2025-205_Required_Equipment_and_Operator_Exp_Form.pdf
PDF 162 KB Posted
- Attached to
- DNR RFB Sandstone Area Winter Site Prep FY25
- Solicitation number
- 2000016276
- Issued by
- Pennington County, St. Paul City, Minnesota
About this file
This document is a Required Equipment Experience Form for the Sandstone Area Winter Site Prep FY25 project, solicitation #2025-205, issued by Pine County. The form requires contractors to list all equipment they will provide for the project, including rollers, skidders, drum choppers, skid steers or tracked crawlers, and drum-style mulching heads. Contractors must provide make, model, year, horsepower, and rental or ownership status for each piece of equipment. Any changes to the listed equipment must be submitted for approval. The contractor must certify that the information provided is accurate, under penalty of law.
The form does not provide details on the project scope, timeline, or pricing. It focuses solely on the equipment and operator experience requirements for this specific site preparation project in the Sandstone area of Pine County.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sandstone Area Winter Site Prep FY25 1 of 1 Required Equipment Form Solicitation # 2025-205 9/23/24
REQUIRED EQUIPMENT EXPERIENCE FORM
Sandstone Area Winter Site Prep FY25
Pine County/Near Sandstone Solicitation # 2025-205
VERSION: ORIGINAL
Refer to Specifications & Terms, Section 7, for full equipment required and operator experience specifications for this project. List ALL equipment items you will provide for this project.
ROLLER CHOPPING EQUIPMENT
SKIDDER OR LIKE-TYPE PRIME MOVER
Make and Model Year Horsepower Rent or Own
DRUM CHOPPER
Make and/or Model Width (feet)
Weight (pounds)
Rent or Own
MULCHING EQUIPMENT
SKID STEER OR TRACKED CRAWLER
Make and Model Engine
Horsepower Hydraulic
Flow (gpm) Ground
Pressure (psi) Rent or Own
DRUM-STYLE MULCHING HEAD
Make and/or Model Width (feet)
Weight (pounds)
Rent or Own
Any changes or additions to this listed equipment may be made if they meet all required equipment specifications and an updated form is supplied to the Business Office and Project Supervisor.
I understand that falsification, in any way, of the facts or conditions I have represented herein constitutes a false statement for which penalties under the law apply and which will be just cause for forfeit of contract. (Any change requires an updated form.)
Signature of Contractor Title Date
File details come from the government source that posted it. Updated .