2025HDDPricingResponseForm.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Horizontal Directional Drilling
Solicitation number
2025-103
Issued by
Alachua County, Glencoe CDP, Florida

About this file

The document is a detailed pricing response form for Horizontal Directional Drilling (HDD) services issued by Gainesville Regional Utilities (GRU) for a comprehensive infrastructure project in Alachua County, Florida. The solicitation, numbered 2025-103, seeks qualified vendors to perform underground utility installations across water distribution, wastewater collection, gas mains, communication conduits, and electric conduits. The contract term spans from October 1, 2025, to September 30, 2028, with potential renewal options for two additional one-year periods. Key procurement dates include a September 5, 2025 release, September 16, 2025 deadline for questions, and a September 30, 2025, 2:00 pm response deadline.

The pricing response form provides an extensive unit pricing schedule covering various pipe materials and sizes, including ductile iron, high-density polyethylene (HDPE), and polyethylene pipes ranging from 2" to 16" in diameter. The document includes line items for carrier pipes, casing pipes, conduits, and additional services such as premium work hours and mobilization. While no specific set-aside designations are mentioned, the solicitation requires comprehensive insurance coverage, including $2,000,000 in Commercial General Liability, $1,000,000 in Automobile Liability, and statutory Workers' Compensation. Vendors must submit detailed documentation, including business registration, experience modification rate documentation, OSHA forms, contractor references, and a 5% bid bond, reflecting GRU's emphasis on technical capabilities, safety records, and proven experience in complex underground utility installations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Bid Item Bid Item Description Unit Unit Price

AWater DistributionGRU FurnishContractor Furnish
Carrier Pipes
A.12" CTS Blue or Purple, DR 9LF
A.24" DI PipeLF
A.36" DI PipeLF
A.48" DI PipeLF
A.612" DI PipeLF
A.716'' DI PipeLF
A.84" HDPE, DR 11LF
A.96" HDPE, DR 11LF
A.108" HDPE, DR 11LF
A.1112" HDPE, DR 11LF
A.1216'' HDPE, DR 11LF
Casing Pipes
A.132" PE Tubing Casing, DR 13.5LF
A.144" PE Tubing Casing, DR 13.5LF
A.156'' PE Tubing Casing, DR 13.5LF
BWastewater Collection - Force MainsGRU FurnishContractor Furnish
B.12" HDPE (IPS), DR 11LF
B.14" HDPE, DR 11LF
B.26" HDPE, DR 11LF
B.38" HDPE, DR 11LF
B.512" HDPE, DR 11LF
B.616'' HDPE, DR 11LF
DGas MainsGRU Furnish
D.12" and Smaller HDPE Carrier/CasingLF
D.23" HDPE SDR 17 Carrier/CasingLF
D.34" HDPE SDR 17 Carrier/CasingLF
D.46" HDPE SDR 17 Carrier/CasingLF
D.58" HDPE SDR 17 Carrier/CasingLF
D.610" HDPE SDR 17 Carrier/CasingLF
ECommunication ConduitsGRU Furnish
E.11.5" HDPE Single ConduitLF
E.22" HDPE Single ConduitLF
E.32.5" HDPE Single ConduitLF
E.43" HDPE Single ConduitLF
E.54" HDPE Single ConduitLF
E.61" PVC ConduitLF
E.71.5" PVC ConduitLF
E.82" PVC ConduitLF
E.92.5" PVC ConduitLF
E.103" PVC ConduitLF
E.114" PVC ConduitLF
E.122" HDPE Parallel ConduitsLF
E.132.5" HDPE Parallel ConduitsLF
E.143" HDPE Parallel ConduitsLF
E.154" HDPE Parallel ConduitsLF
E.16Set 2' x 3' pedestalEA
E.17Set 2' x 3' pedestal in concreteEA
E.18Set underground junction boxEA
E.19Set underground junction box in concreteEA
E.20Set 10" round pedestalEA
E.21Set 10" round pedestal in concreteEA
E.22Remove 2' x 3' pedestalEA
E.23Remove 2' x 3' pedestal set in concreteEA
E.24Remove underground junction boxEA
E.25Remove underground junction box set in concreteEA
E.26Remove 10" round pedestalEA
E.27Remove 10" round pedestal set in concreteEA
E.28Change out 2' x 3' pedestalEA
E.29Change out 2' x 3' pedestal set in concreteEA
E.30Change out underground junction boxEA
E.31Change out underground junction box set in concreteEA
E.32Change out 10" round pedestalEA
E.33Change out 10" round pedestal set in concreteEA
E.34Install Pull StringEA
EElectric ConduitsGRU Furnish
F.11.5'' HDPE ConduitLF
F.22'' HDPE ConduitLF
F.32.5'' HDPE ConduitLF
F.43'' HDPE ConduitLF
F.54'' HDPE ConduitLF
F.66'' HDPE ConduitLF
F.72" HDPE Parallel ConduitsLF
F.82.5" HDPE Parallel ConduitsLF
F.93" HDPE Parallel ConduitsLF
F.104" HDPE Parallel ConduitsLF
FAdditional PricingContractor Furnish
G.1Premium Work HoursPer HR
G.2Mobilization – HDD (<$1,000 Work Order)LS
G.3Emergency MobilizationLS
HDPE Adapters
G.44" HDPE MJ AdapterEA
G.56" HDPE MJ AdapterEA
G.68" HDPE MJ AdapterEA
G.710" HDPE MJ AdapterEA
G.812" HDPE MJ AdapterEA
G.916'' HDPE MJ AdapterEA
Fusing of Pipe for Customers per each
G.104'' PipeEA
G.116'' PipeEA
G.128'' PipeEA
G.1310'' PipeEA
G.1412'' PipeEA
G.1516'' PipeEA
Hydrostatic and Leakage Testing
G.16Testing for 2"-4" PipeEA
G.17Testing for 6" - 8" PipeEA
G.18Testing for 10"-12" PipeEA
G.19Testing for 16'' PipeEA
Rock Removal
G.20Rock Removal for 2"-4" PipeLF
G.21Rock Removal for 6" - 8" PipeLF
G.22Rock Removal for 10"-12" PipeLF
G.23Rock Removal for 16'' PipeLF
Traffic Control
G.24Furnish FlagmanPer HR
G.25Furnish Single Lane Closure per FDOT Index 603LS
G.26Furnish Multilane Closure per FDOT Index 613LS