2025-12-17_MLB_Kalwall_Replacement_-_IFP_-_Architectural_-_Unsigned.pdf
PDF 25 MB Posted
- Attached to
- Skylight Replacement
- Solicitation number
- ITB-2026-0202
- Issued by
- Brevard County, Miramar Beach CDP, Florida
About this file
This is an unsigned architectural drawing for a Kalwall skylight replacement project prepared for the Melbourne Airport Authority in Brevard County, Florida. The project involves replacing the atrium skylight in the main terminal building, which sustained damage from recent major hurricanes. The scope of work encompasses comprehensive project delivery including value engineering, scheduling, permitting, subcontractor coordination, work supervision, document control of submittals and requests for information, inspection coordination, commissioning, training, and project closeout. The successful bidder must manage pedestrian traffic within the terminal, coordinate with other active contractors, and provide operational support while the airport remains operational throughout the installation period. The bid due date is March 10, 2026, with Addendum 1 posted on February 19, 2026, and an updated Invitation for Bid posted on March 19, 2026, indicating ongoing revisions to project requirements. This is a lump sum contract with no specified renewal options.
No specific pricing information, budget ranges, or award values are disclosed in the architectural drawings. No set-asides, disadvantaged enterprise requirements, or incumbent vendor information are indicated in the available documentation. The project requires seamless coordination with Airport Operations, terminal tenants, and concurrent contractors to minimize conflicts and delays while maintaining airport functionality during active construction operations. Bidders must demonstrate proven experience working in active airport environments, strong coordination and communication capabilities, and technical expertise in skylight replacement and related building systems. The Owner has established high expectations for the selected bidder's coordination, support, and professionalism throughout the project lifecycle. Detailed technical specifications are contained in structural and architectural plan documents totaling approximately 25.8 megabytes of design files posted on February 3, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .