- INTEGRATED SOLID WASTE MANAGEMENT FOR GENERAL WASTE COLLECTION AND DISPOSAL SERVICES AT YOKOSUKA
- Solicitation number
- N4008420B0412
About this file
This document outlines requirements for an indefinite delivery/indefinite quantity contract for integrated solid waste management services at U.S. Commander Fleet Activities Yokosuka in Japan. The contractor will provide refuse collection, disposal, and recycling services for general waste at multiple locations, including segregating combustible waste for disposal at an on-base incinerator. The contractor must comply with applicable recycling and hazardous waste regulations. The contract will have both recurring and non-recurring components, with the minimum guaranteed amount covering recurring services. Non-recurring task orders will be issued for additional work. The Navy seeks a partner to safely and responsibly provide these services in accordance with required quality, environmental, safety, and security standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 012-0200000-07_ELINs_ISWM_GwYsk_Revised-nB.PDF | ||
| Amend0003.pdf | ||
| Amend0002.pdf | ||
| Amend0001.pdf | ||
| KTR-SoP-ELINs_ISWM_Renew19D0402.xls | XLS spreadsheet | |
| 20B0412A.pdf | ||
| 20B0412C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIIBO.JAMES.1236109
Digitally signed by
SIIBO.JAMES.1236109670
Date: 2019.12.21 14:11:31 +09'00'
GRANVILLE.KIMBERL
Y.LYNET.1229502863
Digitally signed by
GRANVILLE.KIMBERLY.LYNET.1229
502863 Date: 2020.01.07 06:45:01 +09'00'
B-1
PART I - THE SCHEDULE
SECTION B: SUPPLIES OR SERVICES AND PRICES/COSTS
TABLE OF CONTENTS
Para # Title Page #
B.1 CONTRACT LINE ITEMS AND CONTRACT SUBLINE ITEMS B-2
B.2 NAFS 5252.216-9313, MAXIMUM QUANTITIES (JUN 1994) B-2
B.3 INDEFINITE QUANTITY INDIVIDUAL CONTRACT LINE ITEM QUANTITIES B-2
SCHEDULE OF PRICE B-3
UNCLASSIFIED / FOR OFFICIAL USE ONLY
B-2
PART I - THE SCHEDULE
SECTION B: SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 CONTRACT LINE ITEMS AND CONTRACT SUBLINE ITEMS
a. Bidders/Offerors shall enter unit prices and amounts for contract line items (CLINs), and exhibit line items (ELINs) as indicated in the schedules and the accompanying exhibits, Attachment J-0200000-07.
b. In the event that there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid/offer and the total of the CLINs, or ELINs will be recomputed accordingly. The CLIN which includes recomputed contract ELINs will also be recomputed to take into account the change in the contract ELIN. If the bidder/offeror provides a total amount for a CLIN or ELIN but fails to enter the unit price, the total amount divided by the CLIN, or ELIN will be held to be the intended unit price.
c. The accompanying exhibits will be used as the basis of deductions pursuant to NFAS
5252.246-9303, “CONSEQUENCES OF CONTRACTOR'S FAILURE TO PERFORM
REQUIRED SERVICES”.
B.2 MAXIMUM QUANTITIES
The Government intends to award a Firm Fixed Price (FFP), Indefinite-Delivery Indefinite- Quantity (IDIQ) contract comprised of recurring and non-recurring CLINs. The minimum guaranteed amount is recurring portion of the contract as specified under CLIN 0001. Non-recurring CLIN for the award is 0002. Recurring & non-recurring CLINs for the option years may/may not be exercised. See the option clause for the contract. The maximum shall not be exceeded except as may be provided for by formal modification to the contract. Task/Delivery orders to be issued under non-recurring CLINs 0002, 0004, 0006, 0008 and 0010, may be ordered by the Government within the maximum, not-to-exceed amount.
B.3. NON-RECURRING WORK (IDIQ) CONTRACT LINE ITEM QUANTITIES
The estimated line item quantities for the indefinite quantity portion of the contract may be unilaterally increased by the Contracting Officer by one unit or 30 %, whichever is greater, so long as the total estimated contract price is not exceeded. The Contractor is not obligated to furnish any additional quantity under a line item beyond 130 %. Any quantity greater than 130 % of the original contract line item may be ordered at the bid price if the Contractor agrees by signing the task order.
