2026C-24 Addendum 2 Final Signed.pdf
PDF 339 KB Posted
- Solicitation number
- ITB-14940
- Issued by
- Duval County, Florida
About this file
This is Addendum No. 2 to an Invitation to Bid issued by Florida State College at Jacksonville (FSCJ) for ITB 2026C-24, concerning the construction of wayfinding monument entrances at various locations on the South Campus. The project involves the design and construction of wayfinding monument signs with associated landscape, hardscape, and irrigation improvements across five lots: Lot 1 includes the main entrance sign at Beach Boulevard (Sign Typology 1) with deductive alternates for tree removal and lighting removal; Lot 2 encompasses Sign Typology 5 with fiber optics in two options (A and B); Lot 3 covers the Huffman Road entry sign (Sign Typology 2A) with a tree removal alternate; Lot 4 includes the Alden Road entry sign (Sign Typology 2B) with a clearing alternate; and Lot 5 provides for one-year landscape maintenance. The project scope includes concrete masonry unit construction with limestone veneer, cast stone caps, LED digital displays, electrical installation, landscape demolition and restoration, fence relocation, tree removal, site grading, and landscape establishment. The original bid deadline of February 26, 2026, at 2:00 p.m. remains unchanged, with a non-mandatory pre-proposal conference held on February 4, 2026, at 10:00 a.m., and mandatory one-time site visits available thereafter. The addendum provides clarifications and answers to 30 bidder questions, replacement drawing pages for construction purposes, and a revised bid proposal submittal form. Key specifications clarified include acceptance of 3-inch thick cast stone instead of 2 inches to prevent shipping damage, removal of a $25,000 allowance from Lot 2, confirmation that contractors must supply the Digital EMC for Sign Typology 5 with warranty, illumination requirements for different sign typologies, transformer and voltage specifications for electrical work, and relocation and storage of existing lighting poles.
Bidders must acknowledge receipt of Addendum No. 2 prior to the February 26, 2026, deadline to remain responsive. All bidders must be current pre-qualified contractors approved by FSCJ. The bid submittal requirements include a proposal guarantee bond of not less than five percent of the base bid, a List of Designated Subcontractors Form with license numbers and minority business status, and a Minority Outreach Efforts Statement demonstrating efforts to achieve FSCJ's 25 percent minority business enterprise participation goal. The addendum clarifies that minority participation can include non-certified, self-reported MBE firms, and specifies that outreach advertising can be conducted through any platform acceptable to the bidder. Designated subcontractor trades required include concrete, masonry, electrical, signage, landscaping, and irrigation contractors. The solicitation contains no set-asides for disadvantaged enterprises beyond the minority participation goal, no identified incumbent vendors, and no specified contract award value or duration. Mortar color is specified as HOLCIM 200 Ivory Buff, and a one-year standard warranty applies to all products and workmanship. As of February 18, 2026, sixty-five entities had viewed the solicitation documents on the GetAll platform.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026C-24 Addendum 2 Attach C.pdf | ||
| 2026C-24 Invitation.pdf | ||
| 2026C-24 Addendum 1 Signed.pdf | ||
| 2026C-24 Addendum 1 Attach E.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 2
ISSUE DATE: 2/18/2026
FSCJ ITB NUMBER: 2026C-24
FSCJ ITB TITLE: Wayfinding Monument Entrances at Various locations at South Campus
The above numbered solicitation is amended as follows:
• Attachment “A” Clarifications, Questions and Answers
• Attachment “B” GetAll Solicitation Holders List a.k.a. Plan Holders List (As of 2/18/2026)
• Attachment “C” REPLACEMENT Drawing Pages (includes additional page S1.03): LS0.01, LD1.01, LS2.01, LS2.02, LS2.03, LS2.04, S0.01, S1.03, E1.0, E1.1, E1.2, E1.3, E2.0, and LP1.01 (a separate document “2026C-24 ADDENDUM 2 Attach C”)
• Attachment “D” “REVISED” Part 2 BID PROPOSAL SUBMITTAL
The hour and date specified for receipt of bids:
_X_ is not extended, remains: February 26, 2026 at 2:00 p.m.
___ is extended until: __________________________________________________________________ ___ posting date is extended until: ________________________________________________________
Except as provided herein, all terms and conditions of the solicitation, including changes made by all prior addenda (if any), remain unchanged and in full force and effect.
Bidders must acknowledge receipt of this addendum prior to the time set for receipt and opening of bids as specified in the solicitation, or as amended, by one of the following methods:
(a) By signing and returning one copy of this addendum.
(b) By acknowledging receipt on the copy of the bid submitted.
FAILURE TO ACKNOWLEDGE RECEIPT OF THIS ADDENDUM PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If, by virtue of this addendum, you desire to change an offer already submitted, such change may be made by letter, provided such letter makes reference to the solicitation and this addendum and is received prior to the opening hour and date specified.
Randi Brokvist Executive Director of Purchasing
(Complete this portion)
TO BE RESPONSIVE ALL BIDDERS MUST ACKNOWLEDGE RECEIPT OF ADDENDUM #2
COMPANY: __________________________________________
SIGNATURE: _________________________________________
TITLE: _______________________________________________
DATE: _______________________________________________
FSCJ ITB: 2026C-24 Attachment A FSCJ ITB TITLE: Wayfinding Monument Entrances at Various locations at South Campus
ADDENDUM NO. 2
CLARIFICATIONS
1. The Question Deadline has passed.
2. Bidders are to utilized the Attachment “C” REPLACEMENT Drawing Pages (includes additional page S1.03): LS0.01, LD1.01, LS2.01, LS2.02, LS2.03, LS2.04, S0.01, S1.03, E1.0, E1.1, E1.2, E1.3, E2.0, and LP1.01 (a separate document “2026C-24 ADDENDUM 2 Attach C”) included with the Addendum #2 for construction and bidding purposes.
3. Bidders are to submit the “REVISED” Part 2 BID PROPOSAL SUBMITTAL as identified as Attachment “D”
QUESTIONS AND ANSWERS
1. Q: Please provide the warranty period for this project.
A: Standard 1 yr. warranty for all products and workmanship.
2. Q: The cast stone details on LS2.03 call for 2" thick stone. Our supplier has stated that 2" tends to crack in shipping. Please advise if 3" thick cast stone is acceptable
A: 3” thick is acceptable. Details on sheet LS2.03 have been revised.
3. Q: Sheet LP1.01 references a proposed '6” curb 7/LS3.02'. This page does not appear to be included in the bid set, please clarify the intent
A: The 6” curb was deleted. Sheet LP1.01 has been revised.
4. Q: Sheet LP1.01 indicates clear delineation between landscape materials. Can you clarify what the intent is to make this separation?
A: Contactor to bid plant quantities listed in the PLANT SCHEDULE on sheet LP0.01. The Landscape Calculations Chart is provided for City of Jacksonville submittal purposes only.
5. Q: The drawings indicate two layers of barricades for separation in accordance with SREF. Does this mean all areas of work need to be double fence with screening for the entire work site?
A: All signage locations require a two-layer separation. Where there is impervious conditions or a two-layer separation is not possible either cones, plastic barriers, caution tape maybe used. There can only be one entry point.
6. Q: Please confirm that the $25,000 allowance should be included in Lot 2 “Option A”.
A: The $25,000 dollar allowance is being removed from the documents. This scope will be for both options A & B.
Locate current fiber path, intercept and extend conduit to referenced locations A or B. Pull new fiber from Building
M1 to new location. Include a 25’ cable allowance for inside of Building M1. Fiber will be OM2 rated with LC connectors. Provide Testing and Certification. Bidders are to submit the “REVISED” Part 2 BID PROPOSAL SUBMITTAL as identified as Attachment “D”
7. Q: We would like to request some clarification regarding the table listed in the "Minority Outreach Efforts Statement" document, specifically item number 5. The form currently states that it is intended for "Minority Women Owned" businesses. However, I noticed that the minority types for all categories are still listed below the table. Could you please clarify if this table is for women owned only? Additionally, the statement above the table references listing "potential" subcontractors. Could you provide a generalized explanation of the purpose of this table and what is expected from us in terms of filling it out?
A: The MINORITY OUTREACH EFFORTS STATEMENT form question #5 states: “Identify minority or woman owned subcontractors…” The table heading should be “MINORITY AND WOMAN OWNED SUBCONTRACTOR’S SOLICITED.”
As the College has a 25% GOAL to achieve for State Reporting of MBE’s usage, the College ask that you include a list of all MBE subcontractors you have solicited as potential subcontractors.
8. Q: With some of the signage pillars being fully enclosed once the concrete cap is poured, can the contractor assume that whatever form material is used will remain in the CMU pillar? And, does the type of material matter (e.g. wood support, galvanized deck)?
A: The form material may remain in place. If form material is to remain in place provide insulated concrete forms (IFCs) or similar material suitable for permanent installation.
9. Q: Section 1C/S1.01 shows 12" CMU Block walls aligned with the 8" block above. No other sections show the 12" CMU.
Please provide extents and heights for the 12" block walls.
A: 12” CMU block is only at noted section until the wall steps in and 8” is provided above. See updated Sheets for marked extents of 12” block.
10. Q: Paragraph 25 of the Instructions to Bidders states FSCJ's Minority Participation policy for solicitation. With the recent removal of DEI initiatives, many of the certifying agencies for small and minority businesses have dissolved their DEI programs and no longer offer MBE certificates. Please clarify how we are to address this and still meet the requirements of the ITB.
A: As the College has a 25% GOAL to achieve for State Reporting of MBE’s usage, the College ask that you include a list of all MBE subcontractors you will use or you have solicited as potential subcontractors. This can include “Non- Certified Self-Reported” MBE firms.
11. Q: 'Sheet LP0.01 references 2/LP1.02 for the planting plans for the entrance at Alden Road. LP1.02 does not have a detail
2 for the entrance at Alden Road. Please provide.
A: No plants are being installed at the entrance at Alden Road. The reference to 2/LP1.02 has been removed from sheet
LP0.01.
12. Q: Sheet LR0.01 references 2/LR1.02 for the irrigation plans for the entrance at Alden Road. LP1.02 does not have a detail
2 for the entrance at Alden Road. Please Provide.
A: No plants are being installed at the entrance at Alden Road. The reference to 2/IR 1.02 has been removed from sheet
IR0.01.
13. Q: Detail 1/LS2.04 references footings to be designed by structural. Structural drawings do not include drawings for these sign types. Please clarify.
A: See updated Structural Drawings
14. Q: Sheet LD1.02 calls out removal and relocation of gate at Alden Road and Firefighter Memorial Drive. It appears that there is no gate at that location. Please clarify if the gate exists and what the scope is for this area.
A: There is an existing gate attached to the 2’ sq. CMU columns. This gate will be relocated, as shown on plans.
15. Q: Fencing is shown, but no details/product type is shown or listed. Please clarify what type of fence is existing and provide details for what is desired.
A: The existing metal picket fence is located at the ROW, runs the length of the north boundary of the site.
16. Q: There is no mortar color/type called out on the product schedule. Please provide mortar color and type for stone and block.
A: Please use HOLCIM 200 Ivory Buff.
17. Q: Multiple sections show a cast-in-place cap, which supports the precast cap. No details show how the slab is to be supported. Please provide details that include how to form and how the slab is supported.
A: See Structural sections, cap is doweled into the CMU walls. Contractor to provide forms for slab. If form is to remain in place it must be an insulated concrete form or other material.
18. Q: On the material/product schedule, Item B notes that the signage letters are to be backlit channel letters on 1" stand offs. Please confirm if ALL lettering on sign typology 1 is to be backlit. Additionally, please confirm what type of backlighting is needed (face lit, halo illuminated, etc.)
A: Only the letters on the column “FSCJ Florida State College at Jacksonville – South Campus” are to be backlight. Type of lighting to be determined by sign fabricator.
19. Q: Detail 3/LS2.01 shows a signage box, but the elevation shows lettering and signage is to be surface mounted. Please confirm if an aluminum signage box is required for sign typology 1.
A: Signage box will be required for the wiring of back lit channel letters. Refer to revised sheets LS2.01, LS2.02 and
LS2.04.
20. Q: There is no mention of illumination for signage types 2A and 2B. Please confirm all lettering is NOT illuminated.
A: Sign typology 2A and 2B are to be illuminated from ground mounted up lighting, see sheets E1.2 andE1.3.
21. Q: Sign Typology 2A and 2B do not clearly state what type of materials are to be used. Please clarify the specification and product selection for these signs.
A: Sign Typology 2A and 2B are constructed with the same thin limestone veneer and honed limestone veneer for the vertical surfaces and same 2” thick honed limestone for the cap.
22. Q: Please confirm if the Contractor is to supply the Digital EMC noted for Sign Typology 5. If so, please provide product selection, performance, and warranty requirements.
A: Yes, contractor to provide Digital EMC noted for Typology 5, with warranty. See note #6 for regarding fiber.
23. Q: What are the outreach requirements for item 4 of the Minority Outreach Efforts Statement? Is soliciting the project on platforms such as Planhub and Cbids acceptable? Does this bid require that we advertise via public newspaper?
A: Please refer to questions 7 & 10. Yes, any platform is acceptable and bid does not require advertising via public newspaper.
24. Q: Sheet E1.1 note 1 states that we are to "remove lighting pole," but the note next to the note 1 tags on the electrical plan states "relocate (2) con. light poles.... store (2) conc. pole." Please confirm the two poles with the note 1 tag, regardless of the note, are to be removed and stored per FSCJ's direction, and that the two poles with note 2 tag are the poles being relocated to the island.
A: Two poles to be relocated and two poles to be removed and stored per FSCJ direction. All four lighting fixtures to be relocated
25. Q: What are the requirements for the night time lighting mock-up per note 7 on LS0.01? Does this pertain to one sign type?
A: Nighttime lighting mock up requirement has been removed.
26. Q: Structurals have muliple notes stating "precast cap. by other." Are we to include the precast caps in our pricing? What is the material for the precast caps?
A: Yes, include the cost of the precast caps in your pricing.
27. Q: Sheet E1.0, detail "DMX Control Equipment Mounting Detail", what is meant by "provide enclosure ac"?
A: Provide enclosure cooling unit to maintain a maximum of 90 degrees Fahrenheit inside the box. Revised drawings will be issued.
28. Q: Sheet E1.2, Detail 2: Notes Connect to existing lighting circuit. Can you verify existing voltage?
A: Provide transformer at the closest pole, 480- 240/120V. Provide #10 wires in ¾” conduit to lighting fixtures. Field verify voltage of lighting poles. Revised drawings will be issued.
29. Q: Can you verify voltage at existing lights at Alden Road?
A: Provide 240/120V secondaries transformers and pick up power from the nearby by lighting pole. Field verify voltage of lighting poles. Revised drawings will be issued.
30. Q: Sheet LD1.01 notes to remove and store all 4 light poles. Electricals conflict. Please advise.
A: Notes on sheet LD1.01 have been revised to match notes on Electrical. Two poles to be relocated and two poles to be removed and stored per FSCJ direction. All four lighting fixtures to be relocated.
GetAll Solicitation Holders List a.k.a. Plan Holders List (As of 2/18/2026) Attachment B
Solicitation: 2026C-24 - Wayfinding Monument Entrances at Various locations at South Campus
Company Viewed On
Tim Young Construction, Inc. tracy@timyoungconstruction.com Monday, January 26, 2026
WELBRO ssawyer@welbro.com Monday, January 26, 2026
Elitetex LLC program@governmentbuy.com Monday, January 26, 2026
Tower Davis Construction, LLC chuck@tower-davis.com Monday, January 26, 2026
Lakeside Sign Company wes.kaye@lakesidesigncompany.com Monday, January 26, 2026
CGC INC office@cgccivil.com Monday, January 26, 2026
STG Contracting Group, Inc. clw@stgcontractinggroup.com Monday, January 26, 2026
LEGO Construction snethi@legocc.com Monday, January 26, 2026
Holman Inc jcole@holman-inc.com Monday, January 26, 2026
ACON Construction Co., Inc. cwatson@aconcci.com Monday, January 26, 2026
LEGO Construction CO. nip@legocc.com Monday, January 26, 2026
Marand Builders malvarado@marandbuilders.com Monday, January 26, 2026
Marand Builders jjohnson@marandbuilders.com Monday, January 26, 2026
Dominicus USA mhernandez@dominicusrd.com Monday, January 26, 2026
OLIVENCIO CNSTRUCTION LLC olivenciojp@gmail.com Monday, January 26, 2026
Outstanding Concrete Construction Services LLC jamesjohnsonjr3@yahoo.com Monday, January 26, 2026
SevenOutsource rfpalerts@gmail.com Tuesday, January 27, 2026
Southeastern Lighting Solutions and Signs Florida izzie@southeasternlightingsolutions.com Tuesday, January 27, 2026
Southeastern Lighting Solutions and Signs Florida izzie@southeasternlightingsolutions.com Tuesday, January 27, 2026
LEGO Construction Co. mas@legocc.com Tuesday, January 27, 2026
Birken Construction, Inc. mo@birkeninc.com Tuesday, January 27, 2026 i2 Visual, Inc. john.hose@i2visual.com Tuesday, January 27, 2026
Complete Signs liz@completesigns.net Tuesday, January 27, 2026
Franklin Bronze Plaques audrey@franklinbronzeplaques.com Tuesday, January 27, 2026
Prime Vendor Inc. primevendor124@gmail.com Tuesday, January 27, 2026
PWXPress bids@pwxpress.com Tuesday, January 27, 2026
Gratia davidopoku@gogratia.com Tuesday, January 27, 2026
Sun State Nursery and Landscaping, LLC trey@sunstatenursery.com Wednesday, January 28, 2026
Portal Genial Serv TI LTDA licitaja@licitaja.com.br Wednesday, January 28, 2026
Watchfire hunter.orme@watchfire.com Wednesday, January 28, 2026
ConstructConnect ashley.welker@constructconnect.com Wednesday, January 28, 2026
Visual visualbidalerts@gmail.com Thursday, January 29, 2026
E. Vaughan Rivers, Inc. arielle.pennington@riversconstruction.com Friday, January 30, 2026
Priority One Sign angelar@priority1sign.com Friday, January 30, 2026
CC Borden Construction ccborden@ccborden.com Friday, January 30, 2026
SignCrafters sales@signcraftersflorida.com Friday, January 30, 2026
KBT Contracting Corp info@kbtcorp.com Friday, January 30, 2026
Catalyst Construction nola@catalystcci.com Friday, January 30, 2026
Company Viewed On
GFL elliot@gfltrees.com Friday, January 30, 2026
The Engineering Company guillermod@theengineeringco.com Friday, January 30, 2026
BidJudge.com az@bidjudge.com Friday, January 30, 2026
EGX Group spencer@egxgroup.com Friday, January 30, 2026
Stewart Signs jthrash@stewartsigns.com Friday, January 30, 2026
Gtech contracts@alliedsolutionenterprise.com Monday, February 2, 2026
SIGNSTAR angela.burney@signstar.net Monday, February 2, 2026
Kept Companies jason.krynock@keptcompanies.com Monday, February 2, 2026
Sample Supplier erfp@sysoft.com Tuesday, February 3, 2026
Signdealz werner@signdealz.com Tuesday, February 3, 2026
Ruppert Landscape Phayes@ruppertcompanies.com Wednesday, February 4, 2026
New Day Services dba Fish Window Cleaning ballan@fishwindowcleaning.com Wednesday, February 4, 2026
Warden Construction jsantora@wardencc.com Wednesday, February 4, 2026
Dodge Construction Network darlene.baker-mann@construction.com Wednesday, February 4, 2026
Amazing Buildings LLC info@amazingbuildings.net Wednesday, February 4, 2026
United Land Services mstinson@unitedlandservices.com Thursday, February 5, 2026
E. Vaughan Rivers, Inc. ginger@riversconstruction.com Thursday, February 5, 2026
HOC UNLIMITED ADVERTISING, LLC / HOC SERVICE GROUP manager@hocua.com Thursday, February 5, 2026
Kenco Sign and Awning LLC ledpartnersfl@gmail.com Friday, February 6, 2026
SignCrafters of Florida barry@signcraftersflorida.com Friday, February 6, 2026
Anuvision Technologies Inc svyne@anuvisiontech.com Tuesday, February 10, 2026
Rhema Global Llc fercastro@exportcosta.com Tuesday, February 10, 2026
Lauretano Sign Group tabithakennedy@lauretano.com Thursday, February 12, 2026
WELBRO Building Corporation akerr@welbro.com Thursday, February 12, 2026
Clark-Powell rkessinger@clark-powell.com Monday, February 16, 2026
McLafferty Contracting Group, LLC stephan.mclafferty@gmail.com Monday, February 16, 2026
Kim’s Electric Inc kim.kimselectric@comcast.net Tuesday, February 17, 2026
Taylor Sign and Design staylor@taylorsignco.com Tuesday, February 17, 2026
Attachment C
REPLACEMENT Drawing Pages (includes additional page S1.03): LS0.01, LD1.01, LS2.01, LS2.02, LS2.03, LS2.04, S0.01, S1.03, E1.0, E1.1, E1.2, E1.3, E2.0, and LP1.01 (a separate document “2026C-24 ADDENDUM 2 Attach C”)
“REVISED” Part 2 BID PROPOSAL SUBMITTAL Attachment D
Florida State College at Jacksonville
ITB 2026C-24
Titled: Wayfinding Monument Entrances at Various locations at
South Campus
PART 2
BID PROPOSAL SUBMITTAL
The GetAll website will require that the Dollar Cost Values be entered prior to uploading the supporting submittal document files. If unable to provide the individual line-item service, enter $0.00 (zero dollars) and add in comments “Not able to provide.”
Every line-item dollar amount MUST be completed with a numerical value in order for your submission to be accepted and submitted to the College. These individual dollar amounts MUST match the dollar amounts stated in the Part 2 Cost Bid Proposal. If there are any discrepancies, the signed Part 2 written Bid Proposal amounts will prevail.
To Include:
• Bid Guarantee Bond
• List Of Designated Subcontractors Form
• Minority Outreach Efforts Statement
Date: ___________________________
Name of Bidder: _________________________________________________________
Respectfully submitted by Bidder: _________________________________________ Officer Signature and Title
Print Officer Name
Area Code/Telephone No Extension
SEAL:
STATE OF _________________________
COUNTY OF _______________________
PERSONALLY APPEARED BEFORE ME, the undersigned authority, ____________________________ (Name of individual signing) who, after first being sworn by me, affixed his/her signature in the space provided on this ________ day of _________________, 20_____.
____________________________________________ (NOTARY PUBLIC)
My Commission Expires: _____________________________
PROPOSAL FORM
PROJECT: ITB #2026C-24 Wayfinding Monument Entrances at Various locations at South Campus
Date: ___________________________
Name of Bidder: _________________________________________________________
Address: ________________________________________________________________
To: District Board of Trustees c/o Executive Director of Purchasing Florida State College at Jacksonville 501 West State Street Jacksonville, Florida 32202-4068
_____ have received and reviewed a complete set of the Contract Documents for the project titled above, including addenda _______through __________
Bidder in submitting this Proposal attests full agreement to the following:
1. TO BE RESPONSIVE: Bidder shall accomplish the work in strict compliance in accordance with the specifications including but not limited to the Special Specification Requirements listed below:
• Includes proposal guarantee that shall be in the form of a firm commitment, such as a certified or cashier's check on any national or state bank, or a bid bond issued by a Surety licensed to conduct business in the State of Florida, in a sum not less than five percent (5%) of the base bid, and made payable to the Florida State College at Jacksonville.
• Includes LIST OF DESIGNATED SUBCONTRACTORS FORM which includes sub-contracting firms license numbers and Minority Business status.
• Includes the MINORITY OUTREACH EFFORTS STATEMENT of efforts in generating Minority participation.
2. To hold this quoted bid prices firm and fixed for sixty (60) days after the date of pubic opening of bids;
3. To accept the provisions of "Instructions to Bidders" regarding the disposition and forfeiture of the Proposal Guarantee;
4. To enter into and execute Contract #2026C-24 with the Owner, if awarded on the basis of this Proposal, and if the cumulative award exceeds $200,000 to furnish the Owner a Contract 100% Performance and Payment Bond from a surety authorized to do business in Florida that complies with Section 255.05 F.S. and Insurance Certificate (as specified) in the Contract Documents;
5. To complete the work in accordance with the Contract Documents; without exception or exclusion.
6. To complete the work in accordance with the Contract Time specified in the section titled "Supplementary Conditions", “Contract Time.”
7. Does your bid fully comply with all ITB #2026C-24 specification requirements?
Agreed? Yes ______ No _____
LUMP SUM BASE BID
LOT 1 LUMP SUM BASE BID: Proposed lump sum price for the work complete and acceptable for Main Entrance at Beach Blvd. (Sign Typology 1)
Amount written out:
______________________________________Dollars ($ _______________________)
Lot 1 Deductive Alternate #1: The removal of (18) Sabal Palms.
Amount written out:
Lot 1 Deductive Alternate #2: The removal of (6) Oak Trees.
Lot 1 Deductive Alternate #3: Remove all associated tree lighting including fixtures, conduit, wiring and controllers.
LOT 2 LUMP SUM BASE BID: Proposed lump sum price for the work complete and acceptable for Sign Typology 5, both options A & B. Fiber optics is included.
Lot 2 Option A with all associated plantings and irrigation.
Lot 2 Option B with all associated plantings and irrigation.
(Continuation)
LOT 3 LUMP SUM BASE BID: Proposed lump sum price for the work complete and acceptable for the entry sign on Huffman Road. (Sign Typology 2A)
Amount written out:
Lot 3 Deductive Alternate #1: The removal of (2) Oak Trees.
LOT 4 LUMP SUM BASE BID: Proposed lump sum price for the work complete and acceptable for the entry sign on Alden Road. (Sign Typology 2B)
Amount written out:
Lot 4 Deductive Alternate #1: Clearing of the wood line of invasive species to a deep of 10’ to improve site line. Noted on Sheet LD1.02.
LOT 5 LUMP SUM BASE BID: Lawn Maintenance: Deductive Alternate
Proposed lump sum price for a (1) year maintenance service for all landscaping items installed at (Typology 1, 2A & 2B, 5). This will be based on the work cycles mentioned in the documents. (Sheet LP2.03.)
Amount written out:
Basis of Award
The College reserves the right to recommend award of this solicitation based on a Lump Sum Base bid or any Combination of Lump Sum Base bids, Lots, and alternates as deemed in the Colleges Best interest.
The required Proposal Guarantee is attached hereto? Yes _______ No ________
LIST OF DESIGNATED SUBCONTRACTORS FORM
TO BE RESPONSIVE THIS FORM (WITH DEFINED TRADE SUBCONTRACTOR’S NAME AND SUBCONRACT AMOUNT COMPLETED) SHALL BE SIGNED AND PLACED IN AN ENVELOPE, SEALED AND SUBMITTED WITH CONTRACTOR'S BID. (F.S. 255.0515) The College will require the apparent low Bidder meeting specification to submit in writing (on this form) within 24 hours after notice all additionally required information defined below (i.e. address, minority type and subcontractor license numbers) if not provided at bid opening.
Date: ________________________
This list of designated subcontractors is submitted with, and is an integral part of the bid submitted by:
(Name and Address of Contractor)
For the construction of: ITB #2026C-24 Wayfinding Monument Entrances at Various locations at South Campus
NOTE: The College reserves the right to consider a Bidder/proposer non responsive if they have not submitted with their bid/proposal a comprehensive, completed, signed minority outreach statement, as deemed in the Colleges best interest.
The following names are the subcontractors for designated trades who will perform the phases of the work indicated:
SUBCONTRACTORS (Minority & Non-Minority) to be used
Required at Bid Opening (To Be Responsive)
Required from the apparent low Bidder within 24 hours of Notice
Trade
Name of Company (If self-performed, so indicate)
Subcontract Value
Address Minority Type *
FL Trade License/ Occupational Number
Concrete Contractor
Masonry Contractor
Electrical Contractor
Signage Contractor
Landscaping
Irrigation
* Minority Type #M-1 Black American Man, M-2 Hispanic American, M-3 Asian American, M-4
Native American (Eskimo and Aleutian), M-5 Native Hawaiian, M-6 Small Business, M-7 Disabled, M-8 Women, M-9 Black American Woman and NM Not Minority.
LIST OF DESIGNATED SUBCONTRACTORS FORM
The following names are proposed alternate subcontractors for the College’s review and acceptance for designated trades who will perform the phases of the work if any or all of the bid alternates are awarded (If no change from Base Bid subcontractor listing, identify as such with N/A) Attach with your bid a detailed memo describing the ITB #2026C-24 Wayfinding Monument Entrances at Various locations at South Campus alternate planned subcontractors if it cannot be detailed fully below:
SUBCONTRACTORS (Minority & Non-Minority) to be used
Required at Bid Opening (To Be Responsive)
Required from the apparent low Bidder within 24 hours of Notice
Alt.
No.
Trade
Name of Company (If self-performed, so indicate)
Subcontract Value
Address Minority Type *
FL Trade License/ Occupational Number
"General Contractors and Minority/Woman Business Enterprises that file false misrepresentation of their MBE/WBE status shall be found guilty of a felony of the second degree and be debarred from bidding no less than 36 months pursuant to 287.094 Florida Statute."
* Minority Type #M-1 Black American Man, M-2 Hispanic American, M-3 Asian American, M-4
Native American (Eskimo and Aleutian), M-5 Native Hawaiian, M-6 Small Business, M-7 Disabled, M-8 Women, M-9 Black American Woman and NM Not Minority.
The undersigned declares that he/she has fully investigated each subcontractor listed and has received and has in his/her files evidence that each entity is currently licensed in the State of Florida and maintains a fully equipped, licensed organization capable, technically and financially, capable of performing the pertinent work, and that he has made similar installations in a satisfactory manner, and that no employees of the subcontractor are currently employees of by the College.
In witness whereof, the Bidder has hereunto set his signature and affixed his seal this _________________ day of _________________ A.D., 20 _________.
___________________________ (SEAL)
By: ______________________________
Signature: ______________________________
Florida State College at Jacksonville Minority Outreach (W/MBE) Monitoring Program
MINORITY OUTREACH EFFORTS STATEMENT
NOTE: Bidders are to submit with their bid/proposal a comprehensive completed Minority Outreach Statement that includes W/MBE awards.
Date: __________________
This statement is submitted with, and is an integral part of the bid submitted by:
(Name and Address of Contractor)
For construction of: ITB #2026C-24 Wayfinding Monument Entrances at Various locations at South Campus
Florida State College at Jacksonville has established a Minority Outreach Monitoring program. This program has a 25% minority solicitation (Invitation to Bid) goal with awards being to the low Bidder meeting specifications.
In support of this outreach program Bidders shall complete the following statements and questions which will serve to advise the College of the extensive efforts you have made to solicit and obtain Minority Subcontractor participation. It is important that you respond to each item as requested.
This list is not intended to be exclusive or exhaustive and the College will look not only at the different kinds of efforts that the Contractor has made but also the quantity and intensity of these efforts.
(1) Identify all areas of work in the contract that will be subcontracted. Specify the approximate dollar volume of each item or category stated.
Trades
(2) Specify the company’s efforts to solicit minority subcontractors for each item and/or category to be subcontracted. (Notate the name and addresses of subcontractors solicited and those that are minority or woman owned to monitor percent minority solicited).
(3) Attach available documentation evidence (i.e. Newspaper ads, W/MBE meetings held, etc.) of the effort stated in number (2).
(4) State where your company sought to obtain minority subcontractors through advertisement with the local media (Times Union; Jacksonville Advocate)
(5) Identify minority or woman owned subcontractors solicited and notate minority type by the company as potential subcontractors. Attach documentation of written correspondence concerning all solicitations. (Use additional pages as required.)
MINORITY & WOMAN OWNED SUBCONTRACTOR’S SOLICITED
Name
Address
Trade
Minority Type *
Value
* Minority Type #M-1 Black American Man, M-2 Hispanic American, M-3 Asian American, M-4 Native American (Eskimo and Aleutian), M-5 Native Hawaiian, M-6 Small Business, M-7 Disabled, M-8 Women, M-9 Black American Woman and NM Not Minority.
(6) State whether your company followed up the initial solicitations of interest by contacting minority contractors to determine with certainty whether they were interested in subcontracting on this job.
(7) Identify the areas of work which can be performed by minority sub-contractors in order to increase the likelihood of minority sub-contractor participation (consider where appropriate, breaking down the contract into economically feasible units to facilitate minority contractor participation).
(8) State whether the company provided interested minority contractors with adequate information about the plans, specifications, and requirements of the contract.
(Name and Address of Contractor)
Signature
Florida State College at Jacksonville is a member of the Florida College System and is not affiliated with any other public or private university or college in Florida or elsewhere.
Florida State College at Jacksonville does not discriminate against any person on the basis of race, disability, color, ethnicity, national origin, religion, gender, age, sex, sexual orientation/expression, marital status, veteran status, pregnancy or genetic information in its programs or activities. Inquiries regarding the non-discrimination policies may be directed to the College’s Civil Rights Compliance Office, 501 West State Street, Jacksonville, Florida 32202 | (904) 632-3221 | CRCO@fscj.edu.
Florida State College at Jacksonville is accredited by the Southern Association of Colleges and Schools Commission on Colleges to award the baccalaureate and associate degree. Contact the Commission on Colleges at 1866 Southern Lane, Decatur, Georgia 30033-4097, or call (404) 679-4500 for questions about the accreditation of Florida State College at Jacksonville. The Commission is to be contacted only if there is evidence that appears to support an institution’s significant non-compliance with a requirement or standard.
File details come from the government source that posted it. Updated .