This Addendum No. 1, issued May 18, 2021, by Kenosha County and InSite Consulting Architects, modifies the Request for Bid #2113 for glass damage repairs at the Kenosha County Courthouse Campus located at 912 56th Street, Kenosha, Wisconsin. The project encompasses three buildings: the Kenosha County Courthouse (KCC), Kenosha County Administration Building (KCAB), and Public Safety Building (PSB). The addendum omits Section 08 87 23 (Safety and Security Films) and Section 08 88 53 (Security Glazing) in their entirety and inserts new Section 08 71 00 (Door Hardware) specifications. The work includes replacement-in-kind of all damaged door and window framing, glazing, and associated hardware at the three campus locations. Hardware requirements include hinges, pulls, panic devices, closers, lock and latch sets, cylinders and keys, thresholds, and weatherstripping. Acceptable manufacturers are specified for hinges (Hager), locksets (Best), pulls (Reese Enterprises), panic devices (Von Duprin), closers (LCN), and weatherstripping/thresholds (Reese Enterprises, Zero International, Pemko Manufacturing, National Guard Products). A pre-bid walkthrough was conducted on May 13, 2021, with no written contractor questions submitted thereafter. The reissued drawings provide detailed specifications for three separate glass replacement schedules across the campus buildings.

The specifications require contractors to obtain single-source hardware, submit three copies of complete hardware schedules with product data, and provide a proposed keying schedule. All hinges on exterior doors must feature non-removable pins with stainless steel construction (B.H.M.A. 629 finish in satin), while interior hinges require satin chromium plating (B.H.M.A. 626 finish). Lock cylinders are to be supplied by the lockset manufacturer with removable core cylinders for all locks, and the Owner will provide master keying instructions and coordinate with the new Office Building project for grand-master key requirements. The contractor must master key all locks and furnish five master keys and three nickel silver change keys for each lock, with all keys stamped "DO NOT DUPLICATE." Installation requirements specify precise hardware locations, including locksets at 40 inches above finished floor, door pulls at 42 inches, and panic devices positioned accordingly. All work must comply with the State of Wisconsin Building Code, and contractors are responsible for field measurements, as-built documentation, temporary protection, and restoration of paving and landscaping to original condition upon project completion.

View the file

Other files

File Type Posted
2113 Addendum 3.pdf PDF
2113 Specifications.pdf PDF
2113 Bid Documents.pdf PDF
2113 Addendum 2.pdf PDF
2113 Drawings.pdf PDF
Vendor Responsibility Form Construction.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

May 18, 2021

Addendum No. 1

2021 Kenosha County Courthouse Campus Glass Damage Repairs

Request for Bid #2113

To: All Bidders

From: Kenosha County and InSite Consulting Architects

General:

1) None.

Contractor Questions:

1) There were no written questions submitted after the on‐site pre‐bid walk through on May 13, 2021.

Answer: NONE

Specifications:

1) Omit Section 08 87 23 – Safety and Security Films in its entirety.

2) Omit Section 08 88 53 – Security Glazing in its entirety.

3) Insert Section 08 71 00 – Door Hardware – Addendum No. 1 in its entirety, see attached.

Drawings:

1) Reissue all Drawings, see attached.

END OF ADDENDUM NO. 1

DIVISION 08 - OPENINGS

SECTION 08 71 00 – DOOR HARDWARE

ADDENDUM NO. 1

08 71 00.1

COPYRIGHT ICA

KENOSHA COUNTY

COURTHOUSE CAMPUS

GLASS DAMAGE REPAIRS

PART 1: GENERAL 1

1.1. RELATED DOCUMENTS 3

a. Applicable provisions of Division 1 shall govern work under this Section. 5

1.2. DESCRIPTION OF WORK 7

a. This section includes the following and as indicated in the hardware schedule at the end of this 9 section: 10

Hinges 11

Pulls 12

Panic Devices 13

Closers 14

Lock and latch sets 15

Lock cylinders and keys 16

Thresholds 17

Weatherstripping for exterior doors 18

b. Related Sections: 19

i. Division 8 Section 08 10 00 Doors and Frames 20

1.3. QUALITY ASSURANCE 22

a. Single Source Responsibility: Obtain each type of hardware from the same supplier. 24

1.4. SUBMITTALS 26

a. Submit three copies of complete and detailed hardware schedule. Include product data on all 28 hardware items being submitted. The submitted schedule shall use symbol/letter designations and 29 format shown on construction documents hardware schedule. 30

b. Submit three copies of proposed keying schedule indicating clearly how the Owner’s final 31 instructions on keying of locks has been fulfilled. 32

c. Submit sample of each item of finish hardware that differs from that specified. 33

d. Samples submitted may be used on the project and will be delivered to the building site where 34 comparison will be made with other hardware furnished 35

1.5. PRODUCT DELIVERY 37

a. Mark each item as to contents and location in the building for which it is intended. 39

b. Ship prepaid the hardware templates and/or physical hardware, as required, to metal door and 40 frame manufacturers and wood door manufacturers. 41

PART 2: PRODUCTS 43

2.1. FINISH HARDWARE SCHEDULE 45

a. Refer to notes on the drawings for hardware requirements. 47

2.2. ANCHORS AND FASTENERS 49

a. Furnish as required and of proper size for the purpose for which it is intended. 51

b. Anchors in solid material shall be with machine screws in expansion shields. Furnish toggle bolts 52 where walls are not solid material. 53

2.3. HINGES 55

a. Non-removable pins on exterior doors and interior locked doors swinging out. Furnish non-rising 57 pins on all other doors. 58

b. Stainless steel hinges on exterior doors swinging out and steel hinges for all other doors. 59

Exterior Hinge Finish: B.H.M.A. 629, stainless steel metal, satin (US32D). 60

08 71 00.2

Interior Hinge Finish: B.H.M.A. 626, satin chromium plated (US26D). 61

c. Number of Hinges: 62

i. Continuous, one per door 63

d. Acceptable Manufacturers: Hager. 64

e. Hinge types: Numbers are of Hager, unless otherwise specified. 65

TYPE DESCRIPTION MFR. NO. 67

H1 Anodized to match frame HAGER 780-157HD 69

2.4. LOCKSETS 71

a. Acceptable Manufacturers: Best 73

b. Reuse and install existing cylinders 74

2.5. LOCK CYLINDERS AND KEYING 76

a. Hardware supplier shall make arrangements for and meet with Owner to determine the various 78 keying requirements. 79

b. Owner will provide cylinders and keying for Project. 80

c. Provide new master key system for Project. 81

d. Master key all locks and cylinders. 82

e. Master key and grand-master key all locks and cylinders with the new Office Building project. 83

f. Furnish five master keys for each master keyed set and three nickel silver change keys for each 84 lock. 85

g. Coordinate the number of grand master keys to furnish with the new Office Building project. 86

h. Furnish five master keys for each master keyed set and three nickel silver change keys for each 87 lock. 88

i. Stamp "DO NOT DUPLICATE" on all keys. 89

j. Furnish visual key control for all cylinders. Stamp proper key symbol on the bow of each key and 90 on the face of the cylinder plug of each cylinder. 91

k. Cylinders shall be supplied by manufacturer of locksets. 92

l. Furnish manufacturer’s standard 6-pin tumbler cylinders. 93

m. Furnish removable core cylinders for all locks. Send control key where directed. Provide six extra 94 cores with keys. Master key extra cores. 95

n. Provide cylinders for Aluminum Entrance systems where scheduled: deadbolts. 96

o. Metals: Construct lock cylinder parts from brass or bronze, stainless steel, or nickel-silver. 97

Aluminum, zinc, or plastic parts are not acceptable. Exposed finish shall match lockset, deadbolt, 98 or exit device. 99

p. Deliver keys to the Owner. 100

2.6. Pulls 102

a. Door Pulls: Numbers are of Reese Enterprises, Inc. 104

TYPE DESCRIPTION MFR. NO. 106

P1 Rockwood BF157 1HD 108

(verify center to center) - Oil Rubbed Bronze 109

2.7. Panic Devices 114

TYPE DESCRIPTION MFR. NO. 117

PD1 Von Duprin - 33A 119

Anodized to match frame 120

08 71 00.3

2.8. Closers 125

a. Door Closers: Numbers are of LCN, Inc. 127

TYPE DESCRIPTION MFR. NO. 129

C1 LCN 4040XP SCUSH 131

Install with any necessary mounting plates 132

Bronze to match frames 133

2.9. WEATHERSTRIPPING 135

a. Provide only those units where resilient or flexible seal strip is easily replaceable and readily 137 available from stocks maintained by manufacturer. 138

b. Acceptable Manufacturers: Reese Enterprises, Inc; Zero International; Pemko Manufacturing Co., 139

Inc.; National Guard Products, Inc. 140

c. Weatherstrip sets: Numbers are of Reese Enterprises, Inc. 141

TYPE DESCRIPTION MFR. NO. 143

W1 Jamb and head weatherstrip 775A 145

Door bottom/shoe DB595AU 146

2.10. THRESHOLDS 148

a. Extruded aluminum extending to outside edge of door frames. 150

b. Acceptable Manufacturers: Reese Enterprises, Inc; Zero International; Pemko Manufacturing 151

Co.,Inc.; National Guard Products, Inc. 152

c. Threshold types: Numbers are of National Guard Products, Inc. 153

TYPE DESCRIPTION MFR. NO. 155

T1 Extruded aluminum, thermal break, 5” inches wide NGP 8425 157

PART 3: EXECUTION 159

3.1. INSTALLATION 161

a. Install all hardware in accordance with the Manufacturer's recommendations. 163

b. Drill and tap hollow metal doors and frames for surface applied hardware. 164

c. Remove all applied hardware until painting is completed, then reinstall. 165

d. Locate hardware as follows unless shown otherwise on the drawings: 166

i. Hinges: Continuous from frame head to meeting at threshold. 167

ii. Locksets: 40 inches above the finished floor to centerline of strike. 168

iii. Stops: Install on door if wall condition is not applicable. 169

iv. Flush Bolts: Edge mount. 170

v. Door Pulls: Center line 42 inches above finished floor. Center between door edge and 171 glazed opening or 5 inches from door edge if no glazing. 172

vi. Push/Pull Latch: Center latch 45 inches above floor with handle up on push side and down 173 on pull side. 174

vii. Deadlatches: Center line 48 inches above finished floor. If used in conjunction with a door 175 pull/push plate, mount deadlock center line 32 inches above finish floor. 176

e. Secure wool pile inserts in kerfs in door edges with white glue and small brads spaced 12 inches 177 on center. 178

f. Install electric strike and run wires concealed to location of owner supplied security access controls. 179

g. Install door weatherstripping continuous without coping at hardware. Mount hardware to be located 180

08 71 00.4 in the same location over the weatherstripping. 181

3.2. ADJUSTMENT 183

a. Adjust all operating hardware in accordance with manufacturer's recommendations. 185

b. Deliver to Owner all installation and adjustment tools and two copies of each installation sheet 186 furnished with hardware items. 187

END OF SECTION 08 71 00 190

A001

PROJECT LOCATION PLAN DIAGRAM

SCALE: 1" = 16'-0"

TITLE SHEET / CODE &

SHEET INDEX

A001

A001 TITLE SHEET / CODE & SHEET INDEX

A100A KCC SITE CONTEXT PLAN

A201A KCC SOUTH ELEVATION

A202A KCC WEST,EAST & NORTH ELEVATIONS

A203A KCC OPENING SCHEDULE

A100B KCAB SITE CONTEXT PLAN

A201B KCAB SOUTH ELEVATION

A202B KCAB EAST ELEVATION

A203B KCAB OPENING SCHEDULE

A100C PSB SITE CONTEXT PLAN

A201C PSB SOUTHWEST ELEVATION

A202C PSB SOUTHEAST ELEVATION

A203C PSB OPENING SCHEDULE

KENOSHA, WISCONSIN 53715

GENERAL PROJECT NOTES:

KENOSHA COUNTY COURTHOUSE

CAMPUS

GLASS DAMAGE REPAIRS

1. ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STATE OF WISCONSIN BUILDING

CODE LATEST EDITION.

2. CONTRACTOR(S) ARE RESPONSIBLE FOR VERIFICATION OF, AND COORDINATION WITH, ALL DIMENSIONS SHOWN ON THESE DRAWINGS RELATIVE TO EXISTING CONDITIONS PRIOR TO BEGINNING WORK. DO NOT

SCALE FROM DRAWINGS.

3. CONTRACTOR SHALL REPORT IMMEDIATELY TO THE ARCHITECT ANY DIMENSION(S) OR DISCREPANCIES VERBALLY, A WRITTEN REPORT SHOULD PROMPTLY FOLLOW. CONTRACTOR SHALL CEASE WORK IN THE

AFFECTED AREA UNTIL DIRECTED BY THE ARCHITECT.

4. THE CONTRACTOR SHALL PROVIDE ALL METHODS AND EQUIPMENT FOR PROTECTING THE BUILDING, ALL MATERIALS, AND PERSONNEL FROM FIRE OR OTHER DAMAGE PRIOR TO STARTING. THE CONTRACTOR

SHALL SUBMIT THE APPROVED METHODS AND EQUIPMENT IN WRITING FOR THE OWNER AND

ARCHITECT'S REVIEW PRIOR TO STARTING WORK.

5. THE CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND HEALTH LAWS AND REGULATIONS.

6. EXECUTION OF THE WORK WILL INVOLVE CONSIDERATION FOR ALLOWING THE OWNER TO CONTINUE THE OPERATION OF THE BUILDING AND THE BUSINESS IN THE FACILITY AND ADJACENT FACILITIES. PRIOR TO THE AWARD OF THE CONTRACT, THE CONSTRUCTION SCHEDULE PREPARED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE ARCHITECT AND SHALL BE COORDINATED WITH THE OWNER. OWNER'S APPROVAL OF THE PROPOSED SCHEDULE SHALL SUPERCEDE THE CONTRACT PROVIDED THE OVERALL TIME IS NOT

CHANGED.

7. THE CONTRACTOR SHALL REVIEW ALL EXISTING CONDITIONS TO DETERMINE ALL SERVICES (ELECTRICAL, MECHANICAL AND PLUMBING) AFFECTED BY THE REPAIR WORK. THE CONTRACTOR SHALL MAKE

NECESSARY TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SERVICES TO ALL AREAS OF THE BUILDING DIRECTLY AND INDIRECTLY AFFECTED BY THE WORK. THE CONTRACTOR SHALL SUBMIT

METHODS AND SCHEDULE OF CONNECTIONS TO THE OWNER FOR APPROVAL PRIOR TO BEGINNING

WORK.

8. AS THE WORK PROGRESSES, THE CONTRACTOR SHALL PRODUCE "AS-BUILT" DRAWINGS FOR THE INSTALLATION OF ALL REPAIR ITEMS UNDER THE CONTRACT. THE ARCHITECT WILL PROVIDE THE GENERAL CONTRACTOR WITH A SET OF REPRODUCIBLE PLANS FOR THIS PURPOSE. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE AS-BUILT DRAWINGS ACCORDING TO THE JOB PROGRESS. EACH PAY REQUEST SUBMITTED BY THE CONTRACTOR SHALL BE ACCOMPANIED BY A COPY OF THE UPDATED

AS-BUILT DRAWINGS.

9. THE CONTRACTOR SHALL CALL "DIGGER'S HOTLINE" AT 800-242-8511, 48 HOURS (EXCLUDING WEEKENDS AND/OR HOLIDAYS) PRIOR TO DIGGING ANY EXCAVATION. "DIGGER'S HOTLINE" WILL CONTACT UTILITY COMPANIES TO LOCATE AND MARK THEIR UNDERGROUND FACILITIES. NO SUCH WORK SHALL COMMENCE

PRIOR TO VERIFICATION THAT ALL UTILITIES HAVE RESPONDED.

10.PROTECT TREES, SHRUBS, LAWNS, AND OTHER FEATURES WITHIN PROJECT LIMITS. RESTORE DAMAGED

FEATURES TO ORIGINAL CONDITION.

11.THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY ENCLOSURES, SHORING, BRACING, SHEATHING, REQUIRED FOR THE SAFETY AND PROPER EXECUTION OF THE WORK.

SHEET INDEX:

N

KENOSHA COUNTY PUBLIC SAFETY BUILDING (PSB)

KENOSHA COUNTY ADMINISTRATION BUILDING (KCAB)

KENOSHA COUNTY COURTHOUSE (KCC)

STRUCTURAL DRAWINGS - N/A

CIVIL DRAWINGS - N/A

MECHANICAL DRAWINGS - N/A

ELECTRICAL DRAWINGS - N/A

PLUMBING DRAWINGS - N/A

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

COURTHOUSE CAMPUS

KENOSHA, WI

SH

ER

ID

AN

R O

AD

56TH STREET

TH

A

VE

N U

E

TH

A

VE

N U

E

PROJECT LOCATION MAP

SCALE : NONE

N

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

N

A202A

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

KCC SITE CONTEXT PLAN

A100A

A100A

KCC SITE CONTEXT PLAN

SCALE: 1/4" = 1'-0"

A201A

A202A

56TH STREET

SH

ER

ID

A

N R

O A

D

TH

A

VE

N U

E

N

KENOSHA COUNTY CAMPUS KEY PLAN

SCALE : NONE

KENOSHA COUNTY COURTHOUSE

(KCC)

(PSB)

(KCAB)

GENERAL PLAN NOTES

1. BID IS FOR REPLACEMENT-IN-KIND AT THE KCC, KCAB AND PSB

BUILDINGS OF ALL DAMAGED DOOR AND WINDOW FRAMING, GLAZING

AND ASSOCIATED HARDWARE AS NOTED.

2. REMOVE ALL PLYWOOD PROTECTION FROM WINDOWS AND DOORS

ASSUMED TO NOT BE DAMAGED. INSPECT ALL GLAZING AND FRAMES

FOR DAMAGE AND REPORT ANY DISCOVERED DAMAGE TO THE

ARCHITECT IMMEDIATELY

3. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL FIELD

MEASUREMENTS TO ORDER AND INSTALL ALL REQUIRED MATERIALS

AND SYSTEMS

4. THE COLOR,TINT, REFLECTANCE, COATINGS AND FINISH OF ALL

REPLACEMENT MATERIALS IS INTENDED TO MATCH THE ORIGINAL

BEING REPLACED U.N.O.

5. PHOTO DOCUMENT AND SUBMIT PICTURES AT FIRST DAY OF

MOBILIZATION OF ALL WORK AREAS AND ADJACENT CONDITIONS

6. PAVING AND LANDSCAPING AREAS USED BY CONTRACTOR SHALL BE

RESTORED TO AT MINIMUM ORGINAL CONDITION AT COMPLETION OF

PROJECT

7. PROVIDE FULLY TEMPERED SAFETY GLAZING AT ALL OPENINGS

WHERE REQUIRED BY CODE

8. SALVAGE ALL DOOR HARDWARE AS ASSUMED TO NOT BE DAMAGED

FOR RE-USE BY THE OWNER OR REINSTALLED. REPORT ANY

DISCOVERED DAMAGE TO THE ARCHITECT IMMEDIATELY

9. SHOP DRAWINGS FOR ALL DOORS AND FRAMES TO ADDRESS HOW

FIELD VERIFIED SIZES OF GLASS TO BE REUSED IN NEW OPENINGS

SPECIFIC RESTORATION KEY NOTES

1. REPLACE INSULATED GLAZING UNIT WITH TINT, REFLECTANCE AND

COATING TO MATCH EXISTING UNIT

2. REPLACE INSULATED SPANDREL GLAZING UNIT WITH TINT AND

CERAMIC FRIT COATING ON #3 TO MATCH COLOR OF EXISTING UNIT

3. REPLACE MONOLITHIC GLASS UNIT WITH CODE COMPLIANT SAFETY

GLASS UNIT WITH TINT TO MATCH EXISTING UNIT

4. PROVIDE NEW BRONZE ANODIZED DOOR AND SIDELITE FRAME.

REUSE ALL GLASS NOT INDICATED TO BE REPLACED.

5. PROVIDE NEW DARK BRONZE ANODIZED DOOR AND SIDELITE FRAME

BELOW THE TRANSOM LEVEL. REUSE ALL GLASS NOT INDICATED TO

BE REPLACED.

6. PROVIDE NEW DARK BRONZE ANODIZED DOOR FRAME INCLUDING

TRANSOM. SALVAGE AND REINSTALL THE METAL TRAMSOM

GRILL-WORK. REUSE ALL GLASS NOT INDICATED TO BE REPLACED.

7. REPLACE ALL DOOR HARDWARE EXCEPT: ELEC. STRIKES AND MAG

LOCKS, HANDICAP POWER OPERATORS AND CYLINDER KEYED

LOCKS. INSTALL NEW, AND REINSTALLED EXISTING HARDWARE TO

MATCH THE EXISTING CONFIGURATION AND FUNCTION INCLUDING

ANY ADA ACCESS OPERATOR AND ACCESS CONTROL. PROVIDE NEW

CONTINUOUS HINGES, CLOSER IF NO POWERED OPERATOR IS

PRESENT, THRESHOLD, PULL (U.N.O.) AND PANIC EXIT DEVICE AND

WEATHERSTRIPPING. REINSTALL ALL POWER OPERATORS, MAG

LOCK, CARD READER WIRING, ELECTRIC STRIKE AND KEYED

CYLINDER LOCKSETS.

8. REINSTALL EXISTING STAINLESS STEEL DOOR PULLS

9. REPLACE ANODIZED ALUMINUM TRIM DAMAGED BY IMPACT ON FULL

EXTENTS OF CANOPY ON THREE SIDES. INSPECT SUBSTRATE AND

CONFIRM THAT NO UNDERLYING DAMAGE EXISTS

10. REPLACE IMPACT DAMAGED ANODIZED ALUMINUM TRIM STILE IN

DOOR WITH MATCHING DARK BRONZE ANODIZED MATERIAL

11. INSPECT FRAME AND HARDWARE FOR DAMAGE. REPORT ANY

UNFORESEEN DAMAGE TO THE ARCHITECT IMMEDIATELY

12. VERIFY THAT GLASS IS UNDAMAGED AND RE-USABLE AFTER

PLYWOOD REMOVAL

13. REMOVE ALL TEMPORARY PLYWOOD AND FASTENERS AND FILL ALL

FASTENER HOLES IN METAL FRAMES WITH COLOR MATCHED

SEALANT OR APPROVED FILLER AT KCAB AND PSB (NOTE: THIS WORK

HAS BEEN DONE AT KCC)

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

AutoCAD SHX Text A101

A201A

FIRST FLOOR RENOVATION PLAN

SCALE: 1/4" = 1'-0"

A201A

KCC SOUTH ELEVATION

SCALE: 1/4" = 1'-0"

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

KCC SOUTH ELEVATION

A201A

A201A

A A201A

A A201A

B A201A

B A201A

7 75

5 7

A120 A121 A122 A123 A124 A125

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

C A201A

C A201A

A301

A202A

KCC WEST (PARTIAL) ELEVATION

SCALE: 1/8" = 1'-0"

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

KCC WEST, EAST &

NORTH ELEVATIONS

A202A

A202A

KCC EAST ELEVATION

SCALE: 1/8" = 1'-0"

NOTE THAT THE FRAME AND THRESHOLD HAVE BEEN DISPLACED BY

IMPACT. CONFIRM SOUND STRUCTURE AT JAMBS AND SILL FOR ANCHORS

A130 A131

A140

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

GLASS

REPLACEMENT

SCHEDULE FOR

KENOSHA

COUNTY

COURTHOUSE

CAMPUS Updated: 5/18/2021

KCC

KENOSHA

COUNTY

COURT

HOUSE

LOCATION

OPENING

NUMBER GLASS

OPENING (D.L.O.)

DIMENSIONS

(Approx.Inches) V.I.F.

