Water System SCADA Improvements - Drawings Summary
This file comprises technical construction drawings for Water System SCADA (Supervisory Control and Data Acquisition) improvements commissioned by the Town of Provincetown, Massachusetts, in coordination with the Town of Truro. The project involves upgrading SCADA infrastructure at two primary sites: the Knowles Crossing Water Treatment Plant and the Paul Daley Well Field. The scope includes installation of new fiber optic cables, patch panels, ethernet switches, serial-to-ethernet converters, and programmable logic controllers (PLCs) across multiple well locations and treatment facilities. The work encompasses pulling new fiber optic cable through existing conduits, removing existing Opto-22 control boards, installing new control panels and mounting hardware, and integrating new network devices to modernize the water system's automation and monitoring capabilities. The drawings establish prerequisites for work commencement, including approval of all network devices, submission and approval of fiber cable pull plans and detailed work plans, on-site availability of spare parts, coordination of system downtime with the owner, and completion of fiber optic cable testing prior to installation.
The contract documents indicate that the contractor bears responsibility for field verification of all existing utilities, site conditions, and infrastructure prior to commencing work, including confirmation of pipe sizes, locations, invert elevations, and materials. The contractor must comply with all applicable OSHA, state, and local safety regulations, obtain required permits, arrange for utility locating services, and manage all dewatering and surface water control. Site access is restricted to designated locations, and the contractor is responsible for restoring all disturbed surfaces to original or better condition, including proper erosion and sediment control measures. The project is subject to Massachusetts environmental requirements, and detailed technical specifications are referenced in contract sections for all materials and installation standards, with the engineer's representative responsible for field review and approval of installations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROVINCETOWN
WELLFLEET
EASTHAM
ORLEANS
CHATHAM
HARWICH
BREWSTER
DENNIS
YARMOUTH
BARNSTABLE
PLYMOUTH
BOURNE
SANDWICH
TRURO
MASHPEE
O
RI
GI
N
AL
D
RA
W
IN
G
SI
ZE
: A
RC
H D
(2 4"
X
6"
TOWN OF PROVINCETOWN, MA PERSONNEL
LOCUS MAP: VICINITY MAP:
TOWN OF PROVINCETOWN, MASSACHUSETTS
WATER SYSTEM SCADA IMPROVEMENTS
DECEMBER 2025
EDR JOB #:24247
P:
\jo bs \h ya \2
P ro vi nc et ow n W at er
S
CA
D A
Sy st em Im pr ov em en ts \C ad \W or ki ng D ra w in gs
\0 1_
Ge ne ra l\2
-G
0.
dw g D at e
Pr in te d:
/1
7/
:0 3:
A
M
TOWN MANAGER
ALEX MORSE
DIRECTOR OF PUBLIC WORKS
JIM VINCENT, P.E.
WATER SUPERINTENDENT
CODY SALISBURY
Environmental Design & Research, Landscape Architecture, Engineering & Environmental Services, P.C.
396 Main Street, Suite 15 Hyannis, MA 02601
P. 508.972.3960
PROJECT LOCUS
NOT TO SCALE
N
NOT TO SCALE
N
KNOWLES
CROSSING WATER
TREATMENT PLANT
PAUL DALEY
WELL FIELD
LEGENDS, ABBREVIATIONS, NOTES AND DRAWING INDEX
AS SHOWN
JJO & SVL
JDF
G001
NEW WORK, EQUIPMENT AND STRUCTURES ARE
SHOWN IN THIS TEXT FORMAT
NEW/EXISTING TEXT IDENTIFIER
CLIENT / SUBCONSULTANT:
CONTRACT NO.
O
RI
GI
N
AL
D
RA
W
IN
G
SI
ZE
: A
RC
H D
(2 4"
X
6"
Environmental Design & Research, Landscape Architecture, Engineering & Environmental Services, P.C.
396 Main Street, Suite 15 Hyannis, MA 02601
P. 508.972.3960
DRAWINGS ISSUED FOR / REVISIONS
NO. DATE ISSUED FOR / REVISION BY
PROJECT TITLE:
PROJECT LOCATION:
CLIENT:
DRAWING TITLE:
P:
\jo bs \h ya \2
P ro vi nc et ow n W at er
S
CA
D A
Sy st em Im pr ov em en ts \C ad \W or ki ng D ra w in gs
\0 1_
Ge ne ra l\2
-G
1.
dw g D at e
Pr in te d:
/1
7/
:0 7:
A
M
CHK
©2025 Environmental Design & Research, Landscape Architecture, Engineering, & Environmental Services, P.C. APP
DRAWING NUMBER:
DRAWN BY:
EDR JOB#:
DATE:
SCALE:
CHECKED BY:
WATER SYSTEM SCADA IMPROVEMENTS
PROVINCETOWN AND TRURO MA.
TOWN OF PROVINCETOWN, MA
2/2026
24247
26-01
2/2026 FOR BIDDING JDF RHK MET
AL ALUMINUM
ACT ACTUAL
APPR APPROXIMATE/
APPROXIMATELY
BC BOTTOM OF CURB
BLDG BUILDING
BM BENCHMARK
BOS BOTTOM OF SLOPE
BS BOTTOM OF STAIR
BW BOTTOM OF WALL
B&B BALLED AND BURLAPPED
CAL CALIPER
CB CATCH BASIN
CF CUBIC FEET
CI CAST IRON
CIP CAST IN PLACE
CIR CIRCLE/CIRCULAR
CJ CONTROL JOINT
CLF CHAIN-LINK FENCE
CLL CONTRACT LIMIT LINE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONT CONTAINER
CONTR CONTRACTOR
CY CUBIC YARDS
DET DETAIL
DIM DIMENSION
DIA DIAMETER
DMH DROP MANHOLE
DWG DRAWING
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
EQ EQUAL
ES END SECTION
EX EXISTING
EXP EXPANSION
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FIN FINISH
FL FLOOR
FOPP FIBER OPTIC PATCH PANEL
FTG FOOTING
FT FOOT/FEET
GA GAUGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GR GUARDRAIL
GV GAS VALVE
HOR HORIZONTAL
HP HIGH POINT
HT HEIGHT
HW HEAD WALL
HWY HIGHWAY
HYD HYDRANT
ID INSIDE DIAMETER
IN INCH/INCHES
INL INLET
INV INVERT
IP IRON PIPE
JB JUNCTION BOX
KC KNOWLES CROSSING
L LENGTH/LONG
LA LANDSCAPE ARCHITECT
LAT LATITUDE
LF LINEAR FEET
LFT LEFT
LIN LINEAR
LP LOW POINT
M METER
MAX MAXIMUM
MCP MAIN CONTROL PANEL
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MG MOUNT GILBOA
MON MONUMENT
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
NUM NUMBER
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OIT OPERATOR INTERFACE
TERMINAL
OP OUTLET PROTECTION
PA PLANTING AREA
PC POINT OF CURVATURE
PD PAUL DALEY
PL PROPERTY LINE
PLC PROGRAMMABLE LOGIC
CONTROLLER
PT POINT OF TANGENT/
PERCOLATION TEST
LOCATION
PVC POLYVINYL CHLORIDE
R RADIUS
RCP REINFORCED CONCRETE
PIPE
REINF REINFORCING
REQD REQUIRED
REV REVISION
ROW RIGHT OF WAY
RT RIGHT
S SOUTH
SAN SANITARY
SECT SECTION
SF SQUARE FOOT
SG SUB GRADE
SH SHEET
SI STORM INLET
SL STREET LIGHT
SPEC SPECIFICATIONS/
SPECIFIED
SQ SQUARE
SS STAINLESS STEEL
STA STATION
STL STEEL
SY SQUARE YARD
T TANGENT
TB TEST BORING
TC TOP OF CURB
TOS TOP OF SLOPE
TS TOP OF STAIR
TW TOP OF WALL
TYP TYPICAL
T&G TONGUE AND GROOVE
UD UNDERDRAIN
USGS UNITED STATES
GEOLOGICAL SURVEY
VAR VARIES/VARIABLE
VCP VITRIFIED CLAY PIPE
VERT VERTICAL
W WEST
WE WATER ELEVATION
WL WALK LIGHT
WV WATER VALVE
WWM WOVEN WIRE MESH
W/ WITH
W/O WITHOUT
YD YARD DRAIN
℄ CENTER LINE
± PLUS OR MINUS
Δ CHANGE IN VALUE
< LESS THAN
> GREATER THAN
ABBREVIATIONS
GENERAL NOTES:
1. REFER TO PROJECT SPECIFICATIONS FOR DETAILED INFORMATION AND COORDINATE
WITH PROJECT DRAWINGS.
2. THE CONTRACTOR SHALL USE THE WRITTEN DIMENSIONS PROVIDED WITHIN THE
CONTRACT DRAWINGS. SCALED DIMENSIONS SHALL NOT BE USED FOR CONSTRUCTION
PURPOSES.
3. THE CONTRACTOR SHALL CONTACT OWNER'S REPRESENTATIVE IMMEDIATELY IF
CLARIFICATION OR INTERPRETATION OF THE CONTRACT DOCUMENTS, OR ANY OTHER
ASPECTS OF THE PROJECT, IS REQUIRED.
4. LEGEND REPRESENTS STANDARD LINE TYPES AND HATCHING UNLESS INDICATED ON
SPECIFIC DRAWINGS.
5. THE ABBREVIATIONS AND SYMBOLS HEREIN ARE STANDARD OF THIS OFFICE AND APPLY
TO A VARIETY OF PROJECTS. ONLY A PORTION OF THEM WILL NECESSARILY APPLY TO
ANY GIVEN PROJECT. SEE THE LISTINGS IN OTHER SECTIONS OF THIS PROJECT FOR
ADDITIONAL SYMBOLS AND ABBREVIATIONS.
6. EDR IS NOT RESPONSIBLE FOR SITE SECURITY AND SAFETY, OR CONSTRUCTION MEANS
AND METHODS.
7. EDR IS NOT RESPONSIBLE FOR THE SEQUENCING OF CONSTRUCTION UNLESS A
SEQUENCE OF CONSTRUCTION IS PROVIDED IN THE CONTRACT DOCUMENTS.
SITE CIVIL NOTES:
1. THE CONTRACTOR SHALL APPLY FOR ALL REQUIRED PERMITS, PAY ALL FEES REQUIRED
BY GOVERNING AGENCIES HAVING JURISDICTION OVER THE FACILITIES AND NATURAL
FEATURES FOUND ON SITE, AND FURNISH COPIES TO THE OWNER PRIOR TO COMMENCING
WORK.
2. THE CONTRACTOR'S WORK AREA SHALL BE CONFINED TO THE CONTRACT LIMIT LINES.
THE CONTRACTOR SHALL OBTAIN ANY ADDITIONAL EASEMENTS OR WORK RELEASES
SHOULD THE CONTRACTOR REQUIRE ADDITIONAL AREA TO ACCOMMODATE HIS
OPERATIONS.
3. SITE ACCESS IS RESTRICTED TO THE LOCATIONS DESIGNATED ON PLAN.
4. THE CONTRACTOR SHALL ADHERE TO ALL OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA), STATE AND LOCAL SAFETY REGULATIONS.
5. CONTRACTOR SHALL PROMPTLY REPORT TO THE OWNER'S REPRESENTATIVE ANY
DISCREPANCIES FOUND ON THE SITE OR IN THE CONTRACT DOCUMENTS FOR REVIEW
AND RESOLUTION BEFORE PROCEEDING WITH THE WORK IN THE AREA IN QUESTION.
PROVIDE FIELD INFORMATION SPECIFIC TO THE DISCREPANCY TO EXPEDITE RESOLUTION.
6. THE BOUNDARY INFORMATION SHOWN ON THIS PLAN WAS BASED ON MassGIS GIS 2024 PARCEL DATA . BACKGROUND IMAGERY OBTIANED FROM Mass GIS 2023 AERIAL IMAGERY.
7. NO SUBSURFACE SOIL INFORMATION WAS OBTAINED ON THIS SITE FOR THIS
CONSTRUCTION.
8. THE START OF ANY ON-SITE CONSTRUCTION INCLUDING STRIPPING TOPSOIL, REMOVING
CUT OR PLACING FILL MATERIAL ESTABLISHES THAT THE CONTRACTOR ACCEPTS THE
CONTRACT DOCUMENTS AS ACCURATELY REPRESENTING THE EXISTING SITE
CONDITIONS.
9. DURING SALVAGE OPERATIONS FOR MATERIAL INTENDED FOR REUSE ON SITE, MATERIAL
MAY BE DAMAGED AND OR NOT SUITABLE FOR REUSE. THE CONTRACTOR SHALL VERIFY
QUANTITY AND QUALITY OF SALVAGED MATERIAL AND NOTIFY THE OWNER'S
REPRESENTATIVE OF ANY DEFICIENCIES.
10. ALL FACILITIES TO BE CONSTRUCTED OR INSTALLED SHALL COMPLY WITH ALL SECTIONS
AND LATEST REVISIONS OF THE REQUIREMENTS OF ALL AGENCIES OF GOVERNMENT
HAVING JURISDICTION.
11. LONG LEAD AND SCARCE MATERIALS SHALL BE ORDERED IN A TIMELY MANNER TO
PREVENT AVOIDABLE CONSTRUCTION DELAYS.
12. THE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE CAUSED BY CONSTRUCTION TO
EXISTING UTILITIES AND FACILITIES WHICH ARE NOT INCLUDED AS PART OF THE INTENDED
WORK. THE CONTRACTOR SHALL REPAIR, RESTORE AND/OR REPLACE ALL DAMAGE TO
THE SATISFACTION OF OWNER'S REPRESENTATIVE AT NO ADDITIONAL COST TO THE
OWNER.
13. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO A CONDITION
EQUAL TO THAT WHICH EXISTED PRIOR TO CONSTRUCTION IN ACCORDANCE WITH
SPECIFICATIONS.
14. THE CONTRACTOR SHALL RESTORE ALL DISTURBED SURFACES TO ORIGINAL OR BETTER
CONDITION INCLUDING 6 INCHES OF TOPSOIL, SEED, FERTILIZER, AND MULCH. OTHER
SURFACES SHALL BE RESTORED AS SHOWN ON THE DETAILS.
15. CONTRACTOR SHALL PROVIDE POSITIVE SITE DRAINAGE DURING CONSTRUCTION
OPERATIONS. ALL FINAL LINES AND GRADES SHALL BE CONSTRUCTED TO MAINTAIN
POSITIVE SITE DRAINAGE TO EXISTING DRAINAGE STRUCTURES.
16. ALL PAVEMENT SHALL BE SAW CUT PRIOR TO RESTORATION.
17. CONTRACTOR SHALL COORDINATE STAGING AREAS WITH OWNER.
18. WHILE EVERY EFFORT HAS BEEN MADE TO IDENTIFY THE ITEMS TO BE DEMOLISHED, IT IS
CONTRACTOR'S RESPONSIBILITY TO REVIEW THE SCOPE OF WORK IN THE FIELD, REVIEW
THESE CONTRACT DRAWINGS, ALL PREVIOUS CONSTRUCTION DRAWINGS / DOCUMENTS
SPECIFICATIONS, AND EXISTING FACILITY PLANS. THE CONTRACTOR SHALL REPAIR ALL
SURFACES AND PLUG ABANDONED PENETRATIONS UPON REMOVAL OF THE DEMOLISHED
ITEMS PER THE SPECIFICATIONS.
19. CONTRACTOR SHALL VISIT AND EXAMINE THE SITE TO FULLY UNDERSTAND ALL THE
CONDITIONS PERTAINING TO THE SCOPE OF WORK, UNDERSTAND DIFFICULTIES TO BE
ENCOUNTERED AND MATERIALS REQUIRED FOR THE COMPLETE INSTALLATION OF THE
WORK SHOWN ON THE DRAWINGS AND OR SPECIFIED AT NO ADDITIONAL COST TO THE
OWNER. THE EXACT LOCATION, CONDITION, SIZE, AND RIM/INVERT ELEVATIONS OF THE
EXISTING PIPING, EQUIPMENT, SERVICES, ETC. SHALL BE FIELD VERIFIED. CONTRACTOR
SHALL MODIFY LAYOUT WITH THE APPROVAL OF THE ENGINEER WHERE REQUIRED TO
CLEAR OBSTRUCTIONS AT NO ADDITIONAL COST TO THE OWNER.
20. CONTRACTOR SHALL CLEAN AND CAMERA EXISTING STORM LINES TO REMAIN, PRIOR TO
CONSTRUCTION AND REPORT FINDINGS TO OWNER'S REP.
21. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS AND MAKE ALL
NECESSARY PROVISIONS FOR PROTECTION OF THE PUBLIC, THE WORKERS AND THE
WORK, AND FOR MAINTENANCE AND PROTECTION OF PEDESTRIAN AND VEHICULAR
TRAFFIC AS REQUIRED BY THE AGENCIES OF GOVERNMENT HAVING JURISDICTION.
22. LOCATE, PROTECT, AND MAINTAIN BENCHMARKS, MONUMENTS, CONTROL POINTS AND
PROJECT ENGINEERING REFERENCE POINTS.
23. COMPLY WITH ALL LOCAL, STATE AND FEDERAL REQUIREMENTS REGARDING MATERIALS,
METHODS OF WORK AND DISPOSAL OF EXCESS AND WASTE MATERIALS.
24. BURNING OF MATERIALS OF ANY DESCRIPTION ON THE SITE IS PROHIBITED.
25. PRIOR TO PERFORMING ANY EXCAVATION WITHIN THE CONSTRUCTION AREA, CONFIRM
WITH DIG SAFELY NEW YORK AT 1-800-962-7962 THAT ALL EXISTING UNDERGROUND
UTILITY LOCATIONS ARE CURRENTLY VERIFIED, OR ARRANGE FOR VERIFICATION.
UTILITIES NOTES:
1. EXISTING UTILITIES (PIPE/STRUCTURE LOCATIONS, SIZES, AND INVERT ELEVATIONS)
SHOWN ON THESE PLANS HAVE BEEN PLOTTED FROM FIELD SURVEYS AND RECORDED
MAPS AND SHALL BE INTERPRETED AS APPROXIMATE ONLY. THE CONTRACTOR IS
RESPONSIBLE FOR DETERMINING AND FIELD VERIFYING ALL EXISTING INFORMATION AT
ALL LOCATIONS IN CLOSE PROXIMITY TO THE UTILITIES AND WORK UNDER
CONSTRUCTION. THIS INFORMATION INCLUDES BUT IS NOT LIMITED TO EXISTING PIPE AND
STRUCTURE SIZES, PIPE AND STRUCTURE LOCATIONS, PIPE SLOPES, STRUCTURE RIM AND
INVERT ELEVATIONS, PIPE MATERIALS AND PIPE CONDITIONS. THIS SHALL INCLUDE PIPE
INVERTS, MATERIALS AND SIZES FOR UTILITIES CONNECTING TO DOWNSTREAM
STRUCTURES. THIS VERIFICATION SHALL BE COMPLETED PRIOR TO THE COMMENCEMENT
OF SHOP DRAWING SUBMITTALS, ORDERING OF MATERIALS, AND THE START OF ANY
REMOVALS FOR THIS PROJECT. ANY PROPOSED MODIFICATIONS TO THE DESIGN SHALL BE
SUBMITTED AS SHOP DRAWINGS INCLUDING BUT NOT LIMITED TO DESIGN DRAWINGS AND
UTILITY PROFILES INCLUDING PIPE AND STRUCTURE LAYOUT, STRUCTURE RIM AND
INVERT ELEVATIONS, AND PIPE SIZES, MATERIALS AND SLOPES.
2. THE OWNER'S REPRESENTATIVE SHALL REVIEW THE LAYOUT OF ALL PAVEMENTS,
UTILITIES, AND PLANTINGS IN THE FIELD BEFORE INSTALLATION. THE CONTRACTOR SHALL
SCHEDULE ADVANCED NOTIFICATION TO THE OWNER'S REPRESENTATIVE TO FACILITATE
TIMELY REVIEW.
3. THE OWNER ONLY SHALL OPERATE EXISTING VALVES AND FIRE HYDRANTS, INCLUDING
NEWLY INSTALLED VALVES AND FIRE HYDRANTS THAT HAVE BEEN PLACED INTO SERVICE.
THE CONTRACTOR IS ADVISED THAT WATERTIGHT CONDITIONS MAY NOT EXIST WHEN
EXISTING VALVES ARE CLOSED.
4. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY EXCAVATION WORK WITHIN 10 FEET
OF UTILITY POLES. THE CONTRACTOR SHALL INCLUDE THE COST OF TEMPORARY POLE
SUPPORT IN THE APPROPRIATE BID ITEM. WHERE UTILITY POLES ARE REQUIRED TO BE
SUPPORTED DURING CONSTRUCTION, THE CONTRACTOR SHALL MAKE ALL NECESSARY
ARRANGEMENTS WITH THE UTILITY COMPANY.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING AND MAINTENANCE OF
SURFACE WATER AND/OR GROUNDWATER ENCOUNTERED DURING THE COURSE OF
WORK.
6. PRIOR TO START OF WORK, THE CONTRACTOR SHALL PROVIDE EXPLORATORY
EXCAVATIONS AND COORDINATE ALL PIPING LAYOUTS WITH THE OWNER'S
REPRESENTATIVE TO ELIMINATE ALL CONFLICTS WITH EXISTING UTILITIES.
7. THE USE OF EXPLOSIVES OF ANY DESCRIPTION ON THE SITE IS PROHIBITED.
8. CONSTRUCTION DEBRIS AND DEMOLISHED MATERIALS SHALL BE REMOVED FROM THE
SITE AT REGULAR INTERVALS AS DETERMINED BY THE OWNER'S REPRESENTATIVE AND
SHALL NOT BE ALLOWED TO ACCUMULATE. EMPLOY APPROPRIATE MEASURES TO
PREVENT LOOSE DEBRIS FROM LEAVING THE CONSTRUCTION AREA.
9. THE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE CAUSED BY CONSTRUCTION TO
EXISTING UTILITIES AND FACILITIES WHICH ARE NOT INCLUDED AS PART OF THE INTENDED
WORK. THE CONTRACTOR SHALL REPAIR, RESTORE AND/OR REPLACE ALL DAMAGE TO
THE SATISFACTION OF UTILITY'S REPRESENTATIVE AT NO ADDITIONAL COST TO THE
OWNER.
10. PERFORM WORK AND PROVIDE ALL MATERIALS NECESSARY TO DISCONNECT OR
RELOCATE EXISTING UTILITIES. COORDINATE WITH THE RESPECTIVE UTILITY COMPANIES
FOR SHUTOFF AND RECONNECTION OF ACTIVE SERVICES. RECORD EXISTING UTILITY
TERMINATION POINTS BEFORE DISCONNECTION.
11. ADJUST THE RIM ELEVATIONS OF EXISTING UTILITY STRUCTURES SCHEDULED TO REMAIN
WITH THE FINISHED GRADE ELEVATIONS.
12. THE CONTRACTOR SHALL MAINTAIN EXISTING SANITARY SEWER AND WATER SERVICES AT
ALL TIMES, EXCEPT DURING APPROVED AND SCHEDULED INTERRUPTIONS. THE
CONTRACTOR SHALL SUBMIT A PROPOSED WORK SCHEDULE AND A DETAILED SANITARY
SEWER BY-PASS PROCEDURE TO THE OWNER'S REPRESENTATIVE FOR APPROVAL. THE
CONTRACTOR SHALL RESTORE GRAVITY SANITARY SEWER SERVICE AT THE END OF EACH
WORKDAY. SHOULD THIS NOT BE POSSIBLE, THE CONTRACTOR SHALL PROVIDE AND
MAINTAIN TEMPORARY BY-PASS PUMPING OPERATIONS UNTIL NORMAL GRAVITY FLOWS
CAN BE RE-ESTABLISHED AT NO ADDITIONAL COST TO THE OWNER.
13. ALL STRUCTURES SHALL MEET THE AMERICAN ASSOCIATION OF STATE HIGHWAY &
TRANSPORTATION OFFICIALS (AASHTO) H20 LOADING REQUIREMENTS.
14. ALL NEW UTILITY LATERALS SHALL BE INSTALLED WITH A MINIMUM 1/4" PER FOOT SLOPE
UNLESS OTHERWISE DIRECTED ON THE DRAWINGS OR IN TECHNICAL SPECIFICATIONS.
15. ALL CATCH BASIN GRATES SHALL INCLUDE THE LETTERING, "NO DUMPING".
16. ALL EXISTING DRAINAGE FACILITIES SHALL BE MAINTAINED FREE OF DEBRIS AND FOREIGN
MATTER AND BE IN OPERATION THROUGHOUT CONSTRUCTION.
17. ALL PROPOSED WATER MAIN PIPING SHALL BE INSTALLED WITH A MINIMUM OF 5-FOOT OF
COVER UNLESS OTHERWISE DIRECTED ON THE DRAWINGS OR IN TECHNICAL
SPECIFICATIONS.
18. THE CONTRACTOR SHALL COORDINATE DIRECTLY WITH THE OWNER FOR THE WYE
DIRECTION (UPSTREAM OR DOWNSTREAM), FOR STORM AND SANITARY SYSTEMS BASED
ON THE OWNER'S INFRASTRUCTURE REQUIREMENTS.
19. DISTANCES SHOWN ON PIPING ARE HORIZONTAL DISTANCES FROM CENTER OF
STRUCTURE TO CENTER OF STRUCTURE, UNLESS OTHERWISE NOTED.
20. THE CONTRACTOR IS RESPONSIBLE FOR HANDLING, CUTTING AND DISPOSAL OF ALL
ASBESTOS CEMENT (AC) PIPE TO BE REMOVED OR CUT IN ACCORDANCE WITH ALL
APPLICABLE REGULATIONS.
EROSION & SEDIMENT CONTROL & POLLUTION PREVENTION NOTES
1. AVOID ANY DISTURBANCE OF EXISTING VEGETATION ON THE SITE EXCEPT THE
VEGETATION SPECIFICALLY DESIGNATED TO BE REMOVED.
2. TAKE ALL PRECAUTIONS NECESSARY TO PREVENT EROSION AND CONTROL
SEDIMENTATION AS REQUIRED BY THE AGENCIES OF GOVERNMENT HAVING
JURISDICTION.
3. THIS PROJECT ______HAS OBTAINED ____ DOES NOT REQUIRE COVERAGE UNDER THE
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC) STATE
POLLUTANT DISCHARGE ELIMINATION SYSTEM (SPDES) GENERAL PERMIT FOR
STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES, PERMIT NO. GP-0-20-001
(GENERAL PERMIT). THE GENERAL PERMIT AUTHORIZES STORMWATER DISCHARGES TO
SURFACE WATERS OF THE STATE FROM CONSTRUCTION RELATED ACTIVITIES. A
STORMWATER POLLUTION PREVENTION PLAN (SWPPP) HAS BEEN PREPARED IN
ACCORDANCE WITH THIS PERMIT AND IS PART OF THE CONTRACT AND CONSTRUCTION
REQUIREMENTS FOR THIS PROJECT. THE CONTRACTOR SHALL OBTAIN A COPY OF THE
APPROVED SWPPP FOR THIS PROJECT, PRIOR TO DEVELOPING A BID PRICE FOR THE
OWNER. THE SWPPP INCLUDES THE REQUIREMENTS FOR PRECONSTRUCTION ACTIVITIES,
INSPECTIONS DURING CONSTRUCTION, AND POST CONSTRUCTION CERTIFICATIONS THAT
MUST BE FOLLOWED BY THE CONTRACTOR AND THE OWNER TO STAY IN COMPLIANCE
WITH THIS PERMIT. THESE REQUIREMENTS ARE DESCRIBED IN THE SWPPP AND SHALL BE
INCLUDED INTO THE CONTRACTOR'S BID PRICING FOR THIS PROJECT, AS WELL AS THE
CONDITIONS OF WORK BY BOTH THE CONTRACTOR AND OWNER.
4. TOP DRESS, SEED, AND MULCH OR SOD ALL LAWN AREAS DISTURBED BY THE
CONSTRUCTION AS SOON AS THE FINISHED GRADING OPERATION IS COMPLETED.
5. MAINTAIN AN ADEQUATE SUPPLY OF EROSION AND SEDIMENT CONTROL MATERIALS AT
THE CONSTRUCTION SITE AT ALL TIMES TO BE USED FOR URGENT SITUATIONS, SUCH AS
UNEXPECTED HEAVY RAINFALL.
6. MAINTENANCE AND REPAIR OF ALL EQUIPMENT AND VEHICLES INVOLVING OIL CHANGES,
HYDRAULIC SYSTEM AND FUEL TANK DRAIN DOWN, DEGREASING OPERATIONS AND OTHER
ACTIVITIES THAT MAY RESULT IN THE ACCIDENTAL RELEASE OF CONTAMINANTS MUST BE
CONDUCTED OFF-SITE. ACCIDENTAL SPILLS MUST BE CLEANED UP IMMEDIATELY AND
CONTAMINANTS DISPOSED OF PROPERLY.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING SOIL AND EXCESS EXCAVATED
EARTH STOCKPILES AT A STABLE LOCATION. STOCKPILES SHALL BE STABILIZED PER THE
DETAIL.
8. CONSTRUCTION ROUTES SHALL BE STABILIZED PER THE NYS STANDARDS FOR EROSION
AND SEDIMENT CONTROL, AS NECESSARY BASED ON SITE CONDITIONS.
9. THE CONTRACTOR IS RESPONSIBLE FOR THE PLACEMENT, DESIGN, APPROVAL, AND
OPERATION OF THE CONCRETE WASHOUTS. THE CONCRETE WASHOUTS SHALL BE
INSTALLED A MINIMUM OF 50' FROM STORM DRAINAGE OR SURFACE WATER. CONCRETE
WASTE MATERIAL SHALL NOT BE ALLOWED TO ESCAPE FROM THE CONCRETE WASHOUT.
10. SOLID WASTE SHALL BE STORED IN COVERED DUMPSTERS OR OTHER APPROPRIATE
CONTAINERS. WASTE IS TO BE DISPOSED OF REGULARLY AND PROPERLY IN ACCORDANCE
WITH LOCAL, STATE, AND/OR FEDERAL REGULATIONS.
UFO UFO
SYMBOL ITEM
LEGEND
CAT 6 CABLE
FIBEROPTIC CABLE
SERIAL CABLE
FIBER OPTIC - UNDERGROUND
DRAWING INDEX
DRAWING NAME
GENERAL
G-000 COVER SHEET AND LOCUS AND VICINITY MAPS
G-001 LEGENDS, ABBREVIATIONS, NOTES AND DRAWING INDEX
INSTRUMENTATION
I-001 SCADA ARCHITECTURE DIAGRAMS AND LEGEND
I-101 KNOWLES CROSSING (KC) SITE PLAN AND SCOPE
I-102 PAUL DALEY (PD) SITE PLAN AND SCOPE
TREELINE
ELECTRICAL HANDHOLE
FENCE
PROPERTY LINE
AutoCAD SHX Text
EXISTING EQUIPMENT, CONDITIONS AND STRUCTURES ARE SHOWN IN THIS TEXT FORMAT.
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
EXISTING SCADA
COMPUTER
PD-W5
DESKTOP PC
PROPOSED LEGEND
SYMBOL ITEM
FIBER OPTIC PATCH PANEL (FOPP)
SERIAL TO ETHERNET CONVERTER
ETHERNET SWITCH
O≡ CONSTITUTES Tx + Rx
(1 CHANNEL)
OPERATOR INTERFACE TERMINAL
(OIT)
AVAILABLE PORT
USED PORT
CAT 6 CABLE
FIBEROPTIC CABLE
SERIAL CABLE
PAUL DALEY (PD) SCADA ARCHITECTURE DIAGRAM
PAUL DALEY WTP
CLIENT / SUBCONSULTANT:
CONTRACT NO.
O
RI
GI
N
AL
D
RA
W
IN
G
SI
ZE
: A
RC
H D
(2 4"
X
6"
Environmental Design & Research, Landscape Architecture, Engineering & Environmental Services, P.C.
396 Main Street, Suite 15 Hyannis, MA 02601
P. 508.972.3960
DRAWINGS ISSUED FOR / REVISIONS
NO. DATE ISSUED FOR / REVISION BY
PROJECT TITLE:
PROJECT LOCATION:
CLIENT:
DRAWING TITLE:
P:
\jo bs \h ya \2
P ro vi nc et ow n W at er
S
CA
D A
Sy st em Im pr ov em en ts \C ad \W or ki ng D ra w in gs
\0 3_
Ci vi l\2
-I0
S
CA
D
A Ar ch D ia .d w g
D at e Pr in te d:
/1 7/
:1
0:
A M
CHK
©2025 Environmental Design & Research, Landscape Architecture, Engineering, & Environmental Services, P.C. APP
DRAWING NUMBER:
DRAWN BY:
EDR JOB#:
DATE:
SCALE:
CHECKED BY:
WATER SYSTEM SCADA IMPROVEMENTS
PROVINCETOWN AND TRURO MA.
TOWN OF PROVINCETOWN, MA
2/2026
24247
26-01
2/2026 FOR BIDDING JDF RHK MET
SCADA ARCHITECTURE DIAGRAMS AND LEGEND
AS SHOWN
SVL
JDF
I-001
KC-W1
PLC
KNOWLES CROSSING (KC) SCADA ARCHITECTURE DIAGRAM
PD-MCP
KC-MCP
KNOWLES CROSSING WTP
EXISTING SCADA
COMPUTER
DESKTOP PC
EXISTING SCADA
COMPUTER
DESKTOP PC
PD-W6 PD-W9
PD-W8PD-W7 PD-W10
KC-W2 KC-W3
FILTER PANEL
NOTES:
1. NEW FIBER OPTIC CABLE PULLED THROUGH EXISTING CONDUITS.
SCADA 1
SCADA 1 SCADA 2
PLC PLC
PLC PLC
PLC
PLC
PLC
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
DESKTOP PC
PLC
EXISTING LEGEND
SYMBOL ITEM
DESKTOP PC
PROGRAMMABLE LOGIC
CONTROLLER (PLC)
ETHERNET SWITCH
OPERATOR INTERFACE TERMINAL
(OIT)
AVAILABLE PORT
USED PORT
CAT 6 CABLE
SERIAL CABLE
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
PLC
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
PLC PLCPLC
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
1 1 11 2 2 22 3 3 33 4 4 44 5 5 55 6 6 66
143 SHORE ROAD
TOWN OF TRURO
MAP/PARCEL: 019-001-000
N
KNOWLES CROSSING (KC) SITE PLAN AND SCOPE
AS SHOWN
JJO & SVL
JDF
I-101
CLIENT / SUBCONSULTANT:
CONTRACT NO.
O
RI
GI
N
AL
D
RA
W
IN
G
SI
ZE
: A
RC
H D
(2 4"
X
6"
Environmental Design & Research, Landscape Architecture, Engineering & Environmental Services, P.C.
396 Main Street, Suite 15 Hyannis, MA 02601
P. 508.972.3960
DRAWINGS ISSUED FOR / REVISIONS
NO. DATE ISSUED FOR / REVISION BY
PROJECT TITLE:
PROJECT LOCATION:
CLIENT:
DRAWING TITLE:
P:
\jo bs \h ya \2
P ro vi nc et ow n W at er
S
CA
D A
Sy st em Im pr ov em en ts \C ad \W or ki ng D ra w in gs
\0 3_
Ci vi l\2
-I1
K no w le s S
P.
dw g D at e
Pr in te d:
/1
7/
:1 2:
A
M
CHK
©2025 Environmental Design & Research, Landscape Architecture, Engineering, & Environmental Services, P.C. APP
DRAWING NUMBER:
DRAWN BY:
EDR JOB#:
DATE:
SCALE:
CHECKED BY:
WATER SYSTEM SCADA IMPROVEMENTS
PROVINCETOWN AND TRURO MA.
TOWN OF PROVINCETOWN, MA
2/2026
24247
26-01
2/2026 FOR BIDDING JDF RHK MET
WELL NO. 1 CONTROL PANEL
OUTDOORS
WELL NO. 2 CONTROL PANEL
OUTDOORS IN FENCED IN AREA.
SCADA COMPUTERS AND MCP
LOCATED IN BUILDING
SHORE ROAD
WELL NO. 3 CONTROL PANEL
OUTDOORS IN FENCED IN AREA.
GRAPHIC SCALE (IN FEET)
050 25 50 100
KNOWLES CROSSING (KC) SITE PLAN
SCALE: 1" = 50'
A. ALL NEW NETWORK DEVICES, FIBER OPTIC CABLES AND PATCH PANELS, INSTALLATION HARDWARE, AND REQUIRED MATERIALS TO COMPLETE THE PROJECT APPROVED AND ONSITE.
B. FIBER CABLE PULL PLAN SUBMITTED AND APPROVED.
C. DETAILED WORKPLAN SUBMITTED AND APPROVED.
D. SPECIFIED SPARE PARTS ONSITE.
E. DOWNTIME COORDINATED AND APPROVED BY OWNER.
F. ON THE REEL FIBER OPTICE CABLE TESTING COMPLETED AND RESULTS SUBMITTED AND APPROVED.
G. FIBER OPTIC PATCH PANELS INSTALLED.
H. SERIAL-TO-ETHERNET CONVERTER INSTALLED.
EXAMPLE HAND HOLES
(TYPICAL OF KNOWLES CROSSING AND PAUL DALEY)
NOTES:
1. PROVIDE ETHERNET SWITCH IN ACCORDANCE WITH SECTION 406613. PROVIDE NEW DIN-RAIL MOUNTED FUSE(S), SIZED ACCORDING TO MANUFACTURERS RECOMMENDATIONS, AND POWER NEW ETHERNET SWITCH THROUGH THE FUSE USING EXISTING DC POWER AVAILABLE
WITHIN THE CONTROL PANEL.
2. PROVIDE SERIAL TO ETHERNET CONVERTER IN ACCORDANCE WITH SECTION 406613. PROVIDE NEW DIN-RAL MOUNTED FUSE(S), SIZED ACCORDING TO MANUFACTURERS RECOMMENDATIONS, AND POWER NEW SERIAL TO ETHERNET CONVERTER THROUGH THE FUSE USING EXISTING DC POWER AVAILABLE WITHIN THE CONTROL PANEL. CONFIGURATION OF SERIAL TO ETHERNET CONVERTER WILL BE BY OTHERS.
3. PROVIDE FIBER OPTIC PATCH PANEL (FOPP) IN ACCORDANCE WITH SECTION 406633. PROVIDE ALL HARDWARE NECESSARY TO MOUNT NEW FOPP’S IN LOCATIONS SHOWN. ALL FOPP’S SHALL BE PROVIDED WITH FIBER BREAKOUT KITS, IN ACCORDANCE WITH SECTION 406633, ARTICLE 2.05.
4. MOUNT FIBER OPTIC PATCH PANELS TO EXISTING UNISTRUT OR 3-INCH POLES. UTILIZE FLEXIBLE PVC CONDUIT BETWEEN NEW FOPP AND EXISTING CONTROL PANEL WITH A DRIP LOOP TO PREVENT THE INGRESS OF WATER. CUT BACK EXISTING CONDUIT THAT CONTAINS THE EXISTING SERIAL CABLE 2-3 FEET FROM THE CONTROL PANEL. PROVIDE NEW FLEXIBLE PVC CONDUIT TO CONNECT THE CUT BACK CONDUIT TO THE NEW FOPP.
5. LEFT EDGE OF FIBER OPTIC PATCH PANEL SHALL BE ALIGNED WITH THE LEFT EDGE OF THE EXISTING CONTROL PANEL.CUT BACK EXISTING CONDUIT THAT CONTAINS THE EXISTING SERIAL CABLE 2-3 FEET FROM THE MAIN CONTROL PANEL. PROVIDE NEW FLEXIBLE PVC CONDUIT TO CONNECT THE CUT BACK CONDUIT TO THE NEW FOPP. ADDITIONALLY, PROVIDE NEW FLEXIBLE PVC CONDUIT BETWEEN NEW FOPP AND EXISTING MAIN CONTROL PANEL.
6. REMOVE EXISTING OPTO-22 CONTROL BOARDS. PREREQUISITES TO REMOVING:
7. PROVIDE NEW FIBER OPTIC CABLE IN EXISTING CONDUITS, IN ACCORDANCE WITH SECTION 406633. NEW FIBER OPTIC CABLE TO BE PULLED THROUGH EXISTING CONDUITS USING EXISTING SERIAL CABLE AS A PULL CORD.
8. EXISTING ELECTRICAL HAND HOLE LOCATIONS AND CONDUIT ROUTING IS ESTIMATED AND MAY VARY FROM WHAT IS INSTALLED IN THE FIELD.
9. PROVIDE 10% SLACK OF FIBER OPTIC CABLE NEATLY STORED IN ELECTRICAL HANDHOLE WHILE MAINTAINING BENDING RADII.
10. EXISTING HANDHOLES AND CONDUITS HAVE A SIGNIFICANT AMOUNT OF SAND IN THEM. AS SUCH, THE CONTRACTOR SHALL SUPPLY EQUIPMENT AND LABOR AS NECESSARY TO FULLY EVACUATE SAND FROM CONDUIT INFRASTRUCTURE PRIOR TO INSTALLING NEW CABLING.
11. PROVIDE FIBER OPTIC JUMPER CABLES IN ACCORDANCE WITH SECTION 406633, ARTICLE 2.04, BETWEEN THE FIBER OPTIC PATCH PANELS AND ETHERNET SWITCHES IN EXISTING CONTROL PANELS.
12. PROVIDE COPPER ETHERNET CABLING BETWEEN THE NEW ETHERNET SWITCHES AND SERIAL TO ETHERNET CONVERTERS.
KC-WELL 1 INTERIOR
(TYPICAL FOR KC WELLS 2 AND 3)
KC-MCP EXTERIORKC-MCP INTERIOR KC-WELL 1 EXTERIOR KC-WELL 2 EXTERIOR KC-WELL 3 EXTERIOR
UFO UFO
UFO
U
FO
UFO UFO UFO UFO UFO UFO UFO UFO UFO UFO UFO UFO UFO UFO UFO U
FO
U
FO
UFO UFO UFO UFO UFO UFO UFO UFO UFO UFO UFO UFO
3 & 5
7 9
3 & 4
3 & 4
3 & 4
MINIMUM 1 FOOT
11 SOUTH HOLLOW ROAD
TOWN OF TRURO
MAP/PARCEL: 039-180-000
9 SOUTH HOLLOW ROAD
TOWN OF TRURO
MAP/PARCEL: 039-181-000
2 SOUTH HOLLOW ROAD
TOWN OF TRURO
MAP/PARCEL: 039-176-000
PAUL DALEY (PD) SITE PLAN AND SCOPE
N.T.S.
JJO & SVL
JDF
I-102
CLIENT / SUBCONSULTANT:
CONTRACT NO.
O
RI
GI
N
AL
D
RA
W
IN
G
SI
ZE
: A
RC
H D
(2 4"
X
6"
Environmental Design & Research, Landscape Architecture, Engineering & Environmental Services, P.C.
396 Main Street, Suite 15 Hyannis, MA 02601
P. 508.972.3960
DRAWINGS ISSUED FOR / REVISIONS
NO. DATE ISSUED FOR / REVISION BY
PROJECT TITLE:
PROJECT LOCATION:
CLIENT:
DRAWING TITLE:
P:
\jo bs \h ya \2
P ro vi nc et ow n W at er
S
CA
D A
Sy st em Im pr ov em en ts \C ad \W or ki ng D ra w in gs
\0 3_
Ci vi l\2
-I1
P au l D al ey
.d w g D at e
Pr in te d:
/1
7/
:1 3:
A
M
CHK
©2025 Environmental Design & Research, Landscape Architecture, Engineering, & Environmental Services, P.C. APP
DRAWING NUMBER:
DRAWN BY:
EDR JOB#:
DATE:
SCALE:
CHECKED BY:
WATER SYSTEM SCADA IMPROVEMENTS
PROVINCETOWN AND TRURO MA.
TOWN OF PROVINCETOWN, MA
2/2026
24247
26-01
2/2026 FOR BIDDING JDF RHK MET
PD-WELL 10 INTERIOR
PD - MCP EXTERIOR PD - MCP INTERIOR
MINIMUM 1 FOOT
PD-WELL 5 EXTERIOR
(TYPICAL FOR PD WELLS 6,7,8,9)
PD-WELL 10 EXTERIORPD-WELL 5 INTERIOR
(TYPICAL FOR PD WELLS 6,7,8,9)
3 & 4 6
3 & 13
3 & 5
PAUL DALEY (PD) SITE PLAN
SCALE: 1" = 60' N
GRAPHIC SCALE (IN FEET)
060 20 60 120
SCADA COMPUTER
AND MCP LOCATED
IN BUILDING
WELL 9 CONTROL
PANEL IN FENCED
IN AREA
WELL 5 CONTROL
PANEL OUTDOORS
WELL 6 CONTROL
PANEL IN FENCED
IN AREA
WELL 7 CONTROL
PANEL IN FENCED
IN AREA
WELL 8 CONTROL
PANEL IN FENCED
IN AREA
S HOLLOW ROAD
WELL 10 CONTROL
PANEL IN FENCED
IN AREA
UFO
UFO
UFO
U
FO
UFO
UFO
UFO
UFO
UFO
UFO
UFO
UFO
UFO
UFO
A. ALL NEW NETWORK DEVICES, FIBER OPTIC CABLES AND PATCH PANELS, INSTALLATION HARDWARE, AND REQUIRED MATERIALS TO COMPLETE THE
PROJECT APPROVED AND ONSITE.
B. FIBER CABLE PULL PLAN SUBMITTED AND APPROVED.
C. DETAILED WORKPLAN SUBMITTED AND APPROVED.
D. SPECIFIED SPARE PARTS ONSITE.
E. DOWNTIME COORDINATED AND APPROVED BY OWNER.
F. ON THE REEL FIBER OPTICE CABLE TESTING COMPLETED AND RESULTS SUBMITTED AND APPROVED.
G. FIBER OPTIC PATCH PANELS INSTALLED.
H. SERIAL-TO-ETHERNET CONVERTER INSTALLED.
NOTES:
1. PROVIDE ETHERNET SWITCH IN ACCORDANCE WITH SECTION 406613. PROVIDE NEW DIN-RAIL MOUNTED FUSE(S), SIZED ACCORDING TO MANUFACTURERS RECOMMENDATIONS, AND POWER NEW ETHERNET SWITCH THROUGH THE FUSE USING EXISTING DC POWER AVAILABLE WITHIN THE CONTROL PANEL.
2. PROVIDE SERIAL TO ETHERNET CONVERTER IN ACCORDANCE WITH SECTION 406613. PROVIDE NEW DIN-RAL MOUNTED FUSE(S), SIZED ACCORDING TO MANUFACTURERS RECOMMENDATIONS, AND POWER NEW SERIAL TO ETHERNET CONVERTER THROUGH THE FUSE USING EXISTING DC POWER AVAILABLE WITHIN THE CONTROL PANEL. CONFIGURATION OF SERIAL TO ETHERNET CONVERTER WILL BE BY OTHERS.
3. PROVIDE FIBER OPTIC PATCH PANEL (FOPP) IN ACCORDANCE WITH SECTION 406633. PROVIDE ALL HARDWARE NECESSARY TO MOUNT NEW FOPP’S IN LOCATIONS SHOWN. ALL FOPP’S SHALL BE PROVIDED WITH FIBER BREAKOUT KITS, IN ACCORDANCE WITH SECTION 406633, ARTICLE 2.05.
4. MOUNT FIBER OPTIC PATCH PANELS TO EXISTING UNISTRUT OR 3-INCH POLES. UTILIZE FLEXIBLE PVC CONDUIT BETWEEN NEW FOPP AND EXISTING CONTROL PANEL WITH A DRIP LOOP TO PREVENT THE INGRESS OF WATER. CUT BACK EXISTING CONDUIT THAT CONTAINS THE EXISTING SERIAL CABLE 2-3 FEET FROM THE CONTROL PANEL. PROVIDE NEW FLEXIBLE PVC CONDUIT TO CONNECT THE CUT BACK CONDUIT TO THE NEW FOPP.
5. LEFT EDGE OF FIBER OPTIC PATCH PANEL SHALL BE ALIGNED WITH THE LEFT EDGE OF THE EXISTING CONTROL PANEL.CUT BACK EXISTING CONDUIT THAT CONTAINS THE EXISTING SERIAL CABLE 2-3 FEET FROM THE MAIN CONTROL PANEL. PROVIDE NEW FLEXIBLE PVC CONDUIT TO CONNECT THE CUT BACK CONDUIT TO THE NEW FOPP. ADDITIONALLY, PROVIDE NEW FLEXIBLE PVC CONDUIT BETWEEN NEW FOPP AND EXISTING MAIN CONTROL PANEL.
6. REMOVE EXISTING OPTO-22 CONTROL BOARDS. PREREQUISITES TO REMOVING:
7. PROVIDE NEW FIBER OPTIC CABLE IN EXISTING CONDUITS, IN ACCORDANCE WITH SECTION 406633. NEW FIBER OPTIC CABLE TO BE PULLED THROUGH EXISTING
CONDUITS USING EXISTING SERIAL CABLE AS A PULL CORD.
8. EXISTING ELECTRICAL HAND HOLE LOCATIONS AND CONDUIT ROUTING IS ESTIMATED AND MAY VARY FROM WHAT IS INSTALLED IN THE FIELD.
9. PROVIDE 10% SLACK OF FIBER OPTIC CABLE NEATLY STORED IN ELECTRICAL HANDHOLE WHILE MAINTAINING BENDING RADII.
10. EXISTING HANDHOLES AND CONDUITS HAVE A SIGNIFICANT AMOUNT OF SAND IN THEM. AS SUCH, THE CONTRACTOR SHALL SUPPLY EQUIPMENT AND LABOR AS
NECESSARY TO FULLY EVACUATE SAND FROM CONDUIT INFRASTRUCTURE PRIOR TO INSTALLING NEW CABLING.
11. PROVIDE FIBER OPTIC JUMPER CABLES IN ACCORDANCE WITH SECTION 406633, ARTICLE 2.04, BETWEEN THE FIBER OPTIC PATCH PANELS AND ETHERNET
SWITCHES IN EXISTING CONTROL PANELS.
12. PROVIDE COPPER ETHERNET CABLING BETWEEN THE NEW ETHERNET SWITCHES AND SERIAL TO ETHERNET CONVERTERS.