2025-11_Historic_Campbell_Station_Inn_Interior_Renovation_Phase_CD_Project_Manual.pdf
PDF 3 MB Posted
- Solicitation number
- 2025-11
- Issued by
- Knox County, Tennessee
About this file
The document is a comprehensive Project Manual for the Campbell Station Inn Interior Renovation Phase, developed by Brewer Ingram Fuller Architects for the Town of Farragut, Tennessee. The project involves an interior renovation of the historic Campbell Station Inn located at 11409 Kingston Pike in Farragut, with a mandatory pre-bid conference scheduled for December 17th, 2024, at 10:00am at the project site. Sealed bids are due on January 14th, 2024, at 10:00am and will be received at the Farragut Community Center. The renovation encompasses extensive historic preservation work, including repairing and restoring interior elements such as plaster walls, wood flooring, wood trim, electrical and mechanical systems, and structural components while maintaining the building's historical integrity.
The project manual includes detailed specifications across multiple divisions, covering everything from concrete and masonry work to architectural woodwork, tiling, and finishing. The specifications indicate a focus on preservation and restoration techniques, with specific requirements for materials that match the original historic fabric of the building. While specific budget details are not explicitly stated, the comprehensive nature of the renovation suggests a significant investment in preserving the historic Campbell Station Inn. The project appears to be funded by the Town of Farragut and will require specialized contractors with experience in historic restoration techniques. The last day for bidder questions is January 7th, 2024, and the project emphasizes compliance with historic preservation standards and building codes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAMPBELL STATION INN
INTERIOR RENOVATION PHASE
PROJECT MANUAL
CHEROKEE MILLS
111 N. CONCORD STREET
KNOXVILLE, TN 37919
865-525-2707
FAX 865-637-1532
CONSTRUCTION DOCUMENTS
PROJECT NO. 2307
NOVEMBER 25, 2024
CAMPBELL STATION INN
INTERIOR RENOVATION PHASE
PROJECT MANUAL
ARCHITECT
CHEROKEE MILLS
111 N. CONCORD STREET
KNOXVILLE, TN 37919
865-525-2707
FAX 865-637-1532
CONSULTANTS
STRUCTURAL
BENDER & ASSOCIATES STRUCTURAL ENGINEERS LLC
MECHANICAL, PLUMBING, AND FIRE PROTECTION
BEDINGER CONSULTING ENGINEERS
ELECTRICAL
VREELAND ENGINEERS, INC
CONSTRUCTION DOCUMENTS
PROJECT NO. 2307
NOVEMBER 25, 2024
PROJECT: SECTION: 00 01 10
CAMPBELL STATION INN TABLE OF
INTERIOR RENOVATION PHASE CONTENTS
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 1
NO. OF PAGES
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
BY OWNER
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY OF WORK
01 21 00 ALLOWANCES
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 WEATHER DELAYS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 35 16 ALTERATION PROJECT PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 70 00 EXECUTION REQUIREMENTS
01 74 00 CLEANING
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 77 00 CLOSEOUT REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 00 00 EXISTING CONDITIONS
02 10 00 BUILDING PREPARATION
02 40 00 DEMOLITION
02 42 90 PROTECTION OF HISTORIC CONSTRUCTION MATERIALS
DIVISION 03 - CONCRETE
03 10 00 CONCRETE FORMING AND ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST IN PLACE CONCRETE
03 54 16 HYDRAULIC CEMENT UNDERLAYMENT
03 92 50 REPAIR MORTARS
DIVISION 04 - MASONRY
04 01 20.91 UNIT MASONRY RESTORATION
04 05 13.91 MASONRY RESTORATION MORTARING
DIVISION 05 - METALS
05 50 00 METAL FABRICATIONS
DIVISION 6 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 40 23 INTERIOR ARCHITECTURAL WOODWORK
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 00 DAMPPROOFING
07 26 00 VAPOR RETARDERS
07 84 00 FIRESTOPPING
07 90 00 SEALANTS
DIVISION 08 - OPENINGS
08 14 00 WOOD DOORS
INTERIOR RENOVATION PHASE CONTENTS
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 2
DIVISION 09 - FINISHES
09 01 20.91 PLASTER RESTORATION
09 21 16 GYPSUM BOARD ASSEMBLIES
09 31 00 THIN-SET TILING
09 64 69 WOOD FLOORING RESTORATION
09 65 00 RESILIENT FLOORING
09 90 00 PAINTING AND COATING
DIVISION 10 - SPECIALTIES
10 14 10 INTERIOR SIGNAGE
10 28 13 TOILET ACCESSORIES
10 44 00 FIRE PROTECTION SPECIALTIES
DIVISION 11 - EQUIPMENT
NOT USED
DIVISION 12 - FURNISHINGS
NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION
NOT USED
DIVISION 14 - CONVEYING EQUIPMENT
14 12 00 ELECTRIC DUMBWAITERS
DIVISION 21 - FIRE SUPPRESSION
21 05 00 BASIC FIRE PROTECTION MATERIALS AND METHODS
21 10 00 FIRE PROTECTION
DIVISION 22 - PLUMBING
22 05 00 BASIC PLUMBING SYSTEM MATERIALS AND METHODS
22 10 00 PLUMBING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 05 00 BASIC HVAC SYSTEM MATERIALS AND METHODS
23 10 00 HEATING, VENTILATING AND AIR CONDITIONING
DIVISION 25 - INTEGRATED AUTOMATION
NOT USED
DIVISION 26 - ELECTRICAL
26 00 00 GENERAL ELECTRICAL
26 05 19 600 VOLT CONDUCTORS
26 05 26 ELECTRICAL POWER SERVICE AND GROUNDING
26 05 33 CONDUIT
26 27 26 WIRING DEVICES
26 27 29 BOXES
26 28 16 SAFETY SWITCHES
26 51 00 LIGHTING FIXTURES
INTERIOR RENOVATION PHASE CONTENTS
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 3
DIVISION 27 - COMMUNICATIONS
NOT USED
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
NOT USED
DIVISION 31 - EARTHWORK
31 31 00 SOIL TREATMENT
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 19 23 SODDING
DIVISION 33 - UTILITIES
SEE DRAWINGS FOR SPECIFICATIONS
DIVISIONS 34 - 48
NOT USED
END TABLE OF CONTENTS
PROJECT: SECTION: 01 10 00
CAMPBELL STATION INN SUMMARY OF
INTERIOR RENOVATION PHASE WORK
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 1
PART 1 - GENERAL
1.1 LOCATION OF PROPERTY
THE PROPERTY IS LOCATED AT 11401 KINGSTON PIKE IN FARRAGUT, TENNESSEE.
1.2 PROJECT SCOPE
THIS PROJECT IS AN INTERIOR RENOVATION PHASE. IT INCLUDES MINOR EXTERIOR WORK
RELATED TO INTERIOR CONDITIONS.
PROVIDE LABOR, MATERIAL, EQUIPMENT AND SERVICES, AND PERFORM WORK BOTH
TEMPORARY AND PERMANENT, FOR THE SELECTIVE RENOVATION AND ADAPTIVE REUSE OF
THE HISTORIC CAMPBELL STATION INN.
A. SUMMARY OF WORK: AREAS AND SERVICES AFFECTED BY THE SCOPE OF THIS
PROJECT.
1. SELECTIVE PREPARATION OF THE BUILDING INCLUDING LIMITED REMOVAL OF
CERTAIN BUILDING COMPONENTS, REMOVAL OF DEBRIS, SHORING, PROTECTION OF
EXISTING COMPONENTS TO REMAIN, AND OTHER REQUIREMENTS AS DEFINED IN THE
CONTRACT DOCUMENTS.
2. TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGING ANY PORTION OF THE
HISTORIC HOUSE SCHEDULED TO REMAIN. FLOORS, WALLS AND CEILINGS SHALL BE
PROTECTED FROM DAMAGE, CUTTING, ETC. UNLESS SPECIFICALLY INDICATED FOR
CUTTING TO INSTALL NEW SERVICES.
3. MINOR LAWN DRAINAGE WORK AT AREAS NOTED ON DRAWINGS. RESTORE GRADES
AND LAWNS PER DRAWINGS. RESTORE PAVINGS, SIDEWALKS, CURBS AND UTILITIES
IF DAMAGED BY CONSTRUCTION.
