2032H326Q00053 Amend 0003.pdf
PDF 294 KB Posted
- Attached to
- Department of Treasury 5th Floor Renovation
- Solicitation number
- 2032H326Q00053
About this file
This is Amendment P0003 to Request for Quote (RFQ) 2032H326Q00053 issued by the Internal Revenue Service (IRS), AWSS/Procurement division on July 23, 2026.
The amendment extends the RFQ due date from August 31, 2026 at 1:00 PM ET to September 10, 2026 at 2:00 PM ET. Offerors must submit one electronic copy of their complete quote to Christian.Fowler@treasury.gov. The quote shall provide a lump sum price with breakout into three renovations listed in Section I: Price Schedule, along with all necessary backup documentation. The response may be 10 to 15 additional pages beyond the solicited document page count if needed, excluding price schedules, representations/certifications, staffing forms, corporate experience worksheets, licenses, and amendment acknowledgments from the page count calculation. Resumes are included in the page count.
The amendment provides answers to 16 questions received from vendors. Key responses include: bond requirements allowing 60 days for acceptance with bond due within 15 calendar days after Notice of Award; contractor work commencement required within 15 calendar days of award with 365 calendar days for completion including final cleanup; invoicing submission to www.ipp.gov with simultaneous copies to the Contracting Officer and COR on a percentage complete basis with 5% retainage; U.S.-manufactured materials requirement with allowance for Buy American-compliant products and documented exceptions where U.S. products are unavailable or cannot meet performance requirements; and substantial completion definition requiring all fire and life safety systems to be tested and accepted by the authority having jurisdiction.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
2032H326Q00053 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Lanham MD 20706
TDP-IRS
5000 Ellin Road OS:A:P:T, Stop C7-430 AWSS/Procurement
INTERNAL REVENUE SERVICE
07/23/20260003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/23/2026
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
1. Extend the Request for Quote due date from 31 August 2026, at 1:00 PM ET to 10 September
2026; 2:00 PM ET.
2. Provide answers to questions received. See Amend #0003 Attachment 1.
3. Provide vendor attendance list for the site visit and open Interested Vendors List on SAM posting.
No other changes within this Amendment
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
X 1
SUMMARY OF CHANGES
Amendment P0003
UPDATES to the FOLLOWING (In order of questions received):
QUESTION #3:
(SF 1442 Item 12b, p. 1; RFQ SOW Section 17, pp. 20-21)
12. BOND REQUIREMENTS
a. If the successful bidder upon acceptance of its offer by the Government within the period specified for acceptance fails to execute all contractual documents or give a bond(s) as required by the solicitation within the time specified, the Contracting Officer may terminate the contract for default.
b. Unless otherwise specified in the offer, the bidder will, (1) allow 60 days for acceptance of its offer and give bond within 15 calendar days after receipt of Notice of Award.
QUESTION #4:
(SF 1442 Item 11, p. 1; RFQ Clause C.1, p. 30; SOW Sections 17, 20, and 23.5)
C.1 52.211-10 -- COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 days calendar days after the date the Contractor receives the award, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days. The time stated for completion shall include final cleanup of the premises.
QUESTION #12 & #58:
(RFQ Instructions Section 4.B-4.C, p. 56; Basis for Award p.58)
A. QUOTE DUE DATE AND DELIVERY INSTRUCTIONS
1. Due Date.
The due date for delivery of the quote is Tuesday, September 10, 2026. In order to be accepted, quote must be received, electronically, no later than 2:00 PM ET.
2. Delivery Instructions.
Offerors shall provide a lump sum quote with a breakout into the three renovations listed in Section I: Price Schedule. Offeror shall provide all back-up documentation as necessary. The quote shall be marked “2032H326Q00053 (Business Initials) Quote”
The offeror shall submit one (1) electronic copy of their complete quote to Christian.Fowler@treasury.gov. The vendor’s response can be within 10 to 15 mailto:Christian.Fowler@treasury.gov additional pages of the total page count of the solicited document or less in regard to total page count, if needed.
Note: Price schedule, Representations/Certifications, Staffing form(s), Corporate Experience Worksheets, Licenses, and Amendment acknowledgments are excluded from the total page count. Resumes are part of the page count.
QUESTION #13:
(RFQ SOW Section 12, p. 18; APU 26-01 Attachment 2)
13. INVOICING AND PAYMENT INSTRUCTIONS
(a) Invoices shall be submitted electronically to www.ipp.gov.
(b) An electronic copy shall also simultaneously be submitted to the COR and the Contracting Officer.
(c) Submission of proper invoices shall be rendered on a percentage complete basis in an amount equal to the value of the work performed.
(d) Each invoice submitted shall be supported by appropriate documentation.
Documentation necessary to substantiate an invoice shall include, but is not limited to project name and number, invoice number, percent complete, original contract amount, modification amounts, retainage amount and percent cumulative), cost of materials used this invoice, value of work in place, contractor name, and contract number. Such documentation shall meet the approval of the Contracting Officer.
Electronic Invoicing and Payment Requirements for the Invoice Processing Platform
(IPP)
Invoice Processing Platform (IPP) is a secure web-based electronic invoicing and payment information service available to all Federal agencies and their suppliers. The preferred method for invoicing through September 30, 2012 is through IPP. Effective October 1, 2012 invoicing through IPP will be mandatory for all new contract awards.
Additional information regarding IPP may be found at the IPP website address https://www.ipp.gov. Contractor assistance with enrollment can be obtained by contacting the Bureau of the Public Debt’s IPP Team at 304-480-8000, Option 7 or the IPP Help desk via e-mail at ippgroup@bos.frb.org or via phone at (866) 973-3131
Electronic Invoicing and Payment Requirements
Vendor invoices submitted electronically through IPP should be in the proper format and contain the required information for payment processing. A “proper invoice” must meet the minimum standards specified in FAR 32.905(b) in order to be approved for payment.
Under this contract, the following documents are required to be submitted as an attachment to the invoice:
Retainage will be five percent (5%). The Contractor shall submit a standard Schedule of Values (SOV) for review and approval prior to the first payment application. Monthly invoices shall include the approved SOV, updated to reflect current progress, along with supporting documentation necessary to substantiate the amounts billed.
Payment and Invoice Questions
For payment and invoice questions, contact the Accounting Services Division at (304) 480-8000 option 7 or via e-mail at AccountsPayable@bpd.treas.gov.
Waivers
If the Contractor is unable to utilize IPP for submitting payment requests starting on October 1, 2012 then a waiver form must be completed in advance and submitted via mail or e-mail for review and approval by the Contracting Officer (see Attachment 1).
Adobe Acrobat Portable Document Format (PDF) and Microsoft Word are acceptable formats for submitting waivers electronically. The vendor will be notified in a reasonable number of days as to whether their waiver has been approved or rejected. If the waiver is granted, then a copy of the waiver must be submitted with each invoice that the vendor submits to the payment office.
(End of Clause)
QUESTION #14:
(SOW General Construction Note 31, p. 10)
GENERAL CONSTRUCTION NOTES (Page 2 of 43) - SOW General Construction Note 31, p. 10
31. All materials must be U.S.A. made.
The requirement that “all materials must be U.S.A. made” applies to materials and products incorporated into the Work where U.S.-manufactured products are commercially available and meet the specified performance requirements. Buy American-compliant products will be considered acceptable for purposes of this requirement.
Where a specified or required product, including secure-space, RF-shielding, door/hardware, fire alarm, or mechanical components, is not reasonably available from a U.S. manufacturer or a compliant product cannot meet the specified performance requirements, the Contractor shall identify the item and submit the proposed alternative for review and approval prior to procurement. Such requests mailto:AccountsPayable@bpd.treas.gov shall include supporting documentation regarding country of origin, product availability, and the basis for the proposed substitution or exception. No non-compliant product shall be incorporated into the Work without prior written approval.
QUESTION #16:
(SOW General Construction Note 31, p. 10)
18. SUBSTANTIAL COMPLETION AND CONTRACT COMPLETION
FAR 52.211-10, Commencement, Prosecution, and Completion of Work, is supplemented as follows:
For the purposes of FAR 52.211-10, Commencement, Prosecution and Completion of Work, the work shall be deemed complete when it is “Substantially Complete.”
The work shall be deemed "Substantially Complete" if and only if the Contractor has completed the work and related Contract obligations in accordance with the Contract Documents, such that the Government may enjoy the intended access, occupancy, possession, and use of the entire work without impairment due to incomplete or deficient work, and without interference from the Contractor's completion of remaining work or correction of deficiencies in completed work. In no event shall the Work be deemed Substantially Complete if all fire and life safety systems are not tested and accepted by the authority having jurisdiction, where such acceptance is required under the Contract.
| 2032H326Q00053 Amend 0003 Top Pg |
| SUMMARY OF CHANGES (5th Flr Reno) |
| 12. BOND REQUIREMENTS |
| 13. INVOICING AND PAYMENT INSTRUCTIONS |
File details come from the government source that posted it. Updated .