About this file

This Addendum #1 document, issued April 27, 2026 by the Town of Stratford, Connecticut for Project 2026-24, provides supplemental instructions for structural concrete floor repair work at the Stratford Transfer Station located at 108 Watson Boulevard. The addendum clarifies that work must be executed in two distinct phases to maintain continuous transfer station operations, with Phase 1 expanded to include additional damaged concrete slab areas and requiring a mandatory 21-day concrete cure time before Phase 2 commencement. Additional scope modifications include installation of a 4-foot-deep asphalt apron as shown on marked-up drawings. The project team consists of Snyder Architects, LLC (Architecture/Project Management) based in Trumbull, Connecticut and Cuoco Structural Engineers, Inc. located in Fairfield, Connecticut. Sealed bids are due at 10:00 AM on May 7, 2026, with construction scheduled to commence June 1, 2026 and substantial completion targeted for June 30, 2026.

Addendum #1 further specifies that if Alternate #1 for encasing three steel columns in concrete is included in the scope, the general contractor must relocate and secure the existing garage door track on the north corner to its original position prior to column concrete encasement, as detailed in an annotated photo provided with the addendum. All work must conform to Connecticut prevailing wage requirements and OSHA 10-Hour Construction Safety and Health Course completion for covered employees. Bidders are required to include a $5,000 allowance for unforeseen conditions, submit a five percent bid bond, and furnish both Performance and Payment Bonds equal to 100 percent of the contract award amount within seven business days of notification.

Text of this file

4/27/2026

Addendum 1 1 of 2

ADDENDUM #1

Repairs to:

Stratford Transfer Station

Watson Blvd Stratford, CT

TOWN PROJECT NUMBER: 2026-24

ISSUED: 4/27/2026

PROJECT TEAM

Architect / Project Manager: Structural Engineer:

4/27/2026

Addendum 1 2 of 2

The work shall be carried out in accordance with the following supplemental instructions and in accordance with the Contract Documents.

MISCELLANEOUS CHANGES AND CLARIFICATIONS:

1. Project must be completed in two phases to maintain transfer station operations during construction.

• See attached marked up S1 drawing denoting phase 1 and phase 2 areas.

Secondly please note that phase 1 area has been expanded south to include additional damage concrete slab.

• Contractor shall allow phase 1, 21-day concrete cure time before starting phase 2.

2. Add 4’ asphalt apron as shown on attached marked up S1 drawing.

3. If alternate 1 is included in scope of work, contractor shall move garage door track on north corner back to original location and secure prior to column concrete encasement.

See attached annotated photo.

*** END OF ADDENDUM #1 ***

Brian Line

Brian Callout Please note that to execute Alternate #1 to encase columns in concrete, GC shall move and secure existing garage door track in its original position.

Structural Engineer Cuoco Structural Engineers, Inc.

161 Kings Hwy E, Suite 205 Fairfield, Connecticut 06825

(203) 362-1902

S1

Project

Drawing Title

Drawing No.

Revisions

Issued

Scale

Job No.

2725 Main Street Stratford, CT 06614

SNYDER

ARCHITECTS, LLC

Architecture . Planning . Construction Management

Trumbull, CT 203-243-3346 info@snyderarchitects.com

Drawings Formatted for 24"x36" Paper

RECEIVING LEVEL

PLAN

Transfer Station 108 Watson Boulevard

Stratford, CT 06615

Repairs to:

FOR BID

NOT FOR

CONSTRUCTION

Brian Polygonal Line

Brian Polygonal Line

Brian Typewritten Text

PHASE I

Brian Typewritten Text

Brian Typewritten Text

ADDITIONAL

PHASE I SLAB

REPAIR AREA

Brian Typewritten Text

PHASE 2

Brian Rectangle

Brian Typewritten Text

NEW 4' DEEP ASPHALT APRON

PROJECT TEAM
*** END OF ADDENDUM #1 ***
Garage Door Track Sketch.pdf
IMG_3545

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .