20R4143 Attachment B Basic Pricing Data.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- Ice Class Tanker Federal contract opportunity
- Solicitation number
- N32205-20-R-4143
About this file
This document contains a pricing template for a federal solicitation seeking an ice class tanker vessel. The template includes pricing tables to be completed by offerors for the base period and four option periods. Pricing is to be provided for crew wages, vessel costs including maintenance and repair, insurance, fuel consumption calculated using DLA Energy standard prices, and total evaluated price. Fuel types include IFO-380, IFO-180, MGO and MDO. The solicitation number is N32205-20-R-4143 and is being issued by the Department of the Navy Military Sealift Command for charter of an ice class tanker vessel. Offerors are instructed to complete the pricing template with daily, annual and total pricing as applicable for the vessel proposed.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic Pricing Data
| Attachment B REV1 | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4143 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 365-day year | |||
| Base Period | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 365 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 1
| Attachment B REV1 | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4143 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 365-day year | |||
| Option Period One | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 365 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 2
| Attachment B REV1 | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4143 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 366-day year | |||
| Option Period Two | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 366 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 3
| Attachment B REV1 | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4143 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 365-day year | |||
| Option Period Three | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 365 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Option 4
| Attachment B REV1 | Vessel: | ||
| Basic Pricing Data | RFP: N32205-20-R-4143 | ||
| Unless otherwise specified by the offeror, the price and profit identified below will be assumed | |||
| (a) allocable to the services of the Vessels under this Charter | |||
| (b) in US dollars | |||
| (c) based upon a 335-day year | |||
| Option Period Four | |||
| PRICE PER DAY | |||
| 1 | Crew wages, etc., as itemized in Attachment C | ||
| 2 | Crew Training, not separately itemized in Attachment C | ||
| 3 | Victualling, stores, and water | ||
| 4 | Crew transportation/repatriation | ||
| 5 | Other crew costs (itemize at lines 5-7) | ||
| 6 | |||
| 7 | |||
| 8 | Total crew-related expenses (lines 1-7 above) | $ - 0 | |
| 9 | Maintenance and repair | ||
| 10 | Lubricants | ||
| 11 | Survey and classification expenses | ||
| 12 | Equipment and materials | ||
| 13 | Capitalized costs (Vessel) | ||
| 14 | Depreciation (Vessel) | ||
| 15 | Other Vessel costs (itemize at lines 15-17) | ||
| 16 | |||
| 17 | |||
| 18 | Total Vessel costs (lines 9-17 above) | $ - 0 | |
| 19 | Protection and indemnity premia | ||
| 20 | Protection and indemnity deductibles paid | ||
| 21 | Hull and machinery premia | ||
| 22 | Hull and machinery deductibles paid | ||
| 23 | Other insurance costs (itemize at lines 23-25) | ||
| 24 | |||
| 25 | |||
| 26 | Total insurance costs (lines 19-25 above) | $ - 0 | |
| 27 | Other (itemize at lines 27-30) | ||
| 28 | |||
| 29 | |||
| 30 | |||
| 31 | General and administrative expenses | ||
| 32 | Profit |
33 Total daily costs from above multiplied by 335 $ - 0
34 Days assumed off-hire per year
35 Line 33 divided by the number of days assumed on-hire per year $ - 0
Fuel Consumption Data
| Attachment B REV1 | Vessel: |
| Fuel Consumption Data | RFP: ICE-CLASS TANKER LONG-TERM TIME CHARTER |
Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below. If more than one fuel type is burned either underway or in-port please use extra rows provided.
| Box # | Description | # Days | Metric Tons/day | Fuel Type | Price per Metric Ton | Total | |
| 89 | Fuel Underway (laden) | 791 | $ - 0 | (Fuel type for Box 89 is IFO-380) | |||
| Other Fuel Type (if necessary) | $ - 0 | ||||||
| 90 | Fuel Underway (ballast) | 316 | $ - 0 | (Fuel type for Box 90 is IFO-380) | |||
| Other Fuel Type (if necessary) | $ - 0 | ||||||
| 92 | In-Port Loading | 554 | $ - 0 | (Fuel type for Box 92a is MGO) | |||
| Other Fuel Type (if necessary) | $ - 0 | ||||||
| 92 | In-Port Discharging | 318 | $ - 0 | (Fuel type for Box 92b is MGO) | |||
| Other Fuel Type (if necessary) | $ - 0 | ||||||
| 1979 | TOTAL: | $ - 0 | |||||
| Notes: |
| Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and |
| appropriate fuel conversion factors. The rates to be used are as follows: |
| MGO/MDO: | (1) $778.77 per metric ton |
| IFO-180: | (2) $490.64 per metric ton |
| IFO-380: | (3) $486.26 per metric ton |
| Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request, |
| prior to offers being received, that rates for that fuel be posted via an amendment. |
Fuel conversion factors are as follows:
| MGO/MDO: | 7.507 barrels per metric ton |
| IFO-180: | 6.526 barrels per metric ton |
| IFO-380: | 6.468 barrels per metric ton |
TOTAL EVALUATED PRICE
| TOTAL EVALUATED PRICE | |||
| PER DIEM | |||
| DAILY CHARTER HIRE RATE | # OF DAYS | TOTAL PER DIEM/PERIOD | |
| BASE PERIOD | 365 | $ - 0 | |
| OPTION 1 | 365 | $ - 0 | |
| OPTION 2 | 366 | $ - 0 | |
| OPTION 3 | 365 | $ - 0 | |
| OPTION 4 | 335 | $ - 0 | |
| FAR 52.217-8 | 183 | $ - 0 | |
| 1979 | |||
| TOTAL EVALUATED FUEL | $ - 0 |
PORT CHARGES DIFFERENTIAL N/A
DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR
REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR
TOTAL EVALUATED PRICE $ - 0
File details come from the government source that posted it. Updated .