2026-14 Addendum 1.pdf.crdownload
CRDOWNLOAD file 2 MB Posted
- Attached to
- Repairs & Improvements to Frank DeLuca Field
- Solicitation number
- BID 2026-14
- Issued by
- Connecticut
About this file
This is an Addendum #1 document issued by the Town of Stratford, Connecticut on January 6, 2026, for the Repairs and Improvements to Frank DeLuca Field project located at 1000 Main Street, Stratford, Connecticut. The addendum provides supplemental instructions and clarifications to the original contract documents, including modifications to the bid form, drawing changes, and responses to 25 Requests for Information (RFIs) submitted by bidders. The project encompasses exterior and interior improvements to the concession and locker building, foundation and structural work on the pressbox, new bleacher fabric wraps and screening, site work including asphalt paving with stamped patterns, decking and railings, aluminum fencing, and miscellaneous repairs and replacements. The bid deadline was established as Tuesday, January 20, 2026, at 10:00 AM, with bids submitted to Phillip Ryan, Purchasing Agent at the Town of Stratford Purchasing Office. A non-mandatory pre-bid site meeting was held on Thursday, December 18, 2025, at 10:00 AM. The architectural firm is Snyder Architects, LLC (Trumbull, CT), and the structural engineer is Cuoco Structural Engineers, Inc. (Fairfield, CT).
The base bid includes a mandatory $40,000 allowance for unforeseen conditions and changes to be used at the discretion of the architect and owner, with any unused portion to be credited back to the owner. Multiple add alternates are included in the scope, covering bleacher screen wrap assemblies with optional graphics, chain-link fence replacement with black powder-coated aluminum picket fencing, decking and railing replacements using Azek materials, and stamped asphalt paving in three separate areas around the facility. Unit prices are required for repointing mortar joints in existing stone work and CMU walls. Prevailing wages must be applied if the total bid exceeds $100,000. The addendum includes clarifications on pile material specifications (2 7/8" round shaft), asphalt thickness and mix design details, helical pile spacing requirements, equipment retention (kitchen hood), scope assumptions (200 SF of CMU pointing, 20 bleacher seats needing repair, all toilet partitions requiring adjustment), and confirmation that temporary fencing is not required except to secure unsafe construction areas during games. A 2017 soils report and January 2000 structural drawings of the existing concession and restroom building are provided for reference, though accuracy to existing conditions cannot be confirmed.
Text of this file
1/6/2026
Addendum 1 1 of 2
ADDENDUM #1
Interior Alterations:
Stratford Town Hall
2725 Main Street Stratford, CT
TOWN PROJECT NUMBER: 2026-14
ISSUED: 1/6/2026
PROJECT TEAM
Architect / Project Manager: Structural Engineer:
Addendum 1 2 of 2
The work shall be carried out in accordance with the following supplemental instructions and in accordance with the Contract Documents.
PROJECT MANUAL CHANGES:
1. Bid Form
• See attached.
DRAWING CHANGES:
1. Drawing A-7
• See attached. Alternate 2 fence replacement scope clarification provided.
MISCELLANEOUS CHANGES AND CLARIFICATIONS:
1. See attached paving detail.
2. Requests for Information (RFI’s)
• See attached RFI Log.
3. See attached 2017 Soils Report.
4. See attached 1/14/2000 concession/bathroom building structural drawings. Drawing accuracy to existing conditions not confirmed. Drawings for reference only.
*** END OF ADDENDUM #1 ***
12/23/2025
Bid Form Repairs and Improvements:
Frank DeLuca Field
BID FORM
Bids must be submitted to the Town of Stratford Purchasing Office, attention Phillip Ryan, Purchasing Agent, on the following form signed by an authorized company officer. Bids are due no later than Tuesday, January 20, 2026, 10:00am.
Phillip Ryan, Purchasing Agent Town of Stratford 2725 Main Street Stratford, CT 06615
Repairs and Improvements to:
Frank DeLuca Field 1000 Main Street Stratford, CT 06615
To Whom It May Concern:
(I, We) ______________________________________ the undersigned having visited the project site at Frank DeLuca Field and having familiarized ourselves with the local conditions affecting the cost of the work and with Contract Documents and all addenda thereto, hereby propose to furnish all labor, materials, tools, equipment, insurance to pay all applicable taxes, and to do and perform all things as provided in the drawings and specifications for the following sum(s):
BASE BID:
Refer to enclosed drawings and specifications.
Contractor shall include all monies and fees to complete documented project as indicated in bid documents. Contractor shall include an $40,000 allowance in base bid number for unforeseen conditions and changes to be used at Architect and Owners discretion. Any unused portion of allowance shall be credited back to owner.
*Written Form: __________________________________________________________ *Dollars: ($_________________)
*PLEASE NOTE THAT STATE OF CONNECTICUT PREVAILING WAGES MUST BE
USED IF TOTAL BID EXCEEDS $100,000.
ALTERNATES:
ALTERNATE #1a (Add):
Install new bleacher screen wrap assembly (see 1/A-8 & 8/A-8).
*Written form: _________________________________________________________
ALTERNATE #1b (Add):
Provide single color large graphic (image and color TBD) on new bleacher screen wrap on bleacher section A only. This add alternate is the graphic only.
ALTERNATE #2 (Add):
Remove existing chain-link fence, replace with new 7'-0" tall, powder-coated aluminum picket fence with gates to match. Color: black. "Connecticut Aluminum Fencing” by Reliable Fence Company, West Haven, CT or equal.
ALTERNATE #3a (Add):
Remove existing decking and railings, replace with new Azek decking, railings and gate assemblies.
ALTERNATE #3b (Add):
Remove and replace deck framing with new pressure treaded wood framing in kind if existing framing is in poor condition. This add alternate is framing only.
ALTERNATE #3c (Add):
Remove existing chain-link fencing and concrete curb, install new Azek railing assembly.
ALTERNATE #4a (Add):
Remove existing asphalt paving around restroom/concessions building. Prep and install new stamped asphalt paving with coating. Field: Herringbone pattern. Color TBD. Border color: TBD.
ALTERNATE #4b (Add):
Remove existing asphalt paving around bleacher sections B, C, D & E. Prep and install new stamped asphalt paving with coating. Field: Herringbone pattern. Color TBD. Border color: TBD.
ALTERNATE #4c (Add):
Remove existing asphalt paving around bleacher sections A. Prep and install new stamped asphalt paving with coating. Field: Herringbone pattern. Color TBD.
Border color: TBD.
UNIT PRICES:
Contractor must include unit prices for all items listed below, or bid could be rejected at client discretion.
1. Repointing mortar joints in existing stone work: $____________SF
2. Repointing mortar joints in existing CMU walls: $____________SF
ADDENDA
In submitting this proposal, I have received and included in this Proposal, the following Addenda:
Addendum No. Date
Signed:________________________________ ____________________________________
Signature Corporate Seal
Company Name : _________________________________________________________
Address : _________________________________________________________
City, St, Zip Code : _________________________________________________________
Phone : (__ __ __) - __ __ __ - __ __ __ __
Email : _________________________________________________________
ENLARGED SITE PLAN-
A-7
Project
Drawing Title
Drawing No.
Revisions
Issued
Scale
Job No.
2725 Main Street Stratford, CT 06614
Frank DeLuca Field 1000 Main Street
Stratford, CT 06615
SNYDER
ARCHITECTS, LLC
Architecture . Planning . Construction Management
Trumbull, CT 203-243-3346 info@snyderarchitects.com
Drawings Formatted for 24"x36" Paper
Repairs and Improvements to:
Structural Engineer Cuoco Structural Engineers, Inc.
161 Kings Highway East - Suite 205 Fairfield, Connecticut
(203) 362-1902
ALTERNATES
AutoCAD SHX Text
ENLARGED SITE PLAN- ALTERNATES
AutoCAD SHX Text A-7
AutoCAD SHX Text
AutoCAD SHX Text 0"
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text
BLEACHERS- SECTION A
AutoCAD SHX Text
BLEACHERS- SECTION B
AutoCAD SHX Text
GRANDSTAND
AutoCAD SHX Text
BLEACHERS- SECTION D
AutoCAD SHX Text
BLEACHERS- SECTION C
AutoCAD SHX Text
BLEACHERS- SECTION E
AutoCAD SHX Text
PRESSBOX
AutoCAD SHX Text
RESTROOMS AND CONCESSIONS
AutoCAD SHX Text SLOPE NEW STAMPED ASPHALT PAVING UP TO EXISTING CONCRETE CURB AROUND BUILDING, TYP. (1'-0" TO 20'-0" MINIMUM SLOPE)
AutoCAD SHX Text SLOPE NEW STAMPED ASPHALT PAVING UP TO EXISTING CONCRETE CURB AT STAIRS, TYP. (1'-0" TO 20'-0" MINIMUM SLOPE) (SEE DETAIL 2/A-7 SIM.)
AutoCAD SHX Text
EXISTING TREES AND GRASS (PLANTING) AREA
AutoCAD SHX Text
MODIFY PARKING SPACES
AutoCAD SHX Text
SOFTBALL FIELD
AutoCAD SHX Text ALTERNATES 2 REMOVE EXISTING CHAIN-LINK FENCE, REPLACE WITH NEW BLACK PICKET FENCE
AutoCAD SHX Text ALTERNATE 3b REMOVE EXISTING FRAMING, DECKING AND RAILINGS, REPLACE WITH NEW P.T. WOOD FRAMING, NEW AZEK DECKING, RAILING AND GATE ASSEMBLIES
AutoCAD SHX Text ALTERNATE 3c REMOVE EXISTING CHAIN-LINK FENCING AND CONCRETE CURB, INSTALL NEW AZEK RAILING ASSEMBLY
AutoCAD SHX Text ALTERNATE 3c REMOVE EXISTING CHAIN-LINK FENCING AND CONCRETE CURB, INSTALL NEW AZEK RAILING ASSEMBLY
AutoCAD SHX Text ALTERNATES 2 REMOVE EXISTING CHAIN-LINK FENCE, REPLACE WITH NEW BLACK PICKET FENCE AS SHOWN
AutoCAD SHX Text ALTERNATE 1a INSTALL NEW BLEACHER SCREEN WRAP ASSEMBLY (SEE 1/A8 & 8/A8)
AutoCAD SHX Text ALTERNATE 1b INSTALL NEW BLEACHER SCREEN WRAP ASSEMBLY WITH SINGLE COLOR LARGE GRAPHIC (IMAGE AND COLOR TBD)
AutoCAD SHX Text ALTERNATE 1a INSTALL NEW BLEACHER SCREEN WRAP ASSEMBLY (SEE 1/A8 & 8/A8)
AutoCAD SHX Text ALTERNATE 1a INSTALL NEW BLEACHER SCREEN WRAP ASSEMBLY, BOTH SIDES (SEE 4/A8)
AutoCAD SHX Text ALTERNATE 1a INSTALL NEW BLEACHER SCREEN WRAP ASSEMBLY (SEE 7/A8)
AutoCAD SHX Text EXTENTS OF ALTERNATE 4a
AutoCAD SHX Text EXTENTS OF ALTERNATE 4a
AutoCAD SHX Text ALTERNATE 4b REMOVE EXISTING ASPHALT PAVING AROUND BLEACHER SECTIONS B, C, D & E. PREP AND INSTALL NEW STAMPED ASPHALT PAVING WITH COATING.
AutoCAD SHX Text EXTENTS OF ALTERNATE 4b
AutoCAD SHX Text EXTENTS OF ALTERNATE 4b
AutoCAD SHX Text EXTENTS OF ALTERNATE 4c
AutoCAD SHX Text EXTENTS OF ALTERNATE 4c
AutoCAD SHX Text A-8
AutoCAD SHX Text
AutoCAD SHX Text A-8
AutoCAD SHX Text
AutoCAD SHX Text A-8
AutoCAD SHX Text
AutoCAD SHX Text A-8
AutoCAD SHX Text
AutoCAD SHX Text A-8
AutoCAD SHX Text
AutoCAD SHX Text A-8
AutoCAD SHX Text
AutoCAD SHX Text
SIM., OPP.