Date: mm/dd/yyyy
NAME OF OFFEROR OR CONTRACTOR:
LINE ITEM Q'TY UNIT AMOUNT
NO.
Item 0001 Recurring, Base Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) Services of General Waste for a Period of One Year.
From 1 June 2020 through 31 May 2021.
Item 0002 Non-Recurring, Base Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 June 2020 through 31 May 2021.
Item 0003 Recurring, First Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) Services of General Waste for a Period of One Year.
From 1 June 2021 through 31 May 2022.
Item 0004 Non-Recurring, First Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 June 2021 through 31 May 2022.
Item 0005 Recurring, Second Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) Services of General Waste for a Period of One Year.
From 1 June 2022 through 31 May 2023.
Item 0006 Non-Recurring, Second Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 June 2022 through 31 May 2023.
Item 0007 Recurring, Third Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) Services of General Waste for a Period of One Year.
From 1 June 2023 through 31 May 2024.
Item 0008 Non-Recurring, Third Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 June 2023 through 31 May 2024.
SCHEDULE OF PRICE
ITEM
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 B-3
Date: mm/dd/yyyy
NAME OF OFFEROR OR CONTRACTOR:
LINE ITEM Q'TY UNIT AMOUNT
NO.
SCHEDULE OF PRICE
ITEM
Item 0009 Recurring, Fourth Option Period 1 LS ¥ Provide Integrated Solid Waste Management (ISWM) Services of General Waste for a Period of One Year.
From 1 June 2024 through 31 May 2025.
Item 0010 Non-Recurring, Fourth Option Period 1 LS ¥ Provide Unit Priced Task Work (NTE) upon receipt of a Task Order From 1 June 2024 through 31 May 2025.
TOTAL: (LINE ITEM 0001 through 0010) ¥ FY20 Exchange Rates, $1 = 111.1542¥ -$
CLIN 9000 Exhibit A (Base Period)
CLIN 9001 Exhibit B (First Option Period)
CLIN 9002 Exhibit C (Second Option Period)
CLIN 9003 Exhibit D (Third Option Period)
CLIN 9004 Exhibit E (Fourth Option Period)
NOTE: The number of Placeholders established depends on the maximum number of lines of accounting anticipated on an individual task order.
Detail line items for task order is located in Attachment J-0200000-07
CLIN = CONTRACT LINE ITEM
LS = LUMP SUM
NTE = NOT-TO-EXCEED
Q'TY = QUANTITY
Note: GE was formulated based on market research conducted for same or similar items, previous purchases of similar or same items, and experience of technical engineers for this requirement.
SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104 B-3
C-1
SECTION C
Index
Annex Sub Annex Spec Item # Title Annex 1 0100000 1 General Information
Annex 2 0200000 2 Management and Administration
Integrated Solid Waste Management Services, Annex 15 1503030 1 General Information
Annex 15 1503030 2 Management and Administration
Annex 15 1503030 3 Recurring Work
Annex 15 1503030 4 Non-recurring Work
0100000 – General Information Spec Item Title 1 General Information
1.1 Outline of Services
1.2 Project Location
1.3 Acquisition of Additional Work
1.4 Background Information
1.5 Verification of Workload and Conditions
1.6 Climate Patterns
1.7 Related Information
1.8 Navy Approach to Service Contracting
1.8.1 Partnering Philosophy
1.8.2 Contractor's Knowledge
1.8.3 Industry Best Practices
1.9 Standard Template
1.10 Navy PBSA Approach
1.11 Technical Proposal Certification
Spec Item Title Description 1 General Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Navy Region Japan to include the U.S. Commander Fleet Activities Yokosuka (CFAY), Japan and outlying areas supported by this installation under a performance-based contract that is comprised of both Recurring Work and Non- Recurring Work items
The PWS is organized into annexes. Annex 1 is "General Information". Annex 2 contains the on-site project management and administration requirements.
