This is Addendum 02 to the bidding documents for the MAISD Administrative Offices Interior Renovations project located at 630 Harvey Street in Muskegon, Michigan (Project #1662-26), issued by the owner on May 6, 2026. The addendum clarifies the scope of work allocation between the general contractor and the owner. Specifically, Item #1 designates that all data cable supply and installation shall be provided by the owner, with the electrical contractor responsible only for providing boxes and conduits as detailed in the drawings. Item #2 specifies that all fire alarm modifications will be handled directly by the owner, requiring the general contractor to coordinate timing with the owner for this work. Bidders are required to acknowledge receipt of this addendum on their proposal forms, as the changes supersede the original drawings and specifications.
No additional information regarding pricing terms, contract duration, award dates, site visits, or bidder meetings is contained in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 02
Addendum 02 800 ELLIS ROAD, SUITE 508 NORTON SHORES, MI 49441 Page 1 of 1 PHONE: 231.799.4838 FAX: 231.799.4837
Date May 6, 2026 Project #: 1662-26
Owner: Project Name:
MAISD Administrative Offices – Interior Renovations
630 Harvey Street 630 Harvey
Muskegon, MI 49442 Muskegon, MI 49442
Purpose: Addendum 02
This document shall form part of the bidding documents. Changes, additions, clarifications or deletions herein supersede the drawings and specifications. Bidders shall include on the proposal form, the acknowledgement of this Addendum.
Attachments:
None
Item #1 Data Cable – by Owner:
All Data cable to be supplied and installed by owner. Electrical contractor to provide boxes and conduits as shown on drawings.
Item #2 Fire Alarm modifications:
All Fire Alarm work to be handled directly by owner. GC to coordinate timing with owner.