This is a Questions and Answers document for federal contract FA283526Q0004, pertaining to Motor Fuel Maintenance services. The document provides clarifications on contract requirements and operational procedures for fuel dispenser maintenance work.

The fuel dispensers subject to maintenance are Gasboy Atlas 8700 Series units, which are metered devices. Contractors must follow Appendix A in the Performance Work Statement for maintenance and inspection requirements. The fuel filter change interval is established at every 6 months, though the Government does not currently have specific filter specifications available. No active non-compliance issues have been identified for the dispensers. Contractors should contact the Contracting Officer's Representative (COR) for instruction if repairs are needed and should be mindful of operational impact when dispensers require maintenance or emergency repairs, though no formal time limits have been established. Regarding facility access, contractors must comply with initial vehicle search requirements at gates, and any tools permitted through the security screening are authorized for work performance. All required proposal documentation must be submitted via email to kamryn.anderson@us.af.mil and amanda.thoman@us.af.mil. The Government could not provide definitive answers regarding power availability during inspections at the time of this Q&A release.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA283526Q0004 Motor Fuel Maintenance: Q&A Questions Answers

Can you clarify the manufacturer and model of the fuel dispensers?

What are the fuel filter specifications?

Are the dispensers metered?

The filter chance interval is not clear to me. Do you want this done monthly or every 300,000 gallons or every 6 months?

Will someone be available to secure power during inspection?

The fuel dispensers are Gasboy Atlas 8700 Series.

The Government does not have Filter Specifications at this time.

Yes, the dispensers are metered.

The Government settles on "every 6 months".

The Government does not have a clear answer at this time.

Is the contractor to follow Appendix A in the PWS or the individual Preventative Maintenance 1-5 attachments for components and Recommended Maintenance/Inspections?

The contractor shall follow Appendix A in the PWS.

Are there any active non-compliance issues that are currently known for any of the dispensers?

The Government has not identified active non-compliance issues for any of the dispensers.

Are there any limits on how long the dispensers can be out of service for preventative maintenance or if emergency repairs are required?

No, but the contractor should be mindful of the situation.

What can and cannot be brought into this area as far as testing equipment and materials needed to complete the contract requirements?

Please follow any initial vehicle search requirements at the gates. Any tools that are allowed through the initial whicle search are permitted to perform work.

If repairs need to be made, who should the contractor contact – the COR or the Authorized Service Center to determine the proper course of action?

Can the government please confirm that proposal submission is via email to kamryn.anderson@us.af.mil?

The contractor is to contact the COR for further instruction.

Please submit all required documentation per the solicitation to kamryn.anderson@us.af.mil and amanda.thoman@us.af.mil