20252002_A1_Irrigation Systems Assessment_ITB.pdf

PDF 2 MB Posted

Attached to
ITB 20252002 Parks, Medians, and Stormwater Facilities Irrigation Systems Assessment
Solicitation number
S-KE0010-00011147
Issued by
Lane County, Oregon

About this file

This document is an Invitation to Bid (ITB) issued by the City of Eugene, Oregon for an irrigation systems assessment project. The work involves operating, inspecting, and assessing all existing irrigation systems maintained by the City's Parks and Open Space Division, including those in parks, stormwater planters, and medians. The assessment will gather data on the condition and functionality of equipment such as backflow assemblies, controllers, valves, sprinklers, and piping. A non-mandatory pre-bid conference will be held on August 15, 2024, and bids are due on September 4, 2024. The City will use the assessment data to prioritize future renovation projects. Pricing details are not provided, but the contract will be awarded to the lowest responsible bidder. The City encourages the use of minority, women, and emerging small businesses, as well as local and disadvantaged contractors, in the fulfillment of this work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation to Bid

Parks, Medians, and Stormwater Facilities

Irrigation Systems Assessment

Solicitation No. ITB 20252002

Due Date and Time:

Wednesday, September 4, 2024 at 2:30 PM

Non-mandatory Pre-bid Conference:

August 15, 2024 at 10:00 AM on Microsoft Teams

CITY OF EUGENE

Central Services Finance Division/Purchasing

500 East 4th Avenue, Suite 303 Eugene, Oregon 97401

Eugene.Purchasing@ci.eugene.or.us The Purchasing Office is closed to the public.

https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZTExZGFhYWYtMzdiOS00Y2RmLTlmNjgtNDIxODVkYzE4MTJm%40thread.v2/0?context=%7b%22Tid%22%3a%220c0d3453-aa1d-41bc-8aa3-5c843d4ca0e8%22%2c%22Oid%22%3a%22c6038ee0-bce1-46f5-a70d-ad19d798dd2d%22%7d mailto:Eugene.Purchasing@ci.eugene.or.us

ITB 20252002 Irrigation Systems Assessment Page 2

I. INVITATION TO BID

INVITATION TO BID

Solicitation No. ITB 2052002

Notice to Suppliers Pursuant to ORS 279B.055 and City of Eugene Administrative Order 44-23-01-F, Public Contracting Rule (City Rule) 137-047-0255, sealed bids for Parks, Medians, and Stormwater Facilities Irrigation Systems Assessment for the City of Eugene will be accepted by the Purchasing Office until Wednesday, September 4, 2024 at 2:30 PM. Bids will be opened immediately thereafter and publicly read aloud in a Microsoft Teams meeting. Bids will not be accepted after the bid closing time and date. Bids shall be valid for sixty (60) days after opening unless otherwise specified in the bid specifications. This Invitation to Bid (ITB) does not commit the City to pay any costs incurred by any bidder in the submission of a bid.

Project Description In general, work includes operation, inspection, and assessment of all existing irrigation systems operated and maintained by the City of Eugene Parks and Open Space Division. Irrigated properties to be assessed include portions of parks and stormwater planters or medians located in the public right of way.

Solicitation Documents Solicitation documents may be examined electronically by logging in to OregonBuys. To view City of Eugene solicitations:

• Scroll to Supplier Activities

• Click the Open Bids icon

• Click the Advanced Search button

• Click Select Organization

• Select City of Eugene

• Click Search\Click the Bid Solicitation # to view solicitation details and documents

A copy of the Solicitation may also be obtained by emailing the Purchasing Analyst shown below.

Bidders must submit their bids through OregonBuys before the due date and time specified.

Bidders who need assistance with OregonBuys can contact the Supplier Help Desk at support.oregonbuys@oregon.gov or 1-855-800-5046. Contact the Purchasing Analyst below if a bid cannot be submitted via OregonBuys.

Non-mandatory Pre-bid Conference A non-mandatory pre-bid conference will be held on Thursday, August 15, 2024 at 10:00 AM on Microsoft Teams. This is an opportunity to have access to the Project Team. Statements made by the City’s representatives at the pre-Bid conference are not binding upon the City unless confirmed by written addendum issued under Section II (6.0) of this ITB.

https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2NlYTU5NDAtM2E5Ni00NjU4LTk4ZDgtOTQ4OTZkMTBiMGY0%40thread.v2/0?context=%7b%22Tid%22%3a%220c0d3453-aa1d-41bc-8aa3-5c843d4ca0e8%22%2c%22Oid%22%3a%22c6038ee0-bce1-46f5-a70d-ad19d798dd2d%22%7d https://oregonbuys.gov/bso/ https://www.eugene-or.gov/DocumentCenter/View/68662 mailto:support.oregonbuys@oregon.gov https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZTExZGFhYWYtMzdiOS00Y2RmLTlmNjgtNDIxODVkYzE4MTJm%40thread.v2/0?context=%7b%22Tid%22%3a%220c0d3453-aa1d-41bc-8aa3-5c843d4ca0e8%22%2c%22Oid%22%3a%22c6038ee0-bce1-46f5-a70d-ad19d798dd2d%22%7d

ITB 20252002 Irrigation Systems Assessment Page 3

Single Point of Contact City of Eugene Purchasing is the issuing office. Address all concerns or questions regarding this solicitation to the Purchasing Analyst identified below.

Dated: August 1, 2024

Noel Dietz, NIGP-CPP, CPPB Purchasing Analyst ndietz@eugene-or.gov mailto:ndietz@eugene-or.gov

ITB 20252002 Irrigation Systems Assessment Page 4

II. INSTRUCTIONS TO BIDDERS

1.0 BID FORM

1.1 Bids shall be submitted on forms identical to those forms provided by the City. The bidder shall make no alterations or additional stipulations on the bid form nor qualify the bid in any other manner. Alteration of any part of the bid form content will cause the bid to be considered non-responsive.

1.2 All available fields on the bid form shall be filled in electronically, by typewriter or manually, in ink. Mistakes must be crossed out and corrections typed or written in ink and initialed by the party signing the bid. No erasures are permitted. The omission of any required information or forms may invalidate a bid.

1.3 Complete sets of bid documents shall be used in preparing bids.

2.0 SUBMISSION

2.1 Bidders must submit their bids through OregonBuys before the due date and time specified. Bidders who need assistance with OregonBuys can contact the Supplier Help Desk at support.oregonbuys@oregon.gov or 1-855-800-5046.

2.2 Bidder is responsible for submitting their bid prior to the closing time and date. Late bids will not be accepted. The City is not responsible for any delays caused by delivery methods including, but not limited to, computer/email/software issues of any sort.

2.3 Oral, telephonic, telegraphic, or faxed bids are invalid and will not be considered.

Emailed bids may be considered if pre-approved by the Purchasing Analyst.

3.0 SOLICITATION MODIFICATIONS

Any questions, clarifications, modifications, or substitutions of the specifications or contract shall be delivered to the Purchasing Analyst via email in conformance with City Rule 137- 047-0440(1), and no less than ten (10) calendar days PRIOR to the solicitation closing, and submitted separately from the solicitation response. Contents of questions, clarifications, modifications, or substitutions should include a reference to the page or item being addressed, the reason and any proposed alterations. Questions, clarifications, modifications, or substitutions included with the response to the solicitation may cause it to be considered non-responsive.

4.0 OR EQUAL

4.1 Whenever a process is designated or a manufacturer’s name, brand, or item is designated or described, it shall be understood that the words, “or equal” follow such name, designation, or description, whether in fact they do so or not, unless no substitution is stated in the specifications. Items bid other than specified must be determined by the Purchasing Analyst as an approved equal. Submit to the Purchasing Analyst their intent to bid an approved equal no later than five (5) calendar days prior to the bid closing. Include detailed specifications, cut-sheets, and modifications necessary that would make the proposed item equal to the desired specifications.

4.2 Approval of alternate materials and equipment shall rest solely with the City and all bidders shall be notified of such approval by addenda prior to the bid opening.

https://www.eugene-or.gov/DocumentCenter/View/68662 mailto:support.oregonbuys@oregon.gov

ITB 20252002 Irrigation Systems Assessment Page 5

5.0 SOLICITATION PROTESTS

If a prospective bidder believes that the procurement process is contrary to law or that this solicitation document is unnecessarily restrictive, is legally flawed or improperly specifies a brand name, the prospective bidder may file a protest with the City. Protests must be submitted in writing to the City’s Purchasing Manager, no less than ten (10) days prior to solicitation closing. The protest must be emailed to Eugene.Purchasing@ci.eugene.or.us, clearly identified as a protest and identifying the solicitation being protested. Faxed protests shall not be accepted.

The Purchasing Manager shall consider the protest if it is timely filed in accordance with City Rule 137-047-0730 and contains the following information: 1) sufficient information to identify the solicitation that is the subject of the protest; 2) the grounds that demonstrate how the procurement process is contrary to law or how the solicitation document is unnecessarily restrictive, is legally flawed or improperly specifies a brand name; 3) evidence or supporting documentation that supports the grounds on which the protest is based; and 4) the relief sought. The Purchasing Manager shall issue a decision on the protest no fewer than three

(3) business days before the solicitation closing, unless a written determination is made by the Purchasing Manager that the public interest requires a shorter time limit.

6.0 ADDENDA AND INTERPRETATIONS

6.1 Statements by City staff or its representatives are not binding on City, unless confirmed by written addendum. Addenda will issue and proposers shall receive addenda per City Rule 137-047-0430, and as follows: City will not mail notice of addenda, but will publish any addenda on OregonBuys site. Bidders should frequently check the OregonBuys site until closing (i.e., at least once weekly until the week of closing, and at least once daily the week of the closing period).

6.2 Any written addendum issued which includes changes, corrections, additions, interpretations, or information, and issued in accordance with City Rule 137-047- 0430 shall be binding upon the proposer.

7.0 WITHDRAWAL

Bids may be withdrawn by written notification on company letterhead signed by an authorized person and received prior to the time and date set for bid closing or as otherwise authorized by City Rule 137-047-0440.

8.0 NONDISCRIMINATION

Submittal of a bid in response to this ITB evidences bidder’s agreement that, in performing the work called for by this ITB and in securing and supplying materials, bidder has not and will not discriminate against: 1) any person on the basis of race, color, religious creed, political ideas, sex, age, marital status, physical or mental handicap, national origin or ancestry unless the reasonable demands of employment are such that they cannot be met by a person with a particular physical or mental handicap; and 2) a subcontractor in the awarding of a subcontract because the subcontractor is a minority, woman, or emerging small business enterprise certified under ORS 200.055, or a business enterprise that is owned or controlled by, or that employs a disable veteran as defined in ORS 408.225.

9.0 PREPARATION OF BIDS

Bidders are expected to examine the specifications, schedules and all instructions. The City is not liable for costs associated of preparation of bids in response to this ITB.

mailto:Eugene.Purchasing@ci.eugene.or.us

ITB 20252002 Irrigation Systems Assessment Page 6

10. SILENCE OF SPECIFICATIONS

10.1 The apparent silence of the specifications as to any detail or to the apparent omission from it of a detailed description concerning any point shall be regarded as meaning that only the best commercial practices are to prevail. All interpretations of these specifications shall be made on the basis of this statement.

10.2 It is intended that the Contractor in the selection of components will use material and design practices that are the best available in the industry for the type of operating conditions to which the item(s) will be subjected and at the least meets the minimum standards of performance as specified in this Request. All parts, equipment and accessories shall, at the least, conform in strength, quality of material and workmanship to recognized industry standards and the minimum requirements of this Request.

11 EMPLOYEES NOT TO BENEFIT

No employee or elected official of the City of Eugene shall be permitted to receive any share or part of this contract or any benefit that may arise therefrom.

12 CITY FURNISHED PROPERTY

No material, labor or facilities will be furnished by City unless otherwise provided for in this

ITB.

13 INTERGOVERNMENTAL COOPERATIVE PURCHASING STATEMENT

The City grants to any Oregon public governmental agencies authorization to establish contracts or price agreements under the terms, conditions and prices of any contract between the awardee and the City resulting from this ITB.

14 RESERVED RIGHTS

The City reserves the right:

A. To reject any bid not in compliance with all prescribed public bidding procedures and requirements.

B. To reject for good cause any or all bids upon the City’s written finding that it is in the public interest to do so.

C. To reject any and all bids not meeting or differing from the specifications set forth herein.

D. To waive any or all informalities in the bids submitted.

E. To consider the competency and responsibility of bidders in making any awards.

F. In the event that two or more bids are identical in price, fitness, availability and quality, award shall be made in accordance with City Rule 137-046-0300.

G. In the event any bidder or bidders to whom a contract is awarded shall default in executing said formal contract or in furnishing a satisfactory performance bond within the time and manner herein after specified, to re-award the contract to another bidder or bidders.

H. To extend the deadline for submitting bids, in accordance with City Rule 137-047- 0430(3).

ITB 20252002 Irrigation Systems Assessment Page 7

I. To negotiate additions or deletions to goods and services requested.

15 RECYCLABLE PRODUCTS

Bidders shall use recyclable products to the maximum extent economically feasible in the performance of the contract work set forth in this document, provided said recycled materials meet all applicable standards. Preference for such recycled materials shall be given pursuant to City Rule 137-046-0320.

16 CONSIDERATION OF BIDS

16.1 Bids will be opened publicly by the Purchasing Office at the due date and time indicated in the ITB or any extension thereof made by addendum. Bidders and other interested parties are invited to attend the bid opening; however, the identity of the successful bidder will not be determined at the bid opening time.

16.2 It is the intent of the City to award a contract to the lowest responsible bidder provided the bid has been submitted in accordance with the requirements of these bidding documents and does not exceed the funds available. Consistent with the provisions of the bid documents, award may be made by item, groups of items, or the entire bid upon the City’s determination that it is in the public interest to do so.

16.3 In determining the lowest responsible bid, the City shall, for the purpose of awarding the contract, add a percent increase to the bid of a nonresident bidder equal to the percent, if any, of the preference given to that bidder in the state in which the bidder resides. The City shall rely on the Oregon Department of Administrative Services’ published list of states, which gives preference to in-state bidders to determine the percent increase to be added.

16.4 The City shall give preference to materials and supplies manufactured from recycled materials when available at a cost no greater than five (5) percent above the cost of comparable products manufactured from virgin materials. Subsequent contract or purchase order award will be based on these criteria, and may contain applicable standard contract provisions as required by law.

16.5 The City shall provide written notice by email, regular mail, or facsimile of the City’s intent to award the contract. Award shall not be final until the later of the following:

a. Seven (7) calendar days after the date of the Notice of Intent to Award; or

b. City provides a written response to all timely filed protests, if any, that denies the protest and affirms the award.

Bidders may protest the notice of intent to award the contract in accordance with City

Rule 137-047-0740.

17 CONTRACT AWARD

Submittal of a bid evidences bidder’s intent to execute and be bound by the terms of the attached contract. Negotiation will be conducted only as allowed by City Rule 137-047- 0600. After award of the contract, City and Contractor may only modify the contract in accordance with City Rule 137-047-0800.

18 MATERIAL PURCHASES

18.1 The price offered must be exclusive of any sales, purchaser, or consumer tax. Tax exemption certificates will be furnished upon request. Packing and transportation expenses are the responsibility of the bidder. All prices bid must be F.O.B. Destination, Freight Prepaid and Allowed, delivered and unloaded at delivery address listed.

ITB 20252002 Irrigation Systems Assessment Page 8

18.2 Include complete standard warranty information and factory specifications on the equipment offered. For the warranty, include the length of time, covered components, repair site (city or contractor site) and availability of parts and service not covered under the warranty. If an extended warranty is available, include the details of the extended warranty.

19 PUBLIC RECORDS

19.1 This ITB and one copy of each original bid received in response to it, together with copies of all documents pertaining to the award of a contract, shall be kept by the City of Eugene Purchasing Office and made a part of a file or record which shall be open to public inspection. If a bid contains any information that is considered trade secret under ORS 192.345(2), each sheet of such information must be marked with the following;

“This data constitutes a trade secret under ORS 192.345(2), and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS 192.”

The Oregon Public Records Law exempts from disclosure only bona fide trade secrets, and the exemption from disclosure applies only “unless the public interest requires disclosure in the particular instance.” ORS 192.345(2). Therefore, non-disclosure of documents or any portion of a document submitted as part of a bid may depend upon official or judicial determinations made pursuant to the Public Records Law.

19.2 The above restrictions may not include cost or price information which must be open to public inspection.

ITB 20252002 Irrigation Systems Assessment Page 9

III. SUSTAINABILITY & SOCIAL EQUITY

The City is interested in products and services that have a reduced impact on human health and the environment and that more fully support communities and economies when compared to competing products and services serving the same purpose. For more information regarding sustainability in procurement and related City policy and plans, please refer to the City’s Sustainable Purchasing website at http://www.eugene-or.gov/sustainpurch. The awardee will be expected to support the City’s goals by implementing the following strategies where applicable.

1.0 WASTE REDUCTION

Pursuant to City Zero Waste efforts, the City aims to prevent waste where possible. In order to increase efficient use of resources, the awarded bidder shall adhere to the following items as applicable.

1.1 Unnecessary packaging for goods, beyond packaging compliance or practical safe shipping methods, shall be reduced. Bidder to ship goods utilizing one or more of the following methods:

a. Ship products in reusable, refillable, or returnable containers. For example, reusable trays or totes, which can be stored and returned;

b. Minimal packaging material used inside containers. This includes eliminating or reducing the amount of non-recyclable bubble wrap, foam pellets or other like material;

c. Eliminate non-essential parts of packaging, such as individual wrapping of components;

d. Use packaging made with recycled content, biodegradable, and/or non-toxic materials.

e. No point of purchase material or promotional literature.

1.2 The awarded bidder is to duplex all paper materials that are prepared for the City under the contract, whether such materials are printed or copied, except when impracticable to do so due to the nature of the product being produced.

1.3 Contractor is expected to prevent, reduce, recycle or otherwise divert waste generated from the provision of services procured by the City. City may request information about diversion tactics utilized and quantities of waste materials diverted.

2.0 IDLING REDUCTION

2.1 In the interest of reducing air and noise pollution and promoting energy conservation, all gasoline and diesel powered vehicles and equipment shall be idled only as necessary to perform the required duties, including delivery, and for the essential function(s) of the equipment. A driver of a vehicle must turn off the engine upon stopping at the destination, and must not cause or allow an engine to idle at any location for more than 20 seconds. This idling policy applies except in the following situations:

a. The health and safety of employees, sub-contractors or public is compromised in turning off the vehicle.

b. The engine is required to power auxiliary equipment (e.g. hoist, lift platforms, hydraulic tools, inverters, compactors, medical equipment, specialized public safety radio communication and computer systems, etc.)

c. Vehicle/equipment manufacturer requires additional idle time for warm up or cool down for efficient and proper mechanical or functional operation of the unit.

http://www.eugene-or.gov/sustainpurch

ITB 20252002 Irrigation Systems Assessment Page 10

3.0 ENVIRONMENTALLY PREFERRED PRODUCTS

To promote and encourage environmentally sustainable practices for companies doing business with the City, the City requests vendors under City contract use environmentally preferable products in production of City work products.

3.1 The awarded bidder should use environmentally preferable materials that meet performance requirements wherever practical in the fulfillment of this agreement.

Environmentally preferable products and services have characteristics that include but are not limited to the following:

• Energy Efficient

• Reusable or upgradeable

• Recyclable

• Contain post-consumer recycled materials

• Produce fewer polluting by-products and/or safety hazards during manufacture, use or disposal, and/or

• Are certified by an independent accredited third party program such as

EcoLogo or ENERGY STAR.

3.2 The City desires the use of post-consumer recycled content, chlorine-free paper to encourage environmentally preferable practices for City business wherever practical in the fulfillment of the scope of work.

4.0 SOCIAL EQUITY

Economic prosperity through diversity and collaboration is fundamental to the Equity in Contracting program. Part of Eugene’s City Council Vision states that we will “Encourage a strong, sustainable and vibrant economy, fully utilizing our educational and cultural assets, so that every person has an opportunity to achieve financial security.”

The program aims to reduce barriers for local, small, minority and women-owned businesses to leverage all that our community has to offer, strengthening the business community as a whole.

The City supports the utilization of Minority, Women, Emerging Small Businesses (M/W/ESB), local businesses, Disadvantaged Business Enterprises and Oregon Forward Contractors (OFC) at both a prime and subcontracting and/or supply chain level. The City encourages eligible suppliers to gain certification and encourages the awarded proposer to use the following voluntary practices to promote open competitive opportunities for disadvantaged businesses in the fulfillment of the scope of work:

a. Access lists of certified minority, women, emerging small business or disadvantaged business enterprises from the Certification Office of Business Inclusion and Diversity (COBID) by visiting their website at:

https://oregon4biz.diversitysoftware.com/FrontEnd/SearchCertifiedDirectory.asp?XI D=2315&TN=oregon4bizto find certified businesses from whom to procure products or services.

b. Visit the Oregon State Oregon Forward Program website at https://ofp.dasapp.oregon.gov/ to search for Oregon Forward Program contractors from whom to procure products or services.

https://oregon4biz.diversitysoftware.com/FrontEnd/SearchCertifiedDirectory.asp?XID=2315&TN=oregon4biz https://oregon4biz.diversitysoftware.com/FrontEnd/SearchCertifiedDirectory.asp?XID=2315&TN=oregon4biz https://ofp.dasapp.oregon.gov/

ITB 20252002 Irrigation Systems Assessment Page 11

IV. ANTICIPATED BIDDING SCHEDULE

The following is the anticipated schedule for submission and review of bids and award of the desired contract. This schedule is subject to change by the City in its sole discretion. Any change to the bid submittal deadline will be done by an addendum to this ITB.

ACTIVITY DATE

Invitation to Bid advertise........................................................................... August 1, 2024

Pre-bid Conference ............................................................. August 15, 2024 at 10:00 AM

Last date for solicitation protest ............................................. August 23, 2024 at 4:00 PM

Last date for solicitation questions……………………..………August 28, 2024 at 4:00 PM

Deadline for issuing addenda to ITB ........................................................ August 30, 2024

Bid Closing & Public Opening of bids ........................... September 4, 2024 at 2:30 PM

Notice of Intent to Award .............................................................. by September 20, 2024

ITB 20252002 Irrigation Systems Assessment Page 12

V. REQUIREMENTS / SPECIFICATIONS

A. Project Overview

The City of Eugene (COE) Parks and Open Space Division of Public Works (POS) desires consultant services for performance audits and assessments of irrigation system located within all COE-owned parks and in rights-of-way (ROW) of publicly owned and operated streets.

Park irrigation system landscape types to be assessed include turf, plant beds, and stormwater facilities within small neighborhood parks, sports field facilities, large regional parks, and urban metropolitan parks. ROW irrigation system locations include lawns, plant beds, and stormwater facilities located in COE maintained landscape areas adjacent to public streets and in median islands within public streets.

B. Scope of Work

1. The consultant shall operate and inspect each irrigation system to gather designated field data regarding the function and condition of each system as described in Section ‘C’. The Consultant shall also rate the condition of specified system components.

COE will provide a digital tablet with geographically located diagrams of systems.

(see Section C. Data Collection Procedures, Subsection 2 below)

COE will also provide Microsoft Excel files with existing park and ROW site irrigation data from the City Maxicom system to supplement the information provided on the mobile device. Data for each site includes makes, models, and sizes for equipment used for each system. Equipment includes backflow assemblies, controllers, zones, valves, sprinklers, meters, and piping.

The consultant shall evaluate the condition of equipment and the functionality of systems by operating each zone, inspecting, and rating the condition of the equipment including pressure testing mainlines.

The consultant shall also field verify the accuracy of make and model information in the data files provided.

These field assessments and individual performance rankings will be used to assess and rank the overall condition of each irrigation system.

2. Consultant shall be responsible for providing and placing project notification signs in project sites prior to start of work indicating upcoming irrigation systems' operation.

3. Consultant shall assess COE Central Control System and software and make recommendations for improvements if warranted.

4. COE staff will use assessment data provided by the consultant’s evaluation process to perform a renovation project priority ranking process.

ITB 20252002 Irrigation Systems Assessment Page 13

5. Site Type Descriptions

a) Neighborhood Parks – 48 Sites

Typically, a single irrigation system with Central Control, 5-12 zones

b) Community Parks - 30 sites Typically, multiple irrigation systems with Central Control for different park areas and uses

c) Metropolitan Parks - 18 sites Parks in urban settings with single or multiple irrigation systems using Central Control

d) Sports Field Facilities – 13 sites Varies with single and multiple irrigation systems using Central Control

e) Stormwater Treatment Facilities - 40 sites Varies with single and multiple irrigation systems using Central Control and battery-operated controllers.

f) Community Gardens – 6 sites Non-automatic irrigation systems, potable water pipes from water meters with standpipes and hose bibs for every four beds.

C. Data Collection Procedures Operate all identified irrigation systems, assess systems’ operability, assess equipment conditions, and document results using COE provided equipment, data, and methodologies.

1. COE shall provide the following for contractor use in gathering data and assessing system information:

a) Handheld remote for operation of irrigation controllers.

b) I-Pad set up with the following data and assessment functions:

1. Aerial background of sites.

2. Digital diagrammatic plans of existing irrigation systems over aerial background. Digital diagrammatic plans include selectable irrigation system data for sprinklers, piping, valves, controllers, and other equipment.

c) Fillable data sheet for manual field recording.

d) 1-5 Scoring Criteria based upon the description that most consistently applies.

1 = System equipment is inoperable, irreparable, no longer manufactured, no longer serviceable, installed improperly, extensive water loss.

2 = System equipment is, damaged, displays inconsistent operation, materials consistently degraded, poor distribution uniformity (20% or less in most

ITB 20252002 Irrigation Systems Assessment Page 14 places), inefficient design or equipment selection, consistently incorrect installation, low ease of operability, should avoid operating.

3 = System equipment is aged but generally operable, inconsistent distribution uniformity (50% in most places), degraded but replaceable equipment, some failing equipment, incorrect installation, moderate ease of operability.

4 = System equipment is fully operable with some wear, water-efficient, installed properly, acceptable equipment for use, high distribution uniformity (70% in most places), good ease of operability.

5 = New condition, fully operable, high efficiency water conserving equipment, no degradation, installed properly, optimum distribution (80% or more in most places), high ease of operability.

2. See Attachment ‘A’ for a list of assessment data to be collected.

3. See Attachment ‘B’ for an example of selectable information included in digital files on iPad provided by City.

E. Cost Estimating

1. Consultant shall provide cost estimates for renovation of three high priority irrigation systems at Park and ROW locations to be selected by COE.

2. Cost estimates shall be based on systems being constructed per City of Eugene standard construction details and specifications.

D. Reporting

Upon completion of the assessment of all required irrigation systems, provide a report that includes the following information.

1. Executive summary of work performed including dates of work, data collection methods, and overall scope of project.

2. Overview of irrigation system conditions in Park Settings, ROW Medians and Stormwater Facilities, and Community Garden settings.

3. Summary of water use for irrigation City-wide and estimated impact of leak damage within the system as a whole.

4. Recommendations for priority renovation projects and long-term maintenance of the system.

All data sheets with irrigation evaluation information shall be attached to the report as an Appendix.

ITB 20252002 Irrigation Systems Assessment Page 15

E. Project Coordination

1. Consultant shall provide an overall anticipated project schedule prior to start of work.

2. Consultant shall schedule a process evaluation meeting after completion of assessment of first site.

3. Consultant shall schedule regular bi-weekly check-in meetings with City staff to evaluate process, review progress and provide an updated schedule.

F. Staff Availability for Project Duration

The comprehensive evaluation of the City’s irrigation systems project is expected to last several months. Project personnel are expected to be consistent and available for the duration of the project and as needed beyond the end of the work for as needed for any clarification or questions around the project results.

G. Experience

1. Minimum Requirements. Five (5) years of Irrigation installation experience.

Bidders will not be considered if they cannot provide proof of experience.

Experience/references will be rated pass/fail.

2. Contractor Qualification Requirements. Contractor shall be a licensed Landscape Contractor.

ITB 20252002 Irrigation Systems Assessment Page 16

VI. FORMS TO SUBMIT WITH BID

STANDARD BID FORM

Opening Date: September 4, 2024 at 2:30 PM

I, the undersigned, and authorized representative of certify the following: (Company Name)

Acknowledgement of terms, conditions and specifications

1. The bidder represents that bidder is properly licensed and adequately experienced, equipped, organized and financed to furnish and deliver the equipment specified and perform the services required.

2. The bidder has carefully checked the figures entered in the Form, has carefully reviewed for accuracy all statements in this bid and attachments, and agrees that the City will not be responsible for any errors or omissions of the bidder in preparing this bid. The bidder agrees that this bid may not be revoked or withdrawn for sixty (60) calendar days after the date on which bids are received.

3. Contract Execution. The bidder agrees that if this bid is accepted it will, within ten (10) calendar days after having received the Notice of Award, execute and return to the City the Contract in the form included in the Contract Documents and will, at or before that time, deliver the insurance documentation as required.

4. Addenda. The bidder acknowledges that it has received the following Addenda No(s):

and agrees that all addenda issued are a part of the Contract Documents and have been considered in preparing this bid. (Bidder: insert the number of each addendum received; if no addenda were received, write “NONE” in the space.)

Compliance with Laws Bidder hereby agrees to comply with all applicable Oregon public contracting code provisions, as more specifically described in the attached contract and associated Exhibit A.

Access to Plant or Place of Business Bidder agrees that the City may enter a contractor’s or subcontractor’s plant or place of business during normal business hours for the following purposes: inspect and/or test supplies or services for acceptance by the City pursuant to the terms of the Contract, and investigate the bidder’s minority business certification or other bidder qualifications.

Residency Bidder is _____ is not _____ an Oregon Resident Bidder.

An Oregon Resident Bidder, as defined by ORS 279A.120, means a bidder that has paid unemployment taxes or income taxes in this state during the 12 calendar months immediately preceding submission of the bid, and has a business address in this state.

ITB 20252002 Irrigation Systems Assessment Page 17

If bidder is not an Oregon Resident Bidder, in the field provided indicate the bidder’s (Business)

State of Residence. _____________________

Cooperative Purchasing The bidder _____agrees _____disagrees to extend the terms, conditions and prices of the original City of Eugene contract to any other governmental agency. Pursuant to ORS 279A.215, other governmental agencies may establish contracts or price agreements under the terms, conditions and prices of the original contract. Agency/agencies shall have the power and authority to contract directly with the successful vendor(s).

Certification of Nondiscrimination Bidder has not and will not discriminate against a subcontractor in the awarding of a subcontract because a subcontractor is a minority, woman, or emerging small business enterprise certified under ORS 200.055, or against a business enterprise that is owned or controlled by or that employs a disabled veteran as defined in ORS 408.225.

LCB Registration As a condition to submitting this quote, a contractor must be registered with the Oregon Landscape Contractors Board in accordance with Oregon State Law, and disclose their registration number. Failure to register and disclose the number will make this a nonresponsive bid and the bid will be rejected, unless contrary to Federal Law. In the field below, enter your Oregon Landscape Contractors Board Registration Number.

Oregon LCB Registration Number:

Expiration Date:

Noncollusion The bidder certifies that the bid has been arrived at by the bidder, independently, and has been submitted without collusion with, and without any agreement, understanding or planned course of action with, any other contractor, bidder, or vendor on materials, supplies, equipment or services, described in the solicitation documents, designed to limit independent bids or competition. The contents of the bid herein presented and made have not been communicated by the bidder or their employees or agents to any person not an employee or agent of the bidder or its surety on any bond furnished with the solicitation, and will not be communicated to any such person prior the closing time of the solicitation.

We therefore offer the following equipment/service at the prices indicated hereon in fulfillment of the requirements and specifications contained within the solicitation documents and all addenda.

Staff Position Hourly Rate

Project Manager Lead Worker Field Assistant Data assimilation/Document Preparer Budget Manager

ITB 20252002 Irrigation Systems Assessment Page 18

Completion/Delivery Date:

The bidder agrees, if awarded the contract or a direct purchase, to fully complete the work or deliver the equipment within ______ days after receipt of purchase order or notice to proceed is received from the City of Eugene.

Bid Submitted By:

Company: Date:

Signature:

Title:

Name (Print):

Phone:

Address:

Email:

Company contact for this project (if different from above):

Name: Title:

Phone:

Email:

Required Submittal Initials

Signed Standard Bid Form

Contractor References & Experience Form

ITB 20252002 Irrigation Systems Assessment Page 19

CONTRACTOR REFERENCES AND EXPERIENCE FORM

BIDDER’S NAME:

Company: Contact Name:

Address: City, State, Zip:

Phone Number: Fax:

Project Name and Location:

Year of Project:

Additional Project Information:

Phone Number: Fax:

Project Name and Location:

Phone Number: Fax:

Project Name and Location:

Rev. 04/2023 Contract Number: xxxx-xxxxx Page | 1

VII. SAMPLE CONTRACT

PERSONAL SERVICES CONTRACT

Project Title

BETWEEN: The City of Eugene, (City) an Oregon Municipal Corporation

AND: _________, (Contractor) an __________ organized and existing under the laws of the State of __________

CONTRACT NO.: _________ - _________

EXPIRATION DATE: __________

RECITALS

A. Contractor is engaged in the business of ________.

B. City desires to engage Contractor to provide the Services described in this Agreement and Contractor is willing to provide such Services on the terms and conditions set forth herein.

C. The Contract described herein was awarded under the exemption or procedure authorized by City of Eugene Administrative Order 44-23-01-F, Public Contracting Rules 2022, Rule 137-047-0255, ITB 20250002.

AGREEMENT

1. Incorporation of Exhibits; Definitions; Contractor’s Representations and Warranties.

1.1 Exhibits. The Contract between the parties (the “Contract”) includes and incorporates into this document (this “Agreement”) all of the following, which are listed in order of precedence:

1.1.1 Exhibit A summarizes certain Federal, State, and Municipal laws that apply to government contracts. The provisions of Exhibit A are statements of law and may not be modified.

1.1.2 Other Exhibits. The Contract also includes and incorporates the following exhibits. The provisions of this Agreement will have priority over all conflicting provisions of the following exhibits:

Exhibit B: Statement of Work / Service Deliverables Exhibit C: Compensation Add other Exhibits as necessary

1.2 Definitions. With the exception of proper nouns, capitalized terms not otherwise defined herein shall have the following meanings.

1.2.1 “Agreement” means this document, entitled Personal Services Contract and ending with the signatures of all parties.

Rev. 04/2023 Contract Number: xxxx-xxxxx Page | 2

1.2.2 “Contract” means the written statement of the parties’ mutual and respective agreements, promises, undertakings and rights as set forth in this Agreement and all incorporated exhibits.

1.2.3 “Services” means all of the products, properties, and Services to be provided by Contractor under this Contract, as described in Exhibit B.

1.3 Contractor’s Representations and Warranties. Contractor makes the following representations and warranties to City:

1.3.1 Contractor and Contractor’s personnel are, and will at all times hereunder be, fully qualified by all necessary education, training, experience, licensure, and certification to perform the Services.

1.3.2 As of the date of execution hereof, there are no claims or suits or proceedings, or threats thereof, seeking to enjoin the execution of the Contract by Contractor or the effect of which could prevent Contractor from performing or having the authority to perform the Services.

1.3.3 Neither the execution of the Contract nor the performance of the Services will constitute a breach or violation of any other contract, agreement, or law by which Contractor is bound or to which Contractor or any of its personnel who will perform the Services are subject.

2. Services.

2.1 Commencement. Contractor shall begin to provide the Services on __________, or, if later as soon as this Contract has been executed by all parties.

2.2 Key Personnel. Contractor has agreed that certain key personnel shall be assigned to perform certain parts of the Services, as described below. Removal of these key personnel from the specified tasks without the prior approval of City will be a material breach of the Contract.:________.

2.3 Security. If the Services will be performed on City property, Contractor will comply with all of City’s security policies and procedures.

3. Term.

The term of the Contract shall expire, unless terminated or renewed, on the expiration date shown in the caption of this Agreement.

4. Compensation. Subject to City’s right of offset for breach, Contractor will bill City for the Services by submitting periodic invoices that conform to the requirements of Exhibit C. City will make payments net 30 days of receipt of a properly submitted invoice. Notwithstanding the foregoing, City will have the right to withhold payment for any item which City disputes in good faith, provided that City pays for all non-disputed items and takes commercially reasonable action to resolve the dispute.

Rev. 04/2023 Contract Number: xxxx-xxxxx Page | 3

5. Termination. Notwithstanding any other provisions hereof to the contrary, the Contract may be terminated as follows:

5.1 The parties, by mutual written agreement, may terminate the Contract at any time.

5.2 Either party may terminate the Contract if the other party is in breach of any provision hereof which breach continues for more than 30 days after a notice describing the breach has been given unless, in the case of a breach which cannot be cured within such 30-day period, the breaching party immediately initiates and diligently prosecutes a plan of curative action that is acceptable to the non-breaching party. Notwithstanding the foregoing, termination for a recurring breach may be made if the breach is uncured within seven days after the second notice in any twelve-month period and immediately, without opportunity for cure, in the third or any subsequent notice of breach in any twelve-month period.

5.3 The City may terminate the Contract on any date specified in a notice if funding for the Services becomes unavailable or if the City determines that termination of the Contract is required by the public interest.

5.4 City may terminate the Contract immediately and without prior notice upon Contractor's failure to have in force any insurance required by the Contract, if Contractor breaches the City's security requirements, if Contractor fails to maintain any certificate or license required for performance of the Services, or as provided in Exhibit A.

6. Force Majeure. Neither City nor Contractor is responsible for any failure to perform or for any delay in the performance of any obligation under this Contract caused by public health emergency, fire, riot, acts of God, terrorism, war, or any other cause which is beyond the breaching party’s reasonable control. Contractor shall, however, make all reasonable efforts to remove or eliminate the cause of Contractor’s delay or breach and shall, upon the cessation of the cause, continue performing under this contract. City may terminate this Contract upon written notice to Contractor after City reasonably determines that the delay or breach will likely prevent successful performance of the Contract.

7. Remedies.

7.1 In the event of a termination of the Contract by City because of a breach by Contractor, City may complete the Services either by itself or by contract with other persons, or any combination thereof. Contractor shall be liable to City for any costs or losses incurred by City arising out of or related to the breach, including costs incurred in selecting other contractors, time-delay losses, attorney fees, and the like, less the remaining unpaid balance of the consideration provided in the Contract. City may withhold payment of sums due Contractor for Services performed to the date of termination until City’s costs and losses have been determined, at which time City may offset any such amount due Contractor against the costs and losses incurred by City.

7.2 The foregoing remedies provided to City for breach of the Contract by Contractor shall not be exclusive. City shall be entitled to exercise any one or more other legal or equitable remedies available because of Contractor’s breach with or without termination.

7.3 In the event of breach of the Contract by City, Contractor’s remedy shall be limited to termination of the Contract and payment for Services performed to the date of termination less any offset to which City is entitled.

Rev. 04/2023 Contract Number: xxxx-xxxxx Page | 4

8. Records/Inspection. Contractor shall maintain records of its charges to City under the Contract for a period of not less than three years following Contractor’s completion of the Contract. Upon reasonable advance notice, City or its authorized representatives may from time to time inspect, audit, and make copies of any Contractor’s records that relate to the Contract. If any audit by City discloses that payments to the Contractor were in excess of the amount to which Contractor was entitled under the Contract, Contractor shall promptly pay to City the amount of such excess. If the excess charged by Contractor for any audited period is greater than two percent of the amount that should have been charged for that period, Contractor shall also reimburse City its reasonable costs incurred in performing the audit.

9. Indemnification. Contractor shall indemnify and hold City, and its officers, agents and employees, harmless from and against all claims, actions, liabilities, costs, including attorney fees and other costs of defense, arising out of the acts, errors, or omissions, whether alleged or actual, of Contractor, its subcontractors, agents, and employees in performing or failing to perform the Services, failing to strictly comply with any provision of the Contract or any other actions or failures to act by Contractor and Contractor’s employees, agents, and subcontractors. In the event any such action or claim is brought against City, Contractor shall, if City so elects and upon tender by City, defend the same at Contractor’s sole cost and expense, promptly satisfy any judgment adverse to City or to City and Contractor, jointly, and reimburse City for any loss, cost, damage, or expense, including attorney fees, suffered, or incurred by City. City shall notify Contractor, within a reasonable time, of any claim, threat of claim, or legal action.

10. Insurance. Contractor shall have and maintain the insurance policies specified below. Each policy of insurance shall be written as a primary policy, not contributing with or in excess of any coverage which City may carry. A copy of each policy or a certificate satisfactory to City shall be delivered to City prior to commencement of the Services. The adequacy of all insurance policies for compliance with this Section shall be subject to approval by City’s Risk Manager. Failure to maintain any insurance coverage required by the Contract shall be cause for immediate termination of the Contract by City.

Unless otherwise specified, each policy shall be written on an “occurrence” form with an admitted insurance carrier licensed to do business in the state of Oregon; and shall contain an endorsement entitling City to not less than 30 days prior written notice of cancellation. In the event the statutory limit of liability of a public body for claims arising out of a single accident or occurrence is increased above the combined single limit coverage requirements specified below, City shall have the right to require that Contractor increase the coverage limits of all liability policies by the amount of the increase in the statutory limit.

10.1 Commercial General Liability. Contractor shall maintain a broad form commercial general liability insurance policy reflecting limits of not less than $2,000,000 combined single limit per occurrence, with an annual aggregate of $3,000,000 for bodily injury, personal injury or property damage. Such policy shall contain a contractual liability endorsement to cover Contractor's indemnification obligations under this Contract. The policy shall also contain an endorsement naming City as an additional insured, in a form satisfactory to City, and expressly providing that the interest of City shall not be affected by Contractor's breach of policy provisions.

10.2 Workers’ Compensation Insurance. Contractor shall comply with the Oregon Workers'…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .