Flpl - Installation Pathway.pdf

PDF 179 KB Posted

Attached to
JPPSONE Furniture
Solicitation number
2025-PZI-1525
Issued by

About this file

This image is a floor plan or layout diagram for a facility, with specific annotations highlighting key areas and travel paths. The diagram includes multiple rooms labeled with codes such as C115, C121, C125, and various RIOS spaces, indicating this is likely a technical or research facility. Key features annotated on the diagram include:

The floor plan shows an unobstructed path of travel marked in green, connecting different sections of the facility through "Corridor C" and "Corridor C East". Important designated areas include an "Installation location", a "Staging area", and an "Overhead door". The diagram also indicates double doors into a 9' wide hallway and various room types including conference rooms, storage areas, and what appears to be technical or laboratory spaces. The layout seems designed to provide clear movement routes and strategic positioning of different functional areas within the facility.

View the file

Other files

File Type Posted
Furniture QA.xlsx XLSX spreadsheet
Furniture QA.xlsx XLSX spreadsheet
Combined Synopsis Solicitation 27 August.pdf PDF
Site Visit Registration.pdf PDF
Combined Synopsis Solicitation 20 Aug.pdf PDF
Bid Schedule.xlsx XLSX spreadsheet
Furniture I-100.pdf PDF
SOW JPPSOv3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1536159912C Callout Overhead door

1536159912C Callout Staging area

1536159912C Callout Double doors into a 9' wide hallway

1536159912C Polygonal Line

1536159912C Callout Unobstructed path of travel

1536159912C Callout Installation location

1536159912C Polygon

File details come from the government source that posted it. Updated .