2025-35 Addendum (1).pdf
PDF 141 KB Posted
- Attached to
- Beaumont Park Playground Equipment & Surfacing
- Solicitation number
- 2025-35
- Issued by
- Brown County, Wisconsin
About this file
This is Addendum #1 to RFP #2025-35 for Beaumont Park Playground Equipment, issued by the City of Green Bay in collaboration with Green Bay Public School District. The addendum clarifies vendor questions and modifies specifications for the playground equipment installation project at Beaumont Park. Vendors may conduct site visits at any time as the park is publicly accessible. The RFP due date is November 4, 2025 by 2:00 PM (CDT), and the City anticipates awarding the contract in 2025. The playground must be installed for the 2026 school year, with construction scheduled for mid-June 2026 through mid-August 2026 to avoid disruption to the school year. Vendors must acknowledge receipt of all addenda on Form A – Submittal Checklist, and failure to do so may result in bid rejection. All requirements of the original proposal documents remain unchanged except as modified in this addendum.
The playground and artificial turf budgets are separate, with the artificial turf carrying a maximum budget of $300,000; any cost savings in the turf budget cannot be reallocated to playground equipment. ADA accessibility is required; ramping is desired but not highly prioritized. Green Bay Public School District will perform excavation of the 75' x 100' area, install the concrete curb, and make connections from the storm sewer to inside the curb surrounding the playground area. Vendors must include all prep work and artificial turf base preparation (clear stone) in their pricing. Emma Browne, the Park Planner, is the primary contact, though all proposal-related questions must be directed through the Purchasing Department. This addendum will be incorporated into any resulting contractual agreement with the successful bidder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2025-35 Addendum (2).pdf | ||
| 2025-35 RFP.pdf | ||
| Beaumont Park Existing Area Map.pdf | ||
| Beaumont Park Proposed Area Map.pdf | ||
| 2025-35 Intent to Award and Bid Summary.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
RFP #2025-35 Beaumont Park Playground Equipment
RFP Due Date: November 4, 2025 by 2:00 PM (CDT)
This Addendum must be acknowledged on Form A – Submittal Checklist with your response.
The purpose of this addendum is to clarify questions received from vendors and notify vendors of changes made to the specifications on this bid. Vendors must acknowledge receipt of any and all addenda in the space provided in the bid documents. Failure to do so may result in rejection of the bid. All requirements of the proposal documents remain unchanged except as cited herein.
Information contained in this addendum will be included in any subsequent contractual agreement between the City and the successful bidder(s).
Questions & Answers, Clarifications, or Modifications Below.
QUESTION 1
Requesting a scheduled site visit...?
Response:
This is a public park therefore a vendor can visit the site anytime.
QUESTION 2
If the turf pricing comes in under the max budget of $300,000 would we be allowed to use some of the excess money for the playground equipment and installation? Essentially making the project a not to exceed $500,000.00 but allowing a bit of freedom on how the money is broken down within the max budget.
Response:
No. The playground and artificial turf budgets are separate.
QUESTION 3
Do we anticipate that the contract will be given prior to the end of 2025, or would the contract be executed in 2026?
Response:
We are looking to award the RFP in 2025.
QUESTION 4
I know that ADA accessibility is required, and ramping is also desired. Is ramping highly desired, or just considered would be nice if you can make it work?
Response:
It is not considered highly desired but would be nice.
QUESTION 5
I know that the installation of the concrete curb will be taken care of by Green Bay Public School District, does that include the excavation of the 75' x 100' area? Or should we include the excavation of the area in our price?
Response:
Green Bay Public School district will perform the excavation.
QUESTION 6
Our artificial turf will have clear stone under the turf, and we will include that in pricing, but we also recommend drain tile to get the water out of the concrete area. Will the school staff install the drain tile within the playground space?
Response:
Green Bay Public Schools will make the connection from the storm sewer to inside the curb surrounding the playground area.
QUESTION 7
Do you have a completion date for the project?
Response:
The playground needs to be installed for the 2026 school year.
QUESTION 8
#17 on Form E – Will the City be doing the prep work?
Response:
Include prep work in your proposal.
QUESTION 9
Anyone other from the City or school we should and can talk with?
Response:
Emma Browne is the Park Planner and is the contact, however all questions for the proposal needs to go through the Purchasing Department.
QUESTION 10
We reviewed the recent RFP posted for Beaumont Park Playground Equipment & Surfacing and have a quick question. If known, what is the anticipated schedule for construction of this project?
Response:
Construction of the playground needs to be done in mid-June 2026 – mid-August 2026 to not impact the school year.
***End of Addendum***