20Q0136_Attachment 3_QASP.pdf

PDF 281 KB Posted

Attached to
Barge Overhaul and Repair Services
Solicitation number
N3904020Q0136
Issued by

About this file

This document contains a Quality Assurance Surveillance Plan (QASP) and related federal contract opportunity notice. The QASP outlines quality metrics and inspection methods for barge overhaul and repair services required by the Naval Sea Systems Command. Key deliverables include hazardous waste control, underwater hull inspection and repair, equipment preservation, lifeline and stanchion repair, hull preservation, anode replacement, deck preservation, temporary services, towing services, and cleaning/pumping. Quality, timeliness and responsiveness are measured, with a maximum error rate of 0%. The Contracting Officer's Representative will perform inspections and customer feedback will be collected. Performance standards are outlined along with procedures for meeting or not meeting standards. The related federal contract opportunity is a small business set-aside solicitation for barge overhaul services from the Portsmouth Naval Shipyard to a contractor facility and back. The performance period is July 1 to October 15, 2020. A mandatory site visit is scheduled for June 17, 2020 and requests to visit must be submitted by June 8.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3904020Q0136 Attachment 3

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

YC 1620 OVERHAUL AND MODERNIZATION

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued there under. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received.

2. AUTHORITY

Authority for issuance of this QASP is provided under FAR 52.212-4(a), Inspection/Acceptance, and FAR 52.212-4(m), Termination for cause, and documentation called for in the contract to be accomplished by the Contracting Officer or his duly authorized representative.

3. SCOPE

The QASP is put in place to provide Government surveillance oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract or task order. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan.

4. GOVERNMENT RESOURCES

The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.

Contracting Officer’s Representative (COR)/Alternate Contracting Officer’s Representative (ACOR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.

5. RESPONSIBILITIES

The Government resources shall have responsibilities for the implementation of this QASP as follows:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative (COR) - The COR/ACOR is responsible for administration of Code 350 Barge Program Manager and assures proper Government surveillance of the Contractor’s performance. The COR or ACOR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action. The COR will serve as the Quality Assurance Evaluator (QAE).

6. METHODS OF QA SURVEILLANCE

The below listed methods of surveillance shall be used in the administration of this

QASP.

Customer Feedback – Customer feedback may be obtained from random customer complaints. Naval Supply Systems form 1343 will be made available by the COR for the patrons. The COR shall have sole custody of the suggestion box. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the COR.

Inspections – Each phase of the services rendered under the contract is subject to Government inspection during the Contractor’s operations and after completion of a task.

Inspections may be routine functions performed by the COR. Government inspections may be conducted in an unannounced manner by the COR or ACOR. The COR shall maintain a Contract Discrepancy Report (CDR), a copy of which will be provided to the Contractor. Within three days, the Contractor shall reply in writing to CDR(s) by stating reason(s) for unsatisfactory performance(s) and shall identify the corrective action(s) that will be taken to prevent recurrence(s).

IDENTIFIED QUALITY ASSURANCE SURVEILLANCE ITEMS

The following PBSC items are identified within the Statement of Work presented in Section C of the solicitation and are to be monitored under this QASP.

All deliverables covered by this contract

Measurement/Metric – Quality, Timeliness, and Responsiveness.

Performance Standard – Quality – shall focus on the contractor’s ability to satisfactorily meet the customer’s expectations of completed work. How many deficiencies were found or instances of rework were required are the types of things that shall be examined.

Timeliness – within the times and periods, such as on time delivery of products, status reports, invoicing, contractor’s written response within 3 days of CDR(s), and adherence to schedules shall impact any review of Timeliness.

Responsiveness–shall be concerned with how well the contractor responds to customer concerns and the approach used to resolve problems.

Maximum Error Rate – Quality - 0% Timeliness – 0% Responsiveness – 0%

COR may perform unannounced inspections at any time during the availability.

7. DOCUMENTATION

The COR will, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance file. All such records will be retained for the life of this contract. Information in the Quality Assurance file will be considered when completing the annual Contractors Performance Assessment Reporting Systems report.

8. ATTACHMENTS

Enclosure – QASP Matrix

Attachment 3

QUALITY ASSURANCE SURVEILLANCE PLAN (MATRIX)

YC 1620 ROUTINE OVERHAUL

Deliverable or Service

Requirement

Measurement/ Metric

Performance Standards Maximum Error Rate

Method of Surveillance

Procedures to be taken when performance standards are met/not met

Hazardous Waste Control 077-11-001

Quality

Timeliness

Responsiveness

Contractor’s ability to satisfactorily meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% -Contracting Officer’s Representative (COR) review of Hazardous Waste Manifest Form and Generator Identification number.

-Customer feedback

FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented on

CPARS.

In Addition, FAR 52.246-4 (f)

Underwater Hull Inspection and Repair 110-11-001

Quality

Timeliness

Responsiveness

Contractor’s ability to satisfactorily meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% -COR review UT inspection results.

-COR visually inspect completed work

- Customer feedback

FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented on

CPARS.

In Addition, FAR 52.246-4 (f)

Void; Clean, Inspect, and Preserve.

123-21-001

Quality

Timeliness

Responsiveness

Contractor’s ability to satisfactorily meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% COR review initial inspection report

-Unannounced inspections conducted by the COR and/or by (ACOR)

-COR review of final inspection report.

-Customer feedback

FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented on

CPARS.

In Addition, FAR 52.246-4 (f)

Lifeline and Stanchion; Repair 612-01-001

Quality

Timeliness

Responsiveness

Contractor’s ability to satisfactorily meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% -COR inspect newly installed equipment.

-Customer feedback

FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented on

CPARS.

In Addition, FAR 52.246-4 (f)

Underwater Hull and Freeboard Preserve 631-01-001

Quality

Timeliness

Contractor’s ability to satisfactorily meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to

0% -COR inspect completed work.

-Customer feedback

FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented on

Responsiveness customer concerns and the approach used to resolve problems.

Hull Zinc Anode;

Replace 633-01-

Quality

Timeliness

Responsiveness

Contractor’s ability to satisfactorily meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% -COR inspect completed work.

-Customer feedback

FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented on

Main Deck Exterior;

Preserve 634-01-001 meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% -COR inspect completed work.

-Customer feedback

Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented on

Provide Temporary Services 992-01-001 meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0%

-COR inspection for location of connections, fire alarm system components.

-Inspect protective deck covering.

-Customer feedback

FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented on CPARS.

Towing Service;

Provide 992-01-002 meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% -COR inspect towing equipment.

-Customer feedback

FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented

Cleaning and Pumping;

Accomplish 992-01-003 meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems

0% -COR inspect completed work.

-Customer feedback

FAR Clause 52.212-4 “Contract Terms and Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented

997-11-001 Drydock, -COR witness events.

Fleet and Undock;

Accomplish

Quality

Timeliness

Responsiveness meet the customer’s expectations of completed work.

On time delivery of products, status reports, invoicing Contractor’s written response within 3 days of CDR(s)

How well the contractor responds to customer concerns and the approach used to resolve problems.

0% -Customer feedback

Conditions – Inspection /Acceptance

Positive: Letters of Commendation and/or Appreciation, Favorable Performance Reviews.

Negative: Performance will be documented