This is Amendment A001 to Solicitation 2032H326R00017 issued by the Department of the Treasury, Procurement Services Division, on July 30, 2026. The amendment extends the proposal due date from August 31, 2026 to September 11, 2026 at 1:00 PM EST. Proposals must be submitted to ARLENE.DAVIS@TREASURY.GOV. The solicitation is for a firm fixed price competitive bid contract under GSA Small Business for mechanical, electrical, and control system work at the Treasury Department facility located at 1500 Pennsylvania Avenue, NW, Washington DC 20220, with a 365-day delivery period following award.
The scope of work consists of two mechanical phases involving removal and installation of CRAC (Computer Room Air Conditioning) units in Vault 9, modification and installation of two new 44-inch doors with STC 50 Level 4 ratings and X-10 locks in vault rooms, electrical work including new conduit, wiring, circuit breakers and receptacles, and Siemens controls integration with BACnet interface to both CRAC units. Work includes certified air and water balancing, factory start-up and training, and integration of the units onto the Building Automation System. The work is outlined in referenced drawings dated March 19, 2026 (MT Vault 9 M&E drawings) and June 6, 2026 (MT Vault 9 Installation of New Doors). The delivery location is designated as SSP (Small Business Set-Aside Program), and the contract is FOB Destination.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QAs.pdf | ||
| MT Vault-9 ME drawings dated 3-19-2026.pdf | ||
| APU No. 26-01 - Attachment 2 - Fillable.pdf | ||
| WD.pdf | ||
| Schedule 26PRSSP0238.docx | DOCX document | |
| APU No. 26-01 - Attachment 1 - Fillable.pdf | ||
| 2032H326R00017.pdf | ||
| MT Vault 9 Installation of New Doors dated 6-6-26 (1).pdf | ||
| Corporate Experience Worksheet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
2032H326R00017 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
WASHINGTON DC 20220
SUITE 2100
TDP
MAIL STOP: 1425 NEW YORK AVE, NW
1500 PENNSYLVANIA AVENUE, NW
PROCUREMENT SERVICES DIVISIONS
DEPARTMENT OF THE TREASURY
26PR-SSP-023807/30/2026
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/30/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of AMENDMENT A001
1) Change the proposal due date from 8/31/2026 to 09/11/2026 @ 1:00PM EST
SUBMIT PROPOSALS TO (ARLENE.DAVIS@TREASURY.GOV)
Delivery: 365 Days After Award
Delivery Location Code: SSP
SSP
US DEPARTMENT OF THE TREASURY-DEPAR
FINANCIAL MANAGEMENT, ATTN:MET SQUA
1500 PENNSYLVANIA AVE., NW
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
ARLENE Y. DAVIS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: (202)286-9646 ARLENE.DAVIS@TREASURY.GOV
A001
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
2032H326R00017
WASHINGTON DC 20220 US
FOB: Destination
0001 1. BACKGROUND
This is a firm fixed price competitive bid contract under GSA Small Business.
2. SCOPE OF WORK
The contractor shall provide all labor, tools, equipment, management, supplies and any other items deemed necessary to complete the following:
a) Remove and install the CRAC units in Vault 9 and remove, modify and install two new doors in
Vault 9 as outlined in: a) MT Vault 9 M&E drawings dated 3-19-26 and b) MT Vault 9
Installation of New Doors dated 6-6-26.
The work is outlined in the documents under
“ADDITIONAL DOCUMENTS.” The scope of work includes, but is not limited to, the items identified therein.
A. Mechanical Phase 1
a. Remove the existing doors in V9E and V9D and enlarge wall opening. Forty-four-inch door to be installed in each opening. LAN room door will be
STC 50 Level 4. Both doors will be equipped with hardware including X-10 lock as per the drawings.
Existing card reader to be reused.
b. Shut off existing CRAG 9-1 and make it safe for removal.
c. Disconnect all power and water connections.
d. Rigg, remove and dispose of the existing CRAG 9-1.
e. Provide and install (1) floor stands to match footprint of the new Liebert unit.
f. Modify raised floor tiles and supports around new floor stands.
g. Provide and install new CRAC-9-1 as shown.
h. Provide and install all required pipes, valves and fittings as per the drawings.
i. Fabricate and install ductwork and damper as per the drawings.
j. Provide and install pipe insulation on all new pipes.
k. Perform certified air and water balancing.
l. Provide factory start-up and training for CRAG 9-1.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
2032H326R00017
B. Mechanical Phase 2
a. Shut off existing CRAG 9-1A and make it safe for removal.
b. Disconnect all power and water connections.
c. Rigg, remove and dispose of the existing CRAG 9-1A.
d. Provide and install (1) floor stands to match footprint of the new Liebert unit.
e. Modify raised floor tiles and supports around new floor stands.
f. Provide and install new CRAC-9-1A as shown.
g. Provide and install all required pipes, valves and fittings as per the drawings.
h. Provide and install pipe insulation on all new pipes.
i. Perform certified air and water balancing.
j. Provide factory start-up and training for CRAG 9-1.
k. Repair wall openings and reinstall existing doors that had been previously removed.
Electrical Scope:
a. Provide and install all electrical circuits, raceways, wire and devices per the drawings.
b. Demolish existing power to CRAG unit to be removed.
c. Furnish and install new conduit, wiring, and circuit breakers, and disconnects to CRAG units
9-1 and 9-1A.
d. Furnish and install new conduit, wiring, and devices for two new receptacles by CRAG units.
Each receptacle is a dedicated circuit to panels.
e. Furnish and install conduit connection to CRAG unit one for Low Voltage Control.
Scope of Work Siemens Controls
a. Demo and make safe (1 CRAG) of control connection prior to the demolition by others.
b. Controls for CRAG units (Qty-2) per the below:
a. BACnet interface to (2) units. Furnish control communication wiring to (2) units' manufacturer on board controllers.
b. Mount and wire Space Temp/Humidity
c. Provide labor to assist in integration of the units onto the BAS system.
c. Update point names/ signal as needed in Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
2032H326R00017
Siemens programming database and graphics on the front end.
ADDITIONAL DOCUMENTS:
b) MT Vault 9 M&E drawings dated 3-19-26
c) MT Vault 9 Installation of New Doors dated 6-6-26