About this file

Summary

This is a Contract Documents and Specifications package for the demolition of hazardous structures issued by the City of Scranton, Office of Community Development in Lackawanna County, Pennsylvania (Project #1021122.000). The work encompasses asbestos abatement, structural demolition, utility capping and removal, site grading and restoration, and disposal of all demolition materials for four properties located at 905 Ridge Avenue, 129 South Irving Avenue, 1949 Myrtle Street, and 1016 Stafford Avenue in Scranton, Pennsylvania. Sealed proposals must be submitted online through the City's e-Procurement Portal by 11:00 AM on Tuesday, July 14, 2026, with public bid opening to follow in City Council Chambers. Questions may be submitted until 5:00 PM on Friday, July 10, 2026. Prospective bidders must register and "Follow" the project on the e-Procurement Portal to receive addenda notifications and be eligible for consideration.

The contract documents include detailed specifications organized by division covering general requirements, existing conditions, earthwork, and exterior improvements. Asbestos inspections conducted by Quad Three Group, Inc. and analyzed by accredited laboratories (EMSL Analytical Inc. and Eurofins EPK Built Environment Testing) determined that asbestos-containing materials were not identified in the accessible areas of any of the four properties, though contractors are advised that additional testing may be required for materials that cannot be accessed until complete interior demolition. The procurement package includes requirements for Performance and Payment Bonds (AIA samples), Prevailing Wage Rates compliance, Pennsylvania Tax Exempt Disclosure, and Pennsylvania E-Verify documentation. All labor, materials, tools, oversight, and permits required to complete the demolition work are the responsibility of the selected contractor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Documents and Specifications

FOR

Demolition of Hazardous Structures Summer 2026 – Phase 1 Scranton, Lackawanna County, Pennsylvania

Owner:

City of Scranton, Office of Community Development 340 N. Washington Ave.

Scranton, PA 18503

Date: July 2026 Project #: 1021122.000

Table of Contents

SECTION 000110 – TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT & CONTRACTING REQUIREMENTS

BIDDING INSTRUCTIONS

001116 Invitation to Bid

ADDITIONAL INFORMATION

003121 Photographic Information

003126 Existing Hazardous Materials

003126.13 Asbestos Reports

BIDDING DOCUMENTS

004113 Bid Form- Stipulated Sum

004313 Bid Bond (Sample AIA-310)

CONTRACTING REQUIREMENTS

005213 Agreement by Owner (Sample)

006113.13 Performance Bond (Sample AIA-312)

006113.16 Payment Bond (Sample AIA-312)

007343 Prevailing Wage Rates

008600 PA Tax Exempt Disclosure

009200 PA E-Verify

TECHNICAL SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

011000 Summary

011100 Summary of Work

012600 Contract Modifications Procedures

012900 Payment Procedures

013100 Project Management and Coordination

015000 Temporary Facilities

Table of Contents

017300 Execution

017700 Closeout Procedures

DIVISION 02 – EXISTING CONDITIONS

024116 Structure Demolition

028213 Asbestos Abatement

DIVISION 31 – EARTHWORK

312000 Earth Moving

DIVISION 32 – EXTERIOR IMPROVEMENTS

321212 Concrete Paving

321373 Concrete Paving Joint Sealants

329200 Turf & Grasses

INVITATION TO BID 001116.21 - 1

SECTION 001116.21 – INVITATION TO BID

Notice is hereby given that the City of Scranton, Office of Economic and Community Development is seeking separate, sealed proposals for an individual or firm for the demolition of hazardous structures.

Proposals will be received online by the City of Scranton Controller via the City’s e-Procurement Portal

(https://secure.procurenow.com/portal/scrantonpa) until 11:00 AM, prevailing time on Tuesday, July 14, 2026, at which time such proposals will be opened in City Council Chambers, 2nd Floor and made available for public viewing on ECTV (www.youtube.com/user/electriccitytv570). Questions may be submitted to the City’s e-Procurement Portal until 5:00 PM, prevailing time on Friday, July 10, 2026.

Responses will be provided via City’s e-Procurement Portal to all registered parties.

CITY OF SCRANTON

Demolition of Hazardous Structures

Proposals shall be made upon the specifications included in the official Proposal Request which may be obtained by visiting the City of Scranton’s e-Procurement Portal, https://secure.procurenow.com/portal/scrantonpa. If you intend to submit a proposal, you shall register on the City’s e-Procurement Portal. If you intend to submit a proposal, you shall register on the City’s e-

Procurement Portal. Once registered, Companies may view and click "Follow" to be a prospective

Respondent for this solicitation and will appear on the Follower’s list. Companies that fail to Follow this project will not receive automatic addenda notifications, nor will they be able to draft a response in the

City’s e-Procurement Portal and therefore will be unable to participate or be considered for this RFP.

The work includes but is not limited to all labor, materials, tools, and oversight and permits required to abate existing asbestos as required and demolish the following properties in their entirety. The nature of the work includes asbestos abatement, structural demolition, capping and removal of existing utilities, site grading and restoration, and disposal of all demolition materials.

• 905 Ridge Ave, Scranton, PA 18510

• 129 S. Irving Ave, Scranton, PA 18505

• 1949 Myrtle St. Scranton, PA 18510

• 1016 Stafford Avenue, Scranton, PA 18505

PHOTOGRAPHIC INFORMATION 003121

003121 – PHOTOGRAPHIC INFORMATION

905 Ridge

129 S. Irving

1949 Myrtle

1610 Roselynn

EXISTING HAZARDOUS MATERIAL INFORMATION 003126

SECITON 003126 - EXISTING HAZARDOUS MATERIAL INFORMATION

1.1 EXISTING HAZARDOUS MATERIAL INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting

Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. Existing asbestos reports for individual houses have been prepared by Quad Three Group, Inc.

The reports of properties containing asbestos are herein attached for review and information.

LIMITED ASBESTOS CONTAINING MATERIALS INSPECTION

Throughout:

905 RIDGE AVENUE

SCRANTON, PA 18510

Prepared for:

SCRANTON OFFICE OF ECOMONIC AND COMMUNITY DEVELOPMENT

340 NORTH WASHINGTON AVENUE (MUNICIPAL BUILDING),

SCRANTON, PA 18503

Attention:

Mr. Brian Philips

Prepared by:

QUAD THREE GROUP, INC.

37 NORTH WASHINGTON STREET

WILKES-BARRE, PENNSYLVANIA 18701

PH. (570) 829 - 4200

FAX (570) 829 - 0302

PROJECT # 13030.04.47

MAY 2026

TABLE OF CONTENTS

I. EXECUTIVE SUMMARY…………………………………………….1.

II. INTRODUCTION……………………………………………………..1.

III. SURVEY AREA AND DISCUSSION……………………………....2.

IV. MATERIALS SAMPLING AND ANALYTICAL…………………...2.

V. INSPECTION FINDINGS AND RECOMMENDATIONS…………3.

VI. ASBESTOS CONTAINING MATERIALS ABATEMENT………..3.

COST

VII. INSPECTION DISCLAIMER………………………………………..4.

APPENDICES

APPENDIX A ASBESTOS ANALYSIS RESULTS

APPENDIX B SITE PHOTOS

APPENDIX C CERTIFICATIONS

Scranton Office of Economic and Community Development 340 North Washington Avenue (Municipal Building), I. EXECUTIVE SUMMARY

An Asbestos Containing Materials Inspection was conducted on April 20th, 2026 within the planned demolition site located at 905 Ridge Avenue, Scranton, Pennsylvania. The purpose of the inspection was to determine if asbestos containing materials exist within the structure.

Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc.

conducted the inspection in conjunction with demolition scheduled at the structure.

As part of this asbestos inspection, the quantities and conditions of asbestos containing materials were identified. A total of five (5) bulk material samples were collected and analyzed.

Asbestos containing materials (ACM) were not identified on the accessible areas of the structure located at 905 Ridge Avenue, Scranton, Pennsylvania

Materials that were non-suspect or were sampled and through analysis found to not contain asbestos include interior plaster / debris. Descriptions of all the material samples collected can be found in Appendix A.

If materials that were not sampled are identified and to be disturbed during future demolition, additional testing will be required to determine the asbestos content of those materials.

The conclusions presented in this report are the result of the coalition, compilation and analysis of samples and other information obtained during the inspection. The results presented in this report represent the conditions present at the time of the inspection. Quad Three Group has no control over conditions or events that occurred following the date of inspection.

II. INTRODUCTION

On April 20 th, 2026, a limited asbestos inspection was performed within 905 Ridge Avenue, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, identify and quantify asbestos containing materials (ACM) as they exist within the structure scheduled for demolition. The survey / inspection process included:

A. Inspecting the area to identify representative “suspected” asbestos-containing materials, types and sampling sites.

B. Collecting representative samples from any suspect material in order to identify all

Asbestos Containing Materials (ACM). Examples of these materials include Pipe insulation, plaster, sheet-rock, floor tiles, linoleum, etc.

1.

C. Sampling was performed by experienced, licensed personnel utilizing semi -destructive sampling techniques in an attempt to locate asbestos containing materials.

D. Laboratory analysis of the materials sampled was performed at an accredited laboratory using the EPA recommended method of polarized light microscopy (PLM) for friable samples.

III. SURVEY AREA DISCUSSION

The property was comprised of a multiple story structure at 905 Ridge Avenue. Access to the interior of the structure was limited at the time of the inspection due to structural concerns caused by the collapsing roofs, debris / brush blocking safe entrances and exits to the structure, and locked / chained doors. The Inspection was limited to the accessible areas of the structure. Major structural components include concrete, brick, stone, block, and wood.

IV. MATERIALS SAMPLING AND ANALYTICAL METHODOLOGY

The building inspection was conducted by an inspector, qualified by experience, education and training in the recognition of suspect asbestos-containing materials (ACM). An initial walk through was conducted to identify suspect asbestos containing materials and to group them into homogeneous sampling areas.

Following the walkthrough, the number of samples required to determine the presence of ACM in the study areas was determined. Sample collection was performed with the intent to identify and locate asbestos containing materials and to group them into homogeneous material categories. This grouping allowed the inspectors to identify like materials within the facility to avoid over sampling or mischaracterization of an asbestos containing material.

The majority of the ACM samples were located utilizing non-destructive techniques. Some areas of ACM may still exist in areas that could not be accessed until complete interior demolition is completed.

Representative samples of each “suspect asbestos containing material” were collected utilizing approved federal and state methods. When samples were collected, the locations were noted. Measurements were taken to determine the approximate quantity of suspect material. The condition of the material was also documented at that time.

All material samples were analyzed via Polarized Light Microscopy (PLM) as per EPA/600R- 93-116, July 1993.

The analytical results and locations for all samples collected can be found in Appendix A.

The samples were analyzed by EMSL Analytical Inc. of Cinnaminson New Jersey. EMSL is accredited by the National Institute of Standards and Technology’s “National Voluntary Laboratory Accreditation Program” NVLAP, and has developed and implemented an intra laboratory quality assurance/quality control program to ensure accuracy and consistency of results.

2.

Asbestos is present if the material analyzed is greater than one percent (>1.0%) by weight.

This stipulation is outlined in the EPA Publication EPA 500/5-85-024, Section 2.2.2.2.

V. INSPECTION FINDINGS AND RECOMMENDATIONS

Asbestos containing materials have not been identified on the accessible areas of the structure.

Asbestos containing materials are categorized as containing asbestos concentrations greater than one percent (>1.0%) by weight. Asbestos fiber concentrations less than one percent (<1.0%) by weight are still regulated under OSHA standard 1926.1101.

Below are the results of the building inspection. The results indicate the sample location, sample numbers, material and condition. Some of the materials were homogenized for sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire homogeneous material was classified as asbestos containing in accordance with Environmental Protection Agency Guidelines.

The conditions of the materials are designated as good, damaged or significantly damaged.

The following materials were found to contain more than one percent (>1.0%) asbestos by weight:

ASBESTOS CONTAINING MATERIALS WERE NOT IDENTIFIED ON THE ACCESSIBLE

AREAS OF THE STRUCTURE LOCATED AT 905 RIDGE AVENUE, SCRANTON, PA.

Analytical results for the materials sampled are located in Appendix A.

Friable materials are materials that can be crushed by applying hand pressure. Non-friable materials are materials that typically cannot be crushed by hand pressure (floor tiles/mastics). If grinding or pulverization were to occur during demolition, non-friable materials can be rendered friable.

Asbestos containing materials (friable and non-friable) located on the interior / exterior of a building, which will be disturbed during renovations / demolition, must be removed and disposed of by a licensed asbestos abatement contractor.

VI. ASBESTOS CONTAINING MATERIAL ABATEMENT COSTS

As part of this report, cost estimates have been provided to help assist the Scranton Office of Economic and Community Development to evaluate the costs associated with a renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should independently verify the quantities of materials when preparing a cost estimate for removal.

The following applies:

AREAS OF THE STRUCTURE LOCATED AT 905 RIDGE AVENUE, SCRANTON, PA.

3.

VII. INSPECTION DISCLAIMER

Data and other information in this report are only valid for the prevailing conditions identified during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.

The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The burden for financial or health consequences for action or lack of action taken by the client or the client's agent is the responsibility of the client.

4.

APPENDIX A

EMSL Analytical, Inc.

200 Route 130 North Cinnaminson, NJ 08077

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042608061EMSL Order:

Customer ID: QUAD30

Customer PO:

Project ID:

Attention: Phone:William Sterling (570) 829-4200

Fax:Quad 3 Group, Inc. (570) 829-0302

Received Date:37 N. Washington Street 04/24/2026 9:20 AM

Analysis Date:Wilkes Barre, PA 18701 04/28/2026

Collected Date:

Project: 905 Ridge Avenue

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

001-Plaster

042608061-0001

None DetectedQuartz

Non-fibrous (Other)

30%

62%

Cellulose

Hair

4%

4%

Gray

Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

001-Skim Coat

042608061-0001A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

002-Plaster

042608061-0002

None DetectedQuartz

Non-fibrous (Other)

30%

62%

Cellulose

Hair

4%

4%

Gray

Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

002-Skim Coat

042608061-0002A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

003-Plaster

042608061-0003

None DetectedQuartz

Non-fibrous (Other)

30%

64%

Cellulose

Hair

3%

3%

Gray

Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

003-Skim Coat

042608061-0003A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

004-Plaster

042608061-0004

None DetectedQuartz

Non-fibrous (Other)

30%

64%

Cellulose

Hair

3%

3%

Gray

Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

004-Skim Coat

042608061-0004A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

005-Plaster

042608061-0005

None DetectedQuartz

Non-fibrous (Other)

30%

63%

Cellulose

Hair

3%

4%

Gray

Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

005-Skim Coat

042608061-0005A

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Interior Structure -

Plaster/Debris

Analyst(s)

Jonathan Bach (2)

Michael Bocchicchio (8)

Samantha Sweeney, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127

Initial report from: 04/28/2026 20:49:55

Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 4/28/2026 8:49 PM

APPENDIX B

PHOTOS

APPENDIX C

129 SOUTH IRVING AVENUE

SCRANTON, PA 18505

WILKES-BARRE, PENNSYLVANIA 18701

PROJECT # 13030.04.51

JUNE 2026

An Asbestos Containing Materials Inspection was conducted on June 1st, 2026 within the planned demolition site located at 129 South Irving Avenue, Scranton, Pennsylvania. The purpose of the inspection was to determine if asbestos containing materials exist within the structure. Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc. conducted the inspection in conjunction with demolition scheduled at the structure.

materials were identified. A total of four (4) bulk material samples were collected and structure located at 129 South Irving Avenue, Scranton, Pennsylvania asbestos include exterior shingle materials and brick / motar. Descriptions of all the material samples collected can be found in Appendix A.

presented in this report represent the conditions present at the time of the inspection. Quad

On June 1st, 2026, a limited asbestos inspection was performed within 129 South Irving Avenue, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, The property was comprised of a multiple story structure at 129 South Irving Avenue.

Access to the interior of the structure was limited at the time of the inspection due to unknown structural conditions caused by the rear of the structure appearing to lean back on the rear porch. Large amounts of debris / brush were present blocking safe entrances and exits to the structure as well as locked / chained doors. The Inspection was limited to the accessible areas of the structure. Major structural components include concrete, brick, stone, block, and wood.

identify and locate asbestos containing materials and to group them into homogeneous is accredited by the National Institute of Standards and Technology’s “National Voluntary Laboratory Accreditation Program” NVLAP, and has developed and implemented an intra sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire by weight:

ASBESTOS CONTAINING MATERIALS WERE NOT IDENTIFIED ON THE ACCESSIBLE

AREAS OF THE STRUCTURE LOCATED AT 129 SOUTH IRVING AVENUE, SCRANTON,

PA.

renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should

AREAS OF THE STRUCTURE LOCATED AT 129 SOUTH IRVING AVENUE,

SCRANTON, PA.

during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.

The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042610827EMSL Order:

Customer ID: QUAD30

Customer PO:

Project ID:

Attention: Phone:William Sterling (570) 829-4200

Fax:Quad 3 Group, Inc. (570) 829-0302

Received Date:37 N. Washington Street 06/02/2026 9:55 AM

Analysis Date:Wilkes Barre, PA 18701 06/04/2026

Collected Date: 06/01/2026

Project: 129 South Irving Ave Scranton

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

042610827-0001

None DetectedQuartz

Non-fibrous (Other)

25%

45%

Glass30%White/Black

Fibrous

Homogeneous

Exterior Structure -

Shingle Material

042610827-0002

None DetectedQuartz

Non-fibrous (Other)

15%

70%

Glass15%White/Black

Fibrous

Homogeneous

Exterior Structure -

Shingle Material

003-Brick

042610827-0003

None DetectedQuartz

Non-fibrous (Other)

10%

90%

Red

Non-Fibrous

Homogeneous

Exterior Structure -

Brick

003-Mortar

042610827-0003A

None DetectedQuartz

Non-fibrous (Other)

40%

60%

Tan

Non-Fibrous

Homogeneous

Exterior Structure -

Mortar Foundation

004-Brick

042610827-0004

None DetectedQuartz

Non-fibrous (Other)

20%

80%

Red

Non-Fibrous

Homogeneous

Exterior Structure -

Brick

004-Mortar

042610827-0004A

None DetectedQuartz

Non-fibrous (Other)

40%

60%

Tan

Non-Fibrous

Homogeneous

Exterior Structure -

Mortar Foundation

Analyst(s)

Alex Francois (3)

Jonathan Bach (3)

Samantha Sweeney, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127

Initial report from: 06/04/2026 21:48:07

Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 6/4/2026 9:48 PM

1949 MYRTLE STREET

WILKES-BARRE, PENNSYLVANIA 18701

PROJECT # 13030.04.52

An Asbestos Containing Materials Inspection was conducted on June 1st, 2026 within the planned demolition site located at 1949 Myrtle Street, Scranton, Pennsylvania. The purpose of the inspection was to determine if asbestos containing materials exist within the structure.

Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc.

conducted the inspection in conjunction with demolition scheduled at the structure.

materials were identified. A total of four (4) bulk material samples were collected and structure located at 1949 Myrtle Street, Scranton, Pennsylvania.

asbestos include exterior shingle materials and brick / mortar foundations. Descriptions of all the material samples collected can be found in Appendix A.

presented in this report represent the conditions present at the time of the inspection. Quad

On June 1st, 2026, a limited asbestos inspection was performed within 1949 Myrtle Street, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, The property was comprised of a multiple story structure at 1949 Myrtle Street. Access to the interior of the structure was limited at the time of the inspection due to unknown structural conditions caused by suspected fire damage to the right side of the structures 2nd floor. Large amounts of debris / brush were present blocking safe entrances and exits to the structure as well as locked / chained doors. The Inspection was limited to the accessible areas of the structure. Major structural components include concrete, brick, stone, block, and wood.

identify and locate asbestos containing materials and to group them into homogeneous is accredited by the National Institute of Standards and Technology’s “National Voluntary Laboratory Accreditation Program” NVLAP, and has developed and implemented an intra sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire by weight:

AREAS OF THE STRUCTURE LOCATED AT 1949 MYRTLE STREET, SCRANTON, PA.

renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should

AREAS OF THE STRUCTURE LOCATED AT 1949 MYRTLE STREET, SCRANTON, PA.

during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.

The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The

Tel/Fax: (800) 220-3675 / (856) 786-5974 http://www.EMSL.com / cinnasblab@EMSL.com

042610825EMSL Order:

Customer ID: QUAD30

Customer PO:

Project ID:

Attention: Phone:William Sterling (570) 829-4200

Fax:Quad 3 Group, Inc. (570) 829-0302

Received Date:37 N. Washington Street 06/02/2026 9:55 AM

Analysis Date:Wilkes Barre, PA 18701 06/04/2026

Collected Date: 06/01/2026

Project: 1949 Myrtle Street, Scranton

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

042610825-0001

None DetectedNon-fibrous (Other)60%Cellulose

Synthetic

35%

5%

Tan/Black

Fibrous

Homogeneous

Exterior Structure -

Shingle Material

042610825-0002

None DetectedQuartz

Non-fibrous (Other)

10%

63%

Cellulose

Synthetic

25%

2%

Tan/Black

Fibrous

Homogeneous

Exterior Structure -

Shingle Material

042610825-0003

None DetectedQuartz

Non-fibrous (Other)

40%

60%

Gray

Non-Fibrous

Homogeneous

Exterior Structure -

Brick Mortar

Foundation

042610825-0004

None DetectedQuartz

Non-fibrous (Other)

25%

75%

Gray

Non-Fibrous

Homogeneous

Exterior Structure -

Brick Mortar

Foundation

Analyst(s)

Adam Einwechter (2)

Brett Teixeira (2)

Samantha Sweeney, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Cinnaminson, NJ NVLAP Lab Code 101048-0, AIHA LAP, LLC-IHLAP Lab 100194, PA ID# 68-00367, LA #04127

Initial report from: 06/04/2026 15:14:29

Page 1 of 1ASB_PLM_0008_0002 - 2.31 Printed: 6/4/2026 3:14 PM

1610 ROSELYN STREET

Mr. Brian Phillips

WILKES-BARRE, PENNSYLVANIA 18701

PROJECT # 13030.04.54

UPDATED

An Asbestos Containing Materials Inspection was conducted on May 16th, 2024 and updated in June 2026, within the planned demolition site located at 1610 Roselyn Street, Scranton, Pennsylvania. The purpose of the inspection was to determine if asbestos containing materials exist within the structure. Mr. William Sterling (PA Asbestos Inspector #057069) of Quad Three Group, Inc. conducted the inspection in conjunction with demolition scheduled at the structure.

materials were identified. A total of two (2) layers of material samples were collected and structure located at 1610 Roselyn Street, Scranton, Pennsylvania asbestos include exterior concrete foundation. Descriptions of all the material samples collected can be found in Appendix A.

presented in this report represent the conditions present at the time of the inspection. Quad

On May 16 th, 2024, and updated June 2026, a limited asbestos inspection was performed within 1610 Roselyn Street, Scranton, Pennsylvania. The purpose of the inspection was to visually locate, identify and quantify asbestos containing materials (ACM) as they exist within the structure scheduled for demolition. The survey / inspection process included:

The property was comprised of a three-story structure at 1610 Roselyn Street. The interior of the structure offered limited access at the time of the inspection due to unknown structural conditions. Holes in the roof and third floor of the structure as well as collapsed stairs rendered the structure unsafe for entry. The Inspection was limited to the accessible areas of the structure. Major structural components include concrete, brick, stone, block, and wood.

identify and locate asbestos containing materials and to group them into homogeneous

The samples were analyzed by International Asbestos Testing Laboratories of Mt. Laurel, New Jersey. IATL is accredited by the National Institute of Standards and Technology’s “National Voluntary Laboratory Accreditation Program” NVLAP (#1011500-0). IATL has developed and implemented an intra laboratory quality assurance/quality control program to ensure accuracy and consistency of results.

sampling purposes. For example, once a homogeneous material was sampled, the sample result could be considered representative for that material throughout the residence. If one sample of a homogeneous material tested positive for asbestos, then the entire by weight:

AREAS OF THE STRUCTURE LOCATED AT 1610 ROSELYN AVENUE SCRANTON, PA.

renovation or demolition project. The cost estimates have been arrived at independently and have been inserted in this report solely for the use of the Scranton Office of Economic and Community Development. The following estimate has been prepared for budgetary purposes. All measurements are approximate. Contractors should

AREAS OF THE STRUCTURE LOCATED AT 1610 ROSELYN AVENUE SCRANTON, PA.

during this investigation and will be kept confidential. Any information contained in this report will not be released to third parties without the expressed written consent of the client except where required by law.

The conclusions expressed within this report are intended to advise the client of the potential regulated environmental hazards within the subject property. It is the responsibility of the client to comply with current regulations relating to the hazards identified in this report. The

Approved by:

Approved Signatory Frank Ehrenfeld

Report for:

William Sterling Quad 3 Group 37 North Washington Street Wilkes-Barre, PA 18701

Regarding:

Eurofins EPK Built Environment Testing, LLC Project: 1610 Roselyn Ave - 13030.04.19

EML ID: 3645775

All samples were received in acceptable condition unless noted in the Report Comments portion in the body of the report. The results relate only to the samples as received and tested. The results include an inherent uncertainty of measurement associated with estimating percentages by polarized light microscopy. Measurement uncertainty data for sample results with >1% asbestos concentration can be provided when requested.

Eurofins EPK Built Environment Testing, LLC ("the Company"), a member of the Eurofins Built Environment Testing group of companies, shall have no liability to the client or the client's customer with respect to decisions or recommendations made, actions taken or courses of conduct implemented by either the client or the client's customer as a result of or based upon the Test Results. In no event shall the Company be liable to the client with respect to the Test Results except for the Company's own willful misconduct or gross negligence nor shall the Company be liable for incidental or consequential damages or lost profits or revenues to the fullest extent such liability may be disclaimed by law, even if the Company has been advised of the possibility of such damages, lost profits or lost revenues. In no event shall the Company's liability with respect to the Test Results exceed the amount paid to the Company by the client therefor.

Dates of Analysis:

Asbestos PLM (Layer %): 05-17-2024

Service SOPs: Asbestos PLM (Layer %) (EPA 40CFR App E to Sub E of Part 763 & EPA METHOD 600/R-93-116, SOP EM-AS-S- 1267)

EMLab ID: 3645775, Page 1 of 2Eurofins EPK Built Environment Testing, LLC

Eurofins EPK Built Environment Testing, LLC 9000 Commerce Parkway, Suite B, Mount Laurel, NJ 08054

(856) 231-9449 www.eurofinsus.com/Built Client: Quad 3 Group C/O: William Sterling Re: 1610 Roselyn Ave - 13030.04.19

Date of Receipt: 05-17-2024 Date of Report: 05-17-2024

Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM) Appx E Sub E 40 CFR 763 / EPA 600/R-93/116

Sample ID # Lab-ID version Sample Description Asbestos

Constituents Non-Asbestos Constituents Comment

001. Exterior Foundation 17853533-1

Layer 1 Gray Concrete Homogeneity:Good

Not Detected 100% Non-Fibrous Material

002. Exterior Foundation 17853534-1

Layer 1 Gray Concrete Homogeneity:Good

Not Detected 100% Non-Fibrous Material

Comments:

Analyst(s): Aidan Becker

EMLab ID: 3645775, Page 2 of 2Eurofins EPK Built Environment Testing, LLC

The total percentage of sample components shown may be greater than 100% when some components are detected at <1%.

The test report shall not be reproduced except in full, without written approval of the laboratory. The report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. The Company reserves the right to dispose of all samples after a period of thirty (30) days, according to all state and federal guidelines, unless otherwise specified.

Inhomogeneous samples are separated into homogeneous subsamples and analyzed individually. ND means no fibers of that type were detected.

When detected, the minimum detection and reporting limit is less than 1% unless point counting is performed. Floor tile samples may contain large amounts of interference material and it is recommended that the sample be analyzed by gravimetric point count analysis to lower the detection limit and to aid in asbestos identification.

BID FORM – STIPULATED SUM (SINGLE-PRIME CONTRACT) 004113

SECTION 004113 – BID FORM

TO: City of Scranton FROM:

Office of Community Development

340 N. Washington Avenue Bidder’s Name

Address

Phone Number

Email Address

State of Incorporation

I, the undersigned, having familiarized (him/herself) (itself) (themselves) with the existing conditions of the project areas affecting the cost of the work and with the "Contract Documents,” including the Agreement on file in the office of the Engineer, hereby proposes to furnish all supervision, technical personnel, labor, materials, machinery, tools, appurtenances, equipment and services, including utility, transportation services, and traffic control, required to perform and complete this contract, all in accordance with the Contract Documents, including addenda (if required), for the following lump sum prices.

In submitting this Bid, Bidder represents, as more fully set forth in the agreement, that Bidder has examined and carefully studied the Bidding Documents and Drawings and has observed the site conditions.

Contractor shall be completely familiarized with all contract documents. By submitting a cost proposal to complete the work, the contractor represents that they are familiar with the conditions under which the work will be performed.

BASE BID – NO. 1 “905 RIDGE AVENUE”:

To provide all materials and labor necessary to demolish the property in its entirety and properly dispose of all debris at 905 Ridge Avenue, Scranton, PA 18510; for the sum of:

___________________________________________________Dollars $___________________________

(written) (numbers)

BASE BID – NO. 2 “129 S. IRVING AVENUE”:

To provide all materials and labor necessary to demolish the property in its entirety and properly dispose of all debris at 129 S. Irving Avenue, Scranton, PA 18505; for the sum of:

__________________________________________________Dollars $____________________________

BASE BID – NO. 3 “1949 MYRTLE STREET”:

To provide all materials and labor necessary to demolish the property in its entirety and properly dispose of all debris at 1949 Myrtle Street, Scranton, PA 18510, Scranton, PA; for the sum of:

_________________________________________________Dollars $______________________________

BASE BID – NO. 4 “1610 ROSELYNN STREET”:

To provide all materials and labor necessary to demolish the property in its entirety and properly dispose of all debris at 1610 Roselyn Street, Scranton, PA 18510, Scranton, PA; for the sum of:

_________________________________________________Dollars $______________________________

I hereby acknowledge receipt of:

Addendum No._________dated______________ Addendum No._________dated______________ Addendum No._________dated______________

The Owner retains the right to award any or all of the Base Bids based upon the best interest of the Owner.

Signature:

Title:

Date:

Sealed Bids due via the City of Scranton’s OpenGov Procurement, on or before the date and time set forth in the Advertisement. Bids must be firm for 60 days from the date due for receipt of bids.

mcalvert Pen

CONTRACT BETWEEN THE OFFICE OF ECONOMIC AND COMMUNITY

DEVELOPMENT OF THE CITY OF SCRANTON AND CONTRACTOR TO

PROVIDE CONSTRUCTION SERVICES FOR THE PROJECT

This CONTRACT is entered into this ____ day of __________, 2026, for the construction services for the Project within the City of Scranton, by and between the OFFICE of

COMMUNITY and ECONOMIC DEVELOPMENT of the CITY of SCRANTON, 340 N.

Washington Avenue, Scranton, PA 18503 (“City”) and ______________ (“Contractor”).

WHEREAS, the City entered into a __________ Grant Contract with the Commonwealth of Pennsylvania Commonwealth Financing Authority on or about _____, wherein the City received

__________ to be used in accordance with the terms and conditions set forth within said contract;

WHEREAS, now wishes to use said funds towards a project and requires the Contractor to perform certain work and services in accordance with the terms and conditions hereinafter set forth;

WHEREAS the City sought bids for the work and services to be performed by the

Contractor;

WHEREAS the Contractor was the successful bidder and has demonstrated that it is ready, willing, and able to perform such work and services;

NOW THEREFORE, in consideration of the promises contained herein, the parties do agree and intend to be legally bound as follows:

ARTICLE 1 – SCOPE OF WORK AND SERVICES

1) Contractor shall perform all the necessary services provided under this Agreement in connection with and respecting the following project:

2) To furnish the OECD with:

All services and agrees to render and provide work, labor and/or materials to be completed as set forth in the Bid Proposal and/or Bid Specifications, Project Manual, Blueprints and/or

Addendum(s) which are all attached hereto, made a part hereof, and are incorporated herein by reference jointly as Exhibit “A”. The Bid Proposal and/or Bid Specifications, Project Manual, Blueprints and/or Addendum(s) define specifically the services to be provided by the

CONTRACTOR.

ARTICLE 2 – COMPENSATION

OECD shall pay the CONTRACTOR upon submission and review of invoices, compensation in an amount not to exceed _____________ for the construction services including concrete curbing, concrete sidewalks and paving contemplated in the Bid Proposal and Bid

Specifications. Such amounts reference the lowest responsible bid received from the CONTRACTOR in accordance with the Bids received on or before _________________. When submitting invoices to OECD, refer to project at _______________________.

The CONTRACTOR shall not submit additional invoices for additional compensation without first receiving prior written approval of additional scope of work beyond this agreement from the City of Scranton’s (OECD) representative. This prior written approval shall be required as documentation for a Change Order that must be approved by all parties.

ARTICLE 3: TIME OF PERFORMANCE

The services of the CONTRACTOR shall be undertaken and completed in such sequence as to assure expeditious completion in the light of the purposes of this Agreement. Performance of services by CONTRACTOR shall commence within thirty (30) days of signing this Agreement. All performance of services shall be completed within ninety (90) days of commencement. Reasonable extensions may be granted by the City as needed. Failure to complete the project within the reasonable timeframe agreed is in violation of the Agreement. Beyond that time Liquidated Damages will apply at the Value of $150.00 per day.

ARTICLE 4: CONDITION PRECEDENT

As a condition precedent to the execution of this Contract the CONTRACTOR must comply with the Pennsylvania Public Works Contractor's Bond Law of 1967, 8 P.S. § 191 and deliver to OECD its Performance Bond and Payment Bond for materials and labor each in the amount of one hundred percent (100%) of the Agreement.

ARTICLE 5: NON-DISCRIMINATION CLAUSE

The CONTRACTOR may not, under any program or activity to which the regulations of this part may apply, directly or through contractual or other arrangements, on the grounds of race, color, national origin, or sex:

A. Deny any individual any facilities, services, financial aid, or other benefits provided under the program or activity.

B. Provide any facilities, services, financial aid, or other benefits which are different than those provided to others under the program or activity.

C. Subject any individual to segregated or separate treatment in any facility, or in any matter of process related to receipt of any service or benefit under the program or activity.

D. Restrict any individual in any way in access to, or in the enjoyment of, any advantage or privilege enjoyed by others in connection with facilities, services, financial aid or other benefits under the program or activity.

E. Treat any individual differently from others in determining whether the individual satisfies any admission, enrollment, eligibility, membership, or other requirement or condition which the individual must meet in order to be provided any facilities, services or other benefit provided under the program or activity.

F. Deny any individual an opportunity to participate in a program or activity as an employee.

The CONTRACTOR may not use criteria or methods of administration which have the effect of subjecting persons to discrimination on the basis of race, color, national origin, or sex, or have the effect of defeating or substantially impairing accomplishment of the objectives of the program or activity with respect to persons of a particular race, color, national origin, or sex.

The CITY may cancel or terminate this Agreement and all money due or to become due under this Agreement may be forfeited for a violation of the terms and conditions of this

Nondiscrimination/Sexual Harassment Clause.

ARTICLE 6: INSURANCE & LIABILITY

A. Indemnification. The CONTRACTOR shall indemnify, defend and hold harmless OECD and the City of Scranton and the COMMONWEALTH FINANCING AUTHORITY from all claims, liabilities, suits or action at law or equity of any kind whatsoever arising out of, connected with or caused by any operation or matter relating to the project because of any act of omission, neglect or misconduct of the CONTRACTOR, including among other things, injury to property and injury to and sickness and death of each and every person or persons whatsoever, including without limitations , members of the public and employees of the CONTRACTOR or any Sub-Contractor.

B. Public Liability and Property Damage Insurance. The CONTRACTOR shall take out and maintain during the life of this Agreement such public claims for damages for personal injury, including accidental death as well as from claims for property damages, which may arise from operations connected with or caused by any operation or matter related to this Agreement, whether such operations be by the CONTRACTOR or by anyone directly or indirectly employed by any of them. Said insurance shall also cover as additional insured the indemnity liability of OECD, the City of Scranton, and the COMMONWEALTH FINANCING AUTHORITY, as their interests are present.

C. CONTRACTOR represents that it now carries, and agrees it will continue during the term of this Contract to carry, at a minimum: Worker’s Compensation, Comprehensive General and Contractual Liability and Professional Liability Insurance in the following amounts:

TYPE OF INSURANCE LIMITS OF LIABILITY

Worker’s Compensation Statutory

Employer’s Liability $500,000.00/per incident/$500,000 per employee $500,000 policy limit

Professional Liability $1,000.000 each occurrence $1,000,000 aggregate

Comprehensive General Liability (including Blanket Contractual Liability Insurance)

Bodily Injury $1,000,000 each person

$1,000,000 each occurrence

$2,000,000 aggregate

Property Damage $ 500,000 each occurrence

Personal Injury $ 500,000

Comprehensive Automobile Liability:

Bodily Injury $500,000 each person

$500,000 each occurrence

Property Damage $ 1,000,000 each occurrence

Umbrella Policy $1,000,000 per occurrence/ $1,000,000 aggregate

D. Certificates of all insurance provided by the CONTRACTOR shall be available for OECD’s review and will be furnished to OECD if requested. Such copies of certificates shall include the following:

(a) Name of insurance company, policy number and expiration data;

(b) The coverage required and the limits on each, including the amount of deductibles or self-insured retentions (which shall be for the account of the

CONTRACTOR).

(c) A statement indicating OECD and the City of Scranton shall receive thirty (30) days’ notice of cancellation or significant modification of any of the policies which may affect the interests of OECD or the City of Scranton;

(c) A statement confirming that OECD and the City of Scranton have both been named as additional insured (except for Worker’s Compensation) on all policies;

and

(d) A statement confirming that OECD and the City of Scranton, its agents and employees have been provided a waiver of any rights or subrogation, which the CONTRACTOR may have against them.

ARTICLE 7: PREVAILING WAGES: REGISTRATION WITH THE

DEPARTMENT OF LABOR AND INDUSTRY

CONTRACTOR will be required to register their project with the Department of Labor and

Industry to obtain a Prevailing Wage Rate schedule for each awarded project as this project is using grant funds towards construction, demolition, reconstruction, alteration, repair work, renovations, build-out, and/or installation of machinery and equipment in excess of $25,000.00. Registration can be completed by filling out the Prevailing Wage Rates Determination Request Form. Specific questions regarding the applicability of Prevailing Wage Rates should be directed to ra-li-slmr-llc@pa.gov.

CONTRACTOR will also need to provide copies of certified payroll worksheets collected from all contractors and subcontractors conducting…