FRAME

TYPE

VISION/

SPANDREL NOTES

South - Entry A120 * RE-SET EXIST. Door Vision ADA Operator & CR Access Control South - Entry A121 * RE-SET EXIST. Sidelite Vision South - Entry A122 * RE-SET EXIST. Sidelite Vision South - Entry A123 * RE-SET EXIST. Door Vision South - Entry A124 * RE-SET EXIST. Sidelite Vision South - Entry A125 * RE-SET EXIST. Door Vision ADA Operator & CR Access Control

West - 1st A130 * RE-SET EXIST. Door Vision West - 1st A131 * RE-SET EXIST. Door Vision CR Access Control

East - LL A140 * RE-SET EXIST. Door Vision ADA Operator & CR Access Control

GLASS DAMAGE REPAIR - KENOSHA COUNTY COURTHOUSE - OPENING SCHEDULE

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

KCC OPENING SCHEDULE

A203A

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

A202B

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

A201B

KCAB SITE CONTEXT PLAN

A100B

56TH STREET

TH

A

VE

N U

E

N

A100B

KCAB SITE CONTEXT PLAN

SCALE: 1/4" = 1'-0"

KENOSHA COUNTY CAMPUS KEY PLAN

SCALE : NONE

KENOSHA COUNTY

ADMINISTRATION BUILDING

(KCAB)

(PSB)

(KCC)

A202B

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

GENERAL PLAN NOTES

1. BID IS FOR REPLACEMENT-IN-KIND AT THE KCC, KCAB AND PSB

BUILDINGS OF ALL DAMAGED DOOR AND WINDOW FRAMING, GLAZING

AND ASSOCIATED HARDWARE AS NOTED.

2. REMOVE ALL PLYWOOD PROTECTION FROM WINDOWS AND DOORS

ASSUMED TO NOT BE DAMAGED. INSPECT ALL GLAZING AND FRAMES

FOR DAMAGE AND REPORT ANY DISCOVERED DAMAGE TO THE

ARCHITECT IMMEDIATELY

3. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL FIELD

MEASUREMENTS TO ORDER AND INSTALL ALL REQUIRED MATERIALS

AND SYSTEMS

4. THE COLOR,TINT, REFLECTANCE, COATINGS AND FINISH OF ALL

REPLACEMENT MATERIALS IS INTENDED TO MATCH THE ORIGINAL

BEING REPLACED U.N.O.

5. PHOTO DOCUMENT AND SUBMIT PICTURES AT FIRST DAY OF

MOBILIZATION OF ALL WORK AREAS AND ADJACENT CONDITIONS

6. PAVING AND LANDSCAPING AREAS USED BY CONTRACTOR SHALL BE

RESTORED TO AT MINIMUM ORGINAL CONDITION AT COMPLETION OF

PROJECT

7. PROVIDE FULLY TEMPERED SAFETY GLAZING AT ALL OPENINGS

WHERE REQUIRED BY CODE

8. SALVAGE ALL DOOR HARDWARE AS ASSUMED TO NOT BE DAMAGED

FOR RE-USE BY THE OWNER OR REINSTALLED. REPORT ANY

DISCOVERED DAMAGE TO THE ARCHITECT IMMEDIATELY

9. SHOP DRAWINGS FOR ALL DOORS AND FRAMES TO ADDRESS HOW

FIELD VERIFIED SIZES OF GLASS TO BE REUSED IN NEW OPENINGS

SPECIFIC RESTORATION KEY NOTES

1. REPLACE INSULATED GLAZING UNIT WITH TINT, REFLECTANCE AND

COATING TO MATCH EXISTING UNIT

2. REPLACE INSULATED SPANDREL GLAZING UNIT WITH TINT AND

CERAMIC FRIT COATING ON #3 TO MATCH COLOR OF EXISTING UNIT

3. REPLACE MONOLITHIC GLASS UNIT WITH CODE COMPLIANT SAFETY

GLASS UNIT WITH TINT TO MATCH EXISTING UNIT

4. PROVIDE NEW BRONZE ANODIZED DOOR AND SIDELITE FRAME.

REUSE ALL GLASS NOT INDICATED TO BE REPLACED.

5. PROVIDE NEW DARK BRONZE ANODIZED DOOR AND SIDELITE FRAME

BELOW THE TRANSOM LEVEL. REUSE ALL GLASS NOT INDICATED TO

BE REPLACED.

6. PROVIDE NEW DARK BRONZE ANODIZED DOOR FRAME INCLUDING

TRANSOM. SALVAGE AND REINSTALL THE METAL TRAMSOM

GRILL-WORK. REUSE ALL GLASS NOT INDICATED TO BE REPLACED.

7. REPLACE ALL DOOR HARDWARE EXCEPT: ELEC. STRIKES AND MAG

LOCKS, HANDICAP POWER OPERATORS AND CYLINDER KEYED

LOCKS. INSTALL NEW, AND REINSTALLED EXISTING HARDWARE TO

MATCH THE EXISTING CONFIGURATION AND FUNCTION INCLUDING

ANY ADA ACCESS OPERATOR AND ACCESS CONTROL. PROVIDE NEW

CONTINUOUS HINGES, CLOSER IF NO POWERED OPERATOR IS

PRESENT, THRESHOLD, PULL (U.N.O.) AND PANIC EXIT DEVICE AND

WEATHERSTRIPPING. REINSTALL ALL POWER OPERATORS, MAG

LOCK, CARD READER WIRING, ELECTRIC STRIKE AND KEYED

CYLINDER LOCKSETS.

8. REINSTALL EXISTING STAINLESS STEEL DOOR PULLS

9. REPLACE ANODIZED ALUMINUM TRIM DAMAGED BY IMPACT ON FULL

EXTENTS OF CANOPY ON THREE SIDES. INSPECT SUBSTRATE AND

CONFIRM THAT NO UNDERLYING DAMAGE EXISTS

10. REPLACE IMPACT DAMAGED ANODIZED ALUMINUM TRIM STILE IN

DOOR WITH MATCHING DARK BRONZE ANODIZED MATERIAL

11. INSPECT FRAME AND HARDWARE FOR DAMAGE. REPORT ANY

UNFORESEEN DAMAGE TO THE ARCHITECT IMMEDIATELY

12. VERIFY THAT GLASS IS UNDAMAGED AND RE-USABLE AFTER

PLYWOOD REMOVAL

13. REMOVE ALL TEMPORARY PLYWOOD AND FASTENERS AND FILL ALL

FASTENER HOLES IN METAL FRAMES WITH COLOR MATCHED

SEALANT OR APPROVED FILLER AT KCAB AND PSB (NOTE: THIS WORK

HAS BEEN DONE AT KCC)

A201B

KCAB SOUTH ELEVATION

SCALE: 1/8" = 1'-0"

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

KCAB SOUTH ELEVATION

A201B

A201B

KCAB SOUTH ENTRY VIEW

SCALE: N.T.S.

A201B

A201B

KCAB SOUTH EAST VIEW

SCALE: N.T.S.

E A201B

E

A201B

A201B

KCAB SOUTH WEST VIEW

SCALE: N.T.S.

A A201B

A A201B

X A3xx

A201B

X A3xx

A201B

A201B

KCAB SOUTH WEST VIEW

SCALE: N.T.S.

A201B

KCAB SOUTH EAST VIEW

SCALE: N.T.S.

X A3xx

A201B

X A3xx

A201B

2 2 2

13 TYP.

13 TYP.

13 TYP.

13 TYP.

13 TYP.

13 TYP.

A201B

13 TYP.

13 TYP.

DAMAGE VIEW FROM INTERIOR

B101

B102 B103

B105

B151

B161

B162

B165

B163 B164

B167

B121 B122

B124

B141 B142 B143

B125 B126

B127 B128

B129 B130

B133

B132 B131

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

4 4 4

4 41 4 4

1 6

ENTRANCE GLASS HAS BEEN

REPLACED AND PLYWOOD

REMOVED.

ENTRANCE GLASS HAS BEEN

REPLACED AND PLYWOOD

REMOVED.

B106

111111

11 11 11 11

111111111111

11 11 1111

AutoCAD SHX Text A301

FIRST FLOOR RENOVATION PLAN

A202B

KCAB EAST ELEVATION

SCALE: 1/8" = 1'-0"

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

KCAB EAST ELEVATION

A202B

A202B

KCAB EAST (SOUTH) VIEW

SCALE: N.T.S.

X A3xx

A202B

A

A202B

A A202B

X A3xx

A202B

A202B

KCAB EAST (SOUTH) VIEW

SCALE: N.T.S.

B201 B202

B203 B204

B231

B230

B 225

B 224

B233

B232

B235

B234

B237

B236

B241

B240

B242

B244

B243

B245

B247

B246

A202B

KCAB EAST ENTRANCE

SCALE: N.T.S.

A202B

KCAB NORTH ENTRANCE

SCALE: N.T.S.

13 TYP.

A202B

KCAB EAST (NORTH) VIEW

SCALE: N.T.S.

A202B

3 SIM.

A202B

A202B

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

NO WORK HERE NO WORK HERENO WORK HERE

B 221

B 220

B 223

B 222

(N.I.C.) NO WORK HERE

AutoCAD SHX Text

AutoCAD SHX Text A.D.

AutoCAD SHX Text A301

GLASS DAMAGE REPAIR - KENOSHA COUNTY ADMINISTRATION BUILDING - OPENING SCHEDULE

REPLACEMENT

SCHEDULE FOR

KENOSHA

COUNTY

COURTHOUSE

CAMPUS Updated: 5/18/2021

KCAB

KENOSHA

COUNTY

ADMINIST

RATION

BUILDING

South - 2nd B101 1" IGU ~ 38 x 28 Win-Fix Spandrel

South -1st B102 1" IGU ~ 62 x 28 Win-Fix Spandrel

South -1st B103 1" IGU ~ 62 x 28 Win-Fix Spandrel

South -1st B105 1" IGU ~ 126 x 96 Win-Fix Vision

South -1st B106 1" IGU ~ 64 x 31 Transom Vision

South -1st B107 * RE-SET EXIST.

* RESET EXISTING GLASS IN NEW DOOR/

FRAMES

South -1st B108 (NOT USED)

South -1st B109 (NOT USED)

South -1st B121 1" IGU ~ 125 x 96 Win-Fix Vision South -1st B122 1" IGU ~ 61.5 x 28 Win-Fix Spandrel

South -1st B123 (NOT USED)

South -1st B124 1" IGU ~ 61.5 x 28 Win-Fix Spandrel

South - Entry B125 RE-SET EXIST. Sidelite

* RESET EXISTING GLASS IN NEW DOOR/

FRAME

South - Entry B126 RE-SET EXIST. Sidelite

* RESET EXISTING GLASS IN NEW DOOR/

FRAME

South - Entry B127 RE-SET EXIST. Sidelite

* RESET EXISTING GLASS IN NEW DOOR/

FRAME

South - Entry B128 1" IGU ~ 31 x 36 Sidelite Vision

South - Entry B129 * RE-SET EXIST. Door

* RESET EXISTING GLASS IN NEW DOOR/

FRAME

South - Entry B130 1" IGU ~ 29 x 33 Door Vision

South - Entry B131 * RE-SET EXIST. Door

* RESET EXISTING GLASS IN NEW DOOR/

FRAME

South - Entry B132 * RE-SET EXIST. Door

* RESET EXISTING GLASS IN NEW DOOR/

FRAME

South - Entry B133 * RE-SET EXIST. Transom

* RESET EXISTING GLASS IN NEW DOOR/

FRAME

South -1st B141 1" IGU ~ 62 x 29 Win-Fix Spandrel

South -1st B142 1" IGU ~ 125 x 96 Win-Fix Vision South -1st B143 1" IGU ~ 62 x 29 Win-Fix Spandrel

South -1st B144 1" IGU ~ 62 x 96 Win-Fix (NOT USED)

South - 2nd B151 1" IGU ~ 44 x 35 Win-Fix Spandrel

South -1st B161 1" IGU ~ 51 x 28 Win-Fix Spandrel

South -1st B162 1" IGU ~ 51 x 28 Win-Fix Spandrel

South -1st B163 1" IGU ~ 51 x 28 Win-Fix Spandrel

South -1st B164 1" IGU ~ 51 x 28 Win-Fix Spandrel

South -1st B165 1" IGU ~ 104 x 96 Win-Fix Vision South -1st B166 (NOT USED)

South -1st B167 1" IGU ~ 104 x 96 Win-Fix Vision South -1st B168 (NOT USED)

South -1st B168 (NOT USED)

East - 1st B201 1" IGU ~ 59 x 29 Win-Fix Spandrel

East - 1st B202 1" IGU ~ 120 x 96 Win-Fix Vision East - 1st B203 1" IGU ~ 59 x 29 Win-Fix Spandrel

East - 1st B204 1" IGU ~ 59 x 29 Win-Fix Spandrel

East -1st B220 (NOT USED)

East -1st B221 (NOT USED)

East -1st B222 (NOT USED)

East -1st B223 (NOT USED)

East -1st B224 (NOT USED)

East -1st B225 (NOT USED)

East -1st B230 (NOT USED)

East -1st B231 (NOT USED)

East -1st B232 (NOT USED)

East -1st B233 (NOT USED)

East -1st B234 (NOT USED)

East -1st B235 (NOT USED)

East -1st B236 (NOT USED)

East -1st B237 (NOT USED)

East -1st B240 (NOT USED)

East -1st B241 (NOT USED)

East -1st B242 (NOT USED)

East -1st B243 (NOT USED)

East -1st B244 (NOT USED)

East -1st B245 (NOT USED)

East -1st B246 (NOT USED)

East -1st B247 (NOT USED)

GLASS

REPLACEMENT

SCHEDULE FOR

KENOSHA

COUNTY

COURTHOUSE

CAMPUS Updated: 5/18/2021

KCAB

KENOSHA

COUNTY

ADMINIST

RATION

BUILDING

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

A203B

KCAB OPENING SCHEDULE

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

AutoCAD SHX Text A301

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

PSB SITE CONTEXT PLAN

A100C

N

A100C

PSB SITE CONTEXT PLAN

SCALE: 1/4" = 1'-0"

A201C

55TH STREET

TH

A

VE

N U

E

N

KENOSHA COUNTY CAMPUS KEY PLAN

SCALE : NONE

KENOSHA PUBLIC SAFETY BUILDING

(PSB)

(KCAB)

TH

A

VE

N U

E

A100C

PSB SITE CONTEXT VIEW

SCALE: NOT TO SCALE

A100C

(KCC)

A202C

A202C

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

GENERAL PLAN NOTES

1. BID IS FOR REPLACEMENT-IN-KIND AT THE KCC, KCAB AND PSB

BUILDINGS OF ALL DAMAGED DOOR AND WINDOW FRAMING, GLAZING

AND ASSOCIATED HARDWARE AS NOTED.

2. REMOVE ALL PLYWOOD PROTECTION FROM WINDOWS AND DOORS

ASSUMED TO NOT BE DAMAGED. INSPECT ALL GLAZING AND FRAMES

FOR DAMAGE AND REPORT ANY DISCOVERED DAMAGE TO THE

ARCHITECT IMMEDIATELY

3. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ALL FIELD

MEASUREMENTS TO ORDER AND INSTALL ALL REQUIRED MATERIALS

AND SYSTEMS

4. THE COLOR,TINT, REFLECTANCE, COATINGS AND FINISH OF ALL

REPLACEMENT MATERIALS IS INTENDED TO MATCH THE ORIGINAL

BEING REPLACED U.N.O.

5. PHOTO DOCUMENT AND SUBMIT PICTURES AT FIRST DAY OF

MOBILIZATION OF ALL WORK AREAS AND ADJACENT CONDITIONS

6. PAVING AND LANDSCAPING AREAS USED BY CONTRACTOR SHALL BE

RESTORED TO AT MINIMUM ORGINAL CONDITION AT COMPLETION OF

PROJECT

7. PROVIDE FULLY TEMPERED SAFETY GLAZING AT ALL OPENINGS

WHERE REQUIRED BY CODE

8. SALVAGE ALL DOOR HARDWARE AS ASSUMED TO NOT BE DAMAGED

FOR RE-USE BY THE OWNER OR REINSTALLED. REPORT ANY

DISCOVERED DAMAGE TO THE ARCHITECT IMMEDIATELY

9. SHOP DRAWINGS FOR ALL DOORS AND FRAMES TO ADDRESS HOW

FIELD VERIFIED SIZES OF GLASS TO BE REUSED IN NEW OPENINGS

SPECIFIC RESTORATION KEY NOTES

1. REPLACE INSULATED GLAZING UNIT WITH TINT, REFLECTANCE AND

COATING TO MATCH EXISTING UNIT

2. REPLACE INSULATED SPANDREL GLAZING UNIT WITH TINT AND

CERAMIC FRIT COATING ON #3 TO MATCH COLOR OF EXISTING UNIT

3. REPLACE MONOLITHIC GLASS UNIT WITH CODE COMPLIANT SAFETY

GLASS UNIT WITH TINT TO MATCH EXISTING UNIT

4. PROVIDE NEW BRONZE ANODIZED DOOR AND SIDELITE FRAME.

REUSE ALL GLASS NOT INDICATED TO BE REPLACED.

5. PROVIDE NEW DARK BRONZE ANODIZED DOOR AND SIDELITE FRAME

BELOW THE TRANSOM LEVEL. REUSE ALL GLASS NOT INDICATED TO

BE REPLACED.

6. PROVIDE NEW DARK BRONZE ANODIZED DOOR FRAME INCLUDING

TRANSOM. SALVAGE AND REINSTALL THE METAL TRAMSOM

GRILL-WORK. REUSE ALL GLASS NOT INDICATED TO BE REPLACED.

7. REPLACE ALL DOOR HARDWARE EXCEPT: ELEC. STRIKES AND MAG

LOCKS, HANDICAP POWER OPERATORS AND CYLINDER KEYED

LOCKS. INSTALL NEW, AND REINSTALLED EXISTING HARDWARE TO

MATCH THE EXISTING CONFIGURATION AND FUNCTION INCLUDING

ANY ADA ACCESS OPERATOR AND ACCESS CONTROL. PROVIDE NEW

CONTINUOUS HINGES, CLOSER IF NO POWERED OPERATOR IS

PRESENT, THRESHOLD, PULL (U.N.O.) AND PANIC EXIT DEVICE AND

WEATHERSTRIPPING. REINSTALL ALL POWER OPERATORS, MAG

LOCK, CARD READER WIRING, ELECTRIC STRIKE AND KEYED

CYLINDER LOCKSETS.

