (confirm) South - Entry C113 1" IGU ~ 28 x 77 Door
South - Entry C114a 1" IGU ~ 16 x 58 Sidelite South - Entry C114b 1" IGU ~ 16 x 29 Sidelite
South - Entry C121a 1" IGU ~ 44 x 58 Sidelite South - Entry C121b 1" IGU ~ 44 x 29 Sidelite South - Entry C122a 1" IGU ~ 44 x 58 Sidelite South - Entry C122b 1" IGU ~ 44 x 29 Sidelite
East - 2nd C200 1" IGU ~ 38 x 68 Win-Fix East - 2nd C201 1" IGU ~ 38 x 68 Win-Fix East - 2nd C202 1" IGU ~ 58 x 68 Win-Fix East -1st C203 1" IGU ~ 58 x 48 Win-Fix
ICA NO. KCC 21-001
KE
N
O
SH
A C
O U
N
TY
C O
U R
TH
O
U
SE
C
AM
PU
S
- G
LA
SS
D
AM
AG
E R
EP
AI
R S
C O
U R
TH
O
U
SE
(K C
C
PU
BL
IC
S
AF
ET
Y
BU
IL
D
IN
G
(P
SB
C O
U N
TY
A
D M
IN
IS
TR
AT
IO
N
B U
IL
D
IN
G
(K C
AB
InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com
IN
SI
TE
C
O N
SU
LT
IN
G
A R
C H
IT
EC
TS
NOTE: ALL DIMENSIONS GIVEN
SHALL BE CONSIDERED TO BE
"V.I.F." OR VERIFY-IN-FIELD
FEBRUARY 22, 2021
ISSUED FOR BIDDING
A203C
PSB OPENING SCHEDULE
#1 5/18/2021 ADDENDUM #1
(RE-ISSUED COMPLETE DRAWING)
AutoCAD SHX Text A301
| KCCC-GDR_Drawings_Addendum-1_2021-5-18.pdf |
| Sheets and Views |
| A001 TITLE SHEET-A001 TITLE SHEET |
| KCC-GDR_Set-A100A-Site Plan |
| KCC-GDR_Set-A201A |
| KCC-GDR_Set-A202A |
| KCC-GDR_Set-A203A |
| KCAB-GDR_Set-A100B-Site Plan |
| KCAB-GDR_Set-A201B |
| KCAB-GDR_Set-A202B |
| KCAB-GDR_Set-A203B |
| PSB-GDR_Set-A100C-Site Plan |
| PSB-GDR_Set-A201C |
| PSB-GDR_Set-A202C |
| PSB-GDR_Set-A203C |
File details come from the government source that posted it. Updated .