2026-LGR-0036 JA Redacted.pdf

PDF 293 KB Posted

Attached to
Endpoint Wire Machine
Solicitation number
2026-LGR-0036
Issued by

About this file

This Justification and Approval (J&A) document supports a sole-source procurement by the Library of Congress for one Endpoint Archival Wire Playback Machine. The Library's National Audio-Visual Conservation Center (NAVCC) requires this specialized equipment to preserve and access historic wire recordings, which is an obsolete magnetic audio recording format. The procurement is valued for the period 01/19/2026 – 01/18/2027, with Endpoint Audio as the sole manufacturer.

The justification emphasizes that this is a niche market with no other qualified manufacturers, and the Endpoint Wire Playback Machine is the only modern playback device dedicated to wire recordings. The machine features advanced capabilities including a sophisticated DC motor spooling system, low wow and flutter capstan drive, fine-gap ceramic head, precise footage counter, variable speed transport, and a built-in cleaning roller. The Library will continue market research during the contract period to determine if any competitors emerge, but notes there is a limited probability of marketplace competition due to the aging service provider industry.

View the file

Other files

File Type Posted
2026-LGR-0036 SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Justification and Approval For Other than Full and Open Competition

2026-LGR-0036

Form Updated 4/14/2023

Justification & Approval

As a legislative branch agency, the Library is subject to the competition and advertising requirements of 41 U.S.C. § 6101. Like the

Competition in Contracting Act and the FAR, 41 U.S.C. § 6101 does not require competition when a contracting officer certifies that only one source or brand-name item is available, when dictated by public exigency, or when otherwise authorized by law.

This document sets forth the justification and approval for award of a contract or order by means providing for other than full and open competition per 41 U.S.C. § 6101, LCR 7-210, and, as applicable, FAR 6.302, FAR 13.106-1, FAR 8.405, and FAR 16.505.

Contracting without competition shall not be justified on the basis of a lack of advance planning or concerns related to availability of funds.

This form shall be used to support instances where competition will be limited to a single source, a limited number of sources, including where a brand name product is required.

Part 1 – Identification

1. Contracting Agency and Activity:

Library of Congress, Library Collections and Services Group/Researcher and Collections Services/NAVCC/Preservation Services

Section

2. Nature of Action Being Approved Contract

LoC or Leg Branch Order

GSA Schedule or GWAC

Other

Plan ID Number: 2026-LGR-0036

Contractor (or Brand Name): Endpoint Audio

Estimated Value (Base and all options):

Period of Performance: 01/19/2026 – 01/18/2027

3. Description of Supplies or Services Required to Meet Library Needs:

The NAVCC/Audio Lab requires the purchase of one (1) Endpoint Archival Wire Playback Machine. The purpose of this machine is to support and maintain NAVCC’s audio preservation performance and quality standards. Without this machine, NAVCC will be unable to preserve and make accessible valuable and historic content contained on LoC collections containing wire recordings.

Part 2 – Program Office Justification & Approval

4. Authority for Contracting Without Competition

Over $250,000 For this requirement over $250,000, under FAR part 6, the basis for contracting without providing for full and open competition is:

There is only one responsible source and no other supplies or services will satisfy Library requirements.

41 U.S.C. § 6101(b)(2)(C); FAR 6.302-1.

Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. FAR 6.302-1(b)(1).

Source controls copyrights, patents, raw materials, or secret processes cannot be acquired otherwise, or similar circumstances. FAR 6.302-1(b)(2).

Other exception identified in FAR 6.302-1

There is such unusual & compelling urgency that the Government would be seriously injured if competition is not limited.

41 U.S.C. § 6101(b)(2)(B); FAR 6.302-2. Option years are not permitted.

Source is expressly authorized or required by statute (e.g., AbilityOne, UNICOR, GPO, GSA Public Buildings Service, Appropriations Act, etc.) per 41 U.S.C. § 6101(b)(1) and FAR 6.302-5

Other basis authorized in 41 U.S.C. § 6101(b) or FAR part 6.302

Library’s needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. FAR

6.302-1(c).

The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

IT Standard Data Sheet)

Up to and including $250,000 For this requirement up to $250,000, using simplified acquisition procedures under FAR part 13, the basis for contracting without providing for full and open competition is:

Only one responsible source is reasonably available to meet Library requirements. 41 U.S.C. § 6101(b); FAR 13.106-1.

Product or service is reasonably available from only one source.

Source controls copyrights, patents or other exclusive licensing arrangements.

Urgent circumstances; only one source can reasonably deliver by required date. Option years are not permitted.

Source is expressly authorized or required by statute

Library’s needs can only be satisfied by a brand-name product

The Product is listed the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

GSA Schedule Order For this GSA schedule order under FAR part 8, the basis for not competing among GSA schedule-holders and/or specifying a brand name product or item is:

An urgent and compelling need exists, and following GSA procedures would result in unacceptable delays.

FAR 8.405-6(a)(1)(i)(A).

Only one GSA source is capable of fulfilling the requirement at the level of quality required because the supplies or services are unique or highly specialized. FAR 8.405-6(a)(1)(i)(B).

In the interest of economy and efficiency, the new work is a logical follow-on to an original order that was placed competitively among GSA schedule-holders (i.e., the original order was not sole-source or limited-source.) FAR 8.405-6(a)(1)(i)(C).

Library’s needs can only be satisfied by a brand-name product

The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

Order Under Multiple Award Indefinite-Delivery Contract or GWAC For this order under FAR subpart 16.5, the basis for contracting without providing for full and open competition is:

The need is so urgent fair opportunity would result in unacceptable delays. 41 U.S.C. § 6101(b)(2)(C) and FAR 16.505(b)(2)(i)(A).

The Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. 41 U.S.C. § 6101(b)(1) and

FAR

16.505(b)(2)(i)(B).

A logical follow-on order in the interest of economy and efficiency. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(i)(2)(C).

To satisfy a minimum guarantee. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(D).

Authorized or required by statute. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(E).

The Library’s minimum needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. 41

U.S.C. § 6101(b)(2)(B) and FAR 16.505(a)(4)(i).

The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable

5. Rationale for Contracting Without Competition

In supporting an action not providing for full and open competition, it is not sufficient to demonstrate that the contractor is exceptionally well qualified or even the best qualified, or that the required brand name product is well suited to the Library’s needs.

The rationale must demonstrate that no one else, or no other competing product, can satisfactorily fulfill the Library’s requirement.

Do not focus on the importance of the requirement; the issue is the rationale for not competing.

In supporting urgency, address the following: What are the unexpected facts or the unpredictable events that led to this situation?

When is the required delivery or performance start date? Why this date? What specific harm to the Government will occur if the delivery is not made or performance not begun as scheduled? (Note that expiration of funds is not sufficient harm to justify not competing.) Demonstrate that the contract is only for items and quantities urgently needed until a competitive procurement action can be developed, or that a separate competitive follow-on is not practical.

In supporting a brand name justification, the brand name or feature must be essential to the Library’s requirements, and market research indicates that other company’s similar products or products with similar features cannot meet or be modified to meet the

Library’s needs.

We are authorized to limit competition on the basis of the citation in section 4 because: The Library of Congress understands that this is a niche market with no other qualified manufacturers. Wire is an obsolete magnetic audio recording format. The Endpoint

Wire Playback Machine is the only modern playback device solely dedicated to the playback of magnetic wire recordings. It has many advanced features, such as a sophisticated DC motor spooling system, ensuring even tension for wire safety. It captures the highest possible audio fidelity with a low wow and flutter capstan drive system and a fine-gap ceramic head. It has a precise footage counter and a variable speed transport, which allows slow to fast winding speeds. The player also contains a built-in cleaning roller for gentle cleaning of the media. Cleaning and media prep are paramount to archival playback and transfer of fragile wire. There are no other modern players available in the market, let alone players with the functionality the Endpoint Wire Player features.

6. Actions to Overcome Barriers to Competition Before Subsequent Contract Is Required

State what actions, if any, the program office can take to overcome barriers to competition before a contracting for this requirement again, such as: using action to provide time to develop specifications for a competitive procurement by a certain date; licensing copyrights or patents so other contractors may use the works; or breaking the requirement into parts that may be purchased competitively. If this is a one-time requirement, explain that action to increase future competition is not needed. If the source is expressly required by statute, state “Source is statutory.”

To increase competition, we will: The Library will continue to perform additional market research during the period of performance to ascertain whether any competitors have entered this niche market and have begun providing support for the breadth of manufacturer makes and models required by the Library to be maintained. Service providers are, however, aging out of the industry, and there is a limited probability of seeing the emergence of marketplace competition in the future. This may continue to be a sole-source need indefinitely until Endpoint also leaves the market.

7. Program Office Certification

I certify that the description of the Government’s minimum needs, schedule requirements, and technical information that provide the basis for this justification are accurate and complete.

PART 3 – CONTRACTING OFFICER DETERMINATIONS & CERTIFICATION

8. Efforts to Solicit from As Many Potential Sources As Practicable Unless a justification is based on FAR 6.302-2, Unusual and compelling urgency, contracting officers shall post justifications for other than full and open competition, including brand name justifications, to the Contract Opportunities website on sam.gov (or eBuy for

Brand Name Justifications under FAR Part 8) prior to requesting a proposal or otherwise entering into negotiations.

Advance notice will be published in sam.gov for 15 days before a contract is awarded. FAR 5.203(a).

Advance or concurrent notice will be published in sam.gov for a reasonable time for commercial items FAR 5.203(a) and

12.204(b).

Advance notice will not be published because the action meets the following FAR exception:

Notice would compromise national security. FAR 5.202(a)(1).

Unusual and compelling urgency; notice period would seriously injure Government. FAR 5.202(a)(2).

Expressly authorized or required to be made through another Government agency. FAR 5.202(a)(4).

Order will be placed against an IDIQ contract awarded under FAR 16.5. FAR 5.202(a)(6).

Order will be placed against GSA schedule or other competitively-awarded contract. FAR 5.202(a)(11).

Other

Advance notice will not be published per 41 U.S.C. § 6101; see attached deviation from the FAR per LCR 7-210 § 3.A.

We made the following efforts to interest potential sources in this award: N/A

9. Listing of Sources That Expressed Interest in Writing

The following sources expressed interest in this award: N/A

10. Additional Information

The following additional information is relevant to this justification and approval: N/A

11. Contracting Officer Determination that Price Is Fair and Reasonable As explained in detail below, I have determined that the prices for this contracting action are fair and reasonable based on comparison of the prices to the following (see FAR 15.404-1(b)(2)):

Historical prices paid by the Government Published competitive price lists

Library’s Independent Government Estimate Prices obtained through market research

Other : Any other price analysis methodologies Prices obtained through competitive proposals

The following analysis (based on attached pricing information) supports my determination: A fair and reasonable pricing determination shall be made before an award is executed.

12. Contracting Officer Determination of Responsibility Checked System for Award Management – A responsibility determination shall be made before an award is executed.

13. Contracting Officer Determination of Best Value I have determined that this action represents the best value to the Government because: A best-value determination will be made before an award is executed.

14. Contracting Officer Certification I certify that, to the best of my knowledge and belief, this justification is accurate and complete. For those actions up to

$750,000, I approve contracting without competition for this requirement.

Name

Signature

Date

James R. Robinson 09/29/2025

File details come from the government source that posted it. Updated .