2026-11-09 AGCS - Admininistration- Bid Issue - Structural.pdf

PDF 499 KB Posted

Attached to
AGCS - State Road - Administration Renovation 26-004
Solicitation number
US.261299
Issued by
Chester County, Pennsylvania

About this file

This is a structural engineering bid document for the State Road Administration Renovation Project at Avon Grove Charter School in London Grove Township, Chester County, Pennsylvania. The project involves sealed electronic bids submitted via PennBid with a bid opening deadline of 2:30 PM on Tuesday, December 15, 2026, with public opening and reading at 3:00 PM the same day at the school's location (110 E. State Road, West Grove, PA 19390). A mandatory pre-bid conference for all prime contract bidders is scheduled for November 20, 2026, at 3:30 PM at the State Road Campus. The project is divided into four prime contracts: Contract No. 1 (General Construction), Contract No. 2 (Mechanical), Contract No. 3 (Electrical), and Contract No. 4 (Plumbing). General construction scope includes exterior canopy and facade replacement, window replacement, roof repair/replacement, interior demolition and construction, and coordination with mechanical and plumbing work. Mechanical scope encompasses new OHRU and DOAS units with indoor ceiling cassette units, new exhaust fans, and associated ductwork. Electrical work includes lighting fixtures and controls, panelboards, wiring devices, fire alarm systems, and support of general, mechanical, plumbing, and low-voltage cabling. Plumbing scope covers plumbing fixtures, water heaters, domestic water piping, and sanitary piping. Bidding documents became available on PennBid beginning November 10, 2026, with all addenda and bid notifications posted to the platform.

The project is subject to the Pennsylvania Prevailing Wage Act (43 P.S. 165-1 et seq.) and prevailing minimum wage rates established by the Secretary of Labor and Industry. All prime contract bidders must register on www.pennbid.net to participate in the bidding process. Security in the form of a satisfactory corporate surety bond equal to the bid amount is required. The structural engineer of record has designed systems for final installed conditions in accordance with project specifications, local building codes, and applicable industry standards, with full responsibility for construction means, methods, and procedures assigned to the general contractor and designated construction entities. The contractor assumes sole responsibility for temporary bracing, component stabilization, trade coordination, manufacturer requirements, compliance with OSHA guidelines, equipment selection and monitoring, and all construction sequencing. The structural design addresses only final installed conditions; temporary conditions including transportation, handling, storage, lifting, and installation of prefabricated or modular components are the contractor's responsibility. The contractor must verify all field conditions, report any errors, inconsistencies, or omissions to the architect/engineer, and seek clarification on discrepancies during the bidding process, assuming the more stringent or expensive option when conflicting information exists. No extras are allowed for correction of problems that could have been avoided through careful review and minor adjustments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. THE STRUCTURAL ENGINEER OF RECORD (EOR) HAS DESIGNED THE STRUCTURAL SYSTEMS AND ELEMENTS PRESENTED IN THESE DRAWINGS SOLELY FOR THE FINAL INSTALLED CONDITION, IN

ACCORDANCE WITH PROJECT SPECIFICATIONS, LOCAL BUILDING CODES, AND APPLICABLE

INDUSTRY STANDARDS. THE GENERAL CONTRACTOR OR DESIGNATED CONSTRUCTION ENTITY

SHALL ASSUME FULL RESPONSIBILITY FOR ALL CONSTRUCTION MEANS, METHODS, TECHNIQUES, PROCEDURES, AND SEQUENCES, INCLUDING BUT NOT LIMITED TO TEMPORARY BRACING, COMPONENT STABILIZATION, AND COORDINATION WITH ALL TRADES AND MANUFACTURERS'

REQUIREMENTS.

2. THE CONTRACTOR SHALL EXECUTE ALL CONSTRUCTION PROCESSES IN STRICT ACCORDANCE

WITH LOCAL AND STATE BUILDING CODES, REGULATIONS, AND OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION (OSHA) GUIDELINES. THIS RESPONSIBILITY INCLUDES, BUT IS NOT LIMITED

TO, THE SELECTION, DEPLOYMENT, AND MONITORING OF ALL EQUIPMENT, TEMPORARY

STRUCTURAL SUPPORTS, SHORING, SCAFFOLDING, CRANE OPERATIONS, AND SAFETY PROGRAMS.

THE CONTRACTOR SHALL MAINTAIN DOCUMENTATION OF COMPLIANCE WITH THESE

REQUIREMENTS.

3. THE STRUCTURAL DESIGN AND DETAILS PROVIDED HEREIN DO NOT CONSTITUTE AN

ENDORSEMENT OR APPROVAL OF ANY SPECIFIC CONSTRUCTION METHODOLOGY. THE

CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS, COORDINATE WITH MANUFACTURERS'

REQUIREMENTS, AND SUBMIT FOR REVIEW ANY PROPOSED DEVIATIONS FROM THE DESIGN INTENT.

THE CONTRACTOR SHALL MAINTAIN RESPONSIBILITY FOR IMPLEMENTING ALL CONSTRUCTION

ACTIVITIES IN A SAFE AND APPROPRIATE MANNER.

4. THE DESCRIBED LIMITATIONS ON CONSTRUCTION SEQUENCE ARE PROVIDED TO ASSIST THE

CONTRACTOR IN COORDINATING PROJECT WORK. THESE DESCRIPTIONS DO NOT FULLY

ENCOMPASS ALL LIMITATIONS NOR DO THEY PRECLUDE ALTERNATIVE CONSTRUCTION

SEQUENCES. REGARDLESS OF ADHERENCE TO THE DESCRIBED LIMITATIONS, THE CONTRACTOR

REMAINS FULLY RESPONSIBLE FOR THE STABILITY AND SAFETY OF THE WORK UNTIL THE

STRUCTURAL WORK IS COMPLETED. COMPLIANCE WITH THESE LIMITATIONS DOES NOT ABSOLVE

THE CONTRACTOR OF THIS RESPONSIBILITY.

5. THE STRUCTURAL DESIGN PROVIDED HEREIN ADDRESSES ONLY THE FINAL INSTALLED

CONDITION OF ALL COMPONENTS AND SYSTEMS. ANY TEMPORARY CONDITIONS, INCLUDING BUT

NOT LIMITED TO TRANSPORTATION, HANDLING, STORAGE, LIFTING, ROTATING, STAGING, AND

INSTALLATION OF PREFABRICATED OR MODULAR COMPONENTS, ARE THE SOLE RESPONSIBILITY

OF THE CONTRACTOR AND/OR MANUFACTURER.

MEANS & METHODS DISCLAIMER

1. IF DURING THE PROGRESS OF THE WORK THE CONTRACTOR MAY DISCOVER ANY ERROR,

INCONSISTENCY OR OMISSION IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL AT

ONCE SO REPORT TO THE ARCHITECT/ENGINEER. EXTRAS WILL NOT BE ALLOWED FOR

CORRECTION OF PROBLEMS THAT COULD HAVE BEEN AVOIDED BY CAREFUL REVIEW AND THE

MINOR ADJUSTMENT OF SIZE AND/OR LOCATION OF VARIOUS ITEMS FOR PROPER FIT. THIS

CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF HIS WORK WITH THE OTHER

CONTRACTORS.

2. ANY ITEM NOT SPECIFICALLY LISTED OR SHOWN ON THE CONTRACT DOCUMENTS BUT IS

INCIDENTAL TO THE COMPLETION OF THE PROJECT OR PACKAGE WILL BE CONSIDERED AS PART

OF THE CONTRACT SCOPE OF WORK.

3. IN THE EVENT OF DISCREPANCY OR CONFLICTING INFORMATION PERTAINING TO THE

STRUCTURAL COMPONENTS IN THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL ASSUME

THE MORE STRINGENT OR EXPENSIVE OPTION FOR BIDDING AND CONSTRUCTION PURPOSES. IT

IS THE CONTRACTOR'S RESPONSIBILITY TO SEEK CLARIFICATION FROM THE ENGINEER OF

RECORD DURING THE BIDDING PROCESS IF ANY DISCREPANCIES ARE IDENTIFIED.

4. THE STRUCTURAL ENGINEER OF RECORD IS NOT AND SHALL NOT BE HELD RESPONSIBLE FOR

BUILDING ENVELOPE WATERPROOFING. THIS INCLUDES, BUT IS NOT LIMITED TO, ROOFING,

FLASHING, WINDOWS AND DOORS, SIDING AND VENEERS, FOUNDATION WATERPROOFING, DAMP

PROOFING, ETC. THIS IS THE RESPONSIBILITY OF THE ARCHITECT OF RECORD AND THE GENERAL

CONTRACTOR.

5. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH JOB SPECIFICATIONS AND

ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND SITE DRAWINGS. CONSULT THESE

DRAWINGS FOR LOCATIONS AND DIMENSIONS OF OPENINGS, CHASES, INSERTS, REGLETS,

SLEEVES, DEPRESSIONS, AND OTHER DETAILS NOT SHOWN ON STRUCTURAL DRAWINGS. ALL

DIMENSIONS AND CONDITIONS MUST BE VERIFIED IN THE FIELD. ANY DISCREPANCIES SHALL BE

BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE

AFFECTED PART OF THE WORK.

6. THE STRUCTURE IS DESIGNED TO BE SELF SUPPORTING AND STABLE AFTER THE BUILDING IS

COMPLETE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE ERECTION

PROCEDURES AND SEQUENCE TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENTS

DURING ERECTION. THIS INCLUDES THE ADDITION OF NECESSARY SHORING, SHEETING,

TEMPORARY BRACING, GUYS OR TIEDOWNS, FALSEWORK, FORMWORK, AND STAGING. PROVIDE

ALL SHORING AND BRACING REQUIRED TO STABILIZE AND PROTECT EXISTING AND ADJACENT

STRUCTURES AND SYSTEMS DURING COURSE OF DEMOLITION AND CONSTRUCTION. SUCH

MATERIAL SHALL REMAIN THE PROPERTY OF THE CONTRACTOR AFTER COMPLETION OF THE

PROJECT. IN THE EVENT THAT THE CONTRACTOR DETERMINES THAT SHEETING OR SHORING IS

REQUIRED, THE CONTRACTOR SHALL RETAIN THE SERVICES OF A REGISTERED PROFESSIONAL

STRUCTURAL ENGINEER FOR DESIGN AND DOCUMENTATION OF ALL SHEETING, SHORING AND

TEMPORARY BRACING REQUIRED FOR THE WORK. IF NOT IN THE ORIGINAL CONTRACT FOR

WORK, REVIEW OF ANY ENGINEERED SHEETING, SHORING AND TEMPORARY BRACING REQUIRED

WILL BE CONSIDERED ADDITIONAL SCOPE OF WORK AND WILL BE CONSIDERED ADDITIONAL

SERVICES.

7. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ALLOWABLE CONSTRUCTION LOADS.

8. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT

TO APPROVAL BY THE ENGINEER.

9. ALL APPLICABLE FEDERAL, STATE AND MUNICIPAL REGULATIONS SHALL BE FOLLOWED,

INCLUDING THE FEDERAL DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH ACT.

10. SHOULD THE CONTRACTOR SEEK APPROVAL OF A PRODUCT OTHER THAN THE BRAND OR

BRANDS NAMED IN THESE SPECIFICATIONS, IT SHALL FURNISH WRITTEN EVIDENCE THAT SUCH

PRODUCT CONFORMS IN ALL RESPECTS TO THE SPECIFIED REQUIREMENTS, AND THAT IT HAS

BEEN USED SUCCESSFULLY ELSEWHERE UNDER SIMILAR CONDITIONS. WHERE THE SPECIFIED

REQUIREMENTS INVOLVE CONFORMANCE TO RECOGNIZED CODES OR STANDARDS THE

CONTRACTOR SHALL FURNISH EVIDENCE OF SUCH CONFORMANCE IN THE FORM OF TEST OR

INSPECTION REPORTS, PREPARED BY A RECOGNIZED AGENCY, AND BEARING AN AUTHORIZED

SIGNATURE.

11. MANUFACTURERS' STANDARD DATA AND CATALOG CUT SHEETS WILL NOT BE CONSIDERED

SUFFICIENT SUPPORT FOR PRODUCT ALTERNATES IN THEMSELVES. THE ENGINEER OF RECORD

WILL NOT BE RESPONSIBLE FOR SEEKING FURTHER DATA FROM THE MANUFACTURER, OR FOR

OTHERWISE RESEARCHING THE PRODUCT. FAILURE TO PROVIDE COMPLETE DATA WILL RESULT

IN THE REJECTION OF THE ENTIRE PRODUCT.

12. SUBMIT SHOP DRAWINGS IN THE FORM ELECTRONIC PDF FILES. IN NO CASE SHALL

REPRODUCTION OF THE CONTRACT DOCUMENTS BE USED AS A SHOP DRAWING. AS A MINIMUM,

SUBMIT THE FOLLOWING ITEMS FOR REVIEW:

A. CONCRETE MIX DESIGNS

B. REINFORCING STEEL SHOP DRAWINGS

C. STRUCTURAL STEEL SHOP DRAWINGS [SIGNED AND SEALED]

D. STEEL JOIST/GIRDER SHOP DRAWING

E. METAL DECK SHOP DRAWINGS

F. MASONRY REINFORCING ACCESSORIES

G. WOOD TRUSS SHOP DRAWINGS [SIGNED AND SEALED]

H. LIGHT GAGE STEEL TRUSS SHOP DRAWINGS [SIGNED AND SEALED]

I. COLD-FORMED STEEL FRAMING SHOP DRAWINGS [SIGNED AND SEALED]

13. IF DRAWINGS INDICATE REQUIREMENT(S) FOR SIGNED AND SEALED SHOP DRAWINGS AND

SIGNED AND SEALED CALCULATIONS, THEY SHALL BE PROVIDED WITH THE 1ST SUBMISSION TO

ENGINEER OF RECORD, OR THEY RISK BEING REJECTED.

14. SUBMIT SHOP DRAWINGS 12 BUSINESS DAYS (MINIMUM) PRIOR TO DATE THAT RETURNED SHOP

DRAWINGS ARE REQUIRED. SHOP DRAWINGS SHALL HAVE THE CONTRACTOR'S STAMP OF

APPROVAL PRIOR TO REVIEW BY ENGINEER OF RECORD. THE CONTRACTOR REVIEW/APPROVAL

STAMP PROVIDES CERTIFICATION TO THE ENGINEER OF RECORD THAT THE CONTRACTOR HAS

VERIFIED ALL FIELD MEASUREMENTS, CONSTRUCTION CRITERIA, MATERIALS AND SIMILAR DATA

AND HAS REVIEWED EACH DRAWING FOR COMPLETENESS, COORDINATION AND COMPLIANCE

WITH THE CONTRACT DOCUMENTS.

15. COSTS OF INVESTIGATION AND/OR REDESIGN DUE TO CONTRACTOR ERRORS WILL BE AT THE

CONTRACTOR'S EXPENSE.

16. THE ENGINEER HAS NO ONGOING PRESENCE ON THE SITE, NO CONTROL OF ACTIVITIES ON THE

SITE, NO SUPERVISORY ROLE AND NO FIELD RESPONSIBILITY FOR SITE SAFETY. THE

CONTRACTOR IS RESPONSIBLE FOR SUPERVISION OF THE WORK INCLUDING PERSONNEL

PROTECTION IN ACCORDANCE WITH OSHA AND OTHER APPLICABLE REGULATIONS AND PUBLIC

PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE JURISDICTION IN WHICH THE

PROJECT IS BEING CONSTRUCTED.

17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ALL CONDITIONS AND

MATERIALS WITHIN THE PROPOSED CONSTRUCTION AREA. THE CONTRACTOR SHALL HAVE THE

SOLE RESPONSIBILITY FOR ANY DAMAGE OR INJURIES BY OR DURING THE EXECUTION OF THE

WORK.

18. CONTRACTOR SHALL VERIFY DIMENSIONS AND FIELD CONDITIONS PRIOR TO STARTING WORK, THE ENGINEER SHALL BE NOTIFIED BY THE CONTRACTOR PROMPTLY OF ANY DEVIATION FROM

THE PLAN, UNEXPECTED CONDITIONS, OR INCIDENTS INVOLVING INJURY, COLLAPSE, PROPERTY

DAMAGE OR VIOLATIONS ISSUED BY GOVERNMENT ENTITIES.

GENERAL NOTES

*** THE ARCHITECT/ENGINEER OF RECORD IS NOT AND

SHALL NOT BE HELD LIABLE FOR SITE SAFETY ISSUES ***

1. A GEOTECHNICAL EXPLORATION REPORT DATED ^^/^^/^^^^ CONTAINING SUBSURFACE DATA AND

FOUNDATION/EARTHWORK RECOMMENDATIONS HAS BEEN PREPARED BY ^^^^. ALL

RECOMMENDATIONS CONTAINED IN THE REPORT ARE TO BE CONSIDERED PART OF THE

CONTRACT DOCUMENTS.

2. ALLOWABLE BEARING CAPACITY: ^^^^ psf

3. FOUNDATION DESIGN IS BASED ON SHALLOW SPREAD FOOTINGS BEARING ON SUITABLE NATURAL

SOILS AND/OR NEW COMPACTED STRUCTURAL FILL.

4. ALL ORGANIC MATERIALS, EXCESSIVELY SOFT OR LOOSE SOILS, TREES, ASPHALT, CONCRETE, DEBRIS AND OTHER DELETERIOUS MATERIALS SHOULD BE REMOVED WITHIN AND AT LEAST 5 FEET

BEYOND THE BUILDING LIMIT. SEE SPECIFICATION SECTION 02110 PARAGRAPH 2.3.

5. PROOF ROLL ALL SUBGRADES, UNDER THE OBSERVATION OF THE GEOTECHNICAL ENGINEER.

UNSUITABLE AREAS SHALL BE REMOVED AND REPLACED AS DIRECTED BY THE GEOTECHNICAL

ENGINEER. NO FILL FOR BUILDING SUPPORT SHALL BE PLACED UNTIL SUBGRADES AND FILL

MATERIAL HAVE BEEN OBSERVED AND APPROVED BY THE GEOTECHNICAL ENGINEER.

6. WE RECOMMEND THAT NO FOOTINGS BE EXCAVATED THAT CAN NOT BE POURED ON THE SAME

DAY.

7. AREAS REQUIRING UNDERCUT AND FILL MATERIAL DUE TO THE PRESENCE OF UNSUITABLE

MATERIAL SHALL BE BACKFILLED TO THE DESIGN FOOTING SUBGRADE WITH NEW COMPACTED

STRUCTURAL FILL.

8. COMPACTED STRUCTURAL FILL FOR BUILDING SUPPORT UTILIZING MATERIAL APPROVED FOR USE BY THE GEOTECHNICAL ENGINEER INCLUDE: ON-SITE GRANULAR SOILS INCLUDING GW, GP, GM, SW, SP AND SM CLASSIFIED IN ACCORDANCE WITH THE UNIFIED SOIL CLASSIFICATION SYSTEM (USCS). FURTHERMORE, THE MATERIAL TO BE UTILIZED AS STRUCTURAL FILL SHOULD HAVE A PLASTICITY INDEX (PI) LESS THAN 2 SUBJECT TO FINAL APPROVAL BY GEOTECHNICAL ENGINEER.

9. MATERIAL TRANSPORTED FROM OFF-SITE SHALL MEET THE REQUIREMENTS OF GEOTECHNICAL

REPORT.

10. SLABS ON GRADE MAY BE SUPPORTED ON FIRM SUITABLE NATURAL SOILS, OR ON COMPACTED STRUCTURAL FILL FOLLOWING STRIPPING OF TOPSOIL, VEGETATION, ASPHALT AND ANY SOFT OR

DISTURBED SOILS WITHIN THE BUILDING AREA. A FOUR INCH WASHED GRAVEL OR CRUSHED

STONE LAYER CORRESPONDING TO AASHTO SIZE NO. 57 AGGREGATE SHOULD BE USED BENEATH

ALL FLOOR SLABS ON GRADE.

11. COMPACTED STRUCTURAL FILL BENEATH ALL FOUNDATIONS, SLABS ON GRADE AND ADJACENT

TO FOUNDATION WALLS SHALL BE PLACED IN LIFTS NOT EXCEEDING 8 INCHES IN LOOSE

THICKNESS AND BE COMPACTED TO 95 PERCENT OF MAXIMUM DRY DENSITY PER ASTM D-1557,

MODIFIED PROCTOR TEST. SEE SPECIFICATION SECTION 02211, PARAGRAPH 3.4.

12. BACKFILL IMMEDIATELY BEHIND BASEMENT WALLS SHOULD BE CLEAN, GRANULAR MATERIAL CONTAINING LESS THAN TEN (10) PERCENT PASSING THE NO. 200 SIEVE (0.07MM). IN ADDITION, THE

COMPACTION BEHIND THESE WALLS SHOULD BE NINETY-FIVE (95) PERCENT OF THE MODIFIED

PROCTOR MAXIMUM DRY DENSITY IN ACCORDANCE WITH ASTM D-1557. EXCESSIVE COMPACTION

MAY CAUSE DAMAGE TO THE WALLS. HAND OPERATED EQUIPMENT SHOULD BE USED FOR

COMPACTION NEAR EXISTING AND NEW FOUNDATION WALLS. BACKFILL AGAINST NEW

FOUNDATION WALLS ONLY AFTER FIRST FLOOR IS IN PLACE OR ADEQUATE BRACING HAS BEEN

PROVIDED. CONCRETE FLOOR SLABS SHALL HAVE CURED 7 DAYS MINIMUM PRIOR TO

BACKFILLING.

13. THE EXCAVATION FOR PLACEMENT OF COMPACTED STRUCTURAL FILL SHOULD EXTEND BEYOND

THE EDGE OF FOOTINGS A MINIMUM DISTANCE EQUAL TO THE DEPTH OF FILL.

14. EXTEND BOTTOM OF EXTERIOR FOOTINGS AT LEAST 3 FEET BELOW THE EXTERIOR FINISH GRADE

FOR PROTECTION AGAINST FROST.

15. PROVIDE 4 INCH PVC DRAIN PIPE AROUND THE PERIMETER OF THE STRUCTURE. LOCATE AT THE

BOTTOM OF THE FOUNDATION WALLS AND PROVIDE POSITIVE GRAVITY FLOW TO PROPERLY

DESIGNED OUTLET. SURROUND PIPE ON TOP AND OUTER SIDES BY A MINIMUM 6 INCH THICK

AGGREGATE FILTER OF AASHTO SIZE NO. 7 OR 8 AGGREGATE. WRAP AGGREGATE FILTER WITH

MIRAFI 140N FILTER FABRIC OR APPROVED EQUAL.

ALL SUBGRADES AND UNDERCUTS SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER. SOILS

EXPOSED AT THE BASES OF ALL APPROVED FOUNDATION EXCAVATIONS SHOULD BE PROTECTED

AGAINST ANY DETRIMENTAL CHANGE IN CONDITION, SUCH AS DISTURBANCE FROM RAIN OR FROST.

SURFACE RUNOFF SHOULD BE DRAINED AWAY FROM THE EXCAVATIONS AND NOT BE ALLOWED TO

POND. FOUNDATION EXCAVATIONS SHOULD BE PROTECTED FROM RAINFALL OR FREEZING

CONDITIONS. SLOPE FOOTING EXCAVATIONS AS REQUIRED FOR STABILITY AND SAFETY OR PROVIDE

SHEETING OR SHORING IN ACCORDANCE WITH OSHA REQUIREMENTS. IN THE EVENT THAT THE

CONTRACTOR DETERMINES THAT SHEETING OR SHORING IS REQUIRED FOR EXCAVATION, THE

CONTRACTOR SHALL RETAIN THE SERVICES OF A REGISTERED PROFESSIONAL STRUCTURAL

ENGINEER FOR DESIGN AND DOCUMENTATION OF ALL SHEETING AND SHORING REQUIRED FOR THE

WORK. SEE SPECIFICATION SECTION 02215.

FOUNDATION NOTES

1. ALL CONCRETE WORK SHALL CONFORM TO ACI 318 (LATEST EDITION).

2. CONCRETE COMPRESSIVE STRENGTH AT 28 DAYS SHALL BE:

a. FOUNDATIONS: 4000 PSI

b. SLABS ON GRADE: 4000 PSI

c. SLABS ON DECK: 4000 PSI, NW & LW AS INDICATED.

3. ALL CONCRETE SUBJECT TO FREEZE/THAW CYCLE SHALL BE AIR-ENTRAINED.

4. CONCRETE SHALL NOT BE PLACED IN WATER OR ON FROZEN GROUND.

5. REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60 DEFORMED BARS AND

SHALL BE DETAILED, FABRICATED AND PLACED IN ACCORDANCE WITH ACI 315, LATEST

EDITION. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A-185 AND BE PROVIDED IN FLAT

SHEETS.

6. COMPLETE SHOP DRAWINGS AND SCHEDULES OF ALL REINFORCING STEEL SHALL BE

PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE ENGINEER FOR REVIEW.

7. REINFORCEMENT SHALL BE CONTINUOUS AROUND CORNERS AND AT INTERSECTIONS.

PROVIDE CLASS "A" TENSION LAP SPLICES FOR ALL HORIZONTAL WALL REINFORCING

UNLESS OTHERWISE SHOWN ON PLAN. PROVIDE CLASS "B" TENSION LAP SPLICES FOR ALL

HORIZONTAL GRADE BEAM REINFORCING.

8. CLEARANCES FOR REINFORCEMENT:

a. CONCRETE PLACED DIRECTLY ON EARTH, FOOTINGS: 3"

b. SLABS, FROM TOP UNLESS OTHERWISE NOTED: 1"

c. FORMED SURFACES EXPOSED TO WEATHER OR EARTH:

#5 BAR OR SMALLER: 1 1/2"

#6 BAR OR LARGER: 2"

9. FOR ALL OPENINGS IN CONCRETE WALLS AND SLABS, PROVIDE SUPPLEMENTAL

REINFORCING AROUND OPENING AS SHOWN ON THE CONTRACT DOCUMENTS.

10. CONTROL JOINTS SHALL BE LOCATED BY CONTRACTOR IN ACCORDANCE WITH ACI

CRITERIA, MAXIMUM SPACINGS AS PER TYPICAL SLAB ON GRADE DETAILS AND TYPICAL

CONTROL JOINT LOCATION DETAILS (U.N.O.). MINIMUM CONTROL JOINT DEPTHS ARE

INDICATED ON TYPICAL CONTROL JOINT DETAILS. CONTROL JOINTS WHICH ARE NOT

PROMPTLY OR PROPERLY CUT AND ARE NOT FUNCTIONING SHALL BE RECUT BY THE

CONCRETE CONTRACTOR. RECUTS OF JOINTS WHICH WERE NOT PROMPTLY OR PROPERLY

CUT SHALL BE 3" DEEP MINIMUM.

11. ANCHOR BOLTS SHALL CONFORM TO ASTM F1554 GR. 36 UNLESS NOTED OTHERWISE.

12. LAP ALL BARS MINIMUM 40 DIAMETERS. LAP ALL WWF A MINIMUM OF 6 INCHES.

13. NORMAL WEIGHT CONCRETE SHALL BE USED FOR ALL FRAMED FLOORS. THIS CONCRETE

IS TO HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4000 PSI.

14. UNLESS OTHERWISE APPROVED ALL REINFORCEMENT SHALL BE BLOCKED INTO POSITION

WITH PRECAST CONCRETE BLOCKS HAVING A MINIMUM COMPRESSIVE STRENGTH EQUAL

TO THAT OF THE SLAB OR FOUNDATION SYSTEM.

15. SEE THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF DEPRESSED SLAB

AREAS, DRAINS, AND DIMENSIONS.

16. PROVIDE GALVANIZED STEEL SLEEVES WHERE PIPES PASS THROUGH EXTERIOR

CONCRETE WALLS, BEAMS OR SLABS. PROVIDE PVC SLEEVES WHERE PIPES PASS

THROUGH INTERIOR CONCRETE WALLS, BEAM OR SLABS (UNLESS NOTED OTHERWISE).

17. DO NOT PLACE UNDERGROUND UTILITIES OR PIPES BELOW FOOTINGS. IF ANY SUCH

CONDITIONS OCCUR, NOTIFY THE ENGINEER IMMEDIATELY AND DROP THE BOTTOM OF

FOOTING ELEVATION IN ACCORDANCE WITH THE TYPICAL STEP FOOTING AT PIPE

CROSSING DETAIL IN ORDER TO CLEAR THE PIPE.

18. PROVIDE FOR ANY DEWATERING AS REQUIRED DURING EXCAVATION AND CONSTRUCTION

OF THE FOUNDATION SYSTEM.

19. BOTTOM OF NEW FOOTINGS ADJACENT TO EXISTING FOUNDATIONS SHALL BE AT THE

SAME ELEVATION AS THE EXISTING FOUNDATION UNLESS A 2:1 MAXIMUM SLOPE

(HORIZONTAL TO VERTICAL) IS MAINTAINED BETWEEN BOTTOM OF FOOTINGS.

20. AIR-ENTRAINMENT FOR CONCRETE EXPOSED TO FROST OR WEATHER:

(DO NOT ENTRAIN TROWEL FINISHED FLOORS OR HIGH DENSITY CONCRETE)

MAXIMUM AGGREGATE SIZE AIR CONTENT

2 in 4% TO 6.5%

1.5 in 4% TO 7% 1 in 4.5% TO 7%

0.75 in 4.5% TO 7%

CONCRETE NOTES

1. ALL MASONRY CONSTRUCTION SHALL CONFORM TO ACI 530.1 SPECIFICATION FOR MASONRY

STRUCTURES (LATEST EDITION).

2. ALL CONCRETE MASONRY UNITS SHALL BE ASTM C90, GRADE N, TYPE 1 STANDARD WEIGHT

BLOCKS INCLUDING STRETCHERS AND CORNER BLOCKS. SPECIFIED COMPRESSIVE STRENGTH

OF MASONRY, f'm, SHALL BE A MINIMUM OF 2150. PSI, AS DETERMINED BY THE UNIT STRENGTH

METHOD OR BY PRISM TESTS.

3. MORTAR SHALL CONFORM TO ASTM SPECIFICATION C270, TYPE S. OWNER'S TESTING AGENCY

SHALL VERIFY STRENGTH FROM FIELD-OBTAINED TEST CUBES.

4. WHERE INDICATED, GROUT CORES SOLID WITH A HIGH SLUMP MIX IN ACCORDANCE WITH ASTM SPECIFICATION C476 HAVING A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 2000 PSI. OWNER'S

TESTING AGENCY SHALL VERIFY STRENGTH FROM FIELD-OBTAINED TEST CUBES. THE USE OF

WATER REDUCING ADMIXTURES IN GROUT IS NOT ALLOWED.

5. PROVIDE VERTICAL REINFORCING IN GROUTED CELLS AS INDICATED. REINFORCING BARS SHALL

CONFORM TO ASTM A615 GRADE 60. VERTICAL REINFORCING SHALL BE LAPPED 48 BAR

DIAMETERS.

6. HORIZONTAL WALL REINFORCING SHALL BE DUR-O-WAL TRUSS DESIGN WITH 3/16"Ø SIDE RODS

AND 3/16"Ø CROSS TIES. REINFORCING SHALL BE PLACED IN MASONRY WALLS AT 16" O.C.,

MAXIMUM. SPACE HORIZONTAL JOINT REINFORCEMENT AT 8" ON CENTER IN ALL PARAPETS. USE

SHOP FABRICATED SPECIAL PIECES AT ALL CORNERS AND TEES.

7. CMU PLACED BELOW GRADE SHALL BE GROUTED SOLID.

8. CONCRETE MASONRY UNITS SHALL BE LAID IN RUNNING BOND UNLESS NOTED OTHERWISE ON

THE ARCHITECTURAL DRAWINGS. BOND CORNERS AND INTERSECTIONS OF LOAD BEARING

WALLS. ALL EXTERNAL CORNERS SHALL BE BULL NOSE BLOCKS.

9. ALL LOAD BEARING CMU WALLS SHALL CONTAIN JOINTS WHICH ARE FULLY BEDDED.

10. FILL ALL BOND BEAMS WITH 3000 PSI CONCRETE USING 3/8" MAXIMUM AGGREGATE SIZE.

11. PROVIDE TEMPORARY BRACING OF MASONRY WALLS TO WITHSTAND LATERAL LOADS DURING

CONSTRUCTION.

12. MASONRY WALLS WHICH SUPPORT LINTELS FOR DOORS, WINDOWS, DUCT OPENINGS 3FT OR

LARGER (NOT INCLUDING STEEL JOISTS OR BEAMS) SHALL HAVE MINIMUM 16" WIDE CELLS

GROUTED SOLID FULL HEIGHT UNDER BEARING WITH 1-#5 BAR MINIMUM VERTICAL AND DOWEL

TO MATCH.

13. BRICK VENEER ANCHORS ON STUD BACKUP SHALL HAVE 3/16" ROUND HOT DIPPED GALVANIZED

STEEL TIES FOR USE WITH DW-10 ANCHORS BY HOHMANN & BARNARD. LOCATE 16" O.C.

VERTICALLY 32" O.C. HORIZONTALLY AND 8" O.C. AROUND OPENINGS. REINFORCEMENT FOR

VENEER SHALL INCLUDE A MINIMUM OF ONE 3/16"Ø ROD IN THE VENEER CONNECTED TO

ADJUSTABLE TIES. NOTE HEAVIER VENEERS MAY REQUIRE A SECOND ROD. DESIGN SHALL BE

BASED ON HOHMANN AND BARNARD, INC. DW-10 SEISMICLIP INTERLOCK SYSTEM WITH BYNA-TIE

MASONRY TIES.

14. FOR MULTIWYTHE MASONRY, PROVIDE ADJUSTABLE (2-PIECE) TYPE WITH SINGLE PAIR OF SIDE

RODS AND CROSS TIES SPACED NOT MORE THAN 16 INCHES O.C. AND WITH SEPARATE

ADJUSTABLE VENEER TIES ENGAGING THE CROSS TIES. CROSS TIES ARE EITHER U-SHAPED WITH

EYES OR RECTANGULAR. SPACE SIDE RODS FOR EMBEDMENT WITHIN EACH FACE SHELL OF

BACKUP WYTHE AND SIZE ADJUSTABLE TIES TO EXTEND AT LEAST HALFWAY THROUGH OUTER

WYTHE BUT WITH AT LEAST 5/8 INCH COVER ON OUTSIDE FACE.

REINFORCEMENT SHALL INCLUDE A MINIMUM OF ONE 3/16"∅ ROD IN THE VENEER CONNECTED

TO ADJUSTABLE TIES. NOTE HEAVIER VENEERS MAY REQUIRE A SECOND ROD. DESIGN SHALL BE BASED ON HOHMANN AND BARNARD, INC. 165-2X S.I.S. TRUSS SEISMICLIP INTERLOCK SYSTEM.

COORDINATE REINFORCEMENT REQUIREMENTS, JOINT LOCATION OF CMU BACKUP, AND NON-

STANDARD CMU VENEER WITH RELATED SECTIONS AND DETAILS AND THE ARCHITECTURAL

DRAWINGS.

15. SEE ARCHITECTURAL DRAWINGS FOR CONTROL JOINTS.

16. LOCATION OF LINTELS AT MASONRY OPENINGS SHALL BE COORDINATED WITH THE

ARCHITECTURAL AND MECHANICAL DRAWINGS.

17. UNLESS OTHERWISE NOTED, PROVIDE THE FOLLOWING LINTELS FOR EACH 4 INCH THICKNESS

OF MASONRY WALL WITH 8 INCHES OF BEARING AT EACH END. FOR UNEQUAL LEG ANGLES,

ORIENT THE LONG LEGS VERTICAL: GALVANIZE ALL LINTELS EXPOSED TO THE WEATHER.

• OPENINGS UP TO 4'------ L3 1/2x3 1/2x5/16

• OPENINGS 4' TO 6'------- L4x3 1/2x5/16

• OPENINGS 6' TO 8'------- L5x3 1/2x5/16

18. PROVIDE REBAR DOWELS FROM THE FOUNDATIONS TO MATCH VERTICAL REINFORCING SIZE

AND SPACING. DOWELS SHALL HAVE STANDARD 90 DEGREE HOOKS AND LAP WITH THE FIRST

LIFT OF REINFORCING. STANDARD LAP LENGTH OF GRADE 60 MASONRY REINFORCING BARS

SHALL BE 48 BAR DIAMETERS.

19. PROVIDE STEEL JOIST AND BEAM BEARING PLATES AND OTHER ACCESSORIES AS INDICATED.

PROVIDE 2 COURSES OF SOLIDLY GROUTED CMU BELOW ALL BEAM BEARINGS OVER A WIDTH OF

1'-4" CENTERED ON THE WALL OR BEARING POINT UNLESS OVER A BOND BEAM. SEE TYPICAL

BEAM BEARING DETAIL FOR ADDITIONAL INFORMATION. PROVIDE PIERS PER PLAN AND PIER

SCHEDULE.

20. CONCRETE MASONRY UNITS NOTED AS "IVANY" SHALL BE ONE- CORE, OPEN END UNITS WITH A

COMPRESSIVE STRENGTH OF 3000 PSI ON THE NET AREA OF BLOCK, FURNISHED BY AN IVANY

BLOCK FRANCHISE HOLDER. WALLS BUILT WITH IVANY BLOCK SHALL USE TYPE M MORTAR AND

GROUT FILL SHALL BE A PEA GRAVEL MIX HAVING A 28 DAY COMPRESSIVE STRENGTH OF 3000 PSI. f'm = 2800 PSI. USE SPECIAL IVANY CORNER UNITS AT CORNERS.

21. BREAKAWAY FIRE ANCHORS SHALL BE ROLLED STRIP ZINC ALLOY IN 1/8" THICK BY HECKMANN

BUILDING PRODUCTS INC., ANCHORS SHALL BE SUPPLIED AND INSTALLED BY THE GENERAL

CONTRACTOR. GENERAL CONTRACTOR SHALL VERIFY ACTUAL SIZES, SHAPES AND NUMBER OF

ANCHORS REQUIRED.

MASONRY NOTES

1. STRUCTURAL STEEL FABRICATION, ERECTION, AND CONNECTION DESIGN SHALL CONFORM TO:

a. AISC "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" ANSI/AISC 360-16 (PART 16 OF AISC

"STEEL CONSTRUCTION MANUAL")

b. AISC "STEEL CONSTRUCTION MANUAL", 15TH EDITION

c. AISC "DETAILING FOR STEEL CONSTRUCTION", 3RD EDITION

2. ALL WELDING SHALL CONFORM TO:

a. "STRUCTURAL WELDING CODE - STEEL", AWS D1.1 - LATEST EDITION

b. "STRUCTURAL WELDING CODE - SHEET STEEL" AWS D1.3 - LATEST EDITION

3. ALL STEEL SHALL CONFORM TO THE FOLLOWING ASTM SPECS:

a. WIDE FLANGE SHAPES: ASTM A992, Fy = 50 KSI.

b. CHANNELS, ANGLES, PLATES & BARS: ASTM A36, Fy = 36 KSI

c. CHANNELS, ANGLES, PLATES & BARS: ASTM A572 GR. 50 (WHERE NOTED)

d. HOLLOW STRUCTURAL SECTIONS: ASTM A500 GR. B, Fy = 46 KSI

e. STEEL PIPES: ASTM A53, GR. B, Fy = 35 KSI

f. WELDING ELECTRODES: AWS A5.1 OR A5.5, E70XX

g. HEADED STUDS: AWS D1.1 TYPE "B", Fu = 65 KSI (MIN.)

h. ANCHOR RODS: ASTM F1554 GR 36, U.N.O.

• ASTM F1554 GR. 55 (SECTION S1 WELDABILITY SUPPL.)

• ASTM F1554 GR. 105 (WHERE NOTED)

i. HIGH STRENGTH BOLTS: ASTM A325, U.N.O., ASTM 490 (WHERE NOTED)

4. STRUCTURAL STEEL DAMAGED DURING WELDING SHALL BE REPLACED OR REPAIRED IN A MANNER

THAT IS ACCEPTABLE TO THE ENGINEER OF RECORD.

5. ALL WELDERS RETAINED BY THE CONTRACTOR SHALL HAVE NON-EXPIRED (CURRENT) EVIDENCE

OF PASSING THE APPROPRIATE AWS QUALIFICATIONS TEST AND PROVIDE EVIDENCE UPON THE

REQUEST OF THE ENGINEER OF RECORD, AT ANYTIME.

6. THE GENERAL CONTRACTOR SHALL PROMPTLY NOTIFY THE ENGINEER OF RECORD OF ANY

ERECTION, FABRICATION OR INSTALLATION ERRORS OR CONDITIONS OF NON-CONFORMANCE TO

THE CONSTRUCTION DRAWINGS. THE GENERAL CONTRACTOR SHALL NOT PROVIDE ANY FIELD

CORRECTIONS PRIOR TO A WRITTEN APPROVAL FROM THE ENGINEER OF RECORD.

7. AT ALL COMPOSITE STEEL FLOOR FRAMING, THE CONCRETE SLAB SHALL REACH THEIR MINIMUM

DESIGN COMPRESSIVE STRENGTH PRIOR TO THE APPLICATION OF SUPERIMPOSED LOADS.

8. ALL STEEL NOT RECEIVING FIREPROOFING SHALL BE PAINTED WITH THE FABRICATOR'S RUST INHIBITIVE PRIMER. ALL PRIMER THAT IS DAMAGED IN THE FIELD AND ALL FIELD WELDS SHALL BE

TOUCHED UP WITH FIELD APPLIED PRIMER.

9. ALL STEEL RECEIVING FIREPROOFING SHALL NOT BE PRIMED. REFER TO ARCHITECTURAL

DRAWINGS FOR STEEL THAT IS TO BE FIREPROOFED.

10. ALL STRUCTURAL STEEL (INCLUDING BUT NOT LIMITED TO ANCHOR BOLTS, BOLTS, OTHER HARDWARE) EXPOSED TO WEATHER SHALL BE HOT DIPPED GALVANIZED AFTER FABRICATION. SEE

ARCHITECTURAL DRAWINGS AND SPECIFICATIONS FOR PAINTING REQUIREMENTS. HOT DIPPED

GALVANIZATION SHALL BE PER ASTM A123. ALL GALVANIZED SURFACES DAMAGED DURING

CONSTRUCTION SHALL BE REPAIRED USING A GALVANIZING REPAIR PAINT IN ACCORDANCE WITH

ASTM A780. GALVANIZING PAINT SHALL HAVE 95% ZINC BY WEIGHT. THICKNESS OF APPLIED

GALVANIZING REPAIR PAINT SHALL BE NO LESS THAN THE COATING THICKNESS REQUIRED BY

ASTM A123 OR A153 AS APPLICABLE.

11. BOLTS AND FIELD WELDS INSTALLED ON FACTORY FINISH-PAINTED STRUCTURAL STEEL SHALL BE FIELD PAINTED WITH THE SAME PAINTING SYSTEM. THE FIELD APPLIED PAINT SHALL BE APPLIED IN

A MANNER SUCH THAT IT CAN NOT BE DIFFERENTIATED FROM THE FACTORY FINISH-PAINTED

STRUCTURAL STEEL FROM A DISTANCE OF FIVE FEET.

12. FIELD CONNECTIONS SHALL BE BOLTED USING 3/4" DIAMETER (MINIMUM) ASTM A325N HIGH

STRENGTH BOLTS (MINIMUM) UNLESS NOTED OTHERWISE.

13. THE MINIMUM SIZE OF ALL FILLET WELDS SHOWN ON DRAWINGS SHALL BE IN ACCORDANCE WITH

TABLE J2.4 OF AISC "STEEL CONSTRUCTION MANUAL", UNLESS NOTED OTHERWISE.

14. ALL STRUCTURAL STEEL CONNECTIONS, OTHER THAN THOSE CONNECTIONS IDENTIFIED ON THE DRAWINGS AS "FULLY DESIGNED", SHALL BE DESIGNED BY A LICENSED PROFESSIONAL ENGINEER

WORKING FOR THE FABRICATOR, LICENSED IN THE JURISDICTION IN WHICH THE PROJECT IS

LOCATED. CONNECTIONS SHALL BE DESIGNED IN ACCORDANCE WITH AISC `SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS' AND `AISC CODE OF STANDARD PRACTICE

FOR STEEL BUILDINGS AND BRIDGES'. PROVIDE SIGNED AND SEALED SHOP DRAWINGS AND

CONNECTION CALCULATIONS / TABLES.

15. FOR SHEAR CONNECTIONS, THE STEEL FABRICATOR SHALL SUBMIT TO THE ENGINEER OF

RECORD TABLES FOR ALL SHEAR CONNECTIONS USED IN THE PROJECT. THE TABLES SHALL

CLEARLY INDICATED THE SHEAR STRENGTH FOR ALL CONNECTION CONFIGURATIONS

CONSIDERING THE BEAM SIZES, BOLT SIZES, TYPE AND QUANTITY, CONNECTION GEOMETRY, WELD

SIZES,EDGE DISTANCES AND ECCENTRICITIES AND COPE DIMENSIONS. DOUBLE-ANGLE

CONNECTIONS, SINGLE-ANGLE CONNECTIONS, SINGLE-PLATE CONNECTIONS, SHEAR END-PLATE

CONNECTIONS AND BENT PLATE SHEAR CONNECTIONS ARE PERMITTED, UNLESS NOTED

OTHERWISE.

16. MAXIMUM PERMITTED CONNECTION ECCENTRICITY IN SHEAR CONNECTIONS SHALL BE 3", UNLESS

NOTED OTHERWISE.

17. MINIMUM LENGTH OF THE CONNECTION ANGLE SHALL BE AT LEAST ½ THE "T" DIMENSIONS OF THE

MEMBER BEING SUPPORTED. BOLTS TO BE AT 3" O.C. VERTICAL.

18. ALL WELDS IN SHEAR CONNECTIONS SHALL BE CONTINUOUS.

19. MINIMUM THICKNESS OF SINGLE-PLATE SHEAR CONNECTIONS SHALL 3/8" WITH A MINIMUM WELD SIZE OF 0.75 x PLATE THICKNESS.

20. FULL DEPTH DOUBLE ANGLE END CONNECTIONS ARE TO BE USED ON ALL GIRDER AND BEAM

CONNECTIONS TO COLUMNS.

21. FULL DEPTH DOUBLE ANGLE END SHEAR CONNECTIONS ARE TO BE USED ON ALL COMPOSITE BEAMS AND GIRDERS WITH SHEAR STUDS. CONNECTIONS ARE TO BE DESIGNED FOR 160 % OF AISC

TABLE.

22. PROVIDE A MINIMUM 3/8" THICK FULL DEPTH THRU-PLATE FOR ALL PIPE AND TUBE COLUMN

CONNECTIONS.

23. ALL BEAM TO BEAM AND BEAM TO COLUMN BOLTED SHEAR CONNECTIONS SHALL HAVE A

MINIMUM OF 2 BOLTS. ALL CONNECTIONS SHALL BE DESIGNED FOR THE GREATER OF THE

REACTIONS GIVEN ON THE FRAMING PLANS OR ½ THE AISC UNIFORM LOAD CAPACITY OF THE BEAM

UNLESS A MORE STRINGENT CRITERIA IS GIVEN ELSEWHERE ON THE CONTRACT DOCUMENTS.

24. ALL BOLTED CONNECTIONS SHALL BE BEARING TYPE WITH THREADS INCLUDED IN THE SHEAR PLANE, UNLESS NOTED OTHERWISE. ALL BOLTED CONNECTIONS SHALL BE BOLTED "SNUG-TIGHT", UNLESS NOTED OTHERWISE.

25. ALL STEEL BEAMS FRAMING OVER THE TOP OF COLUMNS SHALL BE FITTED WITH (2) 1/2" THICK STIFFENER PLATES ON EACH SIDE OF THE BEAM WEB. THE COLUMN CAP PLATE SHALL MATCH THE

THICKNESS OF THE BEAM ABOVE (MIN. 1/2" THICK), UNLESS NOTED OTHERWISE.

26. ALL TRUSS VERTICAL AND DIAGONAL MEMBER CONNECTIONS SHALL HAVE A MINIMUM OF 3

BOLTS. ALL TRUSS CHORD MEMBER CONNECTIONS SHALL HAVE A MINIMUM OF 4 BOLTS. ALL

CONNECTIONS SHALL BE DESIGNED FOR THE GREATER OF THE AXIAL LOADS GIVEN ON THE TRUSS

ELEVATIONS OR MINIMUM NUMBER OF BOLTS STATED ABOVE.

27. SHEAR STUDS SHALL BE 3/4" DIA. x 4 1/2" LONG CONFORMING TO ASTM A108. SHEAR STUDS SHALL

BE MANUFACTURED BY NELSON STUD WELDING COMPANY, OR APPROVED EQUAL. WELD SHEAR

CONNECTORS TO SUPPORTS THROUGH DECKING UNITS IN ACCORDANCE WITH MANUFACTURER'S

INSTRUCTIONS. DO NOT WELD SHEAR CONNECTORS THROUGH TWO LAYERS (LAPPED ENDS) OF

DECKING UNITS. WELD ONLY ON CLEAN DRY DECK SURFACES. WELDING SHALL BE PERFORMED

USING A PORTABLE STUD WELDING MACHINE. AN INDEPENDENT TESTING AGENCY SHALL BE

EMPLOYED TO INSPECT SHEAR STUDS FOR PROPER INSTALLATION, SIZE, QUANTITY AND SPACING.

SUBMIT WRITTEN REPORT INDICATING CONFORMANCE WITH DRAWINGS TO THE ARCHITECT PRIOR

TO PLACING CONCRETE.

28. CONTRACTOR SHALL MAKE ALLOWANCES FOR ADDITIONAL CONCRETE REQUIRED AT ELEVATED

DECK SUPPORTED CONCRETE SLAB FLOORS DUE TO DEFLECTION OF THE STEEL DECK FROM THE

DEAD WEIGHT OF THE CONCRETE AND CONSTRUCTION LOADING IN ACCORDANCE WITH SDI

GUIDELINES.

29. CONTRACTION JOINTS IN ELEVATED CONCRETE FLOORS SUPPORTED ON METAL IS NOT

REQUIRED, UNLESS NOTED OTHERWISE.

30. ALL ALUMINUM AND STEEL MEMBERS TO BE TREATED OR PROPERLY SEPARATED TO PREVENT

GALVANIC AND CORROSIVE EFFECTS.

31. SUBMIT ALL STEEL SHOP DRAWINGS FOR REVIEW PRIOR TO ANY FABRICATION.

32. STEEL FABRICATOR IS SOLELY RESPONSIBLE FOR SURVEYING AND VERIFICATION OF EXISTING

CONDITIONS INCLUDING, BUT NOT LIMITED TO, THE LOCATION, ELEVATION, DIMENSIONS OF

EXISTING WALLS, FRAMING, ETC.

33. WHERE STRUCTURAL STEEL IS INDICATED TO BE H.D. GALVANIZED, GALVANIZED A325 BOLTS, NUTS AND WASHERS SHALL BE USED.

34. ALL OPEN ENDS OF HSS AND PIPE STEEL MEMBERS SHALL BE CAPPED WITH 3/8" THICK CAP PLATE, WELDED IN PLACE WITH 3/16" CONTINUOUS FILLET WELDS, ALL AROUND, UNLESS NOTED

OTHERWISE.

35. THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL STEEL MEMBERS FOR THE WORK OF OTHER

TRADES WITHOUT THE PRIOR APPROVAL OF THE DESIGN PROFESSIONAL.

36. FABRICATE BEAMS WITH THE NATURAL CAMBER UP. (PROVIDE CAMBER AS INDICATED).

37. NON-SHRINK GROUT FOR COLUMN BASE PLATES SHALL BE PREMIXED (FACTORY-PACKAGED), SHRINKAGE RESISTANT, NONMETALLIC GROUT COMPLYING WITH ASTM C-1107. NON-SHRINK

GROUT AGGREGATE SHALL BE NONMETALLIC, NON-CORROSIVE, NON-STAINING, MIXED WITH

WATER TO CONSTANCY SUITABLE FOR APPLICATION AND A 30 MINUTE WORKING TIME.

CONTRACTOR SHALL PROVIDE MANUFACTURE'S DATA SHEETS FOR APPROVAL BY ENGINEER OF

RECORD, PRIOR TO CONSTRUCTION.

38. PROMPTLY PACK GROUT SOLIDLY BETWEEN BEARING SURFACES AND BASE OR BEARING PLATES

SO NO VOIDS REMAIN. NEATLY AND CAREFULLY FINISH ALL EXPOSED SURFACES. PROTECT

GROUT AND ALLOW TO CURE, FOLLOWING MANUFACTURER'S RECOMMENDATIONS AND WRITTEN

INSTALLATION INSTRUCTION FOR SHRINKAGE-RESITANT GROUTS.

39. STEEL FABRICATOR SHALL PROVIDE ALL REQUIRED STEEL FRAMING TO SUPPORT ELEVATOR

EQUIPMENT INCLUDING SHAFT RAIL BEAMS, SILL SUPPORT ANGLES AND HOIST BEAMS.

40. PRIOR TO STEEL COLUMN AND BASEPLATE FABRICATION, STEEL FABRICATOR SHALL BE

PROVIDED WITH A COMPLETE SURVEY OF THE LOCATIONS OF ALREADY IN PLACE ANCHOR BOLTS, BY THE CONTRACTOR. STEEL FABRICATOR SHALL ADJUST ANCHOR BOLT HOLES ACCORDINGLY

BASED ON SITE AS-BUILT CONDITIONS BEFORE THE FABRICATION OF COLUMN BASE PLATES AND

DELIVERY TO THE SITE.

