This document is an Addendum issued by Harris County Purchasing Agent for Job No. 25/0243, concerning the Maintenance and Repairs of Roadways – Asphalt Package 1 (2025) for Harris County Precinct 3. The addendum is dated August 14, 2025, with a bid submission deadline of Monday, August 18, 2025, no later than 2:00 p.m. local time in Houston, TX. All vendors are required to acknowledge this addendum in Bonfire with their bid submission.
The addendum includes two primary modifications: a revised attachment titled "General Conditions for Roads, Bridges and Related Work" available on the Bonfire platform, and a summary of changes. The key changes involve updating the Table of Contents numbering and adding Section 4.3.3, which prevents the contractor and its surety from arguing that liquidated damages are a penalty or unenforceable. Vendors must review and acknowledge these changes by the specified due date to be considered for the roadway maintenance project.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Paige McInnis
Harris County Purchasing Agent
1111 Fannin Street, 12th Floor, Houston, TX 77002 Tel 713-274-4400 Fax 713-755-6695
August 14, 2025
TO: ALL VENDORS
RE: Job No. 25/0243
DUE DATE: Monday, August 18, 2025, no later than 2:00 p.m. local time, Houston, TX
All vendors are required to acknowledge this addendum in Bonfire with each bid for the Maintenance and
Repairs of Roadways – Asphalt Package 1 (2025) for Harris County Precinct 3. This addendum must be acknowledged no later than the above due date.
ADDENDUM NO. 1
1. Revised attachment titled General Conditions for Roads, Bridges and Related Work, available on
Bonfire at https://harriscountytx.bonfirehub.com/portal/.
2. Summary of Addendum No. 1 (attached).
https://harriscountytx.bonfirehub.com/portal/
SUMMARY OF ADDENDUM NO. 1
REVISED ATTACHMENT TITLED GENERAL CONDITIONS FOR ROADS, BRIDGES AND
RELATED WORK:
1. Table of Contents numbering updated.
2. Section 4.3.3 added, “In recognition of the foregoing acknowledgments, Contractor and its surety agree that they are expressly estopped from arguing, and waive any rights they may have to argue, that the liquidated damages provided for herein are a penalty or that they are not enforceable.”