This Addendum No. 01, issued October 19, 2026, by Heckendorn Shiles Architects, provides clarifications, interpretations, corrections, and modifications to the Contract Documents for Bid Package #1 – HVAC Renovations and Upgrades at six facilities within the Tredyffrin/Easttown School District (TESD): Beaumont Elementary School (BES), Devon Elementary School (DES), New Eagle Elementary School (NEES), Valley Forge Middle School (VFMS), Conestoga High School (CHS), and West Valley Administration Building (WVAB). The project scope includes mechanical equipment replacement, domestic hot and cold-water piping, electrical panel replacement, and building automation controller upgrades. The addendum addresses 21 general questions, 1 architectural clarification, 1 electrical clarification, with revised drawings E001 (lighting fixture schedule), E202 (lighting layout and switches), and A110 (construction details) provided as attachments. The anticipated notice to proceed is early December 2026, with construction scheduled from June 21, 2027, through August 18, 2027. No field work is required before June 21, 2027, and each building will have designated security check-in locations for contractor access. Bids were due electronically by 2:00 P.M. on Tuesday, October 27, 2026, via PennBid.

Key clarifications in the addendum include that TESD will submit for and pay all Township building permits, while prime contractors are responsible for scheduling and obtaining inspections; the Mechanical Contractor serves as the prime coordinator responsible for coordinating all trades; the two-year performance bond requirement applies following substantial completion; the 233116 Pre Manufactured Exterior Ducting scope includes a required 20-year warranty; and Tri-M Group LLC is the required building automation system (BAS) contractor. Fire alarm system providers are identified by facility (Keystone Fire Protection Company for CHS and VFMS with Notifier systems; Johnson Controls with Simplex for NEES; no fire alarm work at BES). The addendum confirms that no 231433 Facility Natural Gas Piping scope is required, provides fixture counts for plumbing system disinfection (52 sinks/lavatories, 4 mop sinks, 36 water closets, 10 urinals, 4 drinking fountains), specifies maximum opening dimensions at NEES concrete walls, and provides roof warranty information (BES Section A: Firestone roof installed 2008 with current warranty; CHS Section I: Carlisle roof installed 2003, out of warranty). Proposal guaranties of 10 percent are required for General Construction, Mechanical Construction, Electrical Construction, and Plumbing Construction categories. All contract documents and bid forms are available for download through PennBid at no cost.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TESD – Bid Package #1 – HVAC Renovations and Upgrades at

BES, DES, NEES, VFMS, CHS & WVAB

ADDENDUM NO. 01

Heckendorn Shiles Architects October 19, 2026

Addendum No. 01 Page 1 of 4

ADDENDUM NO. 01

This Addendum is a summary of clarifications, interpretations, corrections and/or modifications to the Contract Documents for the Bid Package #1 – HVAC Renovations and Upgrades at BES, DES, NEES, VFMS, CHS & WVAB prepared by Heckendorn Shiles Architects.

The changes, revisions, modifications, deletions and additions referenced in this Addendum shall supercede and supplement all portions of the Drawings and Specifications, including any previously issued Addenda with which they conflict. All provisions of previously executed Contract Documents not modified by information contained in this Addendum remain in effect.

General

1. Question: For Bid Bond Purposes can you please provide the overall project value? As well as, estimated contract values for each prime contract?

Response: The project budget is not provided, nor is it broken out by trades.

2. Question: Per Sheet E301 there appears to be 1ea Type C1 Light Fixture and Per Detail 2/E401 there appears to be 2ea type A1 Lighting Fixtures. However, there does not appear to be a lighting fixture schedule. Please provide a lighting fixture schedule for these fixtures.

Response: Refer to revised drawing E001 for lighting fixture schedule.

3. Question: Can you please provide the POC and/or company information for the Fire Alarm System at each building (BES/CHS/NEES/VFMS)?

Response:

• BES: No fire alarm work associated with this school

• CHS: Notifier, Keystone Fire Protection Company

• NEES: Simplex, Johnson Controls

• VFMS: Notifier, Keystone Fire Protection Company

4. Question: Is the Maintenance Term 1 year as noted in Article 12 of the General Conditions, or 2 years as noted in the Summary of Work?

Response: As stated in section 7 in the Instructions to Bidders, a two year performance bond is required following substantial completion.

5. Question: 231433 Facility Natural Gas Piping - This section is listed in the table of contents but is missing from the PDF. Issue it or confirm it does not apply, and define Mechanical versus Plumbing gas piping scope.

Response: There is no 231433 Facility Natural Gas Piping scope required for this project for mechanical or plumbing.

6. Question: 233116 Pre Manufactured Exterior Ducting - This section is in the PDF but omitted from the table of contents. Confirm it applies; clarify Techna-Duc/PTM, Thermaduct, Kingspan KoolDuct, and the 20-year warranty.

Response: The 233116 Pre Manufactured Exterior Ducting is part of the project scope. The 20-year warranty is required per contract specifications.

7. Question: Confirm who applies for and obtains the Township building permit, who pays its fee, and whether Mechanical must include a separate mechanical permit.

ADDENDUM NO. 01

Addendum No. 01 Page 2 of 4

Response: As per the specifications, TESD will submit for and pay for all Township building permits. Prime contractors are responsible for scheduling and obtaining inspections.

8. Question: Confirm whether Mechanical or General Construction prepares, maintains, and distributes the final master schedule and weekly updates.

Response: As stated in the specifications, the Mechanical Contractor is the prime coordinator responsible for coordinating all trades.

9. Question: Provide each building’s access, shutdown, and work windows, substantial-completion milestones, and any field work required before June 21, 2027 Response: As stated in the specifications, the anticipated notice to proceed date is in early December and the construction timeline is from June 21, 2027 – August 18, 2027. Refer to the General Requirements in the specifications for information on shutdown, work windows, etc. Each building will have a security check-in location for access. No field work is required before June 21, 2027.

10. Question: The Instructions require bids on the PennBid bid form, but the form is not currently visible to

us. Please post the form and advise when it will be available to bidders.

Response: All forms necessary for submitting a bid proposal are available for download via PennBid

11. Question: Please identify all required Mechanical bid price fields, alternates, allowances, and attachments, and confirm whether separate forms are provided for the Mechanical and Plumbing prime contracts.

Response: The Mechanical contractor is required to provide a bid proposal for the base scope of work, which includes a breakout of the value of controls work by the districts assigned vendor (Tri-M Group).

Refer to PennBid for all necessary bid forms. If bidding more than one prime contract, contractors must submit all items for both contracts.

12. Question: Can you please provide the prebid Sign-In sheets?

Response: The Pre-Bid Sign in sheet will be uploaded to PennBid.

13. Question: Can the Roof types and roof warranty information be provided for the schools?

Response: Roof types and warranties below:

BES Section A – Firestone – Installed 2008, currently warranted CHS Section I – Carlisle – Installed 2003, currently out of warranty

14. Question: At NEES, Sheet S102, is there going to need to be some type of lintel on the concrete wall at the new opening? A new steel angle brick shelf is shown, but no wall support on the concrete wall behind it.

Response: The existing concrete wall has sufficient reinforcing steel in it to allow for a maximum 4’-6” wide x2’-2” high opening with the top of opening about 2’-6” down from the underside of slab. The actual opening width should suit the ductwork, but 4’-6” is the maximum that it can be. It is also important that the opening corners are not overcut. The corners need to be cored or otherwise cut so that the cut does not extend past the corners so that wall rebar is not cut outside the opening. A note not to overcut the corners is part of Section 2/S102.

15. Question: Is sterilizing the entire school required after completing the plumbing work? If so, please provide a fixture count.

ADDENDUM NO. 01

Addendum No. 01 Page 3 of 4

Response: Yes, the entire domestic water system requires cleaning and disinfection after cleaning plumbing work per contract specifications. Assume the following fixture counts for bidding purposes: 52 sinks/lavs, 4 mops sinks, 36 water closets, 10 urinals, 4 drinking fountains

16. Question: Drawing E202, "KEYED NOTE" (3), regarding New Switching. We Offer the Following for Details and/or Clarification: 1.) On E001, "Symbol Legend" there are several Type Switches shown. Please specify what Type Switch should be used for this particular installation. 2.) Are ALL Existing Fixtures currently wired for Dimming Control? Nothing has to be done to the Existing Fixtures, correct? 3.) Are ALL Fixtures being controlled from the (1) location as shown? 4.) It appears that there are (4) Switch Legs on Normal and NE Circuitry. How should these be wired at the New Switching? Please provide Switching Detail so that we know how to price with our Vendors Response: Refer to revised drawing E202 for scope of work associated with the library lighting. The existing lights are to remain and do not dim. The lights are currently controlled by low voltage switches that control smart breakers in the panels being demolished. New digital 2 button switches are to be provided.

17. Question: Who is responsible for paying for permits?

Response: As per the specifications, TESD will submit for and pay for all Township building permits. Prime contractors are responsible for scheduling and obtaining inspections.

18. Question: Is there a controls scope or BAS contractor required?

Response: Yes, The Tri-M Group LLC is the required BAS contractor. Refer to specification 230900, 230993 and mechanical contract drawings for requirements.

19. Question: Please supply controls contractor and contact Response: Refer to specification 230900 Section 2.1 for controls contractor and contact information.

20. Question: See Drawing E301. At the Mech. Room it shows a Fixture being replaced with a Type "C1".

Please provide the Specification and/or Part Number for the Type "C1".

21. Question: See Drawing E401. Please provide Specification and/or Part Number for Fixture Type "A1" being installed in the Office.

Architectural

1. Drawing – CHS A110 – Updates to keynotes

Electrical

1. Drawing – E001 Added lighting fixture schedule.

2. Drawing – E202 Modified existing lighting layout and switches. Clarified keyed notes.

Attachments

• DWG A110

• DWG E001

• DWG E202

END OF ADDENDUM NO. 1

T

T

M M

1. REFER TO MEP DRAWINGS FOR ADDITIONAL INFORMATION

CONSTRUCTION PLAN SHEET NOTES

CONSTRUCTION KEYNOTES

1 NEW CONCRETE PAD FOR HEAT PUMP UNIT. GC TO

COORDINATE WITH MC AND EC. REFER TO MEP AND

STRUCTURAL DWGS FOR ADD'L INFO.

2 NEW FENCE WITH GATE. REFER TO STRUCTURAL DWGS

FOR ADD'L INFO.

3 NEW ACT CEILING TILES AND GRID.

4 GC TO PAINT ALL NEW EXPOSED DUCTWORK TO MATCH

CEILING.

5 GC TO INSTALL NEW CLEAR ANODIZED ALUMINUM

LOUVER IN OPENING CREATED FROM EXISTING

WINDOW. PROVIDE NECESSARY FLASHINGS FOR

WEATHER-TIGHT CLOSURE. REFER TO MEP DWGS FOR

ADD'L INFO.

6 NOT USED

7 GC TO PROVIDE PENETRATIONS THROUGH EXTERIOR

WALLS. GC TO SEAL PENETRATIONS AFTER MC AND EC

WORK. REFER TO MEP DWGS FOR ADD'L INFO.

8 GC TO INFILL AND PATCH OPENING AND PAINT WALL TO

MATCH EXISTING.

9 GRADE TO BE PREPARED AND LEVELED FOR NEW

CONCRETE EQUIPMENT PAD. SLOPE/SWALE ADJACENT

GRADE TO DIVERT WATER AWAY FROM PAD AND

BUILDING.

CAFETERIA

GYMANSIUM

B

STG

FAC

DINING

GYMANSIUM

C

GYMANSIUM

A

OFC

MECH

TLT

GIRLS

LOCKER

BOILER

ROOM

CUST OFC

STG

BOYSGIRLS

STG

SCHOOL

STORE

PANTRY

STG

DISH

KITCHEN

BOYS

LOCKER

TEAM

ROOM

TEAM

ROOM

TLT

OFC

8' - 1"

ACT-1

EXTERIORINTERIOR PENETRATION

CAULK ALL SIDES

PENETRATING

OBJECT

MASONRY WALL

DATE ISSUED FOR

H E

C K

E N

D O

R N

S H

IL

E

S A

R C

H

IT

E C

T S e xp re s s ly r e s e rv e s i ts c o m m o n l a w c o p y ri g h t a n d o th e r p ro p e rt y r ig h ts i n t h e s e p la n s

T h e s e a re n o t to b e r e p ro d u c e d n o r a re t h e y t o b e a s s ig n e d t o a n y t h ir d p a rt y w it h o u t fi rs t o b ta in in g t h e e xp re s s e d w ri tt e n c o n s e n t o f

H E

C K

E N

D O

R N

S H

IL

E

S A

R C

H

IT

E C

T S

CLIENT

DRAWING NUMBER

SHEET TITLE

ISSUE HISTORY

PROJECT TEAM

ARCHITECTURAL

Heckendorn Shiles Architects 347 East Conestoga Road Wayne, PA 19087 610-994-3500

OUT OF ARCHITECTURAL SCOPE

PLAN

NORTH

LEGEND

NOT FOR

CONSTRUCTION

/1 /2

:5

:1

A M

A110

VFMS - NEW

CONSTRUCTION FIRST

RCP - LOWER LEVEL

2027 Infrastructure

- Bid Package 1 - HVAC Renovations

Valley Forge Middle School

HSA PROJECT # :26-016.01

Tredyffrin/Easttown School District 940 West Valley Road, Suite 1700 Wayne, PA 19087

(610) 240-1900

Schiller and Hersh Associates, Inc.

636 Skippack Pike, Suit 200 Blue Bell, PA 19422

(215) 886-8947

MEPFP ENGINEER

A.W. Lookup Corporation 500 Fayette Street, Suite 100 Conshohocken, PA 19428' (610)-825-2600

STRUCTURAL ENGINEER

9/23/2026 BID ISSUE

1 10/19/2026 ADDENDUM #01

1" = 20'-0"A110

1 VFMS - NEW CONSTRUCTION OVERALL RCP - LOWER LEVEL

1 1/2" = 1'-0"A110

2 EXTERIOR WALL DETAIL - TYPICAL PENETRATION

FINISH SCHEDULE

TAG MANUFACTURER STYLE COLOR REMARKS

ACOUSTIC CEILING TILE

ACT-1 ARMSTRONG FINE FISSURED ANGLED

TEGULAR #1732

WHITE 24" X 24" X 5/8"

LUMENS WATTS COLOR HOURS @L70 TYPE

A1 LITE CONTROL

APPROVED EQUAL BY

ENGINEER

55L-G-D-24-ASO-WHS-40K-D40-D01-UNV 120/277 4,000 29.2 4000K 50,000 @L90 LED 0-10V DIMMING RECESSED 5 YEARS

2' X 4' HIGH PERFORMANCE RECESSED LED LIGHTING FIXTURE. FIXTURES SHALL HAVE AN ANGLED DIFFUSER SYSTEM WITH DIFFUSED CENTER OPTICS

AND SHALL BE A MAXIMUM OF 4" IN DEPTH.

C1 COLUMBIA

APPROVED EQUAL BY

ENGINEER

MPS4-40LW-CW-EDU 120/277 3,878 27.3 4000K 60,000 @L80 LED 0-10V DIMMING WALL 5 YEARS 4' x 3.11" LED LENSED STRIP LIGHT FIXTURE WITH FROSTED PRISMATIC ACRYLIC LENS AND STEEL HOUSING PAINTED WHITE AFTER FABRICATION.

WARRANTYALTERNATE MANUFACTURER MOUNTING REMARKS

LIGHTING FIXTURE SCHEDULE

LIGHT ENGINE

DRIVER

FIXTURE

TYPE

MANUFACTURER CATALOG NUMBER VOLTS

File details come from the government source that posted it. Updated .