2026-09_CONL_New_London_VNM_RFP_Exhibit_F.xlsx

XLSX spreadsheet 67 KB Posted

Attached to
SOLAR AT THE COMMUNITY RECREATION CENTER AND VIRTUAL NET METERING OFFTAKE
Solicitation number
2026-09 CONL
Issued by
New London County, Connecticut

About this file

Exhibit F is a bid summary and financial benefits template for the City of New London, Connecticut's solar energy RFP (2026-09-CONL) for projects at the Community Recreation Center and Virtual Net Metering sites. The exhibit comprises four detailed sections requiring proposers to submit financial summaries, equipment specifications, projected financial benefits, and NRES program bid details. Key submission requirements include proposer contact information, site specifications (including project size in MW-ac and MW-dc), expected first-year annual production in kilowatt-hours, and projected 20-year total financial benefits to the Town. Proposers must complete Exhibit F.2 with confidential equipment specifications and cost breakdowns detailing system components including module manufacturer and model, inverter specifications, racking systems, data acquisition systems, and a comprehensive cost breakdown itemized by engineering, permitting, interconnection, materials, construction, and contingency. The proposal due date is February 12, 2026, at 2:00 PM, with a preliminary selection notice expected by February 18, 2026.

Exhibit F.3 requires proposers to detail financial benefits projected over the 20-year PPA term using the Non-residential Renewable Energy Solutions (NRES) program's Buy-All-Sell-All (BASA) tariff structure, breaking out the annual tariff rate, developer portion, and city portion for each year. The exhibit indicates a baseline federal Investment Tax Credit (ITC) of 30 percent with potential adders that proposers must describe. Exhibit F.4 requires NRES bid information including the BASA price in dollars per megawatt-hour, application of the City's 20 percent distressed municipality bid preference (non-additive), and allocation percentages between developer and city. All financial figures in the template currently display as zero dollars, indicating this is a blank template to be completed by bidders. Proposers must submit all yellow-highlighted cells while all other cells remain locked, ensuring standardized data entry and evaluation across submissions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit F.1 - Bid Summary

Exhibit F.1: Financial Benefits Summary (To be released at bid opening)

Proposer Information
Contact Name
Address
Contact Person
Telephone Number
E-Mail Address
Project Information
RFP ReferenceNew London - 2026-09-CONL VNM
Site Name
Site Address
SAM Property? If yes, please select which one
Project Size, MW-ac
Project Size, MW-dc
Expected Year 1 Annual Production (kWh)
The first-year total financial benefits to the Town ($)$0
The projected 20-year total financial benefits to the Town ($)$0

Proposer to include any general notes below:

000000&P

Exhibit F.2 - Specs & Cost

Exhibit F.2: CONFIDENTIAL Equipment Specifications & Cost Breakdown (Upload separately)

Proposer Name:

RFP Project Information:
Site Name
Installation Type
Domestic Content?
RFP ReferenceNew London - 2026-09-CONL VNM
System Specifications:
System Size kWacFill in project cell -->
System Size kWdcFill in project cell -->
Production (kWh-AC)Fill in project cell -->
DC:AC RatioFormulaic -->
Capacity FactorFill in project cell -->
Module - ManufacturerFill in project cell -->
Module - ModelFill in project cell -->
Module - Wattage (DC)Fill in project cell -->
Module - QuantityFill in project cell -->
Inverter - ManufacturerFill in project cell -->
Inverter - ModelFill in project cell -->
Inverter - Wattage (AC)Fill in project cell -->
Inverter - QuantityFill in project cell -->
Racking - ManufacturerFill in project cell -->
Racking - ModelFill in project cell -->
Data Acquisition System - ManufacturerFill in project cell -->
Data Acquisition System - ModelFill in project cell -->
System Cost ($/Watt-DC):
EngineeringFill in project cell -->
Siting Council (if applicable)Fill in project cell -->
PermittingFill in project cell -->
InterconnectionFill in project cell -->
ModuleFill in project cell -->
InverterFill in project cell -->
RackingFill in project cell -->
Ballast/Pour in Place Concrete (if applicable)Fill in project cell -->
Data Acquisition SystemFill in project cell -->
Balance of System ComponentsFill in project cell -->
Construction - ElectricalFill in project cell -->
Construction - Site/MechanicalFill in project cell -->
Tree Removal (if determined by Proposer)Fill in project cell -->
General ConditionsFill in project cell -->
Overhead and ProfitFill in project cell -->
Interconnection Project ContingencyFill in project cell -->
Construction Project ContingencyFill in project cell -->
Other Project ContingencyFill in project cell -->
Total System Cost ($/Watt-DC)Formulaic -->$ - 0
General Comments:
Proposer to fill all yellow cells.

000000&P

Exhibit F.3 - Benefit Table

Exhibit F.3: CONFIDENTIAL Projected Financial Benefits to the City from the NRES Program & PPA

Proposer/Project Information:
Proposer Name
Site Name
RFP ReferenceNew London - 2026-09-CONL VNM

Federal ITC Details & Description

Perecentage
ITC Baseline with Adders30%
Proposer to provide a brief description about ITC Adder/s included:

NRES BASA % Allocation

Year : @sam@cswenergy.com n/a -Allen Sabins @sam@cswenergy.com n/a

-Allen SabinsSystem Production (kWh)NRES BASA Tariff ($/kWh)NRES BASA Tariff Developer Portion ($/kWh)NRES BASA Tariff
City of New London Portion ($/kWh)Annual Benefit to the City of New London ($)

: @sam@cswenergy.com n/a

-Allen Sabins
1$0.0000$0.0000$0.0000$0
2$0.0000$0.0000$0.0000$0
3$0.0000$0.0000$0.0000$0
4$0.0000$0.0000$0.0000$0
5$0.0000$0.0000$0.0000$0
6$0.0000$0.0000$0.0000$0
7$0.0000$0.0000$0.0000$0
8$0.0000$0.0000$0.0000$0
9$0.0000$0.0000$0.0000$0
10$0.0000$0.0000$0.0000$0
11$0.0000$0.0000$0.0000$0
12$0.0000$0.0000$0.0000$0
13$0.0000$0.0000$0.0000$0
14$0.0000$0.0000$0.0000$0
15$0.0000$0.0000$0.0000$0
16$0.0000$0.0000$0.0000$0
17$0.0000$0.0000$0.0000$0
18$0.0000$0.0000$0.0000$0
19$0.0000$0.0000$0.0000$0
20$0.0000$0.0000$0.0000$0
Total:$0
General Comments/Notes:
Proposer to fill all yellow cells. All other cells are locked.

Exhibit F.4 - NRES Details

Exhibit F.4: CONFIDENTIAL Buy-All-Sell-All (BASA) Bid into NRES Program For Municipal Virtual Net Metering Offtake (Upload separately)

Proposer Name
Site Name
RFP ReferenceNew London - 2026-09-CONL CRC VNM
Bid Preference (Y/N; Type of Preference)Yes, Distressed Munipality (Not Additive)
Bid Preference (%)20.00%
NRES Bid TypeBuy-All-Sell-All (BASA)
NRES Bid Category (Small, Medium, Large or Low-Emission)
Project Size (MWac)
Expected Year 1 Production (kWh)
BASA Price ($/MWh)$ - 0
“As Evaluated” BASA Price after any NRES Bid Preference ($/MWh)$ - 0
BASA Allocation (% to Developer)0%
BASA Allocation (% to City)0%