4. REPOINT AREAS OF EXISTING BASEMENT BRICK PER ALLOWANCE, AND REPAIR
BRICK CRACK ON SOUTH WALL WHERE NOTED ON DRAWINGS. ALL MASONRY
REPAIRS SHALL UTILIZE A RESTORATION-TYPE MORTAR COMPATIBLE WITH THE
HISTORIC MASONRY.
5. RESTORE FINISH OF HISTORIC FRONT DOOR. TOUCH UP EXTERIOR PAINT AND
SEALANTS AT EXTERIOR WHERE NOTED ON DRAWINGS.
6. PROTECT EXISTING HISTORIC WINDOW FRAMES AND SASHES, AND STORM
WINDOWS.
7. REPAIR EXISTING WOOD DOORS AND HARDWARE.
8. REINFORCE EXISTING HISTORIC STAIR AND RESTORE FINISHES.
9. CONSTRUCT INTERIOR WOOD STUD PARTITIONS AS INDICATED ON DRAWINGS.
10. STRIP WALLCOVERINGS FROM HISTORIC WOOD PLANK PARTITIONS. PREP AND
PAINT.
11. PATCH OR REPLACE MISSING OR IRREPARABLE DOOR AND WOOD TRIM
COMPONENTS TO MATCH ORIGINALS IN EACH ROOM AS NOTED ON DRAWINGS. PREP,
PRIME, AND PAINT INTERIOR WOOD WAINSCOTS, CASINGS, STANDING AND RUNNING
TRIM, STAIR TRIM, AND DOORS.
12. REPLACE MISSING OR IRREPARABLE AREAS OF WOOD PLANK FLOORING WITH IN-
KIND MATERIAL. PATCH, RESTORE AND REFINISH ALL EXISTING WOOD FLOORS AS
SPECIFIED AND NOTED ON DRAWINGS.
INTERIOR RENOVATION PHASE WORK
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 2
13. EXCEPT WHERE NOTED, STRIP WALLCOVERINGS FROM MASONRY WALLS TO BARE
PLASTER. REPAIR, PATCH, SKIMCOAT AND PAINT PLASTER ON MASONRY WALLS.
14. REPLACE FINISH ON EXISTING WOOD STUD WALLS WITH PAINTED GYPSUM BOARD.
WHERE NECESSARY FOR FINISH WORK, REMOVE, LABEL, STORE AND REINSTALL
EXISTING TRIM.
15. REPAIR GYPSUM BOARD CEILINGS AS NECESSARY TO PROVIDE A CONSISTENT
APPEARANCE.
16. REPAIR AND REINFORCE STRUCTURAL MEMBERS WHERE DAMAGED OR MODIFIED.
INSTALL SUPPLEMENTAL FRAMING, CONNECTIONS AND SUPPORTS AS INDICATED ON
DRAWINGS.
17. MODIFY EXISTING NFPA 13 SPRINKLER SYSTEM WHERE NOTED. PATCH FINISHES
WHERE DISTURBED.
18. MODIFY EXISTING HVAC SYSTEMS, AND INSTALL NEW DUCTWORK, GRILLES AND
REGISTERS AS INDICATED.
19. MODIFY EXISTING PLUMBING AND PIPING SYSTEMS AS INDICATED AND INSTALL NEW
FIXTURES.
20. MODIFY ELECTRICAL SYSTEMS AND INSTALL LIGHT FIXTURES AS INDICATED.
21. TEMPORARY FACILITIES, ALL REQUIRED BARRIERS, TEMPORARY BUILDING
CLOSURES, TEMPORARY EXIT FACILITIES, SHORING, DUST CONTROL AND CLEANUP.
22. SEE DRAWINGS AND SPECIFICATIONS FOR INFORMATION ON ALTERNATES. PROVIDE
AND INSTALL ALTERNATE WORK IF ELECTED BY OWNER.
23. MISCELLANEOUS REQUIREMENTS OF THE PROJECT AS DEFINED IN THE CONTRACT
DOCUMENTS.
