20R4143 Attachment P CDRLs.doc

DOC document 40 KB Posted

Attached to
Ice Class Tanker Federal contract opportunity
Solicitation number
N32205-20-R-4143
Issued by
Department of the Navy Military Sealift Command

About this file

This document outlines the contract data requirements for solicitation N32205-20-R-4143 issued by the Department of the Navy Military Sealift Command for an ice class tanker. The contractor must submit various reports and documentation on the specified schedules, including weekly and monthly environmental control and fuel consumption reports, voyage reports, vessel self-assessments, training plans, drawings, manuals, and inventories. Delivery of the vessel must be accompanied by photographs, and insurance documentation is due within 10 calendar days of award. Responses such as installation drawings are expected within 60 days of award or the close of the comment period. Other requirements include cargo handling equipment lists due 72 hours before vessel arrival and small arms inventories annually.

View the file

Other files for this federal contract opportunity

Other files attached to Ice Class Tanker, newest first.
File Type Posted
20R4143 Drawing 803-2554187A.pdf PDF
20R4143 Attachment O DFARS 247-7026 Info.xls XLS spreadsheet
20R4143 Attachment M CONSOL Station Req.docx DOCX document
20R4143 Attachment L Decon Station.PDF PDF
20R4143 Attachment H DOL SIU Wage Determination.pdf PDF
20R4143 Attachment D DD254.pdf PDF
20R4143 Attachment A GFP.xlsx XLSX spreadsheet
20R4143 Drawing 2227933 Rev A.pdf PDF
20R4143 Drawing 2213794 Rev D.pdf PDF
20R4143 Attachment F Tech Offer Worksheet - 16 Mar Update.XLSX XLSX spreadsheet
20R4143 Drawing CONSOL.pdf PDF
20R4143 Drawing 2556869 Rev RLTA.pdf PDF
20R4143 Drawing 2213159 Rev F.pdf PDF
20R4143 Attachment K Specs CBR-D Decon Station.docx DOCX document
20R4143 Attachment C Crew Complement.docx DOCX document
20R4143 Attachment B Basic Pricing Data.xlsx XLSX spreadsheet
20R4143 Drawing 2276338 Rev A.pdf PDF
20R4143 Attachment N Clarification and Question.docx DOCX document
20R4143 Attachment J MECSP Worksheet.docx DOCX document
20R4143 Attachment I SFLLL.pdf PDF
20R4143 Attachment H DOL AMO Wage Determination.pdf PDF
20R4143 Attachment G ATFP CBRD.docx DOCX document
20R4143 Attachment E PWS 3-22-21.docx DOCX document
N32205-20-R-4143 RFP.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-20-R-4143 ATTACHMENT S: Contract Data Requirement List (CDRL)

CONTRACT DATA REQUIREMENT

INITIAL SUMBISSION

FINAL SUBMISSION

Weekly Environmental Control Report (Section C-3.5.3.5.1)
Weekly
Monthly Environmental Control Report (Section C-3.5.3.5.2)
Monthly
Installation Acceptance & General Layout Drawings (Section C-3.5.3.8)
60 days from Contract award
60 days after receipt of Government comments
Reports & Documentation (Section C-8.3)
During Vessel on-hire survey
Fuel Consumption Reports (Section C-12.1.1)
Monthly
Voyage/Passage Reports (Section C-12.1.2)
At the end of each voyage/passage
Vessel Self-Assessment (Section C-15.1.2)
14 calendar days prior to commencement of OCI inspection

Ship Drawings & Cargo Securing Manual (Section C-8.3 and E-1.1)

Full set of ship drawings - Required within 10 calendar days of Contract award. Drawings shall show all proposed or actual modifications required to meet the requirements of this RFP.

Two (2) paper and one (1) electronic copies of Ship Characteristics Pamphlet and Cargo Securing Manual required within 30 calendar days of Contract award

Cargo Handling Equipment List (Section E-1.1)
No later than 72 hours prior to Vessel’s arrival at delivery port, or 24 hours if award is made less than 72 hours away from Vessel’s arrival at delivery port.
Delivery Schedule/Progress Chart (Section C-17.3)
15 calendar days from Contract award
Updated schedule with progress detailed required every 14 calendar days
Vessel Photograph (Section C-17.1)
60 calendar days after delivery of the Vessel
Insurance (Section C-17.2)
10 calendar days from Contract award
Small Arms Inventory (Section C-18.2.1)
Annually
Inventory of Government Property (Attachment A (a))
Annually
Training Plan (Attachment J-3.4)
60 days from Contract award
Drawing (Attachment K-20)
Upon delivery of Vessel

�Where are all the highlighted green Sections referring to?