21-Specifications.pdf
PDF 122 KB Posted
- Solicitation number
- 26/0150
- Issued by
- Harris County, Texas
About this file
This specifications document is issued by Harris County Precinct 3, Texas, for roadway improvements on North Eldridge Parkway from south of Pine Drive to south of Lakewood Meadow Drive. The project scope involves expanding the existing half boulevard to a full standard four-lane concrete boulevard approximately 0.65 miles in length, with two 12-foot wide travel lanes in each direction, concrete curbs, a 30-foot raised median with 12-foot left turn lanes at intersections, and approximately 7,300 feet of storm pipe ranging from 24 inches to 54 inches in diameter. Drainage improvements extend south of Pine Drive to the Cypress Park detention pond. The project requires furnishing all labor, supervision, equipment, materials, and incidentals for completion. A pre-bid conference was scheduled for May 26, 2026, at 10:30 a.m. CST via teleconference (conference number 281-985-1862, code 543 158 446#). Vendors were encouraged to attend, with participation requiring notification to Maria Heinzmann three days prior. All questions must be submitted in writing through Bonfire at https://harriscountytx.bonfirehub.com prior to the designated deadline, with responses compiled and released as a public notice.
Bid pricing must be all-inclusive, incorporating all labor, material, equipment, and other costs, with unit pricing governing in cases of discrepancy between unit and total pricing. Quantities are estimated, and Harris County reserves the right to require more or less work. Performance bonds are required for public works projects exceeding $100,000, and payment bonds for projects exceeding $25,000. Contractors must comply with Texas Government Code Section 2258 regarding prevailing wage rates and submit certified weekly payroll records. Additionally, contractors must comply with Harris County's Minimum Wage Policy, currently requiring payment of at least $21.65 per hour, whichever is higher than applicable prevailing wage rates. Payment terms are Net 30 from the date invoice approval by the Office of the County Engineer. Vendors are responsible for all toll and parking fees incurred during contract performance. The County will not be bound by verbal communications, and all bids become public record upon opening with no confidentiality exceptions. Contractors must complete Form 1295 (Certificate of Interested Parties) prior to bid submission or face disqualification.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
Roadway Improvements on North Eldridge Parkway from South of Pine Drive to South of Lakewood Meadow Drive (2021) for Harris County Precinct 3 – UPIN 22103N306630001
SCOPE
Harris County is soliciting bids for roadway improvements on North Eldridge Parkway from south of Pine Drive to south of Lakewood Meadow Drive (2021) for Harris County Precinct 3.
PRE-BID CONFERENCE
A pre-bid conference is scheduled for this project. Attendance is not mandatory, but vendors are encouraged to attend to gain a better understanding of the requirements listed within this bid. A teleconference for this pre-bid will be held May 26, 2026, 10:30 a.m. CST, local time Houston, TX using the following dial-in information. Conference number (281) 985-1862 conference code 543 158 446#. Space is limited, if you desire to participate in the audio pre-bid conference, please contact Maria Heinzmann, Office of the Purchasing Agent, via email to maria.heinzmann@harriscountytx.gov three (3) days prior to the audio conference.
It is the responsibility of each vendor to examine the entire bid package, seek clarification in writing, and review their bid for accuracy before submitting. Questions relating to this bid must be submitted in writing online within Bonfire at https://harriscountytx.bonfirehub.com. The deadline for submission of questions relating to this bid is listed on the Events Schedule within Bonfire. All questions submitted in writing prior to the deadline will be compiled and answered in writing. A copy of all questions and answers will be released as a Public Notice to all firms through Bonfire. The County will not be bound by any information conveyed verbally.
CERTIFICATE OF INTERESTED PARTIES (FORM 1295)
Texas law requires all parties who enter into any contract with the County which must be approved by Commissioners Court to disclose all interested parties. Form 1295 must be completed in its entirety at the following website: https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm prior to submitting your response. Failure to do so may result in disqualification of your response.
SPECIAL REQUIREMENTS
Where these special requirements and information as detailed in the attachment titled General Conditions for Roads, Bridges and Related Work, under Supporting Documents inside Bonfire, differ from the attachment titled General Requirements, under Supporting Documents inside Bonfire, for bids within, the specific requirements and General Conditions for Roads, Bridges and Related Work, supersede where applicable.
Coordination of the project will be through the Harris County Office of the County Engineer and all invoices must be routed through their department. All invoices shall include submission requirements stated in the specifications including completed certified payroll records and lien waivers. Payment terms are “Net 30” from date the invoice is approved by the Office of the County Engineer; therefore, payment to the vendor may be up to one (1) month from the date the invoice is approved by the Office of the County Engineer. Payment of material shall be in accordance with the attachment titled Policy for Payment.
In addition, the vendor must comply with Texas Government Code (GC) 2258, Prevailing Wage Rates, and GC 2253.021, Performance and Payment Bonds. Accordingly, GC 2258 requires the vendor to submit a certified payroll record as detailed in the attachment titled Prevailing Wage Rates, Worker Classification Definitions and Payroll Submittal Instructions (http://www.eng.hctx.net/Consultants/Construction/Prevailing-Wage-Rates), and compensate any worker mailto:maria.heinzmann@harriscountytx.gov https://harriscountytx.bonfirehub.com/ https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm http://www.eng.hctx.net/Consultants/Construction/Prevailing-Wage-Rates employed on a public works not less than as applicable. As well, GC 2253.021, Performance and Payment Bonds, requires the vendor to provide a payment bond on all public works jobs that exceed $25,000, and a performance bond on all public works jobs that exceed $100,000.
The rates quoted on the BidTable (bid pricing sheets) within Bonfire must be all-inclusive. “All-inclusive" shall be construed as costs incorporating all charges for labor, material, equipment and any other cost incurred. No separate line item rates or charges will be accepted. Quantities are estimated. Harris County may require more or less. In case of a discrepancy between unit and total pricing, unit pricing governs.
The Extra Work Items section of the BidTable are to be used only on the instructions of the field engineer on the job. No compensation will be received for any part of these items unless they are actually used on the job under the direction of the field engineer. Any additional items required over and above those listed on the BidTable will have to be secured on a change-in-contract and are not to be used until they have been approved by the Harris County Auditor’s Office and Commissioners Court.
It may be required that the vendor submit a sample of specified items on the BidTable for inspection and approval by the Office of the County Engineer prior to order placement.
This bid or Commissioners Court approved award does not obligate Harris County to the eventual purchase of any product/service described, implied or which may be proposed. Progress toward this end is solely at the discretion of Harris County and may be terminated at any time.
NO CONFIDENTIALITY OF BIDS
Once opened, bids are public record. There are no exceptions. When submitting a bid, the vendor must be sure to redact confidential information if the information is needed to address requirements of the bid. If there are any questions concerning confidentiality of information to be submitted, contact Maria Heinzmann immediately at maria.heinzmann@harriscountytx.gov.
ALTERATION OF DOCUMENT
No alterations may be made to this document. Any alterations made may result in the bid being rejected.
The terms and conditions contained within this bid supersede all conflicting terms within any cooperative purchasing contracts associated with this purchase.
TOLL/PARKING FEES
Any and all toll/parking FEES incurred by the vendor during the term of this contract will be the responsibility of the vendor.
DRAWINGS/ADDITIONAL SPECIFICATIONS
Vendors may download the drawings, plans, and/or maps for this project through Bonfire at https://harriscountytx.bonfirehub.com as referenced in the attachments titled General Notices, Notes and Information, Report File and Drawings, under Supporting Documents inside Bonfire. Do NOT include the drawings from this bid package with the bid submittal.
SPECIFICATION
The project will consist of furnishing all labor, supervision, equipment, materials, and incidentals necessary for roadway improvements on North Eldridge Parkway from south of Pine Drive to south of Lakewood Meadow Drive for Precinct 3.
The project entails roadway improvements extending from south of Pine Drive to south of Lakewood Meadow Drive, with drainage improvements continuing south of Pine Drive to the Cypress Park detention pond. Proposed improvements include expanding the existing half of the boulevard to establish a full standard four-lane concrete boulevard featuring curbing, storm sewers, a curbed median, left turn lanes, and mailto:maria.heinzmann@pur.hctx.net https://harriscountytx.bonfirehub.com/ https://harriscountytx.bonfirehub.com/ the removal of existing asphalt transitions. The length of the roadway improvements spans approximately
0.65 miles, comprising two 12-feet wide travel lanes in each direction with concrete curbs, a 30-foot raised median incorporating 12-feet left turn lanes at cross streets/intersections, and approximately 7,300 feet of storm pipe varying in size from 24” to 54”.
For bidding purposes and to get a better understanding of the requirements of this bid, please refer to the attachment titled General Notices, Notes and Information, under Supporting Documents inside Bonfire.
OFFICE OF THE COUNTY ENGINEER GENERAL CONDITIONS
The vendor must comply with all requirements in the “Harris County General Conditions for Building Construction and Related Work & Roads, Bridges and Related Work.”
PREVAILING WAGES
In accordance with Section 2258 of the Texas Government Code, contractor and any subcontractor hired by contractor for the construction of any project, shall not pay less than the rates set forth in the Schedule of Prevailing Wages attached and incorporated by reference in each Project Manual. Contractor warrants that it and its subcontractors shall comply with all requirements and worker ratios per the applicable Schedule of Prevailing Wages and Texas state law.
In addition to these wage rates, Contractors must separately comply with Harris County’s Minimum Wage Policy [see link] and pay all workers on county projects at least Harris County’s Contractor Minimum Wage (currently $21.65/hour). Every worker on a Harris County construction project will make at least the higher of the Harris County Minimum Wage or their applicable Prevailing Wage.
Contractor shall submit certified payroll of contractor and all subcontractors on a weekly basis. At County’s request, contractor shall make available and shall require its subcontractors to make available, copies of cancelled checks and check stubs for comparisons by the County or its agents.
County reserves the right for its agents to visit the project site and to interview contractor, its subcontractors and employees of each on any date or time, as often as desired during the construction period, without prior notification.
County will ascertain if proper wage rates are being paid to the employees as required by the Project Manual. In the event of a discrepancy between the work performed and the wages paid, County will document same and notify contractor. All initial determinations of the classification of workers or the appropriate prevailing wage shall be made by the Harris County Contract Compliance Officer. Her determinations shall be binding.
If, for any length of time and as determined by the Harris County Contract Compliance Officer, discrepancies appear between the certified payrolls and the actual wage paid, County shall require check stubs to be attached to each weekly certified payroll.
Pursuant to TEX. GOV’T CODE ANN. §2258.051, the County reserves the right to withhold any monies due contractor until such discrepancy is resolved and the necessary adjustment made. Contractor shall also pay a penalty in accordance with TEX. GOV’T CODE ANN. § 2258.023(b), of Sixty and No/Dollars ($60.00) per day per person per incident that such person is underpaid. Contractor shall impose these same obligations upon its Subcontractors. Contractor understands that with monthly certified payrolls, contractor is responsible for any and all penalties that shall accrue during the month, regardless of the fact that any error could not be discovered by the Contract Compliance Officer until the following certified payroll.
https://purchasing.harriscountytx.gov/Services/Procurement-Data-Information
| SPECIFICATIONS |
| SCOPE |
File details come from the government source that posted it. Updated .