2026_Quarterly Semi-Annual_Task_Schedules.pdf
PDF 18 KB Posted
- Attached to
- Fort Peck Power Plant Janitorial Services
- Solicitation number
- W9128F26QA009
About this file
This is a Semi-Annual Task Schedule and Completion Record form for a six-month maintenance period at a facility with multiple production areas (PP1 and PP2) and various support locations. The document serves as a tracking tool for scheduled and completed maintenance tasks across the facility, with columns for recording when tasks are scheduled, when they are completed, and who completed them.
The maintenance tasks span numerous areas including storage, offices, shops, restrooms, conference rooms, elevators, corridors, erection bays, generator rooms, penstock areas, and basement substations. The required work consists primarily of floor cleaning and maintenance tasks such as sweeping, scrubbing, stripping and rewaxing floors with buffing, and carpet shampooing. Additional tasks include cleaning stairs and railings, removing cobwebs and bugs from penthouse areas, and cleaning up alkali residue in penstock and substation basement areas. Each task is associated with specific drawing references (such as MFP-OPN84E107.1) and location codes (El 2111, El 2096, etc.) to identify the exact areas requiring maintenance. The form is designed to document compliance with maintenance requirements, with references to specification section 21.4.3.1.4(a) for floor treatment standards. The document contains two sheets listing all required maintenance activities across the facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEMI-ANNUAL TASK SCHEDULE AND COMPLETION RECORD
FOR SIX MONTH PERIOD BEGINNING _____________________ENDING__________________
Location Area Task Scheduled Completed Completed By
PP1 Storage Areas Sweep floors
El 2111 Dwg MFP-OPN84E107.1
PP1 Mechanic's Office Strip, scrub & rewax floors; buff as
El 2096 Dwg MFP-OPN84E106.1 required under 21.4.3.1.4(a)
PP1 Electrician's Office Strip, scrub & rewax floors; buff as
El 2096 Dwg MFP-OPN84E106.1 required under 21.4.3.1.4(a)
PP1 Electrician's Shop Scrub floors
El 2096 Dwg MFP-OPN84E103.1
PP1 Electronic Shop Strip, scrub & rewax floors; buff as
El 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)
PP1 Copy Room Strip, scrub & rewax floors; buff as
El 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)
PP1 Carrier Room Strip, scrub & rewax floors; buff as
El 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)
PP1 Men's Restroom Strip, scrub & rewax floors; buff as
EL 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)
PP1 Women's Restroom Shampoo carpet
El 2085 Dwg MFP-OPN84E103.1
PP1 Lunch Room Strip, scrub & rewax floors; buff as
El 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)
PP1 Environmental Engineer Office Strip, scrub & rewax floors; buff as
El 2085 Dwg MFP-OPN84E103.1 required
PP1 Engineering & Print File Rooms Shampoo carpet
El 2085 Dwg MFP-OPN84E103.1
PP1 Conference Room Shampoo carpet
El 2085 Dwg MFP-OPN84E103.1
PP1 M&O Foreman, Maint. Control Tech. Shampoo carpet
El 2085 & Assistant M&O Foreman Offices
PP1 First Aid Room Strip, scrub & rewax floors; buff as
El 2071 Dwg MFP-OPN84E105.5 required
PP1 Passenger Elevator Strip, scrub & rewax floors; buff as
El 2071 Dwg MFP-OPN84E105.5 required
PP1 North Vestibule & Adjoining Corridors Strip, scrub & rewax floors; buff as
El 2071 Dwg MFP-OPN84E105.5 required
SHEET NO. 1 OF 2
SEMI-ANNUAL TASK SCHEDULE AND COMPLETION RECORD
FOR SIX MONTH PERIOD BEGINNING _____________________ENDING__________________
Location Area Task Scheduled Completed Completed By
PP1 Erection Bay Strip, scrub & rewax floors; buff as
El 2069 Dwg MFP-OPN84E105.5 required
PP2 Erection Bay Strip, scrub & rewax floors; buff as
El 2070 Dwg MFP-OPN84E274 required
PP1 Generator Room Strip, scrub & rewax floors; buff as
El 2061.5 Dwg MFP-OPN84E105.5 required
PP2 Generator Room Strip, scrub & rewax floors; buff as
El 2063 Dwg MFP-OPN84E274 required
PP2 Surge Tank Service Room Scrub floors
El 2071 Dwg MFP-OPN83E274
PP2 Equipment Rooms 1 & 2 Scrub floors
El 2051 Dwg MFP-OPN84E273
PP1 Penstock Area Clean up alkali residue, &
El 2026 Dwg PENSTOCK NO. 1 and sweep floors
MFP78-87E506
PP2 Penstock Area Clean up alkali residue, &
El 2026 Dwg 5577.5-C-255 and sweep floor
MPF-OPN84E272
PP1-PP2 All Stairs to Surge Tanks and Clean stairs & railings, sweep floors and
Penthouse Areas remove cobwebs and bugs
Shaft Area Shaft Substation Basement Clean up alkali residue, &
Dwg. MFP-OPN64E502 sweep floor
SHEET NO. 2 OF 2
File details come from the government source that posted it. Updated .