2026_Residential_Streets_Description.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
2026 Residential Streets Project
Solicitation number
26-10
Issued by
Jefferson County, Weston CDP, Colorado

About this file

This is a project description file for the 2026 Residential Streets Project in Colorado, detailing street rehabilitation work across multiple residential streets. The project encompasses asphalt and concrete rehabilitation, including milling and overlay of indicated streets, replacement of concrete sidewalks, and striping updates across approximately 40 street segments. The streets identified for work span various neighborhoods and include segments such as Jellison Street from 32nd North to end, Flower Street, Hoyt Street, and numerous other residential thoroughfares throughout the project area. The scope includes both full-depth work and specialized treatments, such as six-inch depth bubble paving on Everett Street.

The project involves mill and overlay operations on designated streets, replacement of indicated concrete sidewalks, and striping replacement according to a striping plan or existing conditions unless otherwise specified. The file lists specific street names and their corresponding start and end points, enabling clear identification of work locations. Pricing terms, contract duration, funding sources, and submission deadlines are not detailed in this project description document. Additional solicitation information, evaluation criteria, and procurement requirements would be contained in supplementary documents associated with the overall 2026 Residential Streets Project Request for Proposal.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Street description - Start and End
Jellison St - 32nd N to end
Flower St - 32nd N to end
Hoyt St - 38th S to end
W 37th Pl - Hoyt St to end
Hoyt St - 38th N to end
W 39th Ave - Hoyt St to Hoyt Ct
W 39th Ave - Hoyt St to Holland St
Hoyt Ct - W 39th Ave to end
Garland St - 38th to Holland St
Garland St - 38th S to end
W 37th Ave - Garland St to Garrison St
Garrison St - W 37th Ave S to end
N Holland St - 38th N to Garland St
Estes St - Everett St to W 41st Ave
Field Dr - Everett St to Everett St
W 41st Ave - Everett St to Wadsworth
Everett St - 38th to 41st Ave
Everett Dr - W 41st Ave to Dudley St
Yarrow St - 39th Ave to 41st Ave
Brentwood St - 44th to W 46th Ave
W 46th Ave - Brentwood to Balsam
Yukon Ct - W 46th Ave to end
W 46th Ave - Yukon Ct to Yarrow St
Independence Ct - 32nd N to end
W 35th Ave - Garland St to Dudley St
Estes St - 32nd to 38th
Field St - 32nd N to End
Chase St - 38th to 41st (West Half)
Yarrow St - 44th to 46th Ave
W 46th Ave - Yarrow St to Allison St
Zephyr St - 44th to 46th
Allison St - 44th N to Balsam St
W 46th Cir - Allison St W to end
W 46th Pl - Allison St W to end
W 45th Ave - Allison St W to end
W 44th Pl - Allison St W to end
Balsam St - W 46th Ave to Allison St (Including 47th)
Everett St - W 35th Ave S to end
Balsam St - 44th to W 46th Ave
W 41st Ave - Kipling to Independence Ct
Everett St - 6in depth bubble paving

File details come from the government source that posted it. Updated .