1.3 SEPARATE CONTRACTS: WORK DENOTED AS "NOT IN CONTRACT" (N.I.C.) WILL BE FURNISHED
AND INSTALLED BY THE OWNER OR BY OTHERS UNDER SEPARATE CONTRACTS. WORK BY
OWNER WILL BE COORDINATED AND SCHEDULED BY GENERAL CONTRACTOR. CONTRACTOR
SHALL ROUGH-IN AND MAKE CONNECTIONS OF MECHANICAL AND ELECTRICAL SERVICES AS
REQUIRED FOR WORK NOT IN CONTRACT.
1.4 APPLICABLE CODES AND STANDARDS
A. MAJOR CODES GOVERNING THIS PROJECT ARE: INTERNATIONAL BUILDING CODE,
INTERNATIONAL EXISTING BUILDING CODE, INTERNATIONAL MECHANICAL CODE,
INTERNATIONAL PLUMBING CODE, INTERNATIONAL FUEL GAS CODE, NATIONAL
ELECTRICAL CODE, INTERNATIONAL FIRE CODE, ANSI A117.1, AND AMERICANS WITH
DISABILITIES ACT AS IT PERTAINS TO HISTORIC STRUCTURES.
B. IN CASES OF CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL APPLY.
C. THIS PROJECT IS INTENDED TO MEET THE AMERICANS WITH DISABILITIES ACT
ALTERNATIVE MINIMUM REQUIREMENTS FOR ALTERATIONS TO A QUALIFIED HISTORIC
BUILDING OR FACILITY.
D. THE CAMPBELL STATION INN IS A HISTORIC STRUCTURE LISTED IN THE NATIONAL
REGISTER OF HISTORIC PLACES. ALL NECESSARY PRECAUTIONS SHALL BE TAKEN TO
PROTECT THE PORTIONS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN IN
PLACE. ALL WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE SECRETARY OF THE
INTERIOR'S STANDARDS FOR REHABILITATION AND ILLUSTRATED GUIDELINES FOR
INTERIOR RENOVATION PHASE WORK
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 3
REHABILITATING HISTORIC BUILDINGS, LATEST EDITION.
E. ALL REFERENCES TO CODES, SPECIFICATIONS, AND STANDARDS IN THE SPECIFICATION
SECTIONS AND ON THE DRAWINGS SHALL MEAN, AND ARE INTENDED TO BE, THE LATEST
EDITION, AMENDMENT OR REVISION OF SUCH REFERENCE STANDARD IN EFFECT AS OF
THE DATE OF THESE CONTRACT DOCUMENTS IN THE JURISDICTIONS IN WHICH THIS
PROJECT IS LOCATED.
1.5 SPECIAL PRECAUTIONS
A. EXISTING COMPONENTS SHALL BE PROTECTED AT ALL TIMES DURING THE COURSE OF
THE PROJECT FROM DAMAGE DUE TO WEATHER, EARTHWORK, EXCAVATION, FILL,
LOADING, IMPACT, VIBRATION, DEMOLITION, AND OTHER CONSTRUCTION HAZARDS AND
EFFECTS.
B. TAKE EVERY PRECAUTION TO ENSURE THAT THE GENERAL PUBLIC WILL BE EXPOSED TO
NO DANGEROUS CONDITIONS AS A RESULT OF THE WORK.
C. IT SHALL BE MANDATORY FOR THE CONTRACTOR TO KEEP CONSTRUCTION OPERATIONS
PERSONNEL, MATERIALS, DEBRIS, ETC., FROM ENCROACHING ON ACCESS WAYS OR
REQUIRED EXITS FOR FIRE SAFETY AND COMPLIANCE WITH APPLICABLE ORDINANCES OR
LAWS. CONTRACTOR SHALL COORDINATE THE USE OF PREMISES FOR WORK AND
STORAGE OF MATERIALS FOR ALL SUBCONTRACTORS. CONTRACTOR SHALL RESTRICT
ALL CONSTRUCTION TRAFFIC, DELIVERIES, ETC., TO THE AREAS DESIGNATED BY THE
ARCHITECT AND/OR OWNER.
END SECTION
PROJECT: SECTION: 01 21 00
CAMPBELL STATION INN ALLOWANCES
INTERIOR RENOVATION PHASE
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 1
PART 1 - GENERAL
1.1 SUMMARY
A. ALLOWANCES ARE PROVIDED FOR ITEMS, QUANTITIES, OR QUALITIES TO BE
DETERMINED AT A LATER DATE. ALLOWANCES MAY BE IN THE FORM OF LUMP SUM, UNIT
COST, QUANTITY OR CONTINGENCY.
B. ALLOWANCES SHALL BE INCLUDED IN THE BASE CONSTRUCTION COST OR BID.
C. ALLOWANCES SHALL BE ADJUSTED BY CHANGE ORDER TO REFLECT ACTUAL COSTS
AFTER FINAL QUANTITIES OR PRODUCTS ARE DETERMINED.
D. AS SOON AS PRACTICAL AFTER THE AWARD OF THE CONTRACT, THE CONTRACTOR
SHALL NOTIFY THE ARCHITECT OF THE DATES REQUIRED FOR FINAL SELECTION OF
ITEMS SPECIFIED BY ALLOWANCE IN ORDER TO AVOID A DELAY IN THE WORK.
1.2 SUBMITTALS
A. SUBMIT CHANGE ORDER PROPOSALS FOR ADJUSTMENT OF ALLOWANCE ITEMS WITH
DETAILED SUPPORTING COST DOCUMENTATION.
B. SUBMIT INVOICES OR DELIVERY FORMS FOR DOCUMENTATION OF PRODUCTS AND
QUANTITIES DELIVERED TO SITE AND USED ON PROJECT.
C. SUBMIT TIME SHEETS, OR WORK SUMMARY CHARTS TO DOCUMENT HOURS OF WORK
PERFORMED WHERE LABOR COST OR INSTALLATION COST IS PART OF AN ALLOWANCE.
D. PROVIDE THIRD PARTY VERIFICATION DOCUMENTATION OF ACTUAL QUANTITIES USED
FOR SITE RELATED QUANTITY ALLOWANCES, MEASURED IN ACCORDANCE WITH
SPECIFICATIONS.
1.3 LUMP SUM, QUANTITY AND UNIT COST ALLOWANCES
A. THESE ALLOWANCES SHALL INCLUDE THE COST OF THE MATERIAL, DELIVERY, TAX, AND
FREIGHT.
B. UNLESS SPECIFICALLY NOTED OTHERWISE, COSTS SUCH AS THE GENERAL
CONTRACTOR’S OVERHEAD, HANDLING, STORAGE, LABOR, INSTALLATION, OVERHEAD,
PROFIT AND OTHER SIMILAR COSTS SHALL NOT BE PART OF THE ALLOWANCE, AND
SHALL BE INCLUDED IN THE OVERALL PROJECT COST.
C. UNLESS OTHERWISE NOTED, RETURN UNUSED QUANTITIES FOR REFUND ON QUANTITIES
NOT REQUIRED FOR ACCEPTABLE COMPLETION OF THE PROJECT.
1.4 CONTINGENCY ALLOWANCES
A. CONTINGENCY ALLOWANCES SHALL INCLUDE ALL COSTS ASSOCIATED WITH THE
ALLOWANCE INCLUDING MATERIAL QUANTITIES, FREIGHT, DELIVERY, TAXES, LABOR,
INSURANCE, STORAGE, EQUIPMENT RENTAL, OVERHEAD AND PROFIT.
1.5 SCHEDULE OF ALLOWANCES
A. CONSULT DRAWINGS AND SPECIFICATIONS FOR MORE DETAILED INFORMATION ON EACH
ALLOWANCE.
PROJECT: SECTION: 01 25 00
CAMPBELL STATION INN SUBSTITUTION
INTERIOR RENOVATION PHASE PROCEDURES
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 1
PART 1 - GENERAL
1.1 DEFINITIONS
A. SUBSTITUTIONS: CHANGES IN PRODUCTS, MATERIALS, EQUIPMENT, AND METHODS OF
CONSTRUCTION FROM THOSE REQUIRED BY THE CONTRACT DOCUMENTS AND
PROPOSED BY CONTRACTOR.