41. ALL LINTELS AND SHELF ANGLES SHALL HE H.D. GALVANIZED. TOUCH UP DAMAGED AREAS WITH

GALVANIZING REPAIR PAINT IN ACCORDANCE WITH ASTM A780.

42. THE STEEL CONTRACTOR SHALL PROVIDE TEMPORARY BRACING TO RESIST WIND LOADS,

CONSTRUCTION LOADS, ETC... DURING CONSTRUCTION. BRACING SHALL REMAIN IN PLACE UNTIL

THE STRUCTURE IS CAPABLE OF SUSTAINING ALL DESIGN LOADS.

STEEL NOTES

1. STEEL DECK FABRICATION, ERECTION, AND CONNECTION DESIGN SHALL CONFORM TO:

a. AISI "NORTH AMERICAN SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL

STRUCTURAL MEMBERS - LATEST APPLICABLE EDITION

b. SDI "DESIGN MANUAL FOR COMPOSITE DECKS, FORM DECKS, AND ROOF DECKS - LATEST

EDITION.

c. SDI "DIAPHRAGM DESIGN MANUAL"

d. ANSI/SDI-RD1.0 STANDARD FOR STEEL ROOF DECK

e. ANSI/SDI-NC1.0 STANDARD FOR NON-COMPOSITE (FORM) STEEL FLOOR DECK

f. ANSI/SDI-NC1.0 STANDARD FOR COMPOSITE STEEL FLOOR DECK

g. "STRUCTURAL WELDING CODE - SHEET STEEL" AWS D1.3 - LATEST EDITION

2. METAL FLOOR AND ROOF DECK SHALL BE AS INDICATED ON THE DRAWINGS AND BE IN

ACCORDANCE WITH THE LATEST EDITION OF "SDI "DESIGN MANUAL FOR COMPOSITE DECKS, FORM

DECKS, AND ROOD DECKS - LATEST EDITION.

3. METAL DECKS SHALL BE GALVANIZED IN ACCORDANCE WITH ASTM A653, COATING CLASS G60.

4. ALL STEEL DECKS SHALL CONFORM TO THE FOLLOWING:

a. GALV. METAL ROOF DECK: ASTM A653, GRADE 40, Fy = 40 KSI MIN.

b. GALV. METAL FLOOR DECK: ASTM A653, GRADE 40, Fy = 40 KSI MIN.

c. GALV. METAL FORM DECK: ASTM A653, GRADE 40, Fy = 40 KSI MIN.

5. DESIGN FOR 9/16", 1½", 2", 3" FORM, FLOOR AND ROOF DECKS IS BASED ON THE SECTION

PROPERTIES, LOAD CAPACITIES AND U.L. FIRE RATINGS OF VULCRAFT STEEL AND ROOF AND

FLOOR DECK CATALOG (2020 EDITION). DECK FROM MANUFACTURERS OTHER THAN VULCRAFT

MAY BE USED ONLY IF THE DECK CHOSEN BY THE CONTRACTOR HAS THE SECTION PROPERTIES, LOAD CAPACITIES, AND U.L. RATING EQUAL OR GREATER THAN THE EQUIVALENT DECK PRODUCED BY VULCRAFT. ENGINEER AND ARCHITECT APPROVAL IS REQUIRED PRIOR TO ANY SUBSTATIONS.

6. TYPE "B" METAL ROOF DECKS SHALL HAVE MIN. 2" END LAPS.

7. DECKS SHALL HAVE MINIMUM 1½" END BEARING.

8. DECK SUPPLIER SHALL SUPPLY THE FOLLOWING SUPPLEMENTAL ITEMS REQUIRED FOR A

COMPLETE INSTALLATION:

a. CELL CLOSURE PLATES

b. GAGE METAL POUR STOPS

c. FINISH STRIPS

d. RIDGE, BUTT, AND VALLEY STRIPS

e. SUMP PANS

f. REINFORCING CHANNELS

9. MINIMUM FASTENING REQUIREMENTS, U.N.O. ON DRAWINGS (PLANS, SCHEDULES, DETAILS &

SECTIONS) FOR FORM AND ROOF DECKS:

FASTEN METAL FORM DECK OR ROOF DECK TO SUPPORTING STEEL MEMBERS AT ALL BEARING

SUPPORTS AND ALL EDGE SUPPORTS WITH HILTI POWER ACTUATED FASTENERS. ALL SIDE LAPS

AT ADJACENT DECK PANELS SHALL BE WITH #10 SELF-DRILLING (TEK) SCREWS.

a. PAF PINS:

IF BASE STEEL THICKNESS IS 1/4" OR GREATER: HILTI X-ENP19 PINS

IF BASE STEEL THICKNESS IS LESS THAN 1/4": HILTI X-HSN24 PINS

IF BASE STEEL IS GAGE METAL OR LIGHT BAR JOIST: HILTI S-MD 12x24 HWH5

WELDED OPTION: 5/8" PUDDLE WELDS (NOT APPLICABLE TO GAGE METAL OR LIGHT BAR

JOISTS)

b. SIDE LAP FASTENER SPACING: 36" O.C. MAXIMUM OR DECK SPAN / 2 (WHICH EVER IS SMALLER)

c. PAF PINS SPACING OVER BEARING SUPPORTS ON STEEL:

IF TYPE "B" ROOF DECK, 12" O.C.

IF TYPE "N" ROOF DECK, 8" O.C. (SAME SPACING REQUIREMENTS FOR WELDED OPTION)

d. PAF PINS SPACING AT EDGE SUPPORTS ON STEEL: 12" O.C. (SAME SPACING REQUIREMENTS

FOR WELDED OPTION)

10. MINIMUM FASTENING REQUIREMENTS, U.N.O. ON DRAWINGS (PLANS, SCHEDULES, DETAILS &

SECTIONS) FOR COMPOSITE FLOOR DECKS:

FASTEN METAL FORM DECK OR ROOF DECK TO SUPPORTING STEEL MEMBERS AT ALL BEARING

SUPPORTS AND ALL EDGE SUPPORTS WITH HILTI POWER ACTUATED FASTENERS. ALL SIDE LAPS

AT ADJACENT DECK PANELS SHALL BE WITH #10 SELF-DRILLING (TEK) SCREWS.

a. PAF PINS: HILTI X-ENP19 PINS OR 5/8" PUDDLE WELDS

b. SIDE LAP FASTENER SPACING: 36" O.C. MAXIMUM OR DECK SPAN / 2 (WHICH EVER IS SMALLER)

c. PAF PINS SPACING OVER BEARING SUPPORTS ON STEEL: 12" O.C. (SAME SPACING

REQUIREMENTS FOR WELDED OPTION)

d. PAF PINS SPACING AT EDGE SUPPORTS ON STEEL: 12" O.C. (SAME SPACING REQUIREMENTS

FOR WELDED OPTION)

e. HEADED SHEAR STUDS SHALL BE FIELD INSTALLED BY WELDING THROUGH METAL DECK.

REMOVE FERRULES FROM THE DECK PRIOR TO PLACEMENT OF CONCRETE.

11. SUBMIT SHOP DRAWINGS FOR REVIEW PRIOR TO ANY FABRICATION / DELIVERY.

STEEL DECK NOTES

THIS PORTION OF THE PROJECT FROM A ROOFING STAND POINT INVOLVES TEMPORARY REMOVAL OF ROOFING, INSULATION & DECKING ETC. AS REQUIRED FOR THE G.C. / STEEL FABRICATOR TO TAKE MEASUREMENTS OF EXISTING CONDITIONS. THE ROOFING CONTRACTOR SHALL COORDINATE WITH THE G.C. / STEEL FABRICATOR. ONCE ALL MEASUREMENTS AND ELEVATIONS ARE TAKEN, THE

ROOFING CONTRACTOR SHALL TEMPORARILY CLOSE UP ROOF - MAKE WATER TIGHT. WHEN THE

STEEL ERECTOR IS READY TO INSTALL STEEL (COORD. W/ ROOFING CONTRACTOR) ROOFING

CONTRACTOR SHALL REOPEN ROOF FOR THIS INSTALLATION WORK. ONCE ALL STEEL IS

INSTALLED, ROOFING CONTRACTOR SHALL MAKE ALL PENETRATIONS WATER TIGHT.

THIS IS A MULTI STEP PROCESS - COORDINATION IS VITAL.

ROOF PENETRATION NOTES

1. CONTRACTOR IS RESPONSIBLE FOR SURVEYING AND ASCERTAINING THE EXISTING BASE

CONDITIONS THICKNESS IN ACCORDANCE WITH THE EXISTING CONDITIONS AND DEMOLITIONS

NOTES.

2. HIT HY 270 & 200 INJECTION ADHESIVE ANCHORS

INJECTION ADHESIVE ANCHORS SHALL BE HYBRID ADHESIVE TYPE SYSTEM IN PREDRILLED HOLES EXCEPT WHERE DRAWINGS SPECIFICALLY CALL FOR ANOTHER TYPE OF ANCHOR ALL DESIGNS ARE BASED ON HILTI, INC. HIT HY 270 & 200 INJECTION ADHESIVE ANCHOR. INSTALL INJECTION ADHESIVE

ANCHORS IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.

ALL ANCHOR EMBEDMENT LENGTHS SHALL BE BASED ON THE BASE MATERIAL THICKNESS LESS 1½".

3. POST-INSTALLED ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE CONTRACT

DOCUMENTS, MANUFACTURER'S PRINTED INSTALLATION INSTRUCTIONS (MPII), AND APPROVED

INDEPENDENT TESTING REPORT PER ACI 355.

4. ANCHOR INSTALLER(S) SHALL HAVE EXPERIENCE AND TRAINING WITH INSTALLING THE SPECIFIED POST-INSTALLED ANCHORS. INSTALLATION OF ADHESIVE ANCHORS IN HORIZONTAL, OR UPWARDLY

INCLINED ORIENTATIONS, SUPPORTING TENSION LOAD SHALL BE PERFORMED BY INSTALLERS

CERTIFIED THROUGH THE ACI/CRSI ADHESIVE ANCHOR INSTALLER CERTIFICATION PROGRAM, OR

APPROVED EQUIVALENT.

5. ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING AT THE TIME OF

INSTALLATION SO AS TO ACHIEVE THE INTENDED CAPACITY, UNLESS OTHERWISE PERMITTED IN

WRITING FROM THE ANCHOR MANUFACTURER.

a. MINIMUM CONCRETE AGE OF 21 DAYS

b. MINIMUM CONCRETE COMPRESSIVE STRENGTH OF 0.75 F'C

c. MINIMUM CONCRETE TEMPERATURE OF 50 DEGREES FAHRENHEIT

d. HOLES DRILLED WITH CARBIDE-TIPPED DRILL BITS,

e. USING ROTARY IMPACT HAMMER

f. CONCRETE IN "DRY" CONDITION

g. HOLES THOROUGHLY CLEANED AND PREPARED IN ACCORDANCE WITH THE MPII

h. ANCHORS FREE OF RUST, OIL, COATINGS, DIRT, MUD OR ANY DELETERIOUS MATERIALS

6. ANCHORS HAVE BEEN DESIGNED IN ACCORDANCE WITH THE CONCRETE CAPACITY DESIGN

METHODS OF ACI 318, AS MODIFIED BASED ON THE REQUIREMENTS OF THE APPROVED

INDEPENDENT TESTING REPORT PER ACI 355. SUBSTITUTION REQUESTS FOR ALTERNATE PRODUCTS

MUST BE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER PRIOR TO USE. WHERE

SUBSTITUTIONS ARE REQUESTED, CONTRACTOR SHALL PROVIDE SIGNED AND SEALED

CALCULATIONS FROM CONTRACTOR'S PROFESSIONAL STRUCTURAL ENGINEER LICENSED IN THE

PROJECT'S JURISDICTION, DEMONSTRATING THAT THE SUBSTITUTED PRODUCT IS CAPABLE OF

ACHIEVING THE CAPACITY AND PERFORMANCE OF THE ORIGINAL SPECIFIED PRODUCT INCLUDING, BUT NOT LIMITED TO: COMPLIANCE WITH THE BUILDING CODE, SEISMIC USE, LOAD RESISTANCE, I

NSTALLATION CATEGORY, AND IN-SERVICE CONDITIONS.

7. SPECIAL INSPECTION OF POST-INSTALLED ANCHORS SHALL BE IN ACCORDANCE WITH THE BUILDING CODE AND APPROVED INDEPENDENT TESTING REPORT PER ACI 355. AT A MINIMUM, ALL ANCHORS SHALL BE SUBJECT TO PERIODIC SPECIAL INSPECTION. IN ADDITION, ADHESIVE ANCHORS INSTALLED IN HORIZONTAL, OR UPWARDLY INCLINED ORIENTATIONS, SUPPORTING TENSION LOAD SHALL BE SUBJECT TO CONTINUOUS SPECIAL INSPECTION. IN ALL CASES THE SPECIAL INSPECTOR SHALL BE

NOTIFIED PRIOR TO COMMENCEMENT OF WORK.

8. CARE SHALL BE TAKEN TO NOT CUT OR DAMAGE EXISTING REINFORCEMENT. CONTRACTOR SHALL

LOCATE EXISTING REINFORCEMENT, BY NON-DESTRUCTIVE MEANS, PRIOR TO FABRICATION OF

ANCHORAGE ELEMENTS AND/OR DRILLING OF POST-INSTALLED ANCHORS TO CONFIRM THERE ARE NO CONFLICTS. CONTRACTOR IS RESPONSIBLE TO NOTIFY THE STRUCTURAL ENGINEER IN WRITING

IF A CONFLICT EXISTS, FOR REVIEW PRIOR, TO COMMENCEMENT OF THE WORK.

10. PROOF LOAD TESTING (INCLUDING REQUIRED PROOF LOAD, ANCHOR TYPES, LOCATIONS, AND QUANTITIES) BY NON-DESTRUCTIVE MEANS SHALL BE PERFORMED BY AN INDEPENDENT PARTY AT THE DISCRETION OF THE STRUCTURAL ENGINEER. RESULTS OF THIS PROOF LOAD TESTING SHALL

BE SUBMITTED IN WRITING FOR REVIEW.

11. ALL ANCHORS INSTALLED INTO EXISTING MASONRY SHALL BE GRADE 316 STAINLESS STEEL, UNLESS OTHERWISE NOTED.

12. INSTALLED ANCHORS:

a. FOLLOW ANCHOR MANUFACTURER INSTALLATION INSTRUCTIONS (E.G., HILTI, SIMPSON STRONG-

TIE) FOR HOLE DIAMETER, DEPTH, AND ADHESIVE TYPE. USE CARBIDE-TIPPED MASONRY BITS

MATCHED TO ANCHOR SIZE.

b. DEFAULT DRILL MODE: ROTARY HAMMER IN HAMMER-DRILL MODE (ROTATION + LIGHT PERCUSSION) FOR SOLID BRICK; SWITCH TO ROTARY-ONLY FOR SOFT, HISTORIC, OR PERFORATED

BRICK TO MINIMIZE FRACTURING.

c. VERIFICATION: PRIOR TO FULL INSTALLATION, DRILL PILOT HOLES TO CONFIRM WALL THICKNESS, SUBSTRATE CONSISTENCY, AND ACHIEVABLE EMBEDMENT—MINIMUM 1 FOR WALL RUNS <10 LF; 1 PER 20 LF FOR LONGER WALL RUNS. IF VOIDS, RUBBLE, OR INCONSISTENCIES ENCOUNTERED, CEASE WORK AND NOTIFY ENGINEER IMMEDIATELY FOR ASSESSMENT.

d. CLEANING: AFTER DRILLING, REMOVE ALL DUST AND DEBRIS USING COMPRESSED AIR BLOW-OUT, NYLON WIRE BRUSH (MINIMUM 2 PASSES), AND VACUUM. REPEAT UNTIL CLEAN.

e. ADAPTATION: IF EMBEDMENT DEPTH IS LESS THAN REQUIRED AFTER PILOT HOLES, TEST DRILL IN

ROTARY-ONLY MODE. IF ISSUES PERSIST, DO NOT PROCEED WITHOUT ENGINEER APPROVAL.

CONSIDER ALTERNATIVE ANCHORING METHODS (I.E. MECHANICAL ANCHORS OR GROUT

INJECTION).

ANCHOR NOTES

1. STRUCTURAL DELEGATED DESIGNS AND SUBSEQUENT DEFERRED SUBMITTALS ARE FOR

ELEMENTS, PARTS, OR PORTIONS OF THE OVERALL STRUCTURAL SYSTEM THAT ARE CRITICAL TO

THE PERFORMANCE OF THE OVERALL STRUCTURAL SYSTEM.

2. STRUCTURAL DELEGATED DESIGN ITEMS REQUIRING DEFERRED SUBMITTALS INCLUDE, BUT ARE

NOT LIMITED TO:

a. STRUCTURAL STEEL CONNECTION, INCLUDING BEAMS, BRACES, MOMENT CONNECTIONS, PLATES, ETC. (SEE STEEL NOTES FOR ADDITIONAL INFORMATION).

b. BUCKLING-RESTRAINED BRACES, GUSSET PLATES, AND CONNECTIONS. THESE DESIGNS SHALL BE BASED UPON QUALIFIED CYCLIC TESTS IN ACCORDANCE WITH SECTION K3 OF AISC 341-16.

c. METAL OPEN WEB JOIST & GIRDERS, BRIDGING, CONNECTIONS, AND RELATED COMPONENTS

d. COLD-FORMED METAL FRAMING, UNLESS SPECIFICALLY DESIGNED AND DETAILED IN THE

STRUCTURAL DRAWINGS (SEE COLD-FORMED STEEL NOTES FOR ADDITIONAL INFORMATION).

e. CURTAINWALL AND/OR STOREFRONT SYSTEMS.

f. STAIRS, UNLESS SPECIFICALLY DESIGNED AND DETAILED IN THE STRUCTURAL DRAWINGS.

STAIR DESIGN SHALL INCLUDE: TREADS, RISERS, STRINGERS, LANDINGS, RAILINGS (IF NOT BEING

SUBMITTED SEPARATELY), ETC. LOADS IMPOSED ON MAIN STRUCTURE SHALL BE CENTERED ON

MEMBERS TO NOT IMPOSE UNNECESSARY ECCENTRICITIES.

g. SHOP-FABRICATED WOOD TRUSSES, BLOCKING, BRIDGING, BRIDGING CONNECTIONS, TRUSS

HANGERS, AND RELATED COMPONENTS.

h. TILT-UP CONCRETE WALL PANELS THAT ARE PART OF THE PRIMARY SYSTEM.

i. PRE-CAST CONCRETE ELEMENTS AND THEIR CONNECTIONS .

j. CASTELLATED OR CELLULAR BEAMS.

k. HELICAL PIERS/MICRO PILES (SHALL INCLUDE, BUT NOT BE LIMITED TO, PIER LAY-OUT.

QUANTITIES, SHAFT AND HELIX SIZES, FOUNDATION CONNECTION REQUIREMENTS, TEST PIER

REQUIREMENTS, APPLIED SAFETY FACTORS ETC.).

l. GROUND IMPROVEMENT SYSTEMS.

m. CAST-IN-PLACE CONCRETE CAISSONS (SHALL INCLUDE CAISSON LAY-OUT, QUANTITIES, SHAFT

SIZE, TEST REQUIREMENTS, DETAILS SHOWING ATTACHMENT OF CAISSONS TO GRADE BEAMS,

PILE CAPS, AND FOUNDATIONS, ETC.).

n. CARBON/GLASS FIBER CONCRETE REINFORCING.

o. SHEETING, AS REQUIRED FOR EXCAVATION SUPPORT OR AS NOTED IN DRAWINGS.

p. SHORING

q. FALL PROTECTION SYSTEMS SUCH AS ANCHOR POINTS AND HORIZONTAL LIFE LINES

3. DESIGN CRITERIA FOR DELEGATED DESIGNS HAS BEEN PROVIDED IN THE STRUCTURAL NOTES, PLANS, AND DETAILS.

4. STRUCTURAL DEFERRED SUBMITTALS ARE COMPLETE PACKAGES FOR EACH DELEGATED DESIGN.

DEFERRED SUBMITTALS SHALL BE SUBMITTED FOR REVIEW BY ARCHITECT AND ENGINEER OF

RECORD AND ARE TO INCLUDE, AT MINIMUM:

a. PLAN DRAWINGS SHOWING THE DELEGATED DESIGN AND IT'S ASSOCIATION/LOCATION IN THE

OVERALL STRUCTURE

b. SECTIONS AND DETAILS DEPICTING ANY AND ALL CONNECTION TO THE MAIN STRUCTURE

c. CALCULATIONS FOR DELEGATED DESIGN ITEMS AND THEIR CONNECTIONS, AS WELL AS ANY AND

ALL DESIGN ASSUMPTIONS. ADDITIONAL LOADS IMPOSED BY CONNECTIONS OF DELEGATED

DESIGN ITEM TO MAIN STRUCTURE SHALL BE INCLUDED FOR ENGINEER OF RECORD TO REVIEW.

IF PERFORMANCE CRITERIA IS STIPULATED IN STRUCTURAL DRAWINGS (SUCH AS VIBRATION

PERFORMANCE, DEFLECTION CRITERIA ABOVE CODE REQUIREMENTS, ETC.) THEN THE

CALCULATIONS PROVIDED MUST INCLUDE PROOF OF CONFORMANCE TO GIVEN CRITERIA

d. ALL DRAWINGS AND CALCULATIONS SHALL BEAR THE STAMP AND SIGNATURE OF THE DESIGN

PROFESSIONAL RESPONSIBLE FOR THERE DESIGN WHO IS LICENSED IN THE PROJECT

JURISDICTION

5. NOTE THAT IF ANY PARTS LISTED IN NOTE 4 ARE MISSING THE DEFERRED SUBMITTAL WILL BE

SUBJECT TO REJECTION UNTIL ALL REQUIRED ELEMENTS ARE PROVIDED.

6. ENGINEER OF RECORD WILL REVIEW STRUCTURAL DEFERRED SUBMITTALS TO VERIFY DESIGN

CRITERIA IS COMPLIANT WITH THE APPROVED CONSTRUCTION DOCUMENTS.

7. STRUCTURAL DELEGATED DESIGN COMPONENTS SHALL NOT BE INSTALLED UNTIL APPROVED BY

THE BUILDING OFFICIAL.

DELEGATED DESIGN

A

AB

ADD

ADD'L

ADJ

AFF

ALT

APPROX

ARCH

B

BTWN

BLDG

BLKG

BM

BOT

BRG

BW

C

CIP

CJ

CJ

CL

CLR

CMU

COL

CONC

CONN

CONST

CONT

COORD

CTD

CTR

CW

D D

DET

DIA

DIM

DJ

DL

DN

DWG

DWGS

DWLS

E

EA

EF

EIFS

AND

EJ

EL

EOD

EOS

EQ

EQUIP

EW

EWB

EWT

EWEF

EXIST

(E)

EXP BLT

EXT

F

FD

FDN

FF

FIN

FLR

FT

FTG

VIF

G

GA

GALV

GB

GEN

GND

GR

GYP BD

H

HDW

HEF

HIF

HOF

HK

HORIZ

HP

HR

HS

HSKP

HT

I

IBC

INT I

K

KO

KSF

L L

LG

LL

LLH

LLV

LOC

LP

LW

DRAWING ABBREVIATIONS

M

MAS

MAT'L

MAX

MECH

MEMB

MEP

MFG

MIN

MISC

MO

MTL

N

NA

NIC

NOM

NS

NTS

NW

O o/c

OD

OH

OPNG

OPP

OF

P P/C

PCF

PENT

PL

PL

PLUMB

PLYWD

PR

PREFAB

PSF

PSI

PT

PTD

R

RAD

RCP

RD

REBAR

REF

REINF

REQ'D

RM

RO

S

SBC

SCHED

SDL

SECT

SIM

SO

SOG

SPCG

SPEC

SQ

SS

SSF

STD

STIFF

STIR

STL

STRUC

SYM

T T T&B

TC

THK

T.O.

T.O.B.

T.O.C.

T.O.F.

T.O.P.

T.O.S.

T.O.STL

T.O.W.

TYP

U

UNO

V

VAR

VIF

VERT

W w/ w/o W

WD

WF

WL

WP

WWF

ANCHOR BOLT

ADDENDUM

ADDITIONAL

ADJACENT

ABOVE FINISHED FLOOR

ALTERNATE

APPROXIMATE

ARCHITECTURAL

BETWEEN

BUILDING

BLOCKING

BEAM

BOTTOM

BEARING

BEARING WALL

CAST IN PLACE

CONTROL JOINT

CONSTRUCTION JOINT

CENTER LINE

CLEAR

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

COORDINATE

CENTERED

CENTER

CURTAIN WALL

DEPTH; DEEP

DETAIL

DIAMETER

DIMENSION

DEFLECTION JOINT

DEAD LOAD

DOWN

DRAWING

DRAWINGS

DOWELS

EACH

EACH FACE

EXTERIOR INSULATION

FINISH SYSTEM

EXPANSION JOINT

ELEVATION

EDGE OF DECK

EDGE OF SLAB

EQUAL

EQUIPMENT

EACH WAY

EACH WAY BOTTOM

EACH WAY TOP

EACH WAY, EACH FACE

EXISTING

EXISTING

EXPANSION BOLT

EXTERIOR

FLOOR DRAIN

FOUNDATION

FINISH FLOOR

FINISH

FLOOR

FOOT

FOOTING

FIELD VERIFY

GAUGE

GALVANIZED

GRADE BEAM

GENERAL

GROUND

GRADE

GYPSUM BOARD

HARDWARE

HORIZONTAL EACH FACE

HORIZONTAL INSIDE FACE

HORIZONTAL OUTSIDE FACE

HOOK

HORIZONTAL

HIGH POINT

HOUR

HEADED STUD

HOUSEKEEPING

HEIGHT

INTERNATIONAL BUILDING CODE

INTERIOR

KIPS (1000 LB)

KNOCK-OUT

KIPS PER SQUARE FOOT

ANGLE

LONG

LIVE LOAD

LONG LEG HORIZONTAL

LONG LEG VERTICAL

LOCATION

LOW POINT

LIGHTWEIGHT CONCRETE

MASONRY

MATERIAL

MAXIMUM

MECHANICAL

MEMBRANE

MECH, ELEC & PLUMB

MANUFACTURER

MINIMUM

MISCELLANEOUS

MASONRY OPENING

METAL

NOT AVAILABLE

NOT IN CONTRACT

NOMINAL

NEAR SIDE

NOT TO SCALE

NORMAL WEIGHT CONCRETE

ON CENTER

OUTSIDE DIAMETER

OPPOSITE HAND

OPENING

OPPOSITE

OUTSIDE FACE

PRECAST CONCRETE

POUNDS PER CUBIC FOOT

PENTHOUSE

PROPERTY LINE

PLATE

PLUMBING

PLYWOOD

PAIR

PREFABRICATED

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

POINT

PAINTED

RADIUS

REFLECTED CEILING PLAN

ROOF DRAIN

REINFORCING BAR

REFER OR REFERENCE

REINFORCING

REQUIRED

ROOM

ROUGH OPENING

STANDARD BUILDING CODE

SCHEDULE

SUPERIMPOSED DEAD LOAD

SECTION

SIMILAR

STRUCTURAL OPENING

SLAB ON GRADE

SPACE, SPACING

SPECIFICATION

SQUARE

STAINLESS STEEL

SOLID SURFACE

STANDARD

STIFFENER

STIRRUP

STEEL

STRUCTURAL

SYMMETRICAL

TOP

TOP AND BOTTOM

TOP OF CURB

THICK

TOP OF

TOP OF BEAM

TOP OF CONCRETE

TOP OF FOOTING

TOP OF PARAPET

TOP OF SLAB

TOP OF STEEL

TOP OF WALL

TYPICAL

UNLESS NOTED OTHERWISE

VARIES

VERIFY IN FIELD

VERTICAL

WITH

WITHOUT

WIDTH; WIDE

WOOD

WIDE FLANGE

WIND LOAD

WORK POINT

WELDED WIRE FABRIC

DATE ISSUED FOR

H E

C K

E N

D O

R N

S H

IL

E

S A

R C

H

IT

E C

T S e xp re s s ly r e s e rv e s i ts c o m m o n l a w c o p y ri g h t a n d o th e r p ro p e rt y r ig h ts i n t h e s e p la n s

T h e s e a re n o t to b e r e p ro d u c e d n o r a re t h e y t o b e a s s ig n e d t o a n y t h ir d p a rt y w it h o u t fi rs t o b ta in in g t h e e xp re s s e d w ri tt e n c o n s e n t o f

H E

C K

E N

D O

R N

S H

IL

E

S A

R C

H

IT

E C

T S

CLIENT

DRAWING NUMBER

SHEET TITLE

PROFESSIONAL SEAL

KEYPLAN

ISSUE HISTORY

PROJECT TEAM

ARCHITECTURAL

Heckendorn Shiles Architects 347 East Conestoga Road Wayne, PA 19087 610-994-3500

OUT OF ARCHITECTURAL

SECTOR DESIGNATION

PLAN

NORTH

LEGEND

MISC ITEM AS NEEDED

MISC ITEM AS NEEDED

Avon Grove Charter School 110 E State Rd West Grove, PA 19390 484-667-5000

STRUCTURAL ENGINEER

Orndorf & Associates, Inc.

8600 West Chester Pike #201 Upper Darby, PA 19082 610-896-4500

MEP ENGINEER

Schiller & Hersh Associates, Inc.

636 Skippack Pike, Suite 200 Blue Bell, PA 19422 215-886-8947

W es t C he st er

P ik e, S ui te

U pp er D ar by

, P A t:

0.

6.

w w

.o rn do rf.

co m

P A

.P .E

P E

M A

T T H

E W

F E D

W A

R D

S

/9 /2

:1

:0

P

M

S0.0

STRUCTURAL NOTES

AGCS STATE ROAD

ADMINISTRATION

110 E State Rd, West Grove, PA 19390

HSA PROJECT # :602029

marcello Rectangle marcello Snapshot

115 107 102

103 104 83 90 91 92 93 94 95 96 97 98 99 100 101

120.1

120.2

S5.0

S1.0

W12X26

K

K

K

NEW CANTILEVER STEEL BEAM

AND STEEL COLUMN, SEE

DETAIL 1/S5.0

27' - 6"

13' - 4 3/4" 9' - 5 5/8" 3' - 4 3/8"

C1 C1 C1

1' - 3 1/4"

FIRE WATCH NOTES (SUPPLEMENTAL FOR WELDING TO STEEL JOISTS SUPPORTING WOOD PLANK ROOF):

A SITE-SPECIFIC HOT WORK PERMIT SHALL BE OBTAINED FROM THE LOCAL FIRE MARSHAL/AHJ PRIOR TO ANY FIELD WELDING. ALL WOOD PLANK SURFACES WITHIN THE WORK AREA AND WITHIN 35 FEET SHALL BE PROTECTED FROM SPARKS, SLAG, AND CONDUCTED HEAT USING FIRE-RESISTANT WELDING BLANKETS, PADS, OR SHIELDS. THE WOOD DECK SHALL BE PRE-WETTED WHERE PRACTICABLE. A DEDICATED, TRAINED FIRE WATCH SHALL BE PROVIDED ON BOTH THE WELDING SIDE AND THE ROOF SIDE DURING ALL WELDING AND FOR A MINIMUM OF 90 MINUTES AFTER WELDING IS COMPLETE AT EACH LOCATION. FIRE EXTINGUISHERS SUITABLE FOR CLASS A FIRES SHALL BE IMMEDIATELY AVAILABLE ON BOTH SIDES. THE FIRE WATCH PERSONNEL SHALL HAVE NO OTHER DUTIES, SHALL MONITOR FOR SIGNS OF SMOLDERING IN THE WOOD OR CONCEALED SPACES, AND SHALL CONDUCT THOROUGH POST-WELD INSPECTIONS OF THE ROOF ASSEMBLY (INCLUDING FOLLOW-UP CHECKS AT APPROXIMATELY 30, 60, AND 90 MINUTES). ADDITIONAL MONITORING BEYOND 90 MINUTES SHALL BE PERFORMED IF THE STEEL REMAINS HOT

OR IF SMOLDERING IS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .