2026-063._PRICING_RESPONSE_FORM.pdf

PDF 50 KB Posted

Attached to
Demolition, Asbestos Abatement, Lead Paint & Hazardous Materials Removal
Solicitation number
2026-063
Issued by
Alachua County, Graceville City, Florida

About this file

This is a Pricing Response Form for Collin County, Texas's Invitation for Bid (IFB #2026-063) for demolition, asbestos abatement, lead paint removal, and hazardous materials removal services at downtown structures. The project encompasses six facilities: Waste Water Warehouse, Waste Water Admin, Field Services, Electric Operation Offices and Warehouse, Carpenter Shop and Gas Storage, Water Department Admin and Storage, and a Mobile Building, along with a Transformer Shop and Shed. Bidders must submit a total lumpsum price for all building demolition according to the technical specifications and scope of work, which includes the removal of all identified materials. Two mandatory pre-bid meetings and site walks are scheduled for December 2, 2025, at 1:30 p.m. and December 4, 2025, at 10:00 a.m., both at the Collin County Central Plant in McKinney, Texas. The bid submission deadline is December 18, 2025, at 2:00 p.m., with bid opening on the same day. The anticipated contract award is within 90 calendar days after bid opening.

The pricing form requires bidders to provide a single lumpsum price for all building demolition work. The estimated probable construction cost is $1,100,000.00. Bidders must furnish performance, payment, and two-year maintenance bonds within ten calendar days of contract award. The scope includes full asbestos abatement of all identified ACM, lead-based paint waste handling and disposal, removal and disposal of hazardous building components, complete demolition to slab or subgrade, backfill and site stabilization, and full regulatory compliance with EPA, OSHA, DEP, and Florida DOH requirements. The successful bidder shall provide all labor, materials, equipment, permitting, disposal, and documentation necessary for project completion. Liquidated damages of $500 per calendar day apply for failure to meet the completion schedule.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING RESPONSE FORM

DEMOLITION, ASBESTOS ABATEMENT, LEAD PAINT & HAZARDOUS MATERIALS REMOVAL – DOWNTOWN STRUCTURES

TOTAL LUMPSUM PRICE OF ALL BUILDING DEMOLITION: $______________________

ACCORDING TO TECHNICAL SPECS/SCOPE OF WORK WHICH INCLUDES THE REMOVAL OF MATERIAL

• Waste Water Warehouse

• Waste Water Admin

• Field Services

• Electric Operation Offices and Warehouse

• Carpenter Shop and Gas Storage

• Water Department Admin and Storage

• Mobile Building

• Transformer Shop and Shed http://grupernet/departments/administrative/Finance/Internal%20Orders.pdf http://grupernet/departments/administrative/Finance/Internal%20Orders.pdf