20M063CN Buildings HP105 HP125 HP195 Roof Repair Project PD.pdf
PDF 61 KB Posted
- Attached to
- Buildings HP105, HP125 & HP195 Roof Repair
- Solicitation number
- N4008525R2554
About this file
This is a Project Description document for a roofing replacement project at Camp Lejeune, North Carolina, issued by the Naval Facilities Engineering Command. The scope of work involves replacing existing shingle roof systems with standing seam metal roofing systems on three Bachelor Enlisted Quarters buildings (HP115, HP125, and HP195).
The document specifies that the facilities will remain operational throughout the construction period, requiring the contractor to minimize interference with normal operations. The contractor is responsible for moving furniture and objects in the project area as needed. The supervision requirements indicate that one qualified person may simultaneously serve as Superintendent, Quality Control Manager, and Safety & Health Officer if they meet the qualifications for all three positions as defined in the project specifications.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DESCRIPTION
This scope of work is to be accomplished in BEQ buildings HP115, HP125, and HP195 located on Camp Lejeune, North Carolina. Contractor shall Provide the following: Replace existing shingle roof systems with standing seam metal roofing systems on all noted Bachelor Enlisted Quarters noted.
SPECIAL SCHEDULING
The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity. The furniture and other objects in the project area are to be moved by the contractor if required.
SUPERVISION
One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.
File details come from the government source that posted it. Updated .