AutoCAD SHX Text A-8
AutoCAD SHX Text
AutoCAD SHX Text A-8
AutoCAD SHX Text
AutoCAD SHX Text ALTERNATE #1a (ADD): INSTALL NEW BLEACHER SCREEN WRAP ASSEMBLY (SEE 1/A8 & 8/A8). : INSTALL NEW BLEACHER SCREEN WRAP ASSEMBLY (SEE 1/A8 & 8/A8). ALTERNATE #1b (ADD): PROVIDE SINGLE COLOR LARGE GRAPHIC (IMAGE AND COLOR TBD) ON NEW BLEACHER SCREEN WRAP ON : PROVIDE SINGLE COLOR LARGE GRAPHIC (IMAGE AND COLOR TBD) ON NEW BLEACHER SCREEN WRAP ON BLEACHER SECTION A ONLY. THIS ADD ALTERNATE IS THE GRAPHIC ONLY. ALTERNATE #2 (ADD): REMOVE EXISTING CHAIN-LINK FENCE, REPLACE WITH NEW 7'-0" TALL, POWDER-COATED ALUMINUM PICKET REMOVE EXISTING CHAIN-LINK FENCE, REPLACE WITH NEW 7'-0" TALL, POWDER-COATED ALUMINUM PICKET FENCE WITH GATES TO MATCH, COLOR: BLACK. EQUAL TO "CONNECTICUT ALUMINUM FENCING" BY RELIABLE FENCE COMPANY, WEST HAVEN, CT OR EQUAL. ALTERNATE #3a (ADD): REMOVE EXISTING DECKING AND RAILINGS, REPLACE WITH NEW AZEK DECKING, RAILING AND GATE : REMOVE EXISTING DECKING AND RAILINGS, REPLACE WITH NEW AZEK DECKING, RAILING AND GATE ASSEMBLIES. ALTERNATE #3b (ADD): REMOVE AND REPLACE DECK FRAMING WITH NEW PRESSURE-TREATED WOOD FRAMING IN KIND, IF EXISTING : REMOVE AND REPLACE DECK FRAMING WITH NEW PRESSURE-TREATED WOOD FRAMING IN KIND, IF EXISTING FRAMING IS IN POOR CONDITION. THIS ADD ALTERNATE IS FRAMING ONLY. ALTERNATE #3c (ADD): REMOVE EXISTING CHAIN-LINK FENCING AND CONCRETE CURB, INSTALL NEW AZEK RAILING ASSEMBLY. : REMOVE EXISTING CHAIN-LINK FENCING AND CONCRETE CURB, INSTALL NEW AZEK RAILING ASSEMBLY. ALTERNATE #4a (ADD): REMOVE EXISTING ASPHALT PAVING AROUND RESTROOM/CONCESSIONS BUILDING, PREP AND INSTALL NEW : REMOVE EXISTING ASPHALT PAVING AROUND RESTROOM/CONCESSIONS BUILDING, PREP AND INSTALL NEW STAMPED ASPHALT PAVING WITH COATING. FIELD: HERRINGBONE PATTERN, COLOR: TBD. BORDER COLOR: TBD ALTERNATE #4b (ADD): REMOVE EXISTING ASPHALT PAVING AROUND BLEACHER SECTIONS B, C, D & E, PREP AND INSTALL NEW : REMOVE EXISTING ASPHALT PAVING AROUND BLEACHER SECTIONS B, C, D & E, PREP AND INSTALL NEW STAMPED ASPHALT PAVING WITH COATING. FIELD: HERRINGBONE PATTERN, COLOR: TBD. BORDER COLOR: TBD ALTERNATE #4c (ADD): REMOVE EXISTING ASPHALT PAVING AROUND BLEACHER SECTION A, PREP AND INSTALL NEW STAMPED : REMOVE EXISTING ASPHALT PAVING AROUND BLEACHER SECTION A, PREP AND INSTALL NEW STAMPED ASPHALT PAVING WITH COATING. FIELD: HERRINGBONE PATTERN, COLOR: TBD. BORDER COLOR: TBD
AutoCAD SHX Text ALTERNATE 3a REMOVE EXISTING DECKING AND RAILINGS, REPLACE WITH NEW AZEK DECKING, RAILING AND GATE ASSEMBLIES
AutoCAD SHX Text
LIST OF ALTERNATES
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text A-7
AutoCAD SHX Text
AutoCAD SHX Text
TYP. AROUND BUILDING
AutoCAD SHX Text NOTE: ALTERNATES 3a AND 3b APPLY TO BOTH DECK AREA 1 AND DECK AREA 2
AutoCAD SHX Text
DECK AREA 1
AutoCAD SHX Text
DECK AREA 2
AutoCAD SHX Text ALTERNATE 4a REMOVE EXISTING ASPHALT PAVING AROUND BLEACHER SECTIONS B, C, D & E. PREP AND INSTALL NEW STAMPED ASPHALT PAVING WITH COATING.
AutoCAD SHX Text ALTERNATE 4c REMOVE EXISTING ASPHALT PAVING AROUND BLEACHER SECTIONS B, C, D & E. PREP AND INSTALL NEW STAMPED ASPHALT PAVING WITH COATING.
AutoCAD SHX Text STAMPED ASPHALT PAVING NOTES: STAMPED ASPHALT PAVING NOTES: 1. WHILE THE ASPHALT IS STILL HOT AND PLIABLE, PLACE STAMPING TEMPLATES ON SURFACE. USE A HEAVY ROLLER OR PLATE COMPACTOR TO PRESS PATTERN INTO ASPHALT. PATTERNS ARE TO BE REVIEWED AND APPROVED BY OWNER/ARCHITECT. 2. ONCE STAMPED, APPLY A THERMOPLASTIC OR POLYMER-BASED COATING, COLORS TO BE DETERMINED.
AutoCAD SHX Text
EXISTING BUILDING CONCRETE CURB TO NEW STAMPED ASPHALT PAVING ASSEMBLY DETAIL
AutoCAD SHX Text A-7
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING CONCRETE CURB, TYP.
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
ALIGN
AutoCAD SHX Text
ALIGN
AutoCAD SHX Text (V.I.F.)
AutoCAD SHX Text 0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 1'
AutoCAD SHX Text
1:20 MIN. SLOPE
AutoCAD SHX Text
NEW STAMPED ASPHALT PAVING ASSEMBLY
AutoCAD SHX Text 25-014
AutoCAD SHX Text
AS INDICATED
AutoCAD SHX Text 12/8/2025
AutoCAD SHX Text 12/8/2025
AutoCAD SHX Text
ISSUE FOR BID
Brian Polygonal Line
Brian Polygonal Line
Brian Polygonal Line
Brian Polygonal Line
Brian Line
Brian Line
Brian Line
Brian Callout
ALTERNATE B FENCE AND GATE SCOPE CLARIFICATION IN RED
RFI LOG
Improvements to:
Frank DeLuca Field Date: 1/6/2026
Question Date Received
Directed To Response Response Date
1 Will the town waive the permit fee? 12/18/2025 Snyder Yes 12/19/2025 2 Will there be liquidated damages? 12/18/2025 Snyder No 12/24/2025 3 Will you require temporary fencing? 12/18/2025 Snyder No. The only temporary fencing needed is to keep visitors away from unsafe construction areas during games.
12/24/2025
4 Will you require a field office? 12/18/2025 Snyder The town does not require a field office. Contractor shall determine office need to properly manage project.
12/24/2025
5 To ensure accurate bidding would you ask for unit pricing on adjusting the toilet partitions, adjusting railings & seats, or replacing the railings?
12/18/2025 Snyder 1) Assume all toilet partitions and doors need adjusting and tightening. 2) Assume all bleacher railings need some level of tightening. 3) Assume 20 seats need repair/reattachement.
12/24/2025
6 A unit price for cmu cracks and mortar repointing would also provide accurate bidding.
12/18/2025 Snyder Contractor shall assume 200sf of CMU pointing on concession building.
12/24/2025
7 Please provide a spec for the screen door. 12/18/2025 Snyder Screen door shall be the "Grand Floridian" by Screen Tight or approved equal.
12/24/2025
8 Drawing S1 has boring reports, they are difficult to read, would you provide clean sheets or original copies?
12/18/2025 Snyder See attached Soils Report. 12/24/2025
9 One of the contractors for the helical piles says this design requires a minimum of 3’ between the piles. Please clarify.
12/18/2025 Cuoco The typical minimum spacing for helical piles is three times the largest helix diameter, which would be 3 feet in this case, as our largest diameter helix is 12 inches.
We used three piles in our caps for stability, not because we required the full capacity of the three piles.
When applying a reduction in capacity (group effect) by reducing the design spacing from 3 feet to 2.5 feet, we would still have the capacity to resist the required loads.
However, if the contractor would like to move the piles 3 inches, that would be acceptable as well.
12/24/2025
10 Please confirm the asphalt thickness and mix design for the Frank Deluca Field project.
12/22/2025 Snyder See attached paving detail. 12/24/2025
11 Will the range hood stay in place? Or must it be removed with all of the other kitchen equipment?
12/22/2025 Snyder Kitchen hood can remain in place if scope of work can be executed with it in place.
12/24/2025
12 After reviewing the plans, there is a conflict with which pile material the engineer wants to use for the project. On sheet S1, in the notes under the partial foundation plan, it calls out a 2 7/8" round shaft with a .276 wall thickness. On sheet S3, they show the round shaft on detail #1, and the square shaft on detail #2.
On sheet S5 under the Helical Pile notes, it calls out a 1 3/4" square shaft with an 8-10-12" plate configuration. There is no need to use two different pile types for the New Construction Piles and the Underpinning Piles, the same material can be used for both applications. Can you tell us which material is preferred.
12/22/2025 Cuoco Use 2 7/8" round shaft 12/24/2025
13 The plans call out A.B Chance products or Equal. Some manufacturers use stronger steel than others which changes the pile material capacity. Our manufacturer uses stronger steel than A.B Chance and I have a less expensive material that is rated for a design load of 37-kips. The design load on the plans is only calling for 20-kips. This is a round shaft product. Would this be applicable?
12/22/2025 Cuoco Submit product literature for review and approval if low bidder. 12/24/2025
14 Drawing A-7, Alternate 2, please clarify the extent of the chain link fence to be removed and replaced with the black picket fence.
12/22/2025 Snyder See attached drawing A-7 mark-up 12/24/2025
15 Please advise if bleacher paint stripping behind and under seating is intended in scope of work?
12/22/2025 Snyder Yes. The intention is to remove all visible paint from all bleacher elements including behind and underneath.
12/24/2025
16 Please advise intent of existing Ticket Booth and Souvenir buildings if Alternates 4a and/or 4c?
12/22/2025 Snyder Removal of Ticket Booth building shall be included in Alternate 4a, and removal of Souvenir building shall be included in Alternate 4c so paving in building area can be completed.
12/24/2025
17 There are (6) "Light Fixture Base, typ." depicted on drawing ST-1.
Please confirm if those are existing to remain or part of the scope of work. If so, please provide clarification/specs for what is needed.
12/24/2025 Snyder Existing to remain. 1/6/2026
18 Please verify if light fixtures A & B (depicted on A-3) are existing to remain or if those are included in scope of work.
12/24/2025 Snyder Light fixtures A and B are new and are called out in "Reflected Ceiling Plan Notes."
1/6/2026
19 Please clarify on the exhaust grills (depicted on A-3) as to if just the grills are to be replaced and if so what is currently being used.
Also if this is included in the Electrical or HVAC scope of work.
12/24/2025 Snyder "Provide Exterior Fixed Blade Extruded Aluminum Return Air Vent Grilles with High-Resistant Electrostatic Coating, White by ACAMINAIRE or approved equal. Sizes to match existing."
1/6/2026
20 Does the Town have structural or foundation drawings of the existing concession/restroom building?
12/24/2025 Snyder See attached January 2000 structural drawings. Accuracy of drawings to existing condtions cannot be confirmed.
1/6/2026
21 Because of the low overhead height, could the existing Grandstands be removed for shoring purposes?
12/24/2025 Cuoco This is a Means and Methods issue- this would need to be approved by and coordinated with the town.
RFI LOG
Improvements to:
Frank DeLuca Field Date: 1/6/2026
22 If the Grandstands cannot be removed, would it be possible to re-engineer the new supports to only have 2 new concrete piers?
Concern is there is not enough room for a machine to excavate around the existing structures.
12/24/2025 Cuoco No 1/6/2026
23 Drawing A-1 Kitchen Fixture/Appliance Notes advised all fixtures, appliances, and equipment are to be removed and stored to allow for new work to be completed. Please advise if the contractor is responsible to move, store, and re-install the items.
If so, please advise if there is space onsite to store or if the contractor needs to secure a storage container.
12/24/2025 Snyder Contractor is responsible to move, store, reinstall, and clean all appliances, equipment, etc … to execute scope of work.
1/6/2026
24 Note on A-1 advises “existing toilet accessories to be removed and replaced in kind, typ.” Please provide a list of all toilet accessories to be replaced, and specify which products to replace with.
12/24/2025 Snyder Toilet accessories shall be provided by owner and installed by G.C.
1/6/2026
Milone & MacBroom 99 Realty Drive
Cheshire, CT 06410
1000 Main Street, Stratford, CT Saturday, 29 April 2017
1'-5" 0.0
(203) 490-4777 63 Lancaster Drive, Beacon Falls, Connecticut 06403 www.site-llc.com SITElog® Report MMI-1 Depth Blows per 6" Moisture Changes Color DESCRIPTION OF FINDINGS General No. Pen. Rec.
0' to 2' 2 3 4 6 Damp 0.50 rb 1 24" 22"
0.67 br/rb
2' to 4' 18 17 17 13 Wet 0.92 rb FILL 2 24" 18"
1.58 rb
5' 4' to 6' 8 17 18 9 Wet gr/gy 3 24" 11" 5.50
6' to 8' 4 1 2 1 Wet d.br 4 24" 0" 8.00
8' to 10' 0 1 0 1 Moist d.br 5 24" 12"
10' ORGANICS
10' to 12' 0 1 1 0 Wet 6 24" 21" 11.50
13.00 og gy
15' 15' to 17' 4 3 1 1 Wet BEACH 7 24" 22"
16.50
18.00 gy DELTAIC gy/tn
20' 20' to 22' 6 13 14 16 Wet 8 24" 20"
23.00 MORAINE
ob/tn
25' 25' to 27' 7 9 9 11 Wet 9 24" 15"
27.00
30'
35'
41°10.494N 73°07.688W
J. DeAngelis, III
J. DeAngelis, Jr.
/ CME 55LCX
140# CME Auto
2" O.D. Lynac
2.25" H.S.A.
DISCLAIMER:
MMI 1
Sub-surface Investigations, Technology + Experience Soil Borings * Rock Coring * Concrete Coring * Monitor Wells * Geoprobe * Recovery Wells * SITELog Reports
Milone & MacBroom 99 Realty Drive
Cheshire, CT 06410
1000 Main Street, Stratford, CT Saturday, 29 April 2017
1'-9" 0.0
(203) 490-4777 63 Lancaster Drive, Beacon Falls, Connecticut 06403 www.site-llc.com SITElog® Report MMI-2 Depth Blows per 6" Moisture Changes Color DESCRIPTION OF FINDINGS General No. Pen. Rec.
0' to 2' 2 2 3 3 Damp 0.50 rb 1 24" 22"
2.00 br/rb
2' to 4' 10 17 18 17 Wet d.gy FILL 2 24" 20"
5' 5' to 7' 9 5 1 1 Wet 3 24" 19" 6.00
7' to 9' 2 1 1 1 Moist d.br 4 24" 20"
10' 10' to 12' 0 1 0 1 Wet ORGANICS 5 24" 20"
11.50 og
14.00 15' 15' to 17' 4 8 4 1 Wet gy 6 24" 0"
BEACH
16.50
17.50 gy DELTAIC?
gy/tn
20' 20' to 22' 11 16 14 15 Wet 7 24" 20"
MORAINE
25' 25' to 27' 6 9 9 9 Wet gy/ob 8 24" 15"
27.00
30'
35'
41°10.489N 73°07.684W
J. DeAngelis, III
J. DeAngelis, Jr.
/ CME 55LCX
140# CME Auto
2" O.D. Lynac
2.25" H.S.A.
DISCLAIMER:
MMI 2
Sub-surface Investigations, Technology + Experience Soil Borings * Rock Coring * Concrete Coring * Monitor Wells * Geoprobe * Recovery Wells * SITELog Reports
| PROJECT TEAM |
| *** END OF ADDENDUM #1 *** |
| 01.1 BID FORM (DeLuca).pdf |
| BID FORM |
| Repairs and Improvements to: |
| Frank DeLuca Field 1000 Main Street Stratford, CT 06615 |
| 03.4 CONCESSION STRUCTURAL DRAWINGS.pdf |
| Binder1_Page_21 |
| Binder1_Page_22 |
| Binder1_Page_23 |
| Binder1_Page_24 |
| Binder1_Page_25 |
| Binder1_Page_26 |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .