2026_Quarterly Semi-Annual_Task_Schedules.pdf

PDF 18 KB Posted

Attached to
Fort Peck Power Plant Janitorial Services
Solicitation number
W9128F26QA009
Issued by

About this file

This is a Semi-Annual Task Schedule and Completion Record form for a six-month maintenance period at a facility with multiple production areas (PP1 and PP2) and various support locations. The document serves as a tracking tool for scheduled and completed maintenance tasks across the facility, with columns for recording when tasks are scheduled, when they are completed, and who completed them.

The maintenance tasks span numerous areas including storage, offices, shops, restrooms, conference rooms, elevators, corridors, erection bays, generator rooms, penstock areas, and basement substations. The required work consists primarily of floor cleaning and maintenance tasks such as sweeping, scrubbing, stripping and rewaxing floors with buffing, and carpet shampooing. Additional tasks include cleaning stairs and railings, removing cobwebs and bugs from penthouse areas, and cleaning up alkali residue in penstock and substation basement areas. Each task is associated with specific drawing references (such as MFP-OPN84E107.1) and location codes (El 2111, El 2096, etc.) to identify the exact areas requiring maintenance. The form is designed to document compliance with maintenance requirements, with references to specification section 21.4.3.1.4(a) for floor treatment standards. The document contains two sheets listing all required maintenance activities across the facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEMI-ANNUAL TASK SCHEDULE AND COMPLETION RECORD

FOR SIX MONTH PERIOD BEGINNING _____________________ENDING__________________

Location Area Task Scheduled Completed Completed By

PP1 Storage Areas Sweep floors

El 2111 Dwg MFP-OPN84E107.1

PP1 Mechanic's Office Strip, scrub & rewax floors; buff as

El 2096 Dwg MFP-OPN84E106.1 required under 21.4.3.1.4(a)

PP1 Electrician's Office Strip, scrub & rewax floors; buff as

El 2096 Dwg MFP-OPN84E106.1 required under 21.4.3.1.4(a)

PP1 Electrician's Shop Scrub floors

El 2096 Dwg MFP-OPN84E103.1

PP1 Electronic Shop Strip, scrub & rewax floors; buff as

El 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)

PP1 Copy Room Strip, scrub & rewax floors; buff as

El 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)

PP1 Carrier Room Strip, scrub & rewax floors; buff as

El 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)

PP1 Men's Restroom Strip, scrub & rewax floors; buff as

EL 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)

PP1 Women's Restroom Shampoo carpet

El 2085 Dwg MFP-OPN84E103.1

PP1 Lunch Room Strip, scrub & rewax floors; buff as

El 2085 Dwg MFP-OPN84E103.1 required under 21.4.3.1.4(a)

PP1 Environmental Engineer Office Strip, scrub & rewax floors; buff as

El 2085 Dwg MFP-OPN84E103.1 required

PP1 Engineering & Print File Rooms Shampoo carpet

El 2085 Dwg MFP-OPN84E103.1

PP1 Conference Room Shampoo carpet

El 2085 Dwg MFP-OPN84E103.1

PP1 M&O Foreman, Maint. Control Tech. Shampoo carpet

El 2085 & Assistant M&O Foreman Offices

PP1 First Aid Room Strip, scrub & rewax floors; buff as

El 2071 Dwg MFP-OPN84E105.5 required

PP1 Passenger Elevator Strip, scrub & rewax floors; buff as

El 2071 Dwg MFP-OPN84E105.5 required

PP1 North Vestibule & Adjoining Corridors Strip, scrub & rewax floors; buff as

El 2071 Dwg MFP-OPN84E105.5 required

SHEET NO. 1 OF 2

SEMI-ANNUAL TASK SCHEDULE AND COMPLETION RECORD

FOR SIX MONTH PERIOD BEGINNING _____________________ENDING__________________

Location Area Task Scheduled Completed Completed By

PP1 Erection Bay Strip, scrub & rewax floors; buff as

El 2069 Dwg MFP-OPN84E105.5 required

PP2 Erection Bay Strip, scrub & rewax floors; buff as

El 2070 Dwg MFP-OPN84E274 required

PP1 Generator Room Strip, scrub & rewax floors; buff as

El 2061.5 Dwg MFP-OPN84E105.5 required

PP2 Generator Room Strip, scrub & rewax floors; buff as

El 2063 Dwg MFP-OPN84E274 required

PP2 Surge Tank Service Room Scrub floors

El 2071 Dwg MFP-OPN83E274

PP2 Equipment Rooms 1 & 2 Scrub floors

El 2051 Dwg MFP-OPN84E273

PP1 Penstock Area Clean up alkali residue, &

El 2026 Dwg PENSTOCK NO. 1 and sweep floors

MFP78-87E506

PP2 Penstock Area Clean up alkali residue, &

El 2026 Dwg 5577.5-C-255 and sweep floor

MPF-OPN84E272

PP1-PP2 All Stairs to Surge Tanks and Clean stairs & railings, sweep floors and

Penthouse Areas remove cobwebs and bugs

Shaft Area Shaft Substation Basement Clean up alkali residue, &

Dwg. MFP-OPN64E502 sweep floor

SHEET NO. 2 OF 2

File details come from the government source that posted it. Updated .