This document is a submittal form for reporting non-hazardous construction and demolition debris from federal construction projects. It requires contractors to provide estimated weights and percentages of materials from a construction or demolition project that will be landfilled, recycled, or otherwise diverted from landfills. Contractors must also submit actual weights and documentation of disposal from waste haulers once a project is complete. The form collects data on common construction materials to characterize debris from civil, architectural, electrical, and mechanical scopes of work. It is an appendix to the scope of work for a solicitation from the U.S. Army Contracting Command - Rock Island to design and build a replacement sprinkler system in Building 337 at Rock Island Arsenal, Illinois, with a total estimated value between $500,000 and $1,000,000.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimated Weight Estimated Percent to be Landfilled
Estimated Percent to be Recycled
Estimated Percent to be Diverted TOTAL Weight Weight landfilled Landfill Weight recycled Recycler Weight
Diverted Diversion Weight tickets received
(pounds) (%) (%) (%) (pounds) (pounds) (vendor/ company name) (pounds) (vendor/ company name) (pounds) (vendor/ company name) Y or N
CIVIL
Asphalt Concrete Gravel Soil Structural Steel Structural Wood Other Wood Other Steel/Metal Top Soil Sub Soil Trees Crushed Stone/Base
ARCHITECTURAL
Aluminum Brick Carpet Ceiling Tile
CMU
Copper Doors Drywall Glass Insulation Materials Iron Metal Studs Misc Metal Paper Plastic Roofing Materials Sheet Metal Stone Vinyl Base Vinyl Flooring Windows Wood Studs
ELECTRICAL
Ballasts Light Fixtures Transformers Wire Conduit
MECHANICAL
Cast Iron Pipe Copper Pipe Steel Pipe HVAC Equipment White Goods Plumbing Fixtures
RPZ/DCD
Insulation
PHASE II:C&D Report Data
Material
Non-Hazardous Construction and Demolition Debris Submittal Project Title:
Project Number:
Contractor Name:
Contracting Officer's Representative:
PHASE I:C&D Plan Data
File details come from the government source that posted it. Updated .