This bid package document is issued by the Tredyffrin/Easttown School District for HVAC renovations and upgrades across six school facilities in Pennsylvania. The project encompasses mechanical equipment replacement, domestic hot and cold-water piping installation, electrical panel replacement, and building automation controller upgrades at Beaumont Elementary School, Devon Elementary School, New Eagle Elementary School, Valley Forge Middle School, Conestoga High School, and the West Valley Administration Building. Four separate prime contracts are being solicited: General Construction, Mechanical Construction, Plumbing Construction, and Electrical Construction. A mandatory pre-bid meeting and project walk-through will be held on September 30, 2026, at 8:30 A.M. at Conestoga High School. Electronic bids must be submitted via PennBid no later than 2:00 P.M. on October 27, 2026, at which time they will be opened publicly. The anticipated contract award date is late November 2026, with site mobilization scheduled for June 21, 2027, and project final completion required by August 18, 2027. Each bid must include a proposal guaranty of 10 percent of the greatest possible contract amount in the form of a certified check, bank cashier's check, trust company's treasurer's check, or bid bond.

All successful bidders must furnish performance and labor/material payment bonds equal to 100 percent of the contract amount with corporate sureties rated A- or better by A.M. Best. The Mechanical Contractor shall serve as the Prime Coordinator responsible for coordinating all contractors and maintaining the construction schedule, and must coordinate with Tri-M Group, LLC, the designated mechanical controls subcontractor, to outfit HVAC equipment with required onboard control panels prior to site mobilization. Prevailing wage rates established by the Pennsylvania Department of Labor and Industry apply to all workers, with classifications ranging from general laborers to skilled trades such as electricians, plumbers, steamfitters, and sheet metal workers. No asbestos-containing materials or lead-based pipes, solder, or paint are permitted. All personnel working on the project must obtain satisfactory Pennsylvania and FBI criminal background clearances, Act 34.F criminal record checks, Act 151 child abuse clearance, and Act 114 Pennsylvania Department of Education clearance, with costs borne by the contractor. Liquidated damages are assessed at $1,000 per calendar day for each prime contractor for delays beyond August 18, 2027. The District is exempt from Pennsylvania sales tax on building machinery and equipment purchases, and contractors must bid accordingly. All contract documents are available at no cost via PennBid.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

September 23, 2026 – BID ISSUE

Bid Package 1 - HVAC Renovations and Upgrades at BES, DES, NEES, VFMS, CHS & WVAB

Beaumont Elementary School Devon Elementary School 575 Beaumont Road 400 S. Fairfield Road Devon, PA 19333 Devon, PA 19333

New Eagle Elementary School Valley Forge Middle School 507 Pugh Road 105 W. Walker Road Wayne, PA 19087 Wayne, PA 19087

Conestoga High School West Valley Administration Building 200 Irish Road 940 West Valley Road, Suite 1700 Berwyn, PA 19312 Wayne, PA 19087

For the Tredyffrin / Easttown School District 940 West Valley Road, Suite 1700, Wayne, Pennsylvania, 19087 t 620 240 1900

SPECIFICATIONS

HSA Project No. 26-016.01

Schiller & Hersh Associates, Inc.