8. REINSTALL EXISTING STAINLESS STEEL DOOR PULLS

9. REPLACE ANODIZED ALUMINUM TRIM DAMAGED BY IMPACT ON FULL

EXTENTS OF CANOPY ON THREE SIDES. INSPECT SUBSTRATE AND

CONFIRM THAT NO UNDERLYING DAMAGE EXISTS

10. REPLACE IMPACT DAMAGED ANODIZED ALUMINUM TRIM STILE IN

DOOR WITH MATCHING DARK BRONZE ANODIZED MATERIAL

11. INSPECT FRAME AND HARDWARE FOR DAMAGE. REPORT ANY

UNFORESEEN DAMAGE TO THE ARCHITECT IMMEDIATELY

12. VERIFY THAT GLASS IS UNDAMAGED AND RE-USABLE AFTER

PLYWOOD REMOVAL

13. REMOVE ALL TEMPORARY PLYWOOD AND FASTENERS AND FILL ALL

FASTENER HOLES IN METAL FRAMES WITH COLOR MATCHED

SEALANT OR APPROVED FILLER AT KCAB AND PSB (NOTE: THIS WORK

HAS BEEN DONE AT KCC)

A201C

PSB PARTIAL SOUTH ELEVATION

SCALE: N.T.S.

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

PSB - SOUTHWEST

ELEVATION

A201C

A201C

PSB PARTIAL SOUTH PERSPECTIVE

SCALE: N.T.S.

13 TYP.

A201C

PSB INTERIOR OF S. ENTRANCE

SCALE: N.T.S.

C101 C111a C112

C113 C114a

C121 C111b

C114b C122

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

13 TYP.

AutoCAD SHX Text A301

A202C

PSB PARTIAL SOUTH ELEVATION

SCALE: N.T.S.

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

PSB - SOUTHEAST

ELEVATION

A202C

A202C

PSB PARTIAL SOUTH ELEVATION

SCALE: N.T.S.

X A3xx

A202C

A202C

PSB PARTIAL SOUTH (WEST) ELEVATION

SCALE: N.T.S.

X A3xx 2&3

A202C

13 TYP.

A202C

PSB PARTIAL NORTH ELEVATION (NOT SHOWN)

SCALE: N.T.S.

A202C

PSB PARTIAL WEST ELEVATION (NOT SHOWN)

SCALE: N.T.S.

13 TYP.

REMOVE

TEMPORARY

PLYWOOD

PROTECTION AND

RESTORE FRAMES

WITH COLOR

MATCHED FILLER AT

ENTRY DOOR

FRAME.

13 TYP.

REMOVE

TEMPORARY

PLYWOOD

PROTECTION AND

RESTORE FRAMES

WITH COLOR

MATCHED FILLER AT

ENTRY DOOR AND

SIDELITE FRAMES.

C201

C202

C203

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

C200

AutoCAD SHX Text A301

GLASS DAMAGE REPAIR - PUBLIC SAFETY BUILDING - OPENING SCHEDULE

REPLACEMENT

SCHEDULE FOR

KENOSHA

COUNTY

COURTHOUSE

CAMPUS Updated: 5/18/2021

PSB

KENOSHA

COUNTY

PUBLIC

SAFETY

BUILDING

South - 2nd C101 1" IGU ~ 38 x 68 Win-Fix

South - Entry C111a 1" IGU ~ 16 x 58 Sidelite South - Entry C111b 1" IGU ~ 16 x 29 Sidelite

South - Entry C112 1" IGU ~ 28 x 77 Door ADA Operator / CR (confirm) South - Entry C113 1" IGU ~ 28 x 77 Door

South - Entry C114a 1" IGU ~ 16 x 58 Sidelite South - Entry C114b 1" IGU ~ 16 x 29 Sidelite

South - Entry C121a 1" IGU ~ 44 x 58 Sidelite South - Entry C121b 1" IGU ~ 44 x 29 Sidelite South - Entry C122a 1" IGU ~ 44 x 58 Sidelite South - Entry C122b 1" IGU ~ 44 x 29 Sidelite

East - 2nd C200 1" IGU ~ 38 x 68 Win-Fix East - 2nd C201 1" IGU ~ 38 x 68 Win-Fix East - 2nd C202 1" IGU ~ 58 x 68 Win-Fix East -1st C203 1" IGU ~ 58 x 48 Win-Fix

ICA NO. KCC 21-001

KE

N

O

SH

A C

O U

N

TY

C O

U R

TH

O

U

SE

C

AM

PU

S

- G

LA

SS

D

AM

AG

E R

EP

AI

R S

C O

U R

TH

O

U

SE

(K C

C

PU

BL

IC

S

AF

ET

Y

BU

IL

D

IN

G

(P

SB

C O

U N

TY

A

D M

IN

IS

TR

AT

IO

N

B U

IL

D

IN

G

(K C

AB

InSite Consulting Architects 115 E. Main / STE 200 Madison, Wisconsin 53703 608-204-0825 608-531-1533 (fax) info@icsarc.com

IN

SI

TE

C

O N

SU

LT

IN

G

A R

C H

IT

EC

TS

NOTE: ALL DIMENSIONS GIVEN

SHALL BE CONSIDERED TO BE

"V.I.F." OR VERIFY-IN-FIELD

FEBRUARY 22, 2021

ISSUED FOR BIDDING

A203C

PSB OPENING SCHEDULE

#1 5/18/2021 ADDENDUM #1

(RE-ISSUED COMPLETE DRAWING)

AutoCAD SHX Text A301

KCCC-GDR_Drawings_Addendum-1_2021-5-18.pdf
Sheets and Views
A001 TITLE SHEET-A001 TITLE SHEET
KCC-GDR_Set-A100A-Site Plan
KCC-GDR_Set-A201A
KCC-GDR_Set-A202A
KCC-GDR_Set-A203A
KCAB-GDR_Set-A100B-Site Plan
KCAB-GDR_Set-A201B
KCAB-GDR_Set-A202B
KCAB-GDR_Set-A203B
PSB-GDR_Set-A100C-Site Plan
PSB-GDR_Set-A201C
PSB-GDR_Set-A202C
PSB-GDR_Set-A203C

File details come from the government source that posted it. Updated .