1. SUBSTITUTIONS FOR CAUSE: CHANGES PROPOSED BY CONTRACTOR THAT ARE
REQUIRED DUE TO CHANGED PROJECT CONDITIONS, SUCH AS UNAVAILABILITY OF
PRODUCT, REGULATORY CHANGES, OR UNAVAILABILITY OF REQUIRED WARRANTY
TERMS.
2. SUBSTITUTIONS FOR CONVENIENCE: CHANGES PROPOSED BY CONTRACTOR OR
OWNER THAT ARE NOT REQUIRED IN ORDER TO MEET OTHER PROJECT
REQUIREMENTS BUT MAY OFFER ADVANTAGE TO CONTRACTOR OR OWNER.
1.2 SUBSTITUTION REQUESTS
A. SUBMIT THREE COPIES OF EACH REQUEST FOR CONSIDERATION. IDENTIFY PRODUCT OR
FABRICATION OR INSTALLATION METHOD TO BE REPLACED. INCLUDE SPECIFICATION
SECTION NUMBER AND TITLE AND DRAWING NUMBERS AND TITLES. SHOW COMPLIANCE
WITH REQUIREMENTS FOR SUBSTITUTIONS AND THE FOLLOWING, AS APPLICABLE:
1. STATEMENT INDICATING WHY SPECIFIED PRODUCT OR FABRICATION OR
INSTALLATION CANNOT BE PROVIDED, IF APPLICABLE.
2. COORDINATION INFORMATION, INCLUDING A LIST OF CHANGES OR MODIFICATIONS
NEEDED TO OTHER PARTS OF THE WORK AND TO CONSTRUCTION PERFORMED BY
OWNER AND SEPARATE CONTRACTORS, THAT WILL BE NECESSARY TO
ACCOMMODATE PROPOSED SUBSTITUTION.
3. DETAILED COMPARISON OF SIGNIFICANT QUALITIES OF PROPOSED SUBSTITUTION
WITH THOSE OF THE WORK SPECIFIED. INCLUDE ANNOTATED COPY OF APPLICABLE
SPECIFICATION SECTION. SIGNIFICANT QUALITIES MAY INCLUDE ATTRIBUTES SUCH
AS PERFORMANCE, WEIGHT, SIZE, DURABILITY, VISUAL EFFECT, SUSTAINABLE
DESIGN CHARACTERISTICS, WARRANTIES, AND SPECIFIC FEATURES AND
REQUIREMENTS INDICATED. INDICATE DEVIATIONS, IF ANY, FROM THE WORK
SPECIFIED.
4. PRODUCT DATA, INCLUDING DRAWINGS AND DESCRIPTIONS OF PRODUCTS AND
FABRICATION AND INSTALLATION PROCEDURES.
5. SAMPLES, WHERE APPLICABLE OR REQUESTED.
6. CERTIFICATES AND QUALIFICATION DATA, WHERE APPLICABLE OR REQUESTED.
7. LIST OF SIMILAR INSTALLATIONS FOR COMPLETED PROJECTS WITH PROJECT NAMES
AND ADDRESSES AND NAMES AND ADDRESSES OF ARCHITECTS AND OWNERS.
8. MATERIAL TEST REPORTS FROM A QUALIFIED TESTING AGENCY INDICATING AND
INTERPRETING TEST RESULTS FOR COMPLIANCE WITH REQUIREMENTS INDICATED.
9. RESEARCH REPORTS EVIDENCING COMPLIANCE WITH BUILDING CODES IN EFFECT
FOR PROJECT.
10. DETAILED COMPARISON OF CONTRACTOR'S CONSTRUCTION SCHEDULE USING
PROPOSED SUBSTITUTION WITH PRODUCTS SPECIFIED FOR THE WORK, INCLUDING
EFFECT ON THE OVERALL CONTRACT TIME. IF SPECIFIED PRODUCT OR METHOD OF
CONSTRUCTION CANNOT BE PROVIDED WITHIN THE CONTRACT TIME, INCLUDE
LETTER FROM MANUFACTURER, ON MANUFACTURER'S LETTERHEAD, STATING DATE
OF RECEIPT OF PURCHASE ORDER, LACK OF AVAILABILITY, OR DELAYS IN DELIVERY.
11. COST INFORMATION, INCLUDING A PROPOSAL OF CHANGE, IF ANY, IN THE CONTRACT
SUM.
12. CONTRACTOR'S CERTIFICATION THAT PROPOSED SUBSTITUTION COMPLIES WITH
REQUIREMENTS IN THE CONTRACT DOCUMENTS EXCEPT AS INDICATED IN
SUBSTITUTION REQUEST, IS COMPATIBLE WITH RELATED MATERIALS, AND IS
APPROPRIATE FOR APPLICATIONS INDICATED.
13. CONTRACTOR'S WAIVER OF RIGHTS TO ADDITIONAL PAYMENT OR TIME THAT MAY
SUBSEQUENTLY BECOME NECESSARY BECAUSE OF FAILURE OF PROPOSED
SUBSTITUTION TO PRODUCE INDICATED RESULTS.
INTERIOR RENOVATION PHASE PROCEDURES
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 2
B. ARCHITECT'S ACTION: IF NECESSARY, ARCHITECT WILL REQUEST ADDITIONAL
INFORMATION OR DOCUMENTATION FOR EVALUATION WITHIN SEVEN DAYS OF RECEIPT
OF A REQUEST FOR SUBSTITUTION. ARCHITECT WILL NOTIFY OF ACCEPTANCE OR
REJECTION OF PROPOSED SUBSTITUTION WITHIN 15 DAYS OF RECEIPT OF REQUEST, OR
SEVEN DAYS OF RECEIPT OF ADDITIONAL INFORMATION OR DOCUMENTATION,
WHICHEVER IS LATER.
1. FORMS OF ACCEPTANCE: CHANGE ORDER, CONSTRUCTION CHANGE DIRECTIVE, OR
ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS FOR MINOR CHANGES IN THE WORK.
2. USE PRODUCT SPECIFIED IF ARCHITECT DOES NOT ISSUE A DECISION ON USE OF A
PROPOSED SUBSTITUTION WITHIN TIME ALLOCATED.
1.3 QUALITY ASSURANCE
COMPATIBILITY OF SUBSTITUTIONS: INVESTIGATE AND DOCUMENT COMPATIBILITY OF
PROPOSED SUBSTITUTION WITH RELATED PRODUCTS AND MATERIALS. ENGAGE QUALIFIED
TESTING AGENCY TO PERFORM COMPATIBILITY TESTS RECOMMENDED BY MANUFACTURERS.
1.4 COORDINATION
MODIFY OR ADJUST AFFECTED WORK AS NECESSARY TO INTEGRATE WORK OF THE
APPROVED SUBSTITUTIONS.
1.5 SUBSTITUTIONS
A. SUBSTITUTIONS FOR CAUSE: SUBMIT REQUESTS FOR SUBSTITUTION IMMEDIATELY
UPON DISCOVERY OF NEED FOR CHANGE, BUT NOT LATER THAN 15 DAYS PRIOR TO TIME
REQUIRED FOR PREPARATION AND REVIEW OF RELATED SUBMITTALS.
1. CONDITIONS: ARCHITECT WILL CONSIDER CONTRACTOR'S REQUEST FOR
SUBSTITUTION WHEN THE FOLLOWING CONDITIONS ARE SATISFIED. IF THE
FOLLOWING CONDITIONS ARE NOT SATISFIED, ARCHITECT WILL RETURN REQUESTS
WITHOUT ACTION, EXCEPT TO RECORD NONCOMPLIANCE WITH THESE
REQUIREMENTS:
2. REQUESTED SUBSTITUTION IS CONSISTENT WITH THE CONTRACT DOCUMENTS AND
WILL PRODUCE INDICATED RESULTS.
a. SUBSTITUTION REQUEST IS FULLY DOCUMENTED AND PROPERLY SUBMITTED.
b. REQUESTED SUBSTITUTION WILL NOT ADVERSELY AFFECT CONTRACTOR'S
CONSTRUCTION SCHEDULE.
c. REQUESTED SUBSTITUTION HAS RECEIVED NECESSARY APPROVALS OF
AUTHORITIES HAVING JURISDICTION.
d. REQUESTED SUBSTITUTION IS COMPATIBLE WITH OTHER PORTIONS OF THE
WORK.
e. REQUESTED SUBSTITUTION HAS BEEN COORDