2026_09_29 Greenville Salt Shed Contract Documents (ID 3695388).pdf
PDF 11 MB Posted
- Solicitation number
- 2139485
- Issued by
- Orange County, New York
About this file
Salt Storage Facility Contract Summary
This is a general construction contract document package for the Town of Greenville, Orange County, New York, for the design and construction of a new salt storage facility. The project involves site grading, building erection, and restoration activities for a salt storage facility to be located at 1537 Route 6, Port Jervis, New York 12771. The facility will feature an approximately 80 feet by 104 feet timber-framed storage structure with asphalt interior paving. Sealed bids are due no later than 2:00 PM local time on Thursday, October 29th, 2026, and must be submitted in person to the Town of Greenville Town Clerk at the project address. There is no formal pre-bid meeting scheduled; however, bidders may arrange site visits by contacting the Town Supervisor's office. The successful bidder must execute the contract and provide required bonds and insurance documentation within 15 days of the Notice of Award. The contract is on a lump sum basis with an alternate bid item for a delegated designed building structure, with bids remaining subject to acceptance for 45 days after the bid opening.
Bidder qualifications include maintaining an active New York State Department of Labor Certificate of Registration per Labor Law 220-I and demonstrating financial capability and experience with similar projects. The project requires a minimum of 30 percent minority and women-owned business enterprise (MWBE) participation, with MWBE-eligible firms strongly encouraged to respond. The project is partially funded through a $500,000 New York State Department of Environmental Conservation Water Quality Improvement Project grant. Bid security of 5 percent of the maximum bid price is required in the form of a certified check, bank money order, or bid bond. The Town of Greenville is exempt from New York State sales and use taxes on materials incorporated into the work, and prevailing wage rates published by the New York State Department of Labor and U.S. Department of Labor must be paid. The geotechnical investigation indicates an allowable soil bearing pressure of 3,000 pounds per square foot for shallow foundations, with shallow foundations extending a minimum of 4 feet below final exterior grade for frost protection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026_09_29 Greenville Salt Shed Contract Drawings (ID 3693207).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
It is a violation of the New York State Education Law, Article 145 §7209 Special Provisions, for any person, unless they are acting under the direction of a licensed professional engineer, architect, landscape architect, or land surveyor, to alter an item in any way. If an item bearing the stamp of a licensed professional is altered, the altering professional shall stamp the document and include the notation “altered by” followed by their signature, the date of such alteration, and a specific description of the alteration.
CONTRACT DOCUMENTS
AND
SPECIFICATIONS
FOR
SALT STORAGE FACILITY
CONTRACT NO. 1 – GENERAL CONSTRUCTION
TOWN OF GREENVILLE
ORANGE COUNTY, NEW YORK
SEPTEMBER 2026
DAVID ZUBIKOWSKI, TOWN SUPERVISOR
PREPARED BY:
BARTON & LOGUIDICE, D.P.C.
10 AIRLINE DRIVE
SUITE 200
ALBANY, NEW YORK 12205
PREPARED AND APPROVED BY
PROFESSIONAL ENGINEERS LICENSE NO.
DATE SIGNED
EXPIRATION DATE:
CHRISTIAN M. BERTRAM, P.E.
NEW YORK
091597 07/31/2027
09/28/2026
09.26 TABLE OF CONTENTS
2323.003.001 00 01 10-1
SECTION 00 01 10
TABLE OF CONTENTS
TOWN OF GREENVILLE
ORANGE COUNTY, NEW YORK
SALT STORAGE FACILITY
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 10 TABLE OF CONTENTS
00 01 15 LIST OF DRAWINGS
00 11 13 ADVERTISEMENT FOR BIDS
00 21 13 INSTRUCTIONS TO BIDDERS
00 31 32 GEOTECHNICAL DATA REPORT
00 31 46 PERMITS
00 41 16.01 BID FORM – GENERAL (Contract No. 1)
00 43 13 BID SECURITY FORM
00 43 93 BID SUBMITTAL CHECKLIST
00 43 95 MWBE WAIVER REQUEST FORM
00 45 19 NON-COLLUSIVE BIDDING CERTIFICATION
00 45 34 IRANIAN ENERGY SECTOR DIVESTMENT CERTIFICATION
00 45 35 SEXUAL HARASSMENT PREVENTION CERTIFICATION
00 45 45 PROHIBITION ON PURCHASE OF TROPICAL HARDWOODS
CERTIFICATION
00 45 54 CERTIFICATION REGARDING LOBBYING
00 51 00 NOTICE OF AWARD
00 52 13 AGREEMENT FORM
00 52 14 SUBCONTRACT FORM
00 55 00 NOTICE TO PROCEED
00 61 13 SUBCONTRACTORS VERIFIED STATEMENT
00 61 13.13 PERFORMANCE AND PAYMENT BOND FORM
00 63 36 FIELD ORDER FORM
TABLE OF CONTENTS 09.26
00 01 10-2 2323.003.001
00 63 63 CHANGE ORDER FORM
00 65 16 CERTIFICATE OF SUBSTANTIAL COMPLETION FORM
00 72 16 GENERAL CONDITIONS
00 73 16 SUPPLEMENTARY CONDITIONS
00 73 46.10 NEW YORK STATE PREVAILING WAGE RATES
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 00 PAYMENT PROCEDURES
01 29 00.10 LIEN WAIVER AND RELEASE
01 31 19 PROJECT MEETINGS
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 45 16.13 CONTRACTOR QUALITY CONTROL
01 45 33 SPECIAL INSPECTIONS AND STRUCTURAL TESTING
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 57 13 TEMPORARY EROSION AND SEDIMENT CONTROL
01 61 00 COMMON PRODUCT REQUIREMENTS
01 71 23 FIELD ENGINEERING
01 77 00 CLOSEOUT PROCEDURES
DIVISION 02 – EXISTING CONDITIONS
02 31 13 SITE SURVEYS
DIVISION 03 – CONCRETE
03 21 00 REINFORCEMENT BARS
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 41 13 PREFORMED METAL ROOFING AND SIDING
DIVISION 09 – FINISHES
09 91 00 PAINTING
09.26 TABLE OF CONTENTS
2323.003.001 00 01 10-3
DIVISION 13 – SPECIAL CONSTRUCTION
13 37 00 TIMBER FRAMED STORAGE STRUCTURE
DIVISION 31 – EARTHWORK
31 05 13 SOILS FOR EARTHWORK
31 05 16 AGGREGATES FOR EARTHWORK
31 05 19.13 GEOTEXTILES FOR EARTHWORK
31 22 13 SUBGRADE PREPARATION
31 23 16 EXCAVATION
31 23 16.26 ROCK REMOVAL
31 23 19 DEWATERING
31 23 23 FILL
31 41 00 SHORING
END OF SECTION
09.26 LIST OF DRAWINGS
2323.003.001 00 01 15-1
SECTION 00 01 15
LIST OF DRAWINGS
1.01 DRAWINGS
A. The Contract Drawings, which accompany this book and form a part of the Contract Documents, are listed on the Title Sheet of the Drawings.
B. The drawings for related contracts are listed on the Title Sheet for reference only.
Examine the drawings for related contracts to ascertain the relationship of the Work to the related contracts.
BOUND SEPARATELY:
GENERAL
G001 Cover Sheet G002 General Notes and Legend
CONTRACT NO. 1 – GENERAL CONSTRUCTION:
C100 Existing Conditions and Demolition Plan C101 Site Layout Plan C102 Site Grading, Drainage and Erosion Control Plan C501 Civil Details
S001 General Structural Notes S101 Salt Storage Building Foundation Plan S102 Salt Storage Building Framing Plan S201 Salt Storage Building Elevations S301 Salt Storage Building Section S302 Salt Storage Building Sections S501 Foundation Details S502 Typical Framing Details S503 Anchor Plate Details
09.26 ADVERTISEMENT FOR BIDS
2323.003.001 00 11 13-1
SECTION 00 11 13
ADVERTISEMENT FOR BIDS
Sealed bids for the furnishing of all labor and material necessary for the Salt Storage Facility Project will be received in person by the Town of Greenville Town Clerk, at 1537 Route 6, Port Jervis, NY 12771 until 2:00 PM local time on Thursday, October 29th, 2026, at which time and place they will be publicly opened and read aloud.
TOWN OF GREENVILLE SALT STORAGE FACILITY PROJECT
Bids will be received for the following Contract:
Contract No. 1 – General Construction: The scope of work shall include, but is not limited to, all labor, materials, and equipment, necessary and related, for the construction of the Salt Storage Facility, which generally includes, but is not limited to: site grading; building erection; and restoration activities. Bids shall be on a lump sum basis, with alternate bid item for a delegated designed building as indicated in the Bid Form.
Contract Documents, including Advertisement For Bids, Information For Bidders, Labor and Employment, Additional Instructions, Bid Documents, Agreement, General Conditions, General Requirements, Specifications, Contract Drawings and any Addenda, may be obtained from Barton & Loguidice, D.P.C., by providing contact information to Christian Bertram at cbertram@bartonandloguidice.com. Download instructions will be provided upon notification.
Copies of Bidding Documents obtained from any other source are not considered official copies.
Neither Owner nor Engineer can guarantee the accuracy and are not responsible for any errors contained in documents obtained from an alternate source.
Each Bid must be submitted on the prescribed Bid Form and accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Information for Bidders. No Bidder may withdraw his bid within forty-five (45) days after the actual date of opening thereof.
The Successful Bidder will be required to furnish the additional bonds prescribed in the Bidding Documents.
In order to perform public work, the Successful Bidder and Subcontractors prior to contract award shall hold or obtain any such license as required by State statutes, and Federal and local Laws and Regulations.
Participation by Minority and Women-Owned Business Enterprises (MWBE) is required for this project. Thirty percent (30%) minimum participation by MWBE contractors, subcontractors, and suppliers is required.
The successful bidder will be required to provide an Equal Employment Opportunity (EEO) policy statement prior to the award of a contract.
The attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and New York State and Federal minimum wage rates to be paid under the Contracts.
ADVERTISEMENT FOR BIDS 09.26
00 11 13-2 2323.003.001
Bids will not be accepted from Bidders that have been barred from competing on public works under General Municipal Law 5A-103-b. Bids will not be accepted from Bidder’s determined to be Non- Responsive by the New York State Office of General Services. This Project is a “Covered Project” under New York State Labor Law 220-I, and each Bidder must hold a valid Certificate of Registration from the New York State Department of Labor (NYSDOL) to submit a Bid. Each Bidder must submit a copy of their NYSDOL Certificate of Registration with their Bid at the time the Bid is made. Bidders will need to ensure that each Subcontractor working under them hold valid NYSDOL Certificate of Registration before commencing any work on a covered project. Bids received without a price for the additive alternate shall be deemed Non-Responsive.
There will be no formal Pre-Bid Meeting held, but any Bidder that would like to visit the site shall contact the Town Supervisor’s office to arrange a site visit. Town representatives will not answer questions relative to the project.
This is an exempt capital improvement project, and Bidders shall not include in their bid sales and compensating use taxes on the cost of materials which are to be incorporated into the work and which are to be separately sold by the Contractor to the Town of Greenville prior to incorporation into the work of the Contract(s). Purchases made by Town of Greenville are not subject to any Federal, State or local sales tax. Exemption certificates will be executed upon request.
All handling costs (mail, delivery services, etc.) Shall be the responsibility of the bidder.
The Town Board reserves the right to reject any and all bids or proposals, or any specific part of any item of any bid.
For information or questions concerning the proposed Work, contact Christian Bertram, P.E., Barton & Loguidice, D.P.C., 10 Airline Drive, Suite 200, Albany, New York 12205, cbertram@bartonandloguidice.com.
09.26 INSTRUCTIONS TO BIDDERS
2323.003.001 00 21 13-1
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
ARTICLE 1 – DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in Section 00 72 16 General Conditions and Section 00 73 16 Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
B. Owner – Town of Greenville
C. Engineer – Barton & Loguidice, D.P.C.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the Advertisement or Invitation to Bid.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit with its Bid (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:
A. In accordance with Labor Law 220-I, all Bidders submitting Bids on this project shall be registered with the New York State Department of Labor. Bidders submitting Bids on this project shall include their Certificate of Registration number were indicated on the Bid Form. Failure to include the Bidder’s Registration number on the Bid Form shall be deemed a non-responsive Bid and the Bidder’s Bid will be rejected.
B. It is the responsibility of the Bidder to ensure that all subcontractors are registered before commencing work on the site. Subcontractors’ Certification of Registration of the subcontractors shall be submitted once the project is awarded.
C. No Bidder shall be eligible to submit a Bid who has been barred from public works projects as defined in General Municipal Law 5A-103-b.
D. Bids will not be accepted from Bidders deemed as a “Non-Responsible Entity” by the New York State Office of General Services.
E. Evidence of Bidder’s authority to do business in the state where the Project is located.
F. Bidder’s state or other contractor license number, if applicable.
INSTRUCTIONS TO BIDDERS 09.26
00 21 13-2 2323.003.001
G. Subcontractor and Supplier qualification information; coordinate with provisions of Article 12 of these Instructions, “Subcontractors, Suppliers, and Others”.
H. The Contractor shall have and maintain an Active SAM Registration and shall not appear on an excluded parties list or be subject to debt offset.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications and by its submission of a Bid represents and agrees that it has done so.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF
SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor.
Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify:
a. Those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.
b. Those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make digital copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in Section 00 72 16 General Conditions, has been identified and established in the Section 00 73 16 Supplementary Conditions.
Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of Section 00 72 16 General Conditions will apply.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or adjacent to the Site are
2323.003.001 00 21 13-3 set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or Others.
C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of Section 00 72 16 General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of Section 00 72 16 General Conditions.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. Unless Bidder determines it is unable to prepare a complete and accurate Bid otherwise, Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a complete and accurate Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.
D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
4.04 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. As Section 00 72 16 General Conditions indicate, if an Owner safety program exists, it will be noted in Section 00 73 16 Supplementary Conditions.
4.05 Other Work at the Site
A. Reference is made to Article 8 of Section 00 73 16 Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or Others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
00 21 13-4 2323.003.001
ARTICLE 5 – BIDDER’S REPRESENTATIONS
5.01 It is the responsibility of each Bidder before submitting a Bid to:
A. Examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;
B. Visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;
C. Become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;
D. Carefully study all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and
(2) reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings;
E. Consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;
F. Agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;
G. Become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;
H. Promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;
I. Determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work; and
J. Agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
2323.003.001 00 21 13-5
ARTICLE 6 – INTERPRETATIONS AND ADDENDA
6.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing via Christian Bertram, P.E. at cbertram@bartonandloguidice.com.
Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Addenda will be issued at least five (5) days prior to the date of Bid opening.
6.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 7 – BID SECURITY
7.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent of Bidder’s maximum Bid price (determined by adding the base Bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and
6.02 of Section 00 72 16 General Conditions.
7.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the Contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.
7.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 45 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
7.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.
ARTICLE 8 – CONTRACT TIMES
8.01 The number of days within which, or the dates by which, the Work is to be substantially completed, and completed and ready for final payment, are set forth in the Agreement.
ARTICLE 9 – LIQUIDATED DAMAGES
9.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10 – SUBSTITUTE AND “OR-EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and
00 21 13-6 2323.003.001
Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
11.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.
11.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the Work.
11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of Section 00 72 16 General Conditions.
ARTICLE 12 – PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form is received with no pricing on the alternate item, the Bidder will be deemed Non-Responsive and the Bid will be rejected.
12.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.
12.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The partnership’s address for receiving notices shall be shown.
2323.003.001 00 21 13-7
12.04 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the firm’s address for receiving notices shall be shown.
12.05 A Bid by an individual shall show the Bidder’s name and address for receiving notices.
12.06 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture’s address for receiving notices shall be shown.
12.07 All names shall be printed in ink below the signatures.
12.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.
12.09 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
12.10 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.
ARTICLE 13 – BASIS OF BID
13.01 Base Bid with Alternate
A. Bidders shall submit a Bid on a lump sum basis for the base Bid and include a separate price for the alternate described in the Bidding Documents and as provided for in the Bid Form. The price for the alternate will be the amount added to or deleted from the base Bid.
ARTICLE 14 – SUBMITTAL OF BID
14.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 7 of the Bid Form.
14.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in Section 00 11 13 Advertisement for Bids, and shall be enclosed in a plainly marked package with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to:
Town of Greenville Town Clerk 1537 Route 6 Port Jervis, New York 12771
14.03 Bids received after the date and time prescribed for the opening of Bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
00 21 13-8 2323.003.001
ARTICLE 15 – MODIFICATION AND WITHDRAWAL OF BID
15.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If within 3 days after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 16 – OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the Advertisement or Invitation to Bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18 – EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
18.02 If Owner awards the Contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive base Bid with alternate.
18.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, the base Bid with alternate will be evaluated in the Bid Form.
After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid with alternate as selected by the Owner.
18.04 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
2323.003.001 00 21 13-9
ARTICLE 19 – BONDS AND INSURANCE
19.01 Article 6 of Section 00 72 16 General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.
ARTICLE 20 – SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of Section 00 72 16 General Conditions.
ARTICLE 21 – WAGE RATES
21.01 The Work under these Bidding Documents is to be paid for by public funds; therefore, minimum prevailing wage rates published by the New York State Department of Labor and U.S. Department of Labor shall be paid on this project. Reference Prevailing Wage Determination PRC# 2024014136.
ARTICLE 22 – SALES AND USE TAXES
22.01 Owner is exempt from New York State sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes shall not be included in the Bid. Refer to Paragraph SC-
7.09 of the Supplementary Conditions for additional information.
ARTICLE 23 – BUY AMERICAN
23.01 Consistent with Executive Order 13858, “Strengthening Buy-American Preferences for Infrastructure Projects,” the Contractor is encouraged to use to the greatest extent practicable, iron and aluminum as well as steel, cement, and other manufactured products produced in the United States in every contract, subcontract, purchase order, or sub-award that is chargeable under this Award.
09.26 GEOTECHNICAL DATA REPORT
2323.003.001 00 31 32-1
SECTION 00 31 32
GEOTECHNICAL DATA REPORT
SUBSURFACE INVESTIGATION
AND
GEOTECHNICAL EVALUATION
PROPOSED SALT STORAGE BUILDING
GREENVILLE, ORANGE COUNTY, NEW YORK
BARTON & LOGUIDICE, D.P.C.
PREPARED FOR: Barton & Loguidice, D.P.C.
443 Electronics Parkway Liverpool, New York 13088
PREPARED BY: Atlantic Testing Laboratories, Limited 301 St. Anthony Street Utica, New York 13502
ATL Report No. CD10671E-01-04-24
April 9, 2024
TABLE OF CONTENTS
SECTION PAGE NUMBER
1.0 INTRODUCTION 1
2.0 PROJECT DESCRIPTION 1
3.0 SITE SURFACE CONDITIONS & GEOLOGY 1
4.0 SUBSURFACE INVESTIGATION & SAMPLING METHODOLOGY 2
5.0 SITE SUBSURFACE CONDITIONS 2
5.1 Soil Borings
5.2 Subsurface Water
6.0 LABORATORY ANALYSES 3
7.0 GEOTECHNICAL ENGINEERING DISCUSSION & RECOMMENDATIONS 3
7.1 Site Work
7.2 Foundations
7.3 Frost Protection
7.4 Seismic Considerations
7.5 Backfill and Compaction Recommendations
7.6 General
7.7 Dewatering
7.8 Pavement Design Recommendations
7.9 Testing and Inspection
8.0 LIMITATIONS 8
APPENDICES
A. Site Location Plan B. Boring Location Plan C. Subsurface Investigation Logs D. Laboratory Test Reports
SUBSURFACE INVESTIGATION
AND
GEOTECHNICAL EVALUATION
PROPOSED SALT STORAGE BUILDING
GREENVILLE, NEW YORK
BARTON & LOGUIDICE D.P.C.
1.0 INTRODUCTION
At the request of Ryan Weitz, representing Barton & Loguidice, D.P.C (Barton & Loguidice), and in accordance with our proposal (ATL No. CD998-1999-09-22, dated September 28, 2022), Atlantic Testing Laboratories, Limited (ATL) performed a subsurface investigation and geotechnical evaluation for the referenced project.
The purpose of the investigation was to ascertain the general subsurface soil and groundwater conditions at the site, to evaluate the engineering significance of these findings, and to provide recommendations related to the design and construction of the proposed salt storage building.
The proposed salt storage building site is located north of the existing Greenville Town Office building located at 1566 US-6, Greenville, New York. The approximate project coordinates are N 41°22'38" latitude and W 74°33'30" longitude. A Site Location Plan is included in Appendix A. All dimensions and elevations referenced in this report are in units of feet, unless otherwise noted.
2.0 PROJECT DESCRIPTION
Based on information provided to ATL by Barton & Loguidice, the project consists of constructing a salt storage building with an asphalt paved interior. Based on the topographical information shown on the Concept Site Plan provided by Barton & Loguidice the project site slopes downward from approximately elevation 938 feet at a knoll on the west side of the building footprint to approximately 932 feet at the north, east, and south sides. The finished floor elevation, and anticipated foundation loads were not provided to ATL at the time of report preparation.
3.0 SITE SURFACE CONDITIONS & GEOLOGY
The project site is generally covered with a mowed grass area. The project site is bound by woodland to the north; agricultural fields to the east; the existing town office building to the south; and the existing town office garage and woodland to the west.
Barton & Loguidice D.P.C. Page 2 of 8 ATL Report No. CD10671E-01-04-24 April 9, 2024
The project area is located in the south-west portion of the Lower Hudson region of New York State. Based on the Surficial Geologic Map of New York, Lower Hudson Sheet, 1989, the project area is mantled with a silt-clay poorly sorted till deposition that is relatively impermeable with variable clast content from abundant and well-rounded to sandier in some areas. Based on the Geologic Map of New York, Lower Hudson Sheet Sheet, 1970, the project area is underlain by Ordovician age Austin Glen formation, Graywacke Shale.
4.0 SUBSURFACE INVESTIGATION & SAMPLING METHODOLOGY
Two (2) soil borings were selected by Barton & Loguidice and staked in the field by representatives of ATL. The boring surface elevations were not provided at the time of the subsurface investigation. A Boring Location Plan, prepared by Barton & Loguidice, depicting the approximate location of the soil borings, is included in Appendix B.
The individual soil borings were advanced utilizing HW (4-inch), inside diameter flush-joint casing using water as a drilling fluid. Soil sampling and standard penetration testing was performed utilizing a 2-inch outside diameter split spoon sampler and automatic drop hammer in accordance with ASTM D 1586. Soil sampling was performed continuously to a minimum depth of 12 feet below the surface and at 4 to 5-foot intervals thereafter to the boring termination at a depth of approximately 20 feet below the surface.
The recovered soil samples were visually classified in the laboratory by an engineering technician in general accordance with the Burmister Soil Classification System. The split spoon sampler does not recover material larger than 1⅜-inch in nominal dimension; therefore, the soil classifications may not be representative of the entire soil matrix. The visual classifications and standard penetration test (SPT) results are presented on the Subsurface Investigation Logs included in Appendix C.
The borings were backfilled with on-site soil upon completion. It is important that the backfilled boreholes be monitored for settlement or subsidence. This will be the responsibility of Barton & Loguidice and/or their CLIENT. ATL assumes no liability for loss or damage resulting from borehole settlement.
5.0 SITE SUBSURFACE CONDITIONS
The following description of subsurface conditions is based on the subsurface soil and groundwater conditions encountered during this subsurface investigation performed on February 14, 2024. Actual subsurface conditions may vary across the site in both the horizontal and vertical dimensions. Detailed subsurface descriptions are provided on the Subsurface Investigation Logs.
Barton & Loguidice D.P.C. Page 3 of 8
5.1 Soil Borings
The soil borings generally encountered 1 to 3 inches of topsoil and organic material at the surface. Underlying the surficial topsoil in soil boring B-1 was medium compact (SPT N-Values 10 to 30) sand with varying portions of clay, silt and gravel that extended to a depth of 2 feet.
Beneath the sand in boring B-1 and surficial topsoil in soil boring B-2 was stiff (SPT N-Values 8 to 15) to very stiff (SPT N-Values 15 to 30) silt and clay with varying portions of gravel and sand that extended to approximate depths of 8 and 13 feet, respectively. At a depth of approximately 4 feet, soil boring B-1 encountered cobbles and trace organic material (root hairs). The silt and clay was underlain by very compact (SPT N-Values greater than 50) gravel with varying portions of clay, silt and sand that extended to 13 feet in boring B-1 and to boring termination at a depth of 20.3 feet in boring B-2. The gravel in boring B-1 was underlain by hard (SPT N-Values greater than 30) clay and silt with varying portions of gravel and sand that extended to a depth of 18 feet, underlain by a very compact gravel with varying portions of clay, silt and sand that extended to boring termination at a depth of 19.2 feet.
5.2 Subsurface Water
Subsurface water measurements were performed during the subsurface investigation through the cased and open boreholes. The recovered soil samples were also classified for coloration and relative moisture conditions.
Freestanding water was recorded at a depth of 3.3 feet and at the surface in soil borings B-1 and B-2, respectively, during borehole advancement. After removal of the drill casing, borings B- 1 and B-2 caved at depths of approximately 19 and 18 feet, respectively, and freestanding water was recorded at depths of 3.5 feet and at the surface, respectively.
Water was added to the boreholes to advance the borings, therefore, groundwater levels recorded at the time of borehole advancement are not representative of the actual groundwater conditions. Since the boreholes were backfilled immediately upon completion, the water levels did not have time to stabilize in the open boreholes.
Fluctuations in water levels may occur due to seasonal and climatic variations, changes in surface runoff patterns, construction activity, and subsequent development of the site along with other interrelated factors.
6.0 LABORATORY ANALYSES
Select soil samples were submitted to ATL’s geotechnical laboratory for the following physical analyses:
♦ Ten (10) Water Content Determination of Soil (ASTM D 2216) ♦ One (1) Particle Size Analysis without Hydrometer (ASTM D 422) ♦ One (1) Liquid Limit, Plastic Limit, Plasticity Index (Atterberg Limits) (ASTM 4318)
The laboratory test results are provided on the Subsurface Investigation Logs contained in Appendix C, and provided in Appendix D, Laboratory Test Reports.
7.0 GEOTECHNICAL ENGINEERING DISCUSSION & RECOMMENDATIONS
The Geotechnical Engineering Discussion is based on information provided by Barton & Loguidice and the subsurface conditions outlined in this report.
Barton & Loguidice D.P.C. Page 4 of 8
The following recommendations are presented as the minimum requirements for the design, planning, and construction of the foundation systems. The concepts and geotechnical engineering considerations presented should be considered in project design and construction.
These concepts may require alterations to meet the specific design and economic considerations for this project.
7.1 Site Work
Site work will require removal of any surficial topsoil and organics within the proposed building footprint.
At the time of report issuance, final site grading plans and a finished floor elevation was not provided; however, based on the existing topography it is anticipated minor cuts and/or fills will be necessary.
After the subgrade cuts are performed and prior to placing fill to raise site grades, the site subgrade soil should be proof-compacted with a minimum of a 10-ton roller and proof rolled under the direction of a Geotechnical Engineer. Proof rolling should be conducted using a tandem axle truck with a minimum gross weight of 40,000 lbs. Rollers or low ground pressure construction equipment should not be used for proof rolling. The proof rolling should be conducted under the observation of a Geotechnical Engineer. Any areas noted to weave or deflect should be excavated to stable material, at the direction of the Geotechnical Engineer, and replaced with compacted Structural Fill.
Fill required to raise site subgrades within the footprint of the proposed building should consist of Structural Fill that is placed and compacted in accordance with Section 7.5 of this report.
The in-situ soils are considered moisture sensitive and frost susceptible. The subgrade soils may become disturbed by repetitive construction traffic when exposed to excessive moisture.
Construction equipment and foot traffic should be limited on exposed subgrades, especially during wetter periods of the year. Site work should be scheduled during drier portions of the year to avoid possible delays and additional costs associated with construction during the wet seasons.
Site surface grading should be designed to convey surface water away from the site structures.
7.2 Foundations
Based on the subsurface soil and groundwater conditions encountered during ATL’s subsurface investigation, it is our opinion that the use of shallow foundations is acceptable to support the proposed salt storage building. The foundation excavations should be advanced with a flat-lipped bucket to minimize disturbance to the subgrade soils.
All foundation excavations should be continuously monitored by a Geotechnical Engineer to verify the stability and uniformity of the subgrade soil, and to ensure that adequate soil bearing capacity is obtained.
Shallow foundation excavations should be advanced to stable, native soils a minimum of 4 feet below final exterior grade. Unstable subgrades should be over excavated to stable subgrade soil and replaced with structural fill, under the direction of the Geotechnical Engineer.
Subgrades that become saturated and unstable during construction due to surface or groundwater infiltration should be over excavated 6 inches and a 6-inch layer of NYSDOT Number 2, crushed stone should be placed and compacted on the exposed subgrade. The
Barton & Loguidice D.P.C. Page 5 of 8
Number 2, crushed stone should be compacted with four passes of a dual-drum walk-behind vibratory roller; a Wacker DPU 6055 vibrating plate tamper; or equivalent, under the direction of a Geotechnical Engineer. The Number 2 crushed stone will provide a stable working surface and dewatering media if ground or surface water enters the foundation excavations.
Shallow foundations supported on stable native soils, compacted NYSDOT Number 2, crushed stone, and/or compacted Structural Fill that overlies stable, native soils may be designed using an allowable soil bearing pressure of 3000 psf, provided the recommendations presented in this report are followed.
Continuous strip footings should be a minimum 18 inches wide and individual spread footings a minimum 36 inches wide.
Total and differential post construction foundation settlement less than 1-inch and ½-inch, respectively, are estimated provided the recommendations presented in this report are followed.
7.3 Frost Protection
Shallow foundations should extend a minimum of 4 feet below final exterior grade to provide adequate frost protection.
7.4 Seismic Considerations
Based on the average field standard penetration test results, a seismic site classification of C has been determined for the project site.
7.5 Backfill and Compaction Recommendations
The on-site soils, excluding deleterious organics and oversize material (particles larger than 4 inches in diameter), may be used as general site (berms, landscapes, green areas) fill. The on-site soils have a relatively high fines content and will be difficult to achieve proper compaction and stability without moisture conditioning. Structural Fill should be utilized as backfill within structure footprints and as foundation backfill.
All controlled fill and backfill should be placed and compacted in lifts not exceeding eight inches in loose thickness, at a moisture content of ± 2% of the Optimum Moisture Content, and to densities in excess of 95%, as determined by ASTM…
This is the start of the file's text. The full file is on GovTribe.