2026.05.04 Addendum 01.pdf
PDF 142 KB Posted
- Attached to
- ESC North Renovations 2026
- Solicitation number
- RFP MAIS 260000001874 3
- Issued by
- Muskegon County, Michigan
About this file
This is Addendum 01 to the bidding documents for the MAISD Administrative Offices Interior Renovations project located at 630 Harvey Street, Muskegon, Michigan 49442, issued by the project owner on May 4, 2026. The addendum clarifies the scope of work regarding floor finishes, specifying that all carpet flooring, including 4-inch vinyl base installation, will be contracted directly by the owner and must be excluded from the general contractor's work scope. The general contractor remains responsible for the removal of existing carpet and vinyl base materials in the work areas. Bidders are required to acknowledge receipt and incorporation of this addendum on their proposal forms, and the changes outlined herein supersede any conflicting information in the original drawings and specifications.
No attachments are included with this addendum. This modification to the bidding documents ensures clear delineation of responsibilities between the owner and the general contractor regarding flooring materials and installation, reducing potential disputes or scope ambiguities during the renovation project execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 01
Addendum 01 800 ELLIS ROAD, SUITE 508 NORTON SHORES, MI 49441 Page 1 of 1 PHONE: 231.799.4838 FAX: 231.799.4837
Date May 4, 2026 Project #: 1662-26
Owner: Project Name:
MAISD Administrative Offices – Interior Renovations
630 Harvey Street 630 Harvey
Muskegon, MI 49442 Muskegon, MI 49442
Purpose: Addendum 01
This document shall form part of the bidding documents. Changes, additions, clarifications or deletions herein supersede the drawings and specifications. Bidders shall include on the proposal form, the acknowledgement of this Addendum.
Attachments:
None
Item #1 Floor Finishes – by Owner:
All carpet flooring to be contracted directly by owner, including 4” vinyl base.
Exclude from your work scope.
General Contractor is responsible for removal of existing carpet and base in work area.
File details come from the government source that posted it. Updated .