Consulting M/E/P Engineers

636 Skippack Pike, Suite 200, Blue Bell, Pennsylvania 19422 t 215 886 8947 f 215 886 8956

A.W. Lookup Corporation Structural Engineers

500 Fayette Street, Suite 100, Conshohocken, Pennsylvania 19428 t 610 825 2600 f 610 825 2781

347 E Conestoga Rd, Wayne, Pennsylvania 19087 t 610 994 3500

BID PACKAGE 1 - HVAC RENOVATIONS AND UPGRADES TABLE OF CONTENTS

AT BES, DES, NEES, VFMS, CHS & WVAB

#26-016.01 TOC - 1

TABLE OF CONTENTS TOC-1

Division 0/1 ITEM

NOTICE TO BIDDERS

INSTRUCTIONS TO BIDDERS

PENNSYLVANIA EXEMPTION CERTIFICATE

BID BOND

NON-COLLUSION AFFIDAVIT

CONTRACTORS QUALIFICATION STATEMENT

PERFORMANCE (and Maintenance) BOND

LABOR AND MATERIAL PAYMENT BOND

PREVAILING MINIMUM WAGE DETERMINATIONS – BES

PREVAILING MINIMUM WAGE DETERMINATIONS – DES

PREVAILING MINIMUM WAGE DETERMINATIONS – NEES

PREVAILING MINIMUM WAGE DETERMINATIONS – VFMS

PREVAILING MINIMUM WAGE DETERMINATIONS – CHS

PREVAILING MINIMUM WAGE DETERMINATIONS – WVAB

GENERAL CONDITIONS OF THE CONTRACT FOR CONTRACTOR – AIA A201

SUPPLEMENTARY GENERAL CONDITIONS

GENERAL REQUIREMENTS

FORM OF AGREEMENT

BIDDER’S CHECKLIST

010410 PROJECT COORDINATION – MULTIPLE PRIME CONTRACTS

013000 SUBMITTAL PROCEDURES

014000 QUALITY REQUIREMENTS

017700 CLOSEOUT PROCEDURES

ARCHITECTURAL

024119 SELECTIVE DEMOLITION

042000 UNIT MASONRY

061053 MISCELLANEOUS ROUGH CARPENTRY

070151 ROOFING REPAIRING

072100 THERMAL INSULATION

076200 SHEET METAL FLASHING AND TRIM

078413 PENETRATION FIRESTOPPING

079200 JOINT SEALANTS

089000 LOUVERS AND VENTS

095113 ACOUSTICAL PANEL CEILINGS

099000 PAINTING AND COATING

323113 CHAINLINK FENCING AND GATES

PLUMBING

220000 PLUMBING SUMMARY OF WORK

220500 COMMON WORK RESULTS FOR PLUMBING

220523 GENERAL-DUTY VALVES FOR PLUMBING PIPING

220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

220553 IDENTIFICATIONS FOR PLUMBING PIPING AND EQUIPMENT

220700 PLUMBING INSULATION

221116 DOMESTIC WATER PIPING

BID PACKAGE 1 - HVAC RENOVATIONS AND UPGRADES TABLE OF CONTENTS

#26-016.01 TOC - 2

TABLE OF CONTENTS TOC-2

221119 DOMESTIC WATER PIPING SPECIALTIES

MECHANICAL

230000 SUMMARY OF WORK

230130 HVAC AIR-DISTRIBUTION SYSTEM CLEANING

230500 COMMON WORK RESULTS FOR HVAC

230513 COMMON MOTOR REQUIREMENTS

230519 METERS AND GAGES FOR HVAC PIPING.

230523 GENERAL-DUTY VALVES FOR PIPING

230529 HANGERS & SUPPORTS FOR HVAC PIPING & EQUIPMENT

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230700 HVAC INSULATION

230900 INSTRUMENTATION AND CONTROL FOR HVAC

230993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

231433 FACILITY NATURAL GAS PIPING

232113 HYDRONIC PIPING

232300 REFRIGERANT PIPING

233113 METAL DUCTS

233300 AIR DUCT ACCESSORIES

233423 HVAC POWER VENTILATORS

233713 DIFFUSERS, REGISTERS AND GRILLES

237313 INDOOR AIR HANDLING UNITS

237433 ROOF TOP UNITS

238126 SPLIT-SYSTEM AIR-CONDITIONERS

238216 AIR COILS

ELECTRICAL

260000 SUMMARY OF WORK

260400 BASIC ELECTRICAL REQUIREMENTS

260500 COMMON WORK RESULTS FOR ELECTRICAL

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260923 LIGHTING CONTROL DEVICES

262416 PANELBOARDS

262726 WIRING DEVICES

END OF TABLE OF CONTENTS

BID PACKAGE 1 - HVAC RENOVATIONS AND UPGRADES NOTICE TO BIDDERS

#26-016.01 NB - 1

NOTICE TO BIDDERS NB-1

NOTICE TO BIDDERS

Bid Package 1 - HVAC Renovations and Upgrades at Beaumont Elementary School (BES), Devon Elementary School

(DES), New Eagle Elementary School (NEES), Valley Forge Middle School (VFMS), Conestoga High School (CHS), and the West Valley Administration Building (WVAB) for the Tredyffrin/Easttown School District

Bids will be received electronically before 2:00 P.M., Tuesday, October 27, 2026, at which time the bids will be opened on the PennBid website with results displayed publicly. The results will be also read aloud at the offices of the

Purchasing Department, Tredyffrin/Easttown School District, Administration Offices, 940 W Valley Road, Suite 1700

Wayne, PA 19087.

Contract Proposal Guaranty

General Construction 10%

Mechanical Construction 10%

Electrical Construction 10%

Plumbing Construction 10%

Sets of Plans, Specifications, and other documents constituting the Contract Documents may be obtained at no cost on the

PennBid website, www.PennBid.net. Plans and specifications will be available September 23, 2025.

Each proposal must be accompanied by a proposal guaranty, in the amount above stipulated, in the form of a certified check, bank cashier's check, trust company treasurer's check or a bid bond, in the form prescribed in the Contract

Documents, with satisfactory corporate surety authorized to do business in Pennsylvania, naming as payee (or obligee as applicable) the Tredyffrin/Easttown School District.

Acceptance by the Owner of the successful bidder’s proposal shall be in the form of a contingent Notice of Award. Upon receipt of such Notice of Award, the successful bidder must furnish, 1) Contract Bonds in the forms prescribed in the

Contract Documents; 2) evidence of required insurance as detailed in the Contract Documents: and 3) a signed and notarized Form of Agreement in the form provided in the Contract Documents, all prior to receiving a Notice to Proceed.

Proposals must be submitted electronically via the PennBid website.

Except as expressly provided for in these specifications, no proposals may be withdrawn for a period of sixty (60) days after the date specified for receiving, opening, and reading of proposals.

The time allowed for completion shall be as set forth in the Contract Documents. All Contracts will start immediately.

The Tredyffrin/Easttown School District reserves the right to reject any or all proposals or parts thereof or items therein and to waive any defects or irregularities in proposals.

A mandatory Pre-Bid Meeting (project walk-through) will be held on Wednesday, September 30, 2026, at 8:30 A.M. at

Conestoga High School, large group room 142, 200 Irish Road, Berwyn, PA 19312.

Contractors who do not attend the mandatory pre-bid meeting will not be permitted to submit bids.

Tredyffrin/Easttown School District Heckendorn Shiles Architects

Arthur J. McDonnell Matthew A Heckendorn

Business Manager Principal http://www.pennbid.net/

BID PACKAGE 1 - HVAC RENOVATIONS AND UPGRADES INSTRUCTIONS TO BIDDERS

#26-016.01 IB - 1

INSTRUCTIONS TO BIDDERS IB-1

INSTRUCTIONS TO BIDDERS

BID PACKAGE 1 - HVAC RENOVATIONS AND UPGRADES AT BEAUMONT

ELEMENTARY SCHOOL (BES), DEVON ELEMENTARY SCHOOL (DES), NEW EAGLE

ELEMENTARY SCHOOL (NEES), VALLEY FORGE MIDDLE SCHOOL (VFMS),

CONESTOGA HIGH SCHOOL (CHS), AND THE WEST VALLEY ADMINISTRATION

BUILDING (WVAB)

INDEX

SECTION 1 - RECEIVING, OPENING, AND READING OF PROPOSALS

SECTION 2 - PREPARATION OF PROPOSALS & CONTRACTOR QUALIFICATIONS

SECTION 3 - IDENTIFICATION AND SUBMISSIONS OF PROPOSALS

SECTION 4 - PROPOSAL GUARANTY

SECTION 5 - WITHDRAWAL OF BIDS

SECTION 6 - AWARD OF CONTRACT OR REJECTION OF PROPOSALS

SECTION 7 - CONTRACT BONDS & OTHER PRE-CONTRACT REQUIREMENTS

SECTION 8 - EXECUTION OF CONTRACT & COMMENCEMENT OF WORK

SECTION 9 - NOT USED

SECTION 10 - RESPONSIBILITY OF BIDDER

SECTION 11 - CHANGE PRIOR TO OPENING OF PROPOSALS

SECTION 12 - TIME OF COMPLETION: EXTENSIONS OF TIME

SECTION 13 - DOCUMENTS

SECTION 14 - INSPECTIONS & TESTING

SECTION 15 - INSURANCE

SECTION 16 - SUBSTITUTIONS

SECTION 17 - DETAILED COST BREAKDOWN

SECTION 18 - COMPETENT WORKMEN

SECTION 19 - PAYMENTS

SECTION 20 - OCCUPATIONAL SAFETY AND HEALTH ACT REQUIREMENTS

SECTION 21 - PROVISIONS FOR THE USE OF STEEL AND STEEL PRODUCTS MADE IN THE U.S.A.

SECTION 22 - HUMAN RELATIONS ACT

SECTION 23 - STANDARD OF QUALITY

SECTION 24 - REQUIREMENTS OF ANTI-POLLUTION LEGISLATION

SECTION 25 - PENNSYLVANIA PREVAILING WAGE RATES

SECTION 26 - ASBESTOS & LEAD

SECTION 27 - APPLICATION BACKGROUND CHECKS REQUIRED

SECTION 28 - LIQUIDATED DAMAGES

SECTION 29 - CASH ALLOWANCES

SECTION 30 - PENNSYLVANIA SALES TAX EXEMPTION

SECTION 31 - DISCRIMINATION PROHIBITED

SECTION 32 - FEDERAL REQUIREMENTS

SECTION 33 - HVAC – COORDINATION WITH CONTROLS SUBCONTRACTOR

SECTION 1 - RECEIVING, OPENING, AND READING OF PROPOSALS

A. Proposals will be received for the following project:

Bid Package 1 - HVAC Renovations and Upgrades at BES, DES, NEES, VFMS, CHS &

WVAB

by the Tredyffrin/Easttown School District, at the Administration Office, 940 West Valley Road, Suite

1700, Wayne, PA 19087.

#26-016.01 IB - 2

INSTRUCTIONS TO BIDDERS IB-2

Proposals will be accepted up to 2:00 pm, October 27, 2026.

The bids will be unsealed electronically via the PennBid website, and also will be read aloud at 2:00 pm, October 27, 2026.

B. Sealed proposals will be received for the following contracts:

General Construction: This proposal will include all labor, equipment and materials to complete all of the

General Construction work contained in the Contract Documents.

Mechanical Construction: This proposal will include all labor, equipment and materials to complete all of the Mechanical Construction work contained in the Contract Documents. The Mechanical Contractor shall also be responsible as the Prime Coordinator on this project. In that role, he shall be responsible to coordinate activities of all Prime Contractors so that the construction schedule is maintained. See also specification Section 01041.

Plumbing Construction: This proposal will include all labor, equipment and materials to complete all of the Plumbing Construction work contained in the Contract Documents.

Electrical Construction: This proposal will include all labor, equipment and materials to complete all of the Electrical Construction work contained in the Contract Documents.

C. A mandatory Pre-Bid Meeting (project walk-through) will be held on Wednesday, September 30, 2026 at 8:30 A.M. at Conestoga High School, large group room 142, 200 Irish Road, Berwyn, PA 19312.

D. Contractors will be responsible for notifying the Owner/Architect, before bids are submitted, of any discrepancies in the Drawings and/or Contract Documents which would require additional work not included in the base bid or alternate descriptions. Contractors' bids are an affirmative statement by the contractors that any and all questions or discrepancies have been addressed to the contractors' satisfaction pursuant to the terms of Section 10 of these Instructions to Bidders.

1. Questions, substitution requests, and requests for clarification or interpretations of the Bid Documents shall be made in writing and must be submitted by 3:30pm, Thursday, October 8, 2026.

SECTION 2 - PREPARATION OF PROPOSALS

A. Bound herewith is a complete set of bidding forms and Contract Documents. Any Addenda or Bulletins which are promulgated prior to the bid due date shall also be made part of the Contract Documents.

B. No proposal will be considered, which is submitted other than upon the Bid Form through PennBid.

C. The Bidder shall sign and complete the proposal properly in accordance with the following:

1. If the Bidder is an individual, the proposal shall be executed by such individual, personally, such individual's signature shall be witnessed, such individual's business address and phone number shall be stated, and any trade name employed in the conduct of such individual's business shall be stated.

2. If the Bidder is a corporation, the proposal shall be executed in its name and in its behalf: 1) by the President or a Vice-President and attested by the Secretary or an Assistant Secretary and the corporate seal shall be attached; or 2) by a duly authorized agent of the corporation whose authority to act, as of the date of the proposal, shall be established by proof, in a form satisfactory to the Owner, submitted with the proposal. The business address of the corporation shall be stated, the state of incorporation shall be stated, and, if the corporation is a foreign corporation, whether the corporations is registered to do business in Pennsylvania shall be stated.

#26-016.01 IB - 3

INSTRUCTIONS TO BIDDERS IB-3

3. If the Bidder is a partnership, the proposal shall be executed and sealed in the name of the partnership, followed by the signature of a general partner, together with a certification from each general partner that the general partner executing the proposal has been authorized by the partnership to execute and deliver the bid. The business address of the partnership shall be stated, the state of registration shall be stated, if any, and any trade name employed by the partnership in the conduct of its business shall be stated.

D. All blank spaces in the Bid Form (as incorporated on PennBid) shall be completed. All amounts stated in the proposal shall be stated. Failure to complete all blank spaces in the Bid Form renders such a bid incomplete and such a bid may be rejected by the Owner as non-responsive.

E. Each proposal shall be based upon the plans, Specifications, and other documents constituting the Contract

Documents referred to in the Notice to Bidders bound herewith, including related drawings, bulletins, and addenda.

1. Any proposal which contains omissions, additions, or deductions not called for or permitted, alterations of form, conditional of uninvited alternate proposals or irregularities of any kind, and any proposal which is not based upon the documents referred to in the preceding paragraph.

Furthermore any proposal which, while otherwise regular in form, shall not be accompanied by the proper proposal guaranty as set forth in Section 4, may be rejected by the Owner as being informal.

2. The Owner may reject any proposal in which prices are obviously unrealistic.

F. Proposals shall not contain any recapitulations of the work to be performed.

G. Erasures, alterations, or changes made by the Bidder in the completion of the proposal shall be explained or noted appropriately with the signature of the Bidder. These proposals may, at the discretion of the Owner, be rejected.

H. Attached in the specifications is a copy of the AIA Contractors Qualification Statement. This statement must be completed for each Contractor. It will be required that the Contractor retain craftsmen skilled to perform the work.

1. Each Prime Contractor must have been in business for at least five years.

2. Each Prime Contractor must have successfully completed at least four comparable size projects in the past five years. The Contractor must have proven experience doing similar type facilities.

J. All contractors are required to have an 'A-' (A minus) or better bond rating at the time of the bid submission, as determined by AM Best.

SECTION 3 - SUBMISSIONS OF PROPOSALS

A. Each proposal, accompanied by proposal guaranty as set forth in Section 4, shall be submitted electronically via

PennBid.

SECTION 4 - PROPOSAL GUARANTY

A. Each proposal must be accompanied by the proposal guaranty, in the amount of ten (10%) percent of the greatest possible contract amount. The proposal guaranty shall be in the form of a certified check, bank cashier's check, trust company's treasurer's check or a bid bond, in the form bound herewith, with corporate surety authorized to do business in Pennsylvania and satisfactory to the Owner. The proposal guaranty shall name the Owner as payee or obligee, as applicable.

B. The form of Bid Bond is furnished herewith for the use of the Bidder. In the event that a bid bond is submitted with the proposal, the Bidder shall make certain that a proper power of attorney evidencing the authority of the agent of the surety to execute the bid bond is submitted therewith.

#26-016.01 IB - 4

INSTRUCTIONS TO BIDDERS IB-4

Proposal guaranty shall be submitted upon the understanding that the same shall guarantee that if a Bidder, to whom ten (10) calendar days' notice of intention to accept such Bidder's proposal has been made by or on behalf of the Owner, fails to furnish a performance bond and a payment bond in the forms furnished herewith to the Owner, as are required by the law of the Commonwealth of Pennsylvania, as a condition precedent to formal award of the contract and fails to execute the Agreement or to furnish the required insurance certificates within ten (10) days after notice that an award has been made to such Bidder, the

Owner may, in its sole discretion, declare the Bidder to be in default with respect to such Bidder's proposal.

1. In the event that any Bidder shall be declared to be in default with respect to such Bidder's proposal, as provided for above, the Owner may declare such proposal guaranty to be forfeited to the Owner as liquidated damages.

2. With respect to the discovery of inaccurate or incomplete information provided in the Bidder's proposal documents, the Owner shall have the right to declare the Bidder's proposal to be in default, even if the 60 day period, beyond the date for opening of bids for acceptance of the

Bidder's proposal, has lapsed. In the event of such default, the Owner shall also have the right to retain the defaulted Bidder's Bid Bond. See also, Section 6 in these Instructions to Bidders.

C. The proposal guaranty accompanying the proposal, of all Bidders of each contract who have submitted acceptable bids, will be held by the Owner until two days following the execution of an agreement with the successful Bidder. If the Owner decides that no award will be made, then the proposal guaranty will be returned two days following the decision. In any event, the proposal guaranty need not remain valid beyond a point two days after the expiration date for the proposal.

D. The Owner shall not be liable for interest upon the proposal guaranty accompanying any proposal, which is in the form of a check, for the period during which such proposal guaranty is held under Section 4.

E. The proposal shall hold good for sixty days from the date of submission of bids.

SECTION 5 - WITHDRAWAL OF BIDS

A. Any Bidder may, in writing, withdraw such Bidder's proposal within two (2) business days after the opening of bids and in accordance with the Title 73 PS 1602.

SECTION 6 - AWARD OF CONTRACT OR REJECTION OF PROPOSALS

A. An award by the Owner, if made, will be made to the lowest responsible Bidder within sixty (60) days after the opening of the bids or as defined in Title 73 PS 1622.

B. The Owner reserves the right to reject any or all proposals or parts thereof or items therein and to waive any defects or irregularities in proposals.

C. The Owner reserves the right to consider such matters, facts, and circumstances as shall be permitted by

Pennsylvania law in making a determination of whether a Bidder is a responsible Bidder.

D. The Owner, before making an award, may require any Bidder, upon at least three (3) days request, to present evidence, in form to be specified by the Owner, of such Bidder's experience, qualifications, financial ability, and other matters reasonably related to such Bidder's ability to perform and complete the work covered by such Bidder's proposal. Attached is an AIA 305 Contractor’s Qualification Statement, to be completed in its entirety.

E. The Owner, except to the extent required by Pennsylvania law, shall not be obligated to make an award, if an award is to be made, to the lowest Bidder, or to any other Bidder.

#26-016.01 IB - 5

INSTRUCTIONS TO BIDDERS IB-5

F. The work to be done under the Contract for which bids are invited is public work which is subject to various qualifications and restrictions. It is therefore expressly understood and agreed to by each Bidder

(Contractor) that, notwithstanding any other provisions of the Contract Documents, the Owner may at any time cancel any award made by it or cancel any contract entered into with the Bidder, without liability to the Bidder, at any time before the Bidder has been directed to begin and has not actually begun work under the Contract. The Bidder shall have the right similarly to cancel the contract without further obligation, if such Bidder has not received notice to proceed within sixty days following such Bidder's tender of executed

Contract Documents in satisfactory form, but only upon such Bidder's giving fifteen days' prior written notice to the Owner, and the Architect, by registered mail, of such Bidder's intentions to exercise such right if notice to proceed is not given by the expiration of the sixty day period.

SECTION 7 - CONTRACT BONDS & OTHER PRE-CONTRACT REQUIREMENTS

A. Before any contract is awarded to the Contractor for the contemplated work, the Bidder, when notified at the address set forth in such proposal, shall furnish and pay for contract bonds, in the forms bound herewith, and in accordance with Sections 756 and 757 of the Public School Code of 1949, as amended, and the Public Works Contractors Bond Law of 1967, of the Commonwealth of Pennsylvania, conditioned as follows:

1. For faithful performance and maintenance of the contract as designated in the Performance Bond for a period of two years following final completion of all portions of the work.

2. For payment of laborers and materialmen as designated in the Labor and Material Payment

Bond.

B. The stated principal amounts applicable to the Contract Bond required under Section 7, shall be as follows:

1. For Labor and Material Payment Bond, One-Hundred (100%) percent of the amount of the award.

2. For Performance Bond, One-Hundred (100%) percent of the amount of the award.

C. The Contract Bonds required in Section 7 shall have as surety thereon a corporation duly authorized to conduct business in Pennsylvania which is satisfactory to the Owner. The bonds shall be provided by a surety with an A.M. Best rating of "A-" (A minus) or better.

D. The Contract Bonds required in Section 7, shall be executed by or on behalf of the successful Bidder, as principal, in the following manner:

1. If the successful Bidder is an individual, the Contract Bonds shall be executed by such Bidder, personally; such Bidder's signature shall be witnessed and any trade name employed in the conduct of business shall be stated.

2. If the successful Bidder is a partnership, the Contract Bonds shall be executed, in the name of the partnership, by each of the partners and the signature of the partners shall be witnessed.

3. If the successful Bidder is a corporation, the Contract Bonds shall be executed in the name of the corporation: (1) by the president or vice-president and attested by the secretary or assistant secretary, and the corporate seal shall be attached; or (2) by a duly authorized agent of the corporation whose authority to act, as of the date of the Contract Bonds, shall be established by proof satisfactory to the Owner, attached to the Contract Bonds.

E. The Contract Bonds required in Section 7, shall be executed in behalf of the surety in such manner as shall legally bind the surety. Proper power of attorney evidencing the authority of such agent or agents shall be attached to the Contract Bonds. Such power of attorney shall bear the same date as the Contract Bonds to, which it is attached.

F. The Contractor shall comply with the Public Works Employment Verification Act and, as a precondition of the Contract, shall submit the Public Works Employment Verification Form to the District along with its bonds, insurance certificates and form of contract. This form is available through the Pennsylvania State website at:

#26-016.01 IB - 6

INSTRUCTIONS TO BIDDERS IB-6

https://www.dgs.pa.gov/Businesses/Materials%20and%20Services%20Procurement/Public-Works-

Employment-Verification/Documents/Public%20Works%20Employment%20Verification%20Form.pdf

Use the above link for ‘Public Works Employment Verification Form’.

SECTION 8 - EXECUTION OF CONTRACT & COMMENCEMENT OF WORK

A. The successful Bidder to whom an award shall be made by the Owner will be notified in writing of the award, which notice of the award shall be directed to such successful Bidder at the address appearing in such Bidder's proposal. However, in accordance with the Public Works Contractors' Bond Law of 1967, of the Commonwealth of Pennsylvania, the Bidder will be required to furnish the specified Contract Bonds on the forms bound herewith prior to receiving the award. Bonds will become binding upon the award of the

Contract.

B. Within ten (10) days of delivery of the notice of award to any successful Bidder as provided in Section 8, the successful Bidder shall execute and deliver to the Owner the Agreement in the form furnished by the

Owner, and shall deliver to the Owner proper evidence of the effectiveness of insurance coverage required by the Supplementary General Conditions bound herewith.

C. Failure of the Bidder to furnish Contract Bonds in accordance with the Contract Documents and to comply with Section 8, or within such extension of time, if any, as provided for by the Owner, in its sole discretion, shall constitute a default by the Bidder under the proposal. The Owner thereafter either may make an award to the next lowest responsible Bidder, to be determined by the Owner in its sole discretion, or advertise for new proposals and make an award on the basis thereof. The Owner may charge against such initial Bidder the difference between the amount of the proposal, as accepted by the Owner, and any higher amount for which the required work shall be contracted for by the Owner, together with any additional advertising costs, architect's fees, legal fees, and any and all other fees and expenses incurred by the Owner as a result of such default by the Bidder. These charges shall be irrespective of whether such difference shall exceed the amount of proposal guaranty submitted with the proposal.

D. The Agreement referred to in Section 8, shall be executed by or on behalf of the successful Bidder in the same manner as is provided in Section 7, with respect to the Contract Bonds.

E. Commencement of the Work: The successful Bidder, upon notice to proceed by the Owner shall immediately begin to generate shop drawings, submittals and ordering materials due to the nature of the school schedule and the construction schedule.

The intent of the District is to award the contract in late November 2026 with an anticipated site mobilization of June 21, 2027. This long lag-time is designed to provide adequate opportunity for the

Contractor to process, order and receive all materials for the work in advance of the mobilization date.

SECTION 9 - NOT USED

SECTION 10 - RESPONSIBILITY OF BIDDER

A. Each Bidder before submitting a proposal, shall visit the site of the proposed work and shall be held responsible for having observed and ascertained all visible conditions, which may be encountered in the performance of the work, inter alia, location, general conditions and terrain, accessibility, existing objects and structures, the character and extent of work, if any, then in progress, conditions with respect to adjacent properties and the nature of the neighborhood. Likewise, before submitting a proposal, the Bidder shall become familiar, to the extent possible, with labor conditions, which may affect the performance of the work.

https://www.dgs.pa.gov/Businesses/Materials%20and%20Services%20Procurement/Public-Works-Employment-Verification/Documents/Public%20Works%20Employment%20Verification%20Form.pdf https://www.dgs.pa.gov/Businesses/Materials%20and%20Services%20Procurement/Public-Works-Employment-Verification/Documents/Public%20Works%20Employment%20Verification%20Form.pdf

#26-016.01 IB - 7

INSTRUCTIONS TO BIDDERS IB-7

B. The submission by any Bidder of a proposal shall constitute conclusive evidence of compliance by such

Bidder with Section 10. Any claims at any future time for labor, equipment or materials required, or for difficulties encountered, which could have been foreseen had the Bidder so complied with Section 10, will not be recognized by the Owner.

C. Each Bidder shall carefully examine all documents and materials bound herewith or related hereto, together with all appropriate bulletins or addends. Such documents shall include, inter alia, the Notice to Bidders, these Instructions to Bidders, the Bid Form (as incorporated on PennBid), the Form of Bid Bond, the Forms of Contract Bonds, the Description of Alternates, the General Conditions, the Supplementary General

Conditions, the Drawings, the Technical Specifications, and appropriate Bulletins or Addenda. The submission by any Bidder of a proposal shall constitute conclusive evidence that the Bidder has become satisfied as to the conditions to be encountered, as to the character, quality and quantities of work to be performed and materials to be furnished and as to the requirements of the documents hereinbefore mentioned in this Paragraph C; and no allowance or concession will be made by the Owner, at any time, for lack of such information on the part of the Bidder if that Bidder's proposal subsequently shall be accepted by the Owner.

SECTION 11 - CHANGE PRIOR TO OPENING OF PROPOSALS

A. During the period allowed for the preparations of bids, the Architect may furnish to prospective Bidders bulletins or addenda setting forth additions to or alterations of the Contract Documents. The Bidder in the computation of such Bidder's proposal shall include the additions or alterations. The bulletins or addenda shall become a part of the Contract Documents.

B. It shall be the duty of each prospective Bidder (and any of such Bidder's subcontractors) to ascertain what bulletins and/or addenda, if any, have been promulgated by the Architect which may affect the work to be covered by the proposal of such prospective Bidder and to incorporate that work into the bid.

C. If any prospective Bidder shall be in doubt as to the true meaning or intent of any part of the Contract

Documents, the Bidder may submit a request, in writing, for an interpretation. Any request for such an interpretation shall be delivered to the Architect at least six (6) days prior to the date fixed in the Notice to

Bidders bound herewith as the date fixed for receiving, opening, and reading proposals. Any such interpretation will be made only by a bulletin or addenda promulgated by the Architect as provided in

Section 11.

D. The Owner and the Architect shall not be responsible for explanation or interpretations other than contained in bulletins or addenda promulgated as provided in this Section 11. Oral interpretations or explanations shall not be binding upon the Owner or Architect.

E. Failure of any Bidder to receive any bulletin or addenda as provided for in this Section 11 shall not relieve such Bidder from the obligation of such Bidder's proposal.

F. Any addenda promulgated by the Architect will be acknowledged, by the Bidder, in the appropriate place on the Bid Form (as incorporated on PennBid)

SECTION 12 - TIME OF COMPLETION: EXTENSIONS OF TIME

A. The work to be performed shall be commenced by the Contractor, to the extent possible, as covered in the

Contract Documents, within ten (10) days after delivery of a notice to proceed, in writing, by the Owner or the Architect. The nature of the project is such that the time shall be critical. The Prime Contractors and all sub-contractors shall cooperate with each other and shall coordinate their activities and work so that the entire program of construction can be completed on or before August 18, 2027.

#26-016.01 IB - 8

INSTRUCTIONS TO BIDDERS IB-8

1. NOTE: Contractors are notified that any work that occurs on or after August 18, 2027, including scheduled work and regardless of the reason, shall be performed on Second Shift, and between the hours of 3:30 pm and 11:00 pm, or third shift at no additional cost to the Owner.

SECTION 13 - DOCUMENTS

A. Sets of plans, Specifications, and other documents constituting the Contract Documents and requirements for bidding may be obtained at no cost on PennBid.

B. Any contractor with whom the Owner shall enter into a contract shall be entitled to receive a digital PDF set of plans, Specifications and other documents constituting the Contract Documents related to the work to be performed under such contract, without charge.

C. All plans, Specifications, and other documents constituting the Contract Documents are the property of the

Architect and must be returned.

D. The Contract Documents furnished to the Bidders are as follows:

1. Specifications: Bid Package 1 - HVAC Renovations and Upgrades at BES, DES, NEES, VFMS, CHS & WVAB - Specifications

2. Drawings are as follows:

See Sheet A001 on Bid Package 1 - HVAC Renovations and Upgrades at BES

See Sheet A001 on Bid Package 1 - HVAC Renovations and Upgrades at DES

See Sheet A001 on Bid Package 1 - HVAC Renovations and Upgrades at NEES

See Sheet A001 on Bid Package 1 - HVAC Renovations and Upgrades at VFMS

See Sheet A001 on Bid Package 1 - HVAC Renovations and Upgrades at CHS

See Sheet A001 on Bid Package 1 - HVAC Renovations and Upgrades at WVAB

SECTION 14 -INSPECTIONS & TESTING

A. The Owner will engage testing agencies. Each Prime Contractor required to coordinate with Inspection agencies.

B. Refer to General Requirements Section 10 for additional information.

SECTION 15 - INSURANCE

A. Reference is made to the Supplementary General Conditions bound herewith for provisions relating to public liability, property damage, workmen's compensation, fire and extended coverage and other insurance which shall be provided and maintained during the period of performance under the Contract. The

Contractor shall comply with applicable requirements before commencing any work under the Contract, and, as proof of such compliance, shall deliver to the Owner proper certificates or memoranda.

SECTION 16 - SUBSTITUTIONS

A. All proposals must be based upon equipment and materials as specified or drawn, see Section 23 -

Standard of Quality, in this Instructions to Bidders.

B. If a Bidder wishes to substitute an alternative material or product other than that specified or drawn, the

Bidder must adhere to the following:

1. Any requested substitution must be submitted to the Architect by the deadline note in Section 1, so the substitution can be reviewed, and the appropriate notification can be made to all other bidders.

#26-016.01 IB - 9

INSTRUCTIONS TO BIDDERS IB-9

2. All proposed substitutions must state the product to be substituted and where in the project it will be furnished. The proposed product literature, drawings, specifications and documents must contain the comparable information as was listed in the Specifications and Drawings for the product required by the Contract Documents. This is to enable a direct comparison to the specified product.

3. The Bidder bears the responsibility to furnish the same information as is provided in the Contract

Documents. If the information is found to be unclear by the Architect, the Bidder will be required to furnish a sample by the deadline note in Section 1.

4. The Bidder must also provide a list of installations where the proposed product was used, in a similar installation to this project by the deadline note in Section 1.

C. It should be understood that the above requirements are to clarify, prior to the time of bidding, whether the proposed alternative is in fact equal to that specified. This process is also intended to allow enough time for the other bidders to be notified of any additionally accepted items. If the above conditions are not met the Bidder will be responsible to furnish the specified items.

SECTION 17 - DETAILED COST BREAKDOWN

A. The Contractor, within ten days of the notice of award, shall submit to the Architect for approval a detailed cost breakdown, utilizing AIA Document G703-1992, the total of which shall equal the full amount of the contract (including materials, labor, overhead & profit). Failure of the Contractor to submit an approved, detailed cost breakdown, in the time stated above, will result in withheld payments on requisitions.

1. Such breakdown shall separate, for each product or material, the cost for material from the cost for labor.

SECTION 18 - COMPETENT WORKMEN

A. According to Section 752 of the Public School Code of 1949, no person shall be employed to do work under such Contract except competent and first class workmen and mechanics.

1. No workmen shall be regarded as competent first class, within the meaning of this Act, except those who are duly skilled in their respective branches of labor, and who shall be paid not less than such rates of wages and for such hours work as shall be established and current rates of wages paid for such hours by employers of organized labor in doing of similar work in the district where work is being done.

SECTION 19 - PAYMENTS

A. Reference is made to the General and Supplementary General Conditions bound herewith for provisions with respect to payments to contractor.

B. Application for Payment Forms: Contractors must utilize AIA Document G702-1992 and G703-1992 as form for Applications for Payment.

C. Draft Application for Payment (“Pencil Copy”) G702 andG703 to be submitted by the 25 th day of the month, projecting through the end of the month, for review by the Architect. Upon approval of Draft, Contractors may submit notarized application and additional required documentation.

SECTION 20 - OCCUPATIONAL SAFETY AND HEALTH ACT REQUIREMENTS

A. The contractors shall comply with all requirements of the Occupational Safety and Health Act of 1970

(OSHA), along with any amendments thereto.

#26-016.01 IB - 10

INSTRUCTIONS TO BIDDERS IB-10

SECTION 21 - PROVISIONS FOR THE USE OF STEEL AND STEEL PRODUCTS

MADE IN THE U.S.A.

A. In accordance with Act 3 of the 1978 General Assembly of the Commonwealth of Pennsylvania, if any steel or steel products are to be used or supplied in the performance of the Contract, only those produced in the United States of America as defined therein shall be used or supplied in the performance of the Contract or by any subcontractors thereunder.

B. In accordance with Act 161 of 1982, cast iron products shall also be included and produced in the United

States of America. Act 141 of 1984, further defines "steel products" to include machinery and equipment.

The act also provides clarifications and penalties.

C. Written and verifiable confirmation of compliance with the requirements of this Section must be furnished to the Architect upon request.

SECTION 22 - HUMAN RELATIONS ACT

A. The provisions of the Pennsylvania Human Relations Act, Act 222 of October 27, 1955 (P.L. 744) (43 P.S.

Section 951, et. seq.) of the Commonwealth of Pennsylvania prohibit discrimination because of race, color, religious creed, ancestry, age, sex, national origin, handicap or disability, by employers, employment agencies, labor organizations, contractors and others. The Contractor shall agree to comply with the provisions of this Act, as amended, that is made part of this Specification. Attention is directed to the language of the Commonwealth's non-discrimination clause in 16 PA. Code 49.101.

SECTION 23 - STANDARD OF QUALITY

A. The various materials and products specified in this Specifications by name or description are given to establish a standard of quality and of cost for bid purposes. It is not the intent to limit the bidder, the bid, or the evaluation of the bid to any one material or product specified, but rather to name or describe it as the absolute minimum standard that is desired or acceptable. Where proprietary names are used, whether or not followed by the words "or alternatives of the quality necessary to meet the specifications", they shall be subject only as approved by the Architect. A bid containing an alternative which does not meet the specifications may be declared non-responsive. A bid containing an alternative may be accepted but, if an award is made to that bidder, the bidder will be required to replace any alternatives which do not meet the specifications. See Section 16- Substitutions, of these Instructions to Bidders.

SECTION 24 - REQUIREMENTS OF ANTI-POLLUTION LEGISLATION

A. On October 26, 1972, House Bill number 1969 was enacted into law. This Act (No. 247) became effective on November 25, 1972. It requires that Bidders on construction contracts for the Commonwealth of

Pennsylvania be advised of those provisions of Federal and State statutes' rules and regulations dealing with the prevention of environmental pollution and the preservation of public natural resources that affect the project on which bids are being received.

B. The Bidder shall become thoroughly acquainted with the terms of the statutes, rules, and regulations enumerated in this notice, and shall, in such Bidder's bid, price all costs of complying with the terms of the listed statutes, rules, and regulations. No separate or additional payment will be made for such compliance. In the event that the listed statutes, rules, and regulations are amended, or if new statues, rules, and regulations become effective, after date of receipt of bids, upon the receipt of documentation which causes the Contractor to perform additional work, the Owner may issue a change order request setting forth the additional work that must be undertaken. This change order request shall not invalidate the contract.

#26-016.01 IB - 11

INSTRUCTIONS TO BIDDERS IB-11

C. It is the responsibility of each contractor to determine what local ordinances, if any, will affect the work.

The Contractor shall check for any county, city, borough, or township rules or regulations applicable to the area in which the project is being constructed, and in addition, for any rules or regulations of other organizations having jurisdiction, such as chambers of commerce, planning commissions, industries, or utility companies who have jurisdiction over lands which the Contractor occupies. Any costs of compliance with local controls shall be included in the prices bid, even though documents of such local controlling agencies are not listed herein. Each contractor is hereby directed to comply with all applicable

Federal, local, and Pennsylvania statutes and regulations administered by the Department of Environmental

Resources.

SECTION 25 - PENNSYLVANIA PREVAILING WAGE RATES

A. This regulation and the general Pennsylvania prevailing minimum wage rates, (Act 422 of 1961, P.L. 987, amended), as determined by the Secretary of Labor and Industry, which shall be paid for each craft or classification of all workers needed to perform the Contract during the anticipated term therefor in the locality in which public work is performed, are made part of this Specification.

B. Published rates for this Work are bound into this Specification. All questions regarding wage rates, classifications and documentation shall be directed to the Prevailing Wage Division, 717-705-5969, or 800-

932-0665.

SECTION 26 - ASBESTOS & LEAD

A. No A.C.B.M. (asbestos-containing building materials) or A.C.M. (asbestos-containing materials) will be permitted to be used for the construction of this project.

B. No lead based pipes, solder, or paint shall be used.

SECTION 27 - APPLICATION BACKGROUND CHECKS REQUIRED BY ACT 34.F 1985, ACT 151

1994, ACT 114 2006, AND PDE

A. All persons working on a regular basis at the project will be required to submit proof of satisfactory

Pennsylvania and FBI criminal background checks required by Section 111 of the Pennsylvania Public

School Code. Satisfactory certifications/clearances must be dated no earlier than one year prior to the date presented to the District and are required before workers are permitted on site. Costs to obtain these clearances will be paid by the Contractor.

1. Procedures for obtaining the FBI Federal criminal history report can be found at:

http://www.identogo.com

For Act 114, Contractors MUST select the PDE clearance (PA Department of Education).

Contractors must submit proof of application within 5 days of Award of Bid.

B. Satisfactory clearances required by Act 34.F of 1985 Criminal Record Check, and by Act 151 of 1994

Child/Student Abuse Reporting/Clearance, which amended the Department of Welfare's Child Protective

Services Law, must be submitted by the Prime Contractor. Contractors must comply with both Act 34.F and Act 151, and supply background checks on all personnel, including sub-contractors and their employees. Satisfactory clearances must be dated no earlier than one year prior to the date presented to the

District and are required before workers are permitted on site. Costs to obtain these clearances will be paid by the Contractor. Contractors shall note that clearances for Pennsylvania Clearances can take up to 4 weeks to obtain.

1. Procedures for obtaining the Pennsylvania criminal background check (Act 34.F) can be found at:

#26-016.01 IB - 12

INSTRUCTIONS TO BIDDERS IB-12

http://epatch.state.pa.us/Home.jsp

2. Procedures for obtaining the child abuse clearance (Act 151) can be found at:

http://www.compass.state.pa.us/CWIS

C. In addition, all persons working on the project will be required to sign form PDE-6004 (9/1/2011), ARREST CONVICTION AND CERTIFICATION FORM (Act 24). The signed form must be sent to the school district with the above three clearances. Furthermore, Form PDE-6004 must be re-submitted to report any new arrest or conviction for any of the prohibited offenses listed on the form within seventy-two

(72) hours of an arrest or conviction.

1. Procedures for obtaining the arrest conviction and certification form (Act 24) can be found at:

http://www.education.pa.gov/Documents/Teachers-

Administrators/Background%20Checks/Arrest%20or%20Conviction%20form.pdf

SECTION 28 - LIQUIDATED DAMAGES

A. Each Contractor shall be liable, and shall pay to the Owner as fixed, agreed, and liquidated damages, the following sums for each calendar day (Sundays and holidays included), which the actual time of Final completion shall be delayed beyond the time for Final completion set forth in Section 12 of these

Instructions to Bidders.

Contract Damages/Day

General Construction $ 1,000.00

Mechanical Construction $ 1,000.00

Plumbing Construction $ 1,000.00

Electrical Construction $ 1,000.00

Site Mobilization: June 21, 2027

Project Final Completion: August 18, 2027

SECTION 29 - CASH ALLOWANCES

A. No cash allowances for any purposes are included in the Specifications of this project.

SECTION 30 - PENNSYLVANIA SALES TAX EXEMPTION

ARTICLE 22 - STATE SALES TAX

A. The Owner is exempt (excluded) from sales or use tax in Pennsylvania on certain transactions. The

Contractor and all subcontractors shall bid and shall purchase as exempt (excluded) from Pennsylvania sales and use tax all tangible personal property within the definition of "building machinery and equipment" as that term is defined in Act No. 45-1998, Exhibit "A" below and made a part hereof is a true and correct copy of that portion of such Act, which defines the term "building machinery and equipment."

In order to facilitate such purchases free of sales and use tax in Pennsylvania, the Owner agrees to execute a certification prepared by the Contractor or a subcontractor as may be required by the regulations of the

Pennsylvania Department of Revenue. A sample certificate, "Pennsylvania Exemption Certificate", is included in this Specification.

B. The Owner may be entitled to claim refunds of sales or use tax paid on other purchases of tangible personal property required in connection with the Work. The Contractor and all subcontractors hereby assign to the

Owner all rights to claim any such refund claim and to any resulting refund and hereby appoint the Owner as their attorney-in-fact to execute and to acknowledge in their respective names and to prosecute such refund claims before administrative agencies and courts in Pennsylvania having jurisdiction over such http://epatch.state.pa.us/Home.jsp http://www.compass.state.pa.us/CWIS http://www.education.pa.gov/Documents/Teachers-Administrators/Background%20Checks/Arrest%20or%20Conviction%20form.pdf http://www.education.pa.gov/Documents/Teachers-Administrators/Background%20Checks/Arrest%20or%20Conviction%20form.pdf

#26-016.01 IB - 13

INSTRUCTIONS TO BIDDERS IB-13

claims. The Owner or its agent shall have the right at the Owner's expense to review the books and records of the Contractor and all subcontractors for the purpose of documenting and substantiating any such refund claim. The Contractor and all subcontractors shall cooperate fully with the Owner in pursuing any such refund claim and shall make available to the Owner any applicable documents.

C. Access to Accounting Records: The Contractor shall check all materials, equipment, and labor entering into the Work, and shall keep such full and detailed accounts as may be necessary for proper financial management under this Agreement, and the system shall be satisfactory to the Owner. The Owner or its representative shall be afforded access to all the Contractor's records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to this Contract, and the Contractor shall preserve all such records for a period of three (3) years, or for such longer periods as may be required by law, after the Final Payment (as defined in the General Conditions, Article 9, "Payments and

Completion").

D. Contractors with Subcontractors: The Contractor agrees to include the "Access to Accounting Records" and "Assignment of Refund Rights" paragraphs, in full in any contracts with subcontractors. The

Contractor further agrees that it will not file a claim for refund for any sales or use tax which is the subject of the assignment in paragraph B above. The Contractor shall obtain from all subcontractors similar agreements that they will not file claims for refund for any sales or use tax which is the subject of the assignment…