www.tetratech.com
CLIENT INFORMATION:PROJECT LOCATION:
PROJECT DESCRIPTION / NOTES:
Tt PROJECT No.: CLIENT PROJECT No.:
ISSUED:
ENGINEERING BUSINESS NO. 2429
ORANGE COUNTY UTILITIES
UTILITIES ADMINISTRATION BUILDING
FLOATING SOLAR PANELS
9150 CURRY FORD RD
ORLANDO, FLORIDA 32825
200-10034-26001
ORANGE COUNTY UTILITIES
9150 CURRY FORD ROAD
ORLANDO, FL 32825
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32801
TEL: (407) 839-3955
DESIGN CRITERIA PACKAGE DRAWINGS FOR THE ADDITION OF FLOATING SOLAR
ARRAY SYSTEM AT ORANGE COUNTY UTILITIES ADMINISTRATION BUILDING STORM
WATER POND.
VICINITY MAP:
PROJECT LOCATION
ORANGE COUNTY BOARD
OF COUNTY COMMISSIONERS
ORANGE COUNTY MAYOR
JERRY L. DEMINGS
COUNTY ADMINISTRATOR
BYRON BROOKS
DIRECTOR OF UTILITIES
ED TORRES, M.S., P.E., LEED AP.
PREPARED FOR
UTILITIES ENGINEERING
ORANGE COUNTY, FLORIDA
ORANGE COUNTY BOARD
OF COUNTY COMMISSIONERS
DISTRICT 1
NICOLE H. WILSON
DISTRICT 2
CHRISTINE MOORE
DISTRICT 3
MAYRA URIBE
DISTRICT 4
MARIBEL GOMEZ CORDERO
DISTRICT 5
KELLY MARTINEZ SEMRAD
DISTRICT 6
MICHAEL "MIKE" SCOTT
DECEMBER 2025
MARK DATE DESCRIPTION BY
CHKD:
DRWN:
PROJ:
DESN:
www.tetratech.com
/4
/2
:1 0:
A
M
O :\P
R O
JE
C
TS
\O
R
LA
N D
O
\IE
R \1
\2
-1
-2
\C
AD
\S H
EE
TF
IL
ES
\G -0
.D
W G
ST
AN
O
, J
ER
EM
Y
A
2 3 4 5 6 7
B
C
D
E
F
Bar measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
ENGINEERING BUSINESS NO. 2429
200-10034-26001
UTILITIES ADMINISTRATION BUILDING (UAB)
FLOATING SOLAR PANELS
ORANGE COUNTY UTILITIES
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32801
TEL: (407) 839-3955
100% SUBMITTAL
ORANGE COUNTY UTILITIES
UTILITIES ADMINISTRATION BUILDING
ORANGE COUNTY, FL
9150 CURRY FORD ROAD
ORLANDO, FL 32825
PROJECT
ORANGE COUNTY UTILITIES
UTILITIES ADMINISTRATION BUILDING
FLOATING SOLAR PANELS
LOCATION: SECTION 07, TOWNSHIP 23 S, RANGE 31 E,
ORANGE COUNTY, FLORIDA.
NOTE:
ALL DISTURBED AREAS SHALL BE SODDED WITHIN 10 FEET OF ALL
STRUCTURES, PAVEMENTS, SIDEWALKS, SLABS AND EQUIPMENT.
PROVIDE SEED AND MULCH FOR ALL OTHER DISTURBED AREAS.
PROVIDE TWICE PER DAY WATERING FOR 60 DAYS.
100-YEAR FLOODPLAIN
ALL ELECTRICAL EQUIPMENT WILL BE INSTALLED A MINIMUM OF 1'-0"
ABOVE THE 100-YEAR FLOODPLAIN.
GENERAL NOTES
1. EXCAVATE CAUTIOUSLY LOCATIONS OF EXISTING UTILITIES INDICATED HEREIN ARE BASED ON
BEST AVAILABLE INFORMATION AND ARE NOT TO BE CONSIDERED ALL INCLUSIVE.
CONTRACTOR SHALL VERIFY EXACT LOCATION, CHARACTER AND NATURE OF ALL EXISTING AND
PROPOSED UTILITIES PRIOR TO BEGINNING CONSTRUCTION AND PRIOR TO FABRICATION OF
PIPING AND EQUIPMENT TO ENSURE PROPER ASSEMBLY OF ALL ITEMS.
2. COVER OVER ALL PIPES AND CONDUITS SHALL BE THREE (3) FEET MINIMUM, OR AS SHOWN.
3. ALL EXCAVATIONS SHALL BE BACK FILLED AT THE END OF EACH WORK DAY.
4. ALL SITE WORK SHALL BE COORDINATED WITH THE COUNTY RESIDENT PROJECT
REPRESENTATIVE (RPR).
5. ALL EXISTING WATER, WASTEWATER AND REUSE VALVES SHALL BE OPERATED BY ORANGE
COUNTY UTILITIES AUTHORIZED REPRESENTATIVES. EXISTING VALVE BOXES AND MANHOLES,
WHICH ARE TO REMAIN, SHALL BE ADJUSTED TO THE FINISHED GRADE.
6. THE CONTRACTOR SHALL PROVIDE TANKERS AND SIGNED DOCUMENT ACKNOWLEDGING THE
UNDERSTANDING OF THE ORANGE COUNTY UTILITY "EMERGENCY WASTEWATER SPILL AND
WATER MAIN BREAK PROCEDURES", IN THE PRE-CONSTRUCTION PACKET FOR THE MEETING.
7. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ON-SITE DURING THE LIFE OF THE PROJECT, A WEATHERPROOF ENCLOSURE CONTAINING A READILY ACCESSIBLE LIST OF EMERGENCY
CONTACTS AND PHONE NUMBERS.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SATISFACTION OF ALL REQUIREMENTS OF
REGULATORY AGENCY PERMITS WITH REGARD TO CONSTRUCTION ACTIVITIES AND RELATED
CONDITIONS.
9. THE CONTRACTOR SHALL CALL SUNSHINE STATE ONE CALL NO LESS THAN FOURTY-EIGHT (48)
HOURS PRIOR TO THE START OF CONSTRUCTION. - PHONE - 800-432-4777.
10. ADVANCE NOTIFICATION OF CONSTRUCTION
THE ORANGE COUNTY UTILITY CONSTRUCTION SECTION (407) 254-9798, SHALL BE NOTIFIED AT
LEAST SEVEN (7) DAYS PRIOR TO ANY CONSTRUCTION ACTIVITY.
11. THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AT ALL INTERSECTIONS OF
PROPOSED WORK AND EXISTING UTILITIES. THE EXPLORATORY EXCAVATIONS SHALL BE MADE
IN ADVANCE OF ORDERING MATERIALS FOR THE WORK. IF THERE IS A POTENTIAL CONFLICT,
THE CONTRACTOR SHALL NOTIFY THE COUNTY RESIDENT PROJECT REPRESENTATIVE
IMMEDIATELY WITH INFORMATION WHICH SHALL INCLUDE LOCATION, ELEVATION, UTILITY TYPE, MATERIAL AND SIZE.
12. IN AREAS WHERE CONSTRUCTION ACTIVITIES RESTRICT NORMAL ACCESS TO PROPERTIES, THE
CONTRACTOR SHALL PROVIDE AND MAINTAIN ALTERNATE ACCESS ROUTES WHICH ARE
SUBJECT TO APPROVAL BY THE ENGINEER, AS PART OF THE M.O.T. (MAINTENANCE OF TRAFFIC)
PLAN.
13. THE DISPOSAL OF ANY EXCESS EARTH WORK MATERIAL SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
14. THE CONTRACTOR SHALL REPLACE WITH EQUAL MATERIAL, OR AS DIRECTED BY THE RPR, ALL PAVING, GRASSED AREAS, STABILIZED EARTH, DRIVEWAYS, ETC., DISTURBED OR DAMAGED BY
THE CONSTRUCTION OR RELATED ACTIVITIES. ALL DISTURBED AREAS SHALL BE SODDED,
EXCEPT DIRT DRIVES AND WHERE INDICATED IN THE DRAWINGS.
15. SALVAGE AND/OR DISPOSAL OF ALL EXISTING EQUIPMENT SHALL BE AT THE DIRECTION OF THE
RPR.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER DISPOSAL OF ALL STRUCTURES, PIPE, CONDUIT, WIRE, FITTINGS, PANELS, ETC. THAT ARE DEMOLISHED, DISASSEMBLED, OR
REMOVED, PER SECTION 02080 OF THE SPECIFICATION MANUAL OF THIS PROJECT.
17. OPERATION OF ORANGE COUNTY UTILITIES ADMINISTRATION BUILDING CONSTRUCTION
ACTIVITIES SHALL NOT CAUSE INTERRUPTION TO THE FACILITIES OPERATION WITHOUT
APPROVAL FROM THE COUNTY. CONTRACTOR SHALL COORDINATE WITH COUNTY RPR WITH
SEVEN (7) DAYS MINIMUM NOTICE FOR SCHEDULING ALL SHUT DOWNS AND OUTAGES.
TRAINING, SPARE PARTS TRANSFER OR ANY OTHER INTERACTION WITH THE USE OF A
CONSTRUCTION ASSISTANCE REQUEST FORM (CAR).
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DE-WATERING REQUIRED DURING
CONSTRUCTION AND TO OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR THE TEMPORARY
DEWATERING.
19. THE CONTRACTOR SHALL PREPARE AND SUBMIT FOR APPROVAL BY THE COUNTY, A
COMPREHENSIVE WRITTEN PROCEDURE THAT DESCRIBES THE INTENDED CONSTRUCTION
SEQUENCE FOR MAINTAINING SERVICE. THIS PROCEDURE SHALL BE SUBMITTED WITH THE
PROJECT SCHEDULE.
20. THE CONTRACTOR SHALL NOTIFY THE COUNTY SEVEN (7) WORKING DAYS IN ADVANCE OF
NWRF FACILITY MAIN SHUT-DOWN.
21. ALL CONNECTIONS TO EXISTING SYSTEMS SHALL BE MADE BY THE CONTRACTOR ONLY AFTER
THE CONNECTION PROCEDURE AND THE WORK SCHEDULING HAS BEEN REVIEWED AND
APPROVED BY THE COUNTY. THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST TO THE
COUNTY A MINIMUM OF SEVEN (7) WORKING DAYS PRIOR TO SCHEDULING SAID CONNECTIONS.
THE REQUEST SHALL OUTLINE THE FOLLOWING:
A. POINTS OF CONNECTION, AND MATERIALS TO BE USED.
B. ESTIMATED CONSTRUCTION TIME FOR SAID CONNECTIONS.
28. THE COUNTY SHALL REVIEW THE SUBMITTAL WITHIN SEVEN (7) WORKING DAYS AFTER RECEIPT
AND INFORM THE CONTRACTOR REGARDING APPROVAL OR DENIAL OF THE REQUEST. IF THE
REQUEST IS REJECTED BY THE COUNTY, THE CONTRACTOR SHALL RESUBMIT THE WRITTEN
REQUEST, WHICH HAS BEEN MODIFIED IN A MANNER ACCEPTABLE TO THE COUNTY. ALL
CONNECTIONS SHALL BE MADE ONLY ON THE AGREED UPON DATE AND TIME. IF THE
CONTRACTOR DOES NOT INITIATE AND COMPLETE THE CONNECTION WORK IN THE AGREED
UPON MANNER, HE SHALL BE REQUIRED TO RESCHEDULE THE SAID CONNECTIONS BY
FOLLOWING THE PROCEDURE OUTLINED IN NOTE 29.
29. REPAIR IMMEDIATELY
ALL DAMAGE TO ORANGE COUNTY FACILITIES SHALL BE REPAIRED IMMEDIATELY BY THE
CONTRACTOR AT THE CONTRACTOR'S EXPENSE. IF THE REPAIR IS NOT DONE IN A TIMELY
MANER, AS DETERMINED BY THE ORANGE COUNTY UTILITY INSPECTOR, ORANGE COUNTY MAY
PERFORM REPAIRS AND THE CONTRACTOR WILL BE CHARGED FOR SAID REPAIRS.
30. TELEPHONE NOTIFICATIONS
THE ORANGE COUNTY DISPATCH OPERATOR SHALL BE NOTIFIED IMMEDIATELY IN THE EVENT
OF A FORCEMAIN, GRAVITY SEWER, OR WATER MAIN BREAK OR DAMAGE AT (407)836-2777
(24-HOURS ASSISTANCE).
31. ALL WORK AND MATERIAL SHALL CONFORM TO THE ORANGE COUNTY UTILITIES STANDARDS
AND CONSTRUCTION SPECIFICATIONS MANUAL, LATEST EDITION OR AS INDICATED IN THE
PROJECT SPECIFICATIONS OR DRAWINGS.
32. ALL AREAS DISTURBED BY THE CONSTRUCTION WITHIN TEN FEET OF PAVEMENT, BUILDINGS
AND SLABS SHALL BE SODDED WITH BAHIA SOD. ALL OTHER AREAS DISTURBED BY THE
CONSTRUCTION ACTIVITIES SHALL BE SEEDED AND MULCHED.
33. AN EROSION CONTROL PLAN SHALL BE PREPARED BY THE CONTRACTOR AND SUBMITTED TO
THE ENGINEER FOR APPROVAL PRIOR TO ANY CONSTRUCTION ACTIVITIES. CONTRACTOR
SHALL EXECUTE ALL MEASURES NECESSARY TO LIMIT THE TRANSPORT OF SEDIMENTS
OUTSIDE THE LIMITS OF THE CONSTRUCTION AREAS. CONTRACTOR SHALL PRESERVE THE
INTEGRITY AND CAPACITY OF THE EXISTING DRAINAGE SYSTEM. CONTRACTOR SHALL PROVIDE
HAY BALES, SILT BARRIERS, TEMPORARY GRASSING, ETC. AS REQUIRED TO FULLY COMPLY
WITH THE INTENT OF THIS SPECIFICATION. PROVIDE STORM WATER BY-PASS PIPING OR
PUMPING TO MAINTAIN DRAINAGE IN ALL LOCATIONS. TEMPORARY SILT FENCES AND STAKED
SILT BARRIERS SHALL BE IN ACCORDANCE WITH FDOT STANDARD SPECIFICATION, SEC. 104-6
AND 104-7 AND SHALL BE INSTALLED AROUND ALL AREAS DISTURBED BY THE CONSTRUCTION
ACTIVITIES. AS A MINIMUM ALL CONSTRUCTION AREAS SHALL BE COMPLETELY SURROUNDED
BY SILT FENCE.
34. NOTIFY COUNTY RPR FOR SCHEDULING ALL SHUT DOWNS AND OUTAGES, TRAINING, SPARE
PARTS TRANSFER OR ANY OTHER INTERACTION WITH THE USE OF A C.A.R..
EMERGENCY NUMBERS
UTILITY PIPE DESIGNATION
NOTE:
THIS DRAWING WAS PREPARED IN CONFORMANCE WITH ASCE STANDARD CE/ASCE 38-02 "AMERICAN SOCIETY OF CIVIL ENGINEERS STANDARD GUIDELINE FOR THE COLLECTION AND DEPICTION OF
EXISTING SUBSURFACE UTILITY DATA"
CI/ASCE 3802 SUBSURFACE UTILITY QUALITY LEVEL INDEX
1. QUALITY LEVEL A (QLA): UTILITY INFORMATION WHICH HAS BEEN VISUALLY VERIFIED, SURVEY
LOCATED (BOTH HORIZONTALLY AND VERTICALLY) AND ACCURATELY REDUCED ONTO THE
DRAWINGS. THIS IS TYPICALLY SHOWN AS A HV VERIFICATION EXCAVATION HOLE.
2. QUALITY LEVEL B (QLB): UTILITY INFORMATION DERIVED BY MARKING THE APPROXIMATE SURFACE
HORIZONTAL LOCATION OF UTILITY USING ELECTRONIC METHODS BY THE UTILITY OWNER.
MARKINGS BY UTILITY OWNERS ARE ASSUMED TO BE LOCATED BY ELECTRONIC METHODS AND
SEPARATE LOCATES WILL NOT BE PERFORMED BY THE ENGINEER. MARKING IS SUBSEQUENTLY
FIELD SURVEY LOCATED AND ACCURATELY REDUCED ONTO THE DRAWINGS.
3. QUALITY LEVEL C (QLC): UTILITY INFORMATION OBTAINED AS BELOW FOR QUALITY LEVEL D, PLOTTED TO CORRELATE WITH SURFACE UTILITY FEATURES WHICH HAVE BEEN FIELD VERIFIED, SURVEY LOCATED AND ACCURATELY REDUCED ONTO THE DRAWINGS. INCLUDED IN THIS
CATEGORY ARE AERIAL UTILITY INFORMATION AND UTILITY DEPICTIONS, WHICH IN THE
PROFESSIONAL OPINION OF THE SUBSURFACE UTILITY ENGINEER, REPRESENT THE MOST
PROBABLE APPROXIMATE HORIZONTAL LOCATION, TYPE AND / OR EXISTENCE OF A UTILITY.
4. QUALITY LEVEL D (QLD): UTILITY INFORMATION PLOTTED ON THE DRAWING BASED SOLELY ON RECORD INFORMATION, INDIVIDUAL RECOLLECTIONS OR THE EXISTENCE OF UTILITY SERVICE. IT SHALL BE NOTED THAT ALL INFORMATION SHOWN (OTHER THAN AT TEST HOLE LOCATIONS, SEE
QLA ABOVE) WITH REFERENCE TO A UTILITIES SIZE, CAPACITY, MATERIAL COMPOSITION,
CONDITION OR SERVICE STATUS SHALL BE CONSIDERED QLD EVEN THOUGH THE UTILITY MAY BE
PLOTTED AND LABELED QLC OR QLB.
8" CLAY SAN (C)
UTILITIES ORANGE COUNTY DISPATCH ------------------------ 407-836-2777 (24-HR ASSISTANCE)
ELECTRIC DUKE ENERGY---------------------------------------------- 407-398-6670
SIZE
MATL TYPE
QUALITY
TYPE
CONCRETE REQUIREMENTS
1. 3000 PSI MINIMUM FOR SLABS, WALKS AND ENCASEMENTS NOT IN CONTACT WITH CORROSIVE SOILS. 5000 PSI IF IN CONTACT WITH CORROSIVE SOILS AS DEFINED BY FDOT STANDARDS, REFER
TO GEOTECHNICAL REPORT IN SPECIFICATIONS.
APPLICABLE CODES
8TH EDITION FLORIDA BUILDING CODE - 2023
NFPA1, FIRE CODE, FLORIDA EDITION, 2023 EDITION
NFPA70, NATIONAL ELECTRICAL CODE 2023 EDITION
NFPA101, LIFE SAFETY CODE - 2024 EDITION
G-001
GENERAL NOTES
AND INDEX
J. RIBOTTI
J. STANO
SHEET INDEX
SHEET NO. SHEET DESCRIPTION
GENERAL
G-000 COVER
G-001 GENERAL NOTES AND INDEX
CIVIL
C-101 OVERALL SITE AERIAL
C-501 CIVIL DETAILS
ELECTRICAL
E-001 SITE PLANS
E-002 SINGLE LINE DIAGRAM MODIFICATIONS
E-003 DETAILS
E-004 DETAILS
MARK DATE DESCRIPTION BY
CHKD:
DRWN:
PROJ:
DESN:
www.tetratech.com
/4
/2
:0 1:
A
M
O :\P
R O
JE
C
TS
\O
R
LA
N D
O
\IE
R \1
\2
-1
-2
\C
AD
\S H
EE
TF
IL
ES
\C -1
.D
W G
ST
AN
O
, J
ER
EM
Y
A
2 3 4 5 6 7
B
C
D
E
F
Bar measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
ENGINEERING BUSINESS NO. 2429
200-10034-26001
UTILITIES ADMINISTRATION BUILDING (UAB)
FLOATING SOLAR PANELS
ORANGE COUNTY UTILITIES
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32801
TEL: (407) 839-3955
100% SUBMITTAL
N
C-101
OVERALL SITE AERIAL
J. RIBOTTI
J. STANO
SCALE:
40' 80' 160'
1'' = 80'
R15'
(TYP)
6" STONE PAD, STONE
SIZE ASTM D448 SIZE #1
(1 1/2" TO 3 1/2" DIA.)
WOOD
GUARDRAILS.
(OPTIONAL)
50' 24'
SILT FENCE PROTECTION IN DITCHES
WITH INTERMITTENT FLOW
SILT FENCE PROTECTION AROUND
DITCH BOTTOM INLETS
SECTION
STORMWATER
RUNOFF
SILT FENCE
WATERCOURSE
SILT FENCE
SILT FLOW
A
POST OPTIONS: TYPE III
SOFTWOOD 2-1/2" DIA.
SOFTWOOD 2"X4"
HARDWOOD 1-1/2" DIA.
STEEL 1.33LBS/FT MIN.
POST OPTIONS: TYPE IV
SOFTWOOD 4" DIA.
SOFTWOOD 4"X4"
HARDWOOD 3" DIA.
STEEL 1.33LBS/FT MIN.
OPTIONAL POST
POSITIONS
20°±
FILTER
FABRIC
PRINCIPLE POST
POSITION
(CANTED 20°
TOWARD FLOW)
VE
R
TI
C
AL
B
" M
IN
8" C
ELEVATION
FILTER FABRIC (IN
CONFORMANCE
WITH SEC. 985 FDOT
SPEC.) SILT FLOW
NOTES FOR SILT FENCES
1. TYPE III SILT FENCE TO BE USED AT MOST
LOCATIONS.
2. TYPE IV SILT FENCE TO BE USED WHERE LARGE
SEDIMENT LOADS ARE ANTICIPATED.
SUGGESTED USE IS WHERE FILL SLOPE IS 1:2
OR STEEPER AND LENGTH OF SLOPE EXCEEDS
25 FEET. AVOID WHERE THE DETAINED WATER
MAY BACK INTO TRAVEL LANES OR OFF THE
RIGHT OF WAY.
3. DO NOT CONSTRUCT SILT FENCES ACROSS
PERMANENT FLOWING WATERCOURSES. SILT
FENCES ARE TO BE USED AT UPLAND
LOCATIONS AND TURBIDITY BARRIERS USED AT
PERMANENT BODIES OF WATER.
4. WHERE USED AS SLOPE PROTECTION, SILT
FENCE IS TO BE CONSTRUCTED ON 0%
LONGITUDINAL GRADE TO AVOID
CHANNELIZING RUNOFF ALONG THE LENGTH
OF THE FENCE.
5. SILT FENCE TO BE PAID UNDER THE CONTRACT
UNIT PRICE FOR STACKED SILT FENCE, (LF).
TYPE III TYPE IV
A 6' MAX. 10' MAX
B 3' OR MORE 5' OR MORE
C 15"-18" 33"
D 12" MIN. 18" MIN.
SOD
4" MIN. TOP SOIL
NOTE:
SEE PLANS FOR LOCATION
2"
PAVEMENT
NOTES:
1. INITIAL BACKFILL AND HAUNCHING: SELECT COMMON FILL COMPACTED TO MIN 95%
(98% UNDER PAVEMENT OR FUTURE PAVEMENT) OF THE MAXIMUM DENSITY AS PER
AASHTO T-180.
2. TRENCH BACKFILL: COMMON FILL COMPACTED TO MIN 95% (98% UNDER PAVEMENT OR
FUTURE PAVEMENT) OF THE MAXIMUM DENSITY AS PER AASHTO T-180.
3. PIPE BEDDING UTILIZING SELECT COMMON FILL IN ACCORDANCE WITH "TYPE B"
BEDDING AND TRENCHING DETAIL MAY BE REQUIRED AS DIRECTED BY UTILITIES.
4. 15-IN MAX. (12-IN MIN.) FOR PIPE DIAMETER LESS THAN 24-IN AND 24-IN MAX (12-IN MIN)
FOR PIPE DIAMETER 24-IN AND LARGER.
5. WATER SHALL NOT BE PERMITTED IN THE TRENCH DURING CONSTRUCTION.
6. ALL PIPE SHALL BE INSTALLED WITH BELL FACING UPSTREAM TO THE DIRECTION OF
THE FLOW.
7. FINAL RESTORATION IN IMPROVED AREAS SHALL BE IN COMPLIANCE WITH ALL
APPLICABLE REGULATIONS OF GOVERNING AGENCIES. SURFACE RESTORATION WITHIN
ORANGE COUNTY RIGHT-OF-WAY SHALL COMPLY WITH REQUIREMENTS OF
RIGHT-OF-WAY UTILIZATION REGULATIONS AND ROAD CONSTRUCTION SPECIFICATIONS.
8. FOR GRAVITY SEWER, THE FIRST LIFT SHALL BE PLACED TO THE SPRING LINE OF THE
PIPE AND COMPACTED BY HAND TAMP.
TRENCH WIDTH
VARIES
W/ PIPE SIZE
PIPE O.D.
(SEE NOTE 4)
COMMON FILL
12" (TYP)
SELECT
COMMON FILL
UNDISTURBED
EARTH
(SEE NOTE 3)
HAUNCHING
(SEE NOTE 8) (S
EE
N
O
TE
INITIAL
BACKFILL
TR
EN
C H
B
AC
KF
IL
L (S
EE
N
O
TE
" L
IF
TS
M
AX
IM
U
M
FINISHED GRADE
MIN 12" WATER LEVEL
1.5
NOTES:
1. LONGITUDINAL CUTS SHALL REQUIRE OVERLAY/RESURFACE OF THE COMPLETE WIDTH OF THE
TRAVELED WAY.
2. ACTUAL REQUIREMENTS WILL BE AS STATED ON THE APPROVED PERMIT AND DRAWINGS.
3. BASE REPLACEMENT SHALL BE 8-IN THICK AND 3,000 PSI HIGH EARLY STRENGTH CONCRETE.
4. ASPHALT CONCRETE SURFACE MATERIAL SHALL BE REPLACED WITH THE SAME TYPE OF
MATERIAL THAT EXISTED AT THE TIME OF REMOVAL, OR AS APPROVED BY THE COUNTY PUBLIC
WORKS DEPARTMENT.
5. MINIMUM ASPHALTIC CONCRETE SURFACE OVERLAY THICKNESS SHALL BE 1-IN OR AS
APPROVED BY THE COUNTY ENGINEER.
6. ALL JOINT CUTS SHALL BE MECHANICALLY SAW CUT.
7. IF PERMANENT ASPHALT IS NOT APPLIED WITHIN 24-HRS OF WORK, MIN 2" TEMPORARY COLD
PATCH REQUIRED.
8. SUB-GRADE CUT TO BE COMPACTED TO 98% MAX DENSITY AS DETERMINED BY AASHTO T-180.
EXISTING BASE MATERIAL AND BE PLACED AT TIME OF ASPHALT PLACEMENT. CUT AREA TO BE
PLATED OR PROTECTED THE DAY OF THE POUR.
9. MIN 8" THICK 3,000 PSI CONCRETE, 5000 PSI FOR CORROSIVE SOILS AS DEFINED BY FDOT, REFER TO GEOTECHNICAL REPORT. FOR DUCT BANK USE RED DYE THROUGHOUT, NOT
SPREAD ON TOP.
" M
IN
NOTE 9
TRENCH WIDTH =
PIPE DIAMETER +
2'-0" (MIN)
VARIES
FINAL ASPHALT MIN 2" OR
MATCH EXISTING
(WHICHEVER IS GREATER)
VARIES
SAWCUT
(TYP)
MIN 1" MILL &
RESURFACE
TO EXISTING
(TYP)
UNDISTURBED
EARTH
SUBGRADE
(COMPACTED TO
98% MAX DENSITY)
2'-0" MIN
2" COVERAGE
ALL AROUND
#3/O BARE
COPPER
CONDUITS (TYP.)
NOTE 9
3 SODDING DETAIL
SCALE: NTS
2 SILT FENCE DETAIL AS PER 2006 FDOT INDEX #102
SCALE: NTS
1 CONSTRUCTION ENTRANCE DETAIL
SCALE: NTS
4 BEDDING AND TRENCHING - TYPE A - DETAIL
SCALE: NTS
5 OPEN CUT DETAIL
SCALE: NTS
6 REMOVABLE BOLLARD DETAIL
SCALE: NTS
7 EXTERIOR EQUIPMENT PAD DETAIL
SCALE: NTS
SAND, GRAVEL OR
CRUSHED STONE
4" MIN.
CONCRETE
ENCASEMENT
PAVEMENT
36"x36"
CONCRETE SLAB
APPLY NON-SHRINK GROUT TO
FILL ANNULAR SPACE BETWEEN
SLEEVE AND PRECAST PAD
8" SCH 40 STAINLESS SLEEVE
EXTENDED 4" ABOVE CONCRETE
SLAB AND PAINT WITH SAFETY
YELLOW
6" SCH 40 GALVANIZED STEEL
PIPE PAINT ENTIRE BOLLARD
WITH 2 COATS OF SAFETY
YELLOW
6" SCH 40 GALVANIZED CAP
STEEL LIFTING HOOKS
(INSIDE CAP)
5' -0
2'
-6
6"
12" (TYP)
1" PVC WEEPHOLE
(TYP)
8" SCH 40 GALVANIZED STEEL
CAP WITH 2" OPEN TAP TO
ALLOW DRAINAGE
PLASTIC COVER TO
KEEP WATER OUT
NOTES:
1. COORDINATE PAD WIDTH AND LENGTH WITH EQUIPMENT MANUFACTURER AND
CONTRACT DRAWINGS. PROVIDE SCHEDULED CLEARANCE AROUND THE PERIMETER
BETWEEN THE OUTSIDE EDGE OF PAD AND OUTERMOST PORTION OF EQUIPMENT.
2. COORDINATE SIZE AND LOCATION OF REQUIRED OPENINGS WITH EQUIPMENT
MANUFACTURER.
3. PROVIDE A BROOM FINISH TO TOP CONCRETE SURFACE.
4. ANCHOR EQUIPMENT TO CONCRETE PER MANUFACTURER RECOMMENDATIONS.
5. COORDINATE DRAIN AND CONCRETE SLOPE REQUIREMENTS.
6. MIN 8" THICK 3,000 PSI CONCRETE, 5000 PSI FOR CORROSIVE SOILS AS DEFINED BY
FDOT, REFER TO GEOTECHNICAL REPORT
GRADE
PLAN
6" CRUSHED
AGGREGATE
#5 AT 12" EACH WAY
TOP AND BOTTOM
3/4" CHAMFER
ALL EDGES
COMPACTED SUBGRADE
(TYP), REFER TO CIVIL
SHEET C-102 AND
GEOTECHNICAL REPORT
SECTION
EQUIPMENT LENGTH +6"
EQ
U
IP
M
EN
T
W
ID
TH
6"
1' -0
2"
2" 3"
MARK DATE DESCRIPTION BY
CHKD:
DRWN:
PROJ:
DESN:
www.tetratech.com
/4
/2
:0 2:
A
M
O :\P
R O
JE
C
TS
\O
R
LA
N D
O
\IE
R \1
\2
-1
-2
\C
AD
\S H
EE
TF
IL
ES
\C -5
.D
W G
ST
AN
O
, J
ER
EM
Y
A
2 3 4 5 6 7
B
C
D
E
F
Bar measures 1 inch, otherwise drawing not to scale
C op yr ig ht : T et ra
T ec h
ENGINEERING BUSINESS NO. 2429
200-10034-26001
UTILITIES ADMINISTRATION BUILDING (UAB)
FLOATING SOLAR PANELS
ORANGE COUNTY UTILITIES
201 EAST PINE STREET, SUITE 1000
ORLANDO, FLORIDA 32801
TEL: (407) 839-3955
100% SUBMITTAL
C-501
CIVIL DETAILS
J. RIBOTTI
J. STANO
UTILITIES ADMINISTRATION
BUILDING (UAB)
FLOATING SOLAR PANELS
PROJECT NO.
Designed by: WCN
Drawn by: SDV SHEET NO.Checked by: WCN
1-004‘EtectricaC (Design AssociatesApproved by: WCN
CHK’D.DATE DESCRIPTIONREV. DRAWN
Date:
REVISIONS
6965 PIAZZA GRANDE AVE., STE. 311
ORLANDO, FLORIDA 32835
PHONE: (407) 745-5604
FAX: (407) 745-5605
C.O.A. No. 8079
WILLIAM C. NELSON, P.E.
Florida P.E. No. 42017 E-001
SITE PLANS
OVERALL SITE PLAN
NTS
NEW 2500A
TAP BOX &
DISCONNECT
NEW
BI-DIRECTIONAL
METER
TRANSFORMERS PLAN -1
NTS
GENERATOR/FUEL LOCATION - 3
NTS
SERVICE ENTRANCE PLAN
NTS
ELECTRICAL ROOM PANEL MDP MAIN - 2
NTS
SEE SERVICE
ENTRANCE
PLAN
FIRE PUMP
TRANSFORMER
& METER
BUILDING
TRANSFORMER
& METER
NOVEMBER 2025
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY WILLIAM C. NELSON ON THE DATE
ADJACENT TO THE SEAL.
SIGNATURE MUST BE VERIFIED ON ANY
ELECTRONIC COPIES.
FLOATING SOLAR PANELS
L
TVSS
ES ST 277/480V 30 4W 10FIRE PUMP MDP 2 TVSS
TO CARRY 472 AMPS CONTROLLER ATS 277/480V 30 4W800A 3 15 6 19 |l0 11 12 13 14 15 16 EDP1 2 4 7 8CONTINUIOUSLYUTILITY UTILITY 8) K Ox Ox Ox Ox Ox Ox Ox Ox Ox Ox Ox Ox
/ 0) 0/ 0) Q) 0) Q) 0/ 0> 0/ 0) 0) 0)
) O-N.COMPANY COMPANY O'
2500E
O- O O- OQ Q Q
75HP 1
00, 1150]
10 2!00, 125 2 00} LUPS^125
22. 00 2 2 CHILLER4/0 2
EH2A
500 25 LEH2B
CHILLER150
H3/H3A1ST FLOOREXTERIOR
H2AH2A
H1AH1A
ELEVATOR NORMAL
— CHILLER
CHILLER
H3B
H2B H1B
ONE-LINE DIAGRAM
NTS
PROJECT NO.
WCN
SDV
SHEET NO.WCN
I-004‘EtectricaC (Design AssociatesWCN
CHK’D.REV. DATE DRAWN DESCRIPTION
REVISIONS
Designed by:
Drawn by:
Checked by:
Approved by:
Date:
o- Q
O o-
BUILDING
TRANS.
IN
IG
SEE
NOTE 1
FIRE PUMP
TRANS. 500 KW, 480/277V
3 PHASE, STANDBY
GENERATOR WITH
MAIN BREAKER
LOCATED AT
MAIN ENTRY
100,000AIC
SERVICE
RATED
SURGE
ARRESTOR
NOTE 1 -----
75HP LOAD.
MUST BE SIZED
PROVIDE
SURGE
ARRESTORS
ON CABLES
FOR EACH
TRANSFORMER
JOCKEY ~ -
PUMP
TO EH2A 32:34:36
30/3
6965 PIAZZA GRANDE AVE., STE. 311
ORLANDO, FLORIDA 32835
PHONE: (407) 745-5604
FAX: (407) 745-5605
C.O.A. No. 8079
WILLIAM C. NELSON, P.E.
Florida P.E. No. 42017
, FIRE
J PUMP
E-002
SINGLE LINE DIAGRAM
MODIFICATIONS
6 - 4" W/ 4#750 KCMIL EACH
NOTES:
PROVIDE NEW WIRE AND CONDUIT AS NOTED FROM THE EXISTING DUKE ENERGY
BUILDING TRANSFORMER TO THE NEW TAP BOX.
INTERCEPT EXISTING CONDUITS AND EXTEND TO THE NEW TAP BOX WITH NEW WIRING
FROM PANEL MDP TO THE TAP BOX. OUTAGE SHALL BE LIMITED TO 8 HOURS AND
PERFORMED AFTER NORMAL OPERATING HOURS FOR THE BUILDING.
THE EXISTING SINGLE LINE DIAGRAM IS FROM RECORD DRAWINGS DATED IN 2003.
DESIGN BUILDER TO CONFIRM EXISTING EQUIPMENT, WIRING AND CONDUIT
INFORMATION FOR CONSIDERATION IN THEIR DESIGN.
THIS EQUIPMENT TO BE MOUNTED ADJACENT TO THE EXISTING DUKE ENERGY
TRANSFORMERS AS SHOWN ON E-001.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE 2023 FLORIDA BUILDING CODE
AMENDMENTS, THE 2020 NATIONAL ELECTRICAL CODE AND SHALL COMPLY WITH ALL
LOCAL RULES AND ORDINANCES.
ALL MATERIALS SHALL BE NEW AND BEAR UNDERWRITERS LABORATORIES
RECOGNIZED LABELS WHERE APPLICABLE.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED OF
THEIR WORK.
ALL HARDWARE AND MATERIALS SHALL BE 316 STAINLESS STEEL. PROVIDE NEW
PROTECTIVE CAPS FOR ALL MOUNTING STRUT.
CONFIRM EXISTING GENERATOR AND ATS ARE OPEN TRANSITION AND WILL NOT
OPERATE IN PARALLEL WITH SOLAR SYSTEM. PROVIDE NECESSARY PROTECTION AS
REQUIRED.
VOLTAGE DROP SHALL NOT EXCEED 3% FOR ALL CONDUCTOR SIZING.
REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
NEW SOLAR SYSTEM SHALL MEET ALL DUKE ENERGY REQUIREMENTS INCLUDING
COORDINATING NEW AND MODIFIED WORK.
SOLAR SYSTEM ADDITIONAL NOTES:
INVERTER ASSEMBLY TO BE IEEE 1547 AND UL 1741 CERTIFIED.
COMBINER BOXES SHALL BE LOCATED LANDSIDE OR RAISED TO HAVE NO WATER
ENTRY. CABLE CONNECTORS SHALL BE RATED FOR SUBMERGENCE TO AVOID WATER
IN BOXES. PV CONNECTORS TO BE DESIGNED TO WITHSTAND UV AND CABLE
STRESSES WITHOUT BREAKAGE. SPACE FOR WALKING AROUND ANY WATER SIDE
BOXES WITHOUT CLIMBING OVER SHALL BE PROVIDED. CABLE MANAGEMENT SYSTEM
TO BE PROVIDED FOR WATER SIDE DESIGN.
PROVIDE FOR SOLAR DATA ACQUISITION SYSTEM, CUSTOMER SEPARATE METER AND
SEL PROTECTIVE RELAYS INCLUDING FIBER OPTIC COMMUNCIATIONS AND CONTROLS.
PROTECTION RELAY SETTINGS TO BE COORDINATED WITH DUKE ENERGY.
PROVIDE FOR BUS MOUNTED SURGE PROTECTION DEVICES THROUGHOUT THE
DISTRIBUTION.
2500 AMP, 480V, 4W
PAD MOUNTED
CABLE TAP BOX IN
NEMA 4X PAD
LOCKABLE
ENCLOSURE WITH
CONCRETE PAD
1200 AMP, 480V,
FUSED GENERATOR
DISCONNECT
SWITCH IN NEMA 4X
ENCLOSURE PER
DUKE ENERGY
REQUIREMENTS
NOVEMBER 2025
TO PV SWITCHBOARD,
METERING, INVERTERS,
DISCONNECTS, ETC.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY WILLIAM C. NELSON ON THE DATE
ADJACENT TO THE SEAL.
FLOATING SOLAR PANELS
PROJECT NO.
WCN
SDV
SHEET NO.WCN
I-004‘EtectricaC (Design AssociatesWCN
CHK’D.REV. DATE DRAWN DESCRIPTION
REVISIONS
Designed by:
Drawn by:
Checked by:
Approved by:
Date:
6965 PIAZZA GRANDE AVE., STE. 311
ORLANDO, FLORIDA 32835
PHONE: (407) 745-5604
FAX: (407) 745-5605
C.O.A. No. 8079
WILLIAM C. NELSON, P.E.
Florida P.E. No. 42017
TYPICAL CONDUIT THRU SLAB
N.T.S.
R
VARIES
VARIES
3"
2"
3"
4"
4"
FINISHED FLOOR
INSTALL PULLSTRINGS AND CAP
ALL EMPTY CONDUITS. SEE
SPECS FOR CONDUITS TO
PANELS
HOUSEKEEPING PAD
3/4" X 45° CHAMFER
CABLE ℄ RADIUS
TANGENT AT THIS
POINT
PLAN VIEW
SECTION
NOTES:
1" AT SWITCHGEAR.
PROVIDE 316 SS TAG WITH
CONDUIT SIZE AND LOCATION OF
OTHER END TIED TO CONDUIT
WITH 316 SS WIRE.
NOTES:
48 INCH X 48 INCH X 48 INCH
OLDCASTLE PRECAST
CONCRETE PULLBOX
#6 BARE TO STEEL
CONDUITS OR BOND
WIRES.
COPE TYPE 'C' CABLE
RACK AND ARM
BIND CIRCUIT CONDUCTOR
IN EACH CONDUIT W/
NYLON STRIPS.
GRADE
PULLBOX DETAIL
PVC END BELL FITTING
SUITABLE FOR USE WITH
SCHEDULE 40, AND SCHEDULE
60. MANUFACTURED BY CARLON
ELECTRICAL PRODUCTS OR
EQUAL. (TYPICAL)
ALL WIRES IN PULL BOX TO BE LABELED INDICATING CIRCUIT NUMBERS. SEE
SPECIFICATIONS.
DO NOT SPLICE CABLES IN PULL BOXES UNLESS OTHERWISE NOTED.
PATCH CONDUIT ENTRY WINDOW WITH CONCRETE.
3/4" X 20' GROUND ROD
N.T.S.
GRAVEL
TRAFFIC COVER AND FRAME.
PULL-IN EYE OPPOSITE
DUCT ENTRANCE
SMOKE SEAL SEALANT
OR GROUT
2" MIN. SMOKE SEAL
COMPOUND. FILL VOID
COMPLETELY AROUND
CONDUIT
CORE DRILL HOLE
1/8"Ø GREATER
THAN SLEEVE O.D.
CONTINUOUS CONDUIT -
CENTER IN SLEEVE, SUPPORT
TO PREVENT MOVEMENT. ONE
CONDUIT MAX. PER SLEEVE
6" NOM. MIN.
@ 2 HR. WALLS
2"2"
RIDGID STEEL CONDUIT
SLEEVE. ONE SIZE
LARGER THAN CONDUIT.
LOCKNUT ON BOTH
SIDES OF WALL
2 1/2" MIN. FORMING
MATERIAL - FIRE SAFING
INSULATION
PLASTER, CONC. BLOCK
OR CONC. WALL
NOTES:
THIS DETAIL USED IN BOTH 1 HR. AND 2 HR.
PARTITIONS.
CONDUIT SLEEVE DETAIL AT WALL
N.T.S.
NOTES:
ALL MOUNTING HARDWARE SHALL BE STAINLESS STEEL,
UNLESS OTHERWISE NOTED.
RACK STRUCTURE TO BE CERTIFIED PER FLORIDA
BUILDING CODE. CONTRACTOR SHALL SUBMIT SIGNED
AND SEALED WIND LOAD CALCULATIONS FROM A
STRUCTURAL ENGINEER LICENSED IN THE STATE OF
FLORIDA.
MECHANICAL
CONNECTION
(TYP. OF END
CHANNEL, LENGTH
6" ALUMINUM
AS REQUIRED.
ADD MIDDLE
CONCRETE
SLAB
SUPPORT AS
5'-0" LONG.
INDICATED ON
RACK IS MORE THAN
PLAN DWG. & WHEN
SUPPORTS)
ACCOMMODATE VARYING EQUIPMENT SIZES.
ARRANGEMENT OF EQUIPMENT, ADD EXTRA
OF EACH PIECE
OF EQUIPMENT
COPPER GND. TO
GND. GRID & TO
GROUNDING STUD
#4 AWG. BARE
CHANNEL, 72"
FASTENER
CONCRETE
(TYP. OF 3)
ON RACK
BASEPLATE
6" ALUMINUM
HORIZONTAL SUPPORTS AS REQUIRED TO
BE DETERMINED BY MOUNTING HOLE
POSITION OF BOTTOM SUPPORT SHALL
HIGH
EQUIPMENT RACK DETAIL
N.T.S.
SUPPORT FROM BUILDING STRUCTURE
CONDUIT CLAMP
NOTE: 1-5/8" x 1-5/8"
316 SS CHANNELALL HARDWARE SHALL BE
316 STAINLESS STEEL.
CLAMP MATERIAL TO
MATCH ALUMINUM
CONDUIT.
WALL MOUNTED
WALKWAY ANDTRAPEZE ASSEMBLY
WELL
GROUND TEST
/8
19 3/4"
N.T.S.
GROUND TEST WELL
3" HIGH LETTERS
CAST IN IRON COVER
RECESSED HOLD
DOWN (TYP.)
LIFTING HOLE
CAST IRON
COVER
PLAN VIEW
14-5/8"
COURSE SAND OR
PEA GRAVEL
(OPEN BOTTOM)
COMPACTED
GRAVEL BASE
2"
PRE-CAST
CONCRETE
5/8" X 20'
STAINLESS STEEL
GROUND ROD/ELECTRODE
GROUND WIRE
MECHANICAL
CONNECTION
SECTION
TO
MAIN
COUNTERPOISE
GROUND SYSTEM
NOTE:
1. INSTALL COUNTERPOISE CONDUIT DIRECTLY TO
BOTTOM OF ENCLOSURE IN APPROVED MATTER
AND CONNECT COUNTERPOISE CONDUCTOR TO
MANUFACTURER'S DESIGNATED GROUNDING BAR.
MAIN ENCLOSURE GROUND BAR
MINIMUM SIZED 6 AWG MTW INSULATED
GREEN STRANDED COPPER CONDUCTOR
SEE NOTE 1
ENCLOSURE
BACK PANEL
ENCLOSURE
EXTERIOR
#4/0 AWG STRANDED BARE
TINNED COPPER CONDUCTOR
#6 AWG HI PRESS, 1
HOLE LUG
SERVIT LUG w/ STUD
SEAL CONDUIT WITH "DUXSEAL" OR
APPROVED EQUAL
CONTROL, JUNCTION AND INSTRUMENT PEDESTAL
ENCLOSURES GROUNDING DETAIL
N.T.S.
E-003
DETAILS
NOVEMBER 2025
CONDUIT PIPE STRAP MOUNTING DETAILS
N.T.S.
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY WILLIAM C. NELSON ON THE DATE
ADJACENT TO THE SEAL.
FLOATING SOLAR PANELS
PROJECT NO.
WCN
SDV
SHEET NO.WCN
I-004‘EtectricaC (Design AssociatesWCN
CHK’D.REV. DATE DRAWN DESCRIPTION
REVISIONS
Designed by:
Drawn by:
Checked by:
Approved by:
Date:
6965 PIAZZA GRANDE AVE., STE. 311
ORLANDO, FLORIDA 32835
PHONE: (407) 745-5604
FAX: (407) 745-5605
C.O.A. No. 8079
WILLIAM C. NELSON, P.E.
Florida P.E. No. 42017
TERMINALS
MYERS HUB CONNECTOR
CONDUCTORS TO
CABLE
GRADE
UNION
CONTROL PANEL, DISCONNECT
OR JUNCTION BOX, ETC.
WATER TIGHT CONNECTION DETAIL
N.T.S.
M
IN
0.
NOTE 1
NOTE 2
NOTE 3
1. GROUND ROD TO COUNTERPOISE CONDUCTOR SHALL BE
CONNECTED BY MEANS OF A EXOTHERMIC WELD. GROUND
ROD SHALL BE 3/4 INCH IN DIAMETER AND 20 FOOT
LENGTH MINIMUM.
2. COUNTERPOISE CONDUCTOR TO CONDUCTOR CONNECTION
SHALL BE CONNECTED BY MEANS OF EXOTHERMIC WELD
AND THE CONDUCTOR FROM COUNTERPOISE LENGTH TO
GROUND ROD SHALL HAVE A MINIMUM OF 36 INCHES.
3. UNDERGROUND INSTALLATION OF COUNTERPOISE SYSTEM
SHALL BE BURIED AT A MINIMUM DEPTH OF 30 INCHES.
4. ALL COMPONENTS USED IN INSTALLATION WITHIN SHALL
COMPLY WITH SPECIFICATION 16450.
5. #3/0 AWG STRANDED BARE COPPER CONDUCTOR
NOTE 2
FINISHED GRADE
NOTE 5
NOTE 5
#3/0 AWG STRANDED
BARE COPPER
N.T.S.
COUNTERPOISE GROUND ROD
CONNECTION DETAIL
N O
TE
FINISHED GRADE
1. UNDERGROUND INSTALLATION OF COUNTERPOISE SYSTEM
SHALL BE BURIED AT A MINIMUM DEPTH OF 30 INCHES.
2. ALL COMPONENTS USED IN INSTALLATION WITHIN SHALL
COMPLY WITH SPECIFICATION 16450.
COUNTERPOISE CONDUCTOR
TO SPECIFIC AREA OR
DEVICE
EXOTHERMIC WELDED
CONNECTION
#4/0 STRANDED BARE
TINNED COPPER
MAIN COUNTERPOISE
GROUNDING SYSTEM
CONDUCTOR
N.T.S.
COUNTERPOISE CONDUCTOR
CONNECTION DETAILPULL BOX CABLE SUPPORT
N.T.S.
E-004
DETAILS
NOVEMBER 2025
THIS ITEM HAS BEEN DIGITALLY SIGNED AND
SEALED BY WILLIAM C. NELSON ON THE DATE
ADJACENT TO THE SEAL.
| GENERAL |
| CIVIL |
| ELECTRICAL |
| G-000.pdf |
| Sheets and Views |
| G-000 |
File details come from the government source that posted it. Updated .