Annexes 3 through 18 contain the technical requirements. The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven (7) digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information Annex 2 Management and Administration Annex 3 Not Applicable (N/A) Annex 4 N/A Annex 5 N/A Annex 6 N/A Annex 7 N/A Annex 8 N/A Annex 9 N/A Annex 10 N/A Annex 11 N/A Annex 12 N/A Annex 13 N/A Annex 14 N/A Annex 15 Facilities Support Sub Annex 1503030 Integrated Solid Waste Management Annex 16 N/A Annex 17 N/A Annex 18 N/A
1.2 Project Location The work shall be performed at various locations and could vary from location to location, Yokosuka Main Base, NOF Urago, Azuma island, Hakozaki and Ikego in the U.S. Commander Fleet Activities, Yokosuka (CFAY), in Japan.
(1) Integrated Solid Waste Management: various locations in the CFAY
1.3 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations, identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the Non-Recurring Work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.4 Background Information Commander, Navy Region Japan
Acts as Navy representative and coordinator in our area of responsibility, executes shore installation management, and promotes operability and conducts liaison with the Japan Maritime Self Defense Force.
Additional information for Commander Navy Region Japan is available at:
http://www.cnic.navy.mil/Japan/index.htm.
Commander Fleet Activities Yokosuka Our mission is to maintain and operate base facilities for the logistic, recreational, administrative support and service of the U.S. Naval Forces Japan, U.S. SEVENTH Fleet and other operating forces forward-deployed in the Western Pacific.
Commander Fleet Activities, Yokosuka comprises 568 acres and is located 43 miles south of Tokyo at the entrance of Tokyo Bay and approximately 18 miles south of Yokohama. Yokosuka is on the Miura peninsula in the Kanto Plain region of the Pacific Coast in Central Honshu, Japan. CFAY is the largest overseas U.S. Naval installation in the world and is considered to be one (1) of the most strategically important bases in the U.S. military.
Additional information for Commander Fleet Activities Yokosuka is available at: https://www.cnic.navy.mil/Yokosuka/index.htm
1.5 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.
As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
1.6 Climate Patterns Average rainfall data can be found at the following website:
Japan Meteorological Agency http://www.jma.go.jp/jma/index.html
Naval Oceanography Antisubmarine Warfare Center Fleet Activities Yokosuka
(NOAC)
http://www.usno.navy.mil/NOOC/noac-yokosuka
Joint Typhoon Warning Center (JTWC) http://www.usno.navy.mil/JTWC/
1.7 Related Information There are four (4) types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Spec Item Title Description
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.8 Navy Approach to
Service Contracting
The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.
The Navy also supports the following principles:
1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion. Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use Contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).
1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract. Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information.
Specification Item 2 will always contain the management and administrative requirements. Specification Item 3 will always contain the Recurring Work requirements. Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item
3.1 is applicable to all 3.1 subordinate specification items. Specification Items
Spec Item Title Description
3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 must be priced and their price must be allocated across the Exhibit Line Items.
1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four (4) component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.11 Technical Proposal
Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
0200000 – Management and Administration Spec Item Title
2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Informal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Government Information Technology (IT) System
2.3.8 Directives, Instructions, and References
2.3.9 Invoicing Procedures
2.3.10 Forms
2.4 Government-Furnished Property, Materials and Services
2.4.1 Government-Furnished Facilities (GFF)
2.4.2 Government-Furnished Utilities
2.4.3 Government-Furnished Materials (GFM)
2.4.4 Government-Furnished Equipment (GFE)
2.4.5 Government-Furnished Services (GFS)
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Service Interruptions
2.6.6 NAVFAC MAXIMO
2.6.7 Quality Management System (QMS)
2.6.7.1 Quality Management (QM) Plan
2.6.7.2 Quality Inspection and Surveillance
2.6.7.3 Quality Inspection and Surveillance Report
2.6.8 Property Management Plan
2.6.9 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental/Energy Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 DBIDS Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.8 Access to Sensitive Unclassified Information
2.8.9 Access to Navy Marine Corps Intranet (NMCI)
2.8.10 Employee Status
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Chemical Hazard Communication Program
2.9.3.3 Confined Space Program
2.9.3.4 Critical Lift Plan
2.9.3.5 Fall Prevention and Protection Plan
2.9.3.6 Emergency Response Plans
2.9.3.7 Public Safety Plan
2.9.4 Crane Operations
2.9.4.1 Crane Inspections
2.9.4.2 Rigging Gear
2.9.4.3 Crane Operators
2.9.5 Accident and Damage Reporting
2.9.5.1 Accident Reporting and Notification Criteria
2.9.5.2 CFAY Accident Reporting Notification
2.9.6 Fire Protection
2.9.7 Monthly On-Site Labor Report
2.9.8 OSHA Citations and Violations
2.9.8.1 Japanese Labor Standards Inspection Office (LSIO) Citations and Violations
2.9.9 Safety Inspections and Monitoring
2.9.10 Safety Certification
2.9.11 Safety Apparel on Jobsites
2.9.12 Emergency Medical Treatment
2.9.13 Excavations
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 Sampling, Testing and Laboratory Services
2.10.2.2 ODS Requirements for Refrigerant Recycling
2.10.2.3 Solid Waste Management and Recycling
2.10.2.4 Non-Regulated Waste Disposal
2.10.2.5 Regulated Waste Disposal
2.10.2.6 Universal Waste
2.10.2.7 Spill Prevention, Containment, and Clean-up
2.10.2.8 Hazardous Material Management
2.10.2.9 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.10 Noise Control
2.10.2.11 Salvage
2.10.2.12 Asbestos Containing Material (ACM)
2.10.2.13 Air Emission
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Notification to the Government for Work Above the Recurring Work Limitations
2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.3 Non-Recurring Work ELINs
2.16 Performance Evaluation
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General Information
2.2.1 Government Regular
Working Hours The Government's regular working hours are from 0800-1645, five (5) days per week, Monday through Friday, except observed Federal holidays.
Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to Contractor
Working Hours
Unless otherwise specified, the Contractor’s normal working hours for performing contract requirements are from every day.
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage Determinations N/A
2.2.3 Requirements Hierarchy Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General Administrative
Requirements
2.3.1 Required Conferences
and Meetings
The Contractor shall attend administrative and coordination meetings. The Pre-Performance Conference meeting shall be held within 14 calendar days after the date of award. The Contractor shall attend meetings as shown in J-0200000-02. Submit request for the pre-performance conference per section F.
The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two (2) working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence. Historically, there have been approximately one (1) meeting per month.
2.3.2 Training for Maintenance
and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering To increase the likelihood of successful performance of this contract, the
Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Partnering should accomplish three (3) goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated by the KO. The senior Government stakeholder present will lead the meeting, however, the Contractor’s Project Manager (PM) or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.3.2 Contract Partnering
Administration
Upon award, the Administrative Contracting Office (ACO) will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering.
A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Quality Manager Site Safety and Health Officer
2.3.4 Permits and Licenses The Contractor shall provide evidence of such Permits and Licenses to the COR as a part of QM plan before work commences and at other times as requested by the KO. The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, host nation (Japanese), prefecture, and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of Insurance
The Contractor shall submit certificate of insurance including contract number, contract title, and following sentences.
Note: The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum Insurance
Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
a. Comprehensive General Liability: ¥50,000,000 per occurrence
b. Automobile Liability: ¥20,000,000 per person, ¥50,000,000 per occurrence for bodily injury, ¥3,000,000 per occurrence for property damage
c. Workmen's Compensation: As required by Japanese worker's compensation and occupational disease statutes
d. Employer's Liability coverage: ¥10,000,000
e. Other as required by Japanese Law
Above insurance coverage’s are to extend to Contractor personnel operating Government-owned equipment and vehicles.
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.7 Government Information
Technology (IT) System
N/A
2.3.8 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.9 Invoicing Procedures Refer to Section G for invoicing instructions and following web sites.
Wide Area Work Flow (WAWF) web site:
https://wawf.eb.mil/
Online training of WAWF web site:
https://wawftraining.eb.mil/wbt/
NAVFACFE portal for contractors information:
https://www.navfac.navy.mil/navfac_worldwide/pacific/fecs/far_east/abou t_us/contractors_information.html.
2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-04.
Refer to J-0200000-04 in Section J for all forms referenced of Quality Management System Pre-Performance Review Checklist, Contractor Incident Report System (CIRS), Contractor’s Fire Prevention Guide Form, Fire Usage Request, Hot Work Permit, Special Permission Energized Electrical Work Permit, Environmental Brief Checklist for Contractor and Sub Contractor(s), Hazardous Substance Spill Contingency Plan, CFAY Solid Waste Tonnage Report, Environmental Protection Plan (EPP) Form, Sample Form of APP, and Sample Form of AHA, Personal History Statement, Solid Waste Management Report, Contractor Hazardous Material Inventory Log, Monthly Man Hour Report, VOC/HAP Tracking Form.
2.4 Government-Furnished
Property, Materials and Services
In accordance with Section H, paragraph H.10 Government-Furnished Property and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities utilities, materials, equipment and services for use in connection with this contract as stated below.
A list of Government Furnished Property, Materials, and Services are provided in J-1503030-04.
2.4.1 Government-Furnished
Facilities (GFF)
The Contractor shall be responsible for such facilities accepted for use and shall take adequate precautions to prevent fire hazards, odors, and vermin.
Janitorial services for Government-furnished facilities shall be provided by the Contractor. The Contractor shall obtain written approval from the KO per Section F. Any such modifications or alterations approved by the Government will be made at the expense of the Contractor. At the completion of the contract all facilities shall be returned to the Government in the same condition as received, except for reasonable wear and tear.
The Government will furnish or make available to the Contractor the facilities Bldg. 1829 (incinerator plant) and Bldg. 5004, Material Recovery Facility (MRF) shown floor plan and phots in J-1503030-08.
The Government reserves the right to require facilities deemed as unsafe or unclean by the KO to be removed or repaired within 24 hours of notification.
2.4.2 Government-Furnished
Utilities
The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. The Contractor shall provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Those shall meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
The Contractor is responsible for the cost of all utilities at all Government-provided facilities and any additional Contractor-owned facilities, at prevailing Naval Station rates. The Contractor will be billed directly for all utilities provided to all Contractor occupied facilities. Utility rates billed to the Contractor will be at the following rates. The quantities will be estimated where meters are not provided based on UFC 3-401-05N.
1. Electrical - the current rate for electrical services is $242.01 MWH
2. Water - the current rate for water is $13.74 per KGAL
3. Wastewater (Sewage) - the current rate for sewage services is $8.88 per KGAL, based on 100% of the water consumption
Variations in Rates: Utility rates are subject to change. Changes in one
(1) or more utility rates shall not be basis for adjustment to the contract price or a claim unless the deviation from the quoted price for a utility rate exceeds 15%. When a utility rate varies by more than 15%, the contract price will be adjusted to reflect the amount the actual charge exceeds the rate quoted; however, the Government will only be liable for the amount of cost exceeding 15% of the rate quoted. For example, if a quoted rate increases by 16%, the Government will only be liable for 1% of the rate increase. Vice versa if the quoted rate decreases by 16%.
Historically, electrical and water utility consumption at the Government- Furnished Facilities has averaged approximately 351 MWH of electricity and 316 KGAL annually. However, historical data associated with contracts prior to this solicitation may present data that may not be representative of the requirements specified in this contract.
2.4.3 Government-Furnished
Materials (GFM)
None.
2.4.4 Government-Furnished
Equipment (GFE)
The Government will provide the Contractor the use of existing and available Government – owned equipment as listed below.
32 and 50 Gallon Containers, Segregation type bin and Dumpster specified in J-1503030-05 as necessary.
1) The Contractor shall provide periodic servicing, maintenance, and repair of the equipment accepted for use. Servicing, maintenance, and repair shall be provided in accordance with the manufacturer's recommendations, and records of all work performed shall be maintained and made available to the KO upon request.
2) The total or partial breakdown or failure of the Government-furnished equipment shall not relieve the Contractor’s responsibility of fully performing the work in accordance with the contract. Upon completion or termination of the contract, all Government-owned equipment shall be returned to the Government in the same condition as received, except for normal wear and tear. Equipment which becomes worn out due to normal wear and tear shall be returned to the Government. The Contractor shall be responsible for the cost of any repairs or replacement caused by negligence or abuse.
3) The Contractor and KO shall conduct a joint inventory prior to commencing work under this contract to determine the exact number and serviceability of Government-furnished equipment. The
Contractor shall then certify the findings of this inventory before assuming full responsibility, and subsequently report inventory discrepancies to the KO. Government-furnished equipment shall not be removed from the U.S. Naval Base/ facility unless approved by the KO in writing.
2.4.5 Government-Furnished
Services (GFS)
Waterborne Transportation for Azuma Island Work The Government will provide necessary daily transportation for personnel, for Azuma Island work providing notification is given to the Government not less than seven (7) calendar days in advance. The Government will provide this daily waterborne transportation at no cost to the Contractor between Arai Dock and the U.S. Navy Azuma Petroleum Area.
Contractor's personnel shall possess a valid security pass to the Petroleum area prior to boarding at Arai Dock. Transportation will be by small boat with a capacity of about 20 people. In addition to above, the U.S.
Government will also provide waterborne transportation for the Contractor's truck and it's operator between the ramp adjacent to Berth 5 at the U.S. Fleet Activities, Yokosuka, and the U.S. Navy Azuma Petroleum Area, at no cost to the Contractor, providing that written notification specifying the size of the truck for this movement is submitted not less than seven (7) calendar days in advance.
2.5 Contractor-Furnished
Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available.
The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
The Contractor shall furnish following material:
Bag, Plastic 19-1/2 x 38-1/2 x 14-1/2 inches, for lining of 50 Gallon
Containers.
The Contractor shall record quantities used for above item per month and submit report per section F, unless direction by COR.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards.
Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work Reception Unless otherwise specified hereinafter, the Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls/order and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided per Section F.
2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business. In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls. The work schedule shall be provided per Section F.
2.6.4 Deliverables Records and reports are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government. All Contractor submittals shall be in English or may be submitted in Japanese with English translations.
Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.
Deliverables shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable.
Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
The Government shall take ownership of all the Management and Administration submittals to include but not limited to those listed in Section F. The Contractors including relating OEM, agency and personnel shall not claim any ownership of the submittals to the Government.
The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website.
The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website. Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.
2.6.5 Service Interruptions If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures per Section F. If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.
2.6.6 NAVFAC MAXIMO N/A
2.6.7 Quality Management
System (QMS) The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:
Accurate documentation of work processes, procedures, and output measures.
A systematic procedure for assessing compliance with performance objectives and standards.
Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
The Contractor QMS Pre-Performance Review Checklist for compliance with this requirement is provided in J-0200000-04.
2.6.7.1 Quality Management
(QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.
The Contractor’s QM Plan shall include, at a minimum, the following:
• Policy and objectives of Quality Management System (QMS)
• Quality organization o List of personnel/employee o Organization chart o Responsibilities & lines of authority o Training and qualifications o Quality manager resume
• Approach to assuring quality of services provided and conformance with performance objectives and standards
• Methods and procedures for effective planning, operation and control of processes and performance of work
• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work
• Documentation and records management
• Communication with government (customers)
2.6.7.2 Quality Inspection and
Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the KO after termination of the contract per Section F.
2.6.7.3 Quality Inspection and
Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month.
The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.8 Property Management
Plan
The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted per Section F.
2.6.9 System and Equipment
Replacement
The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced.
Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.
2.7 Personnel Requirements The Contractor shall comply with the personnel requirements stated below.
Note: The Contractor will not be allowed to bring any employees aboard United States Forces, Japan (USFJ) installations and areas from countries listed in under USFJ Instruction 31-204 (Designated Third Country Nationals).
2.7.1 Key Personnel The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.
The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.
Key personnel shall be able to speak, read and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures or an interpreter shall be made available at no additional cost to the Government.
2.7.1.1 Project Manager (PM) The Contractor shall provide a PM and designated alternate, as applicable, who has full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within two (2) hours after the Government requests.
The PM shall have at least three (3) years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.
2.7.1.2 Quality Manager The Contractor shall provide a Quality Manager or designated alternate shall be on-site during performance work and the Government's regular working hours and shall be available on-site within two (2) hours after the Government request.
The Quality Manager must report directly to a senior corporate official and shall not report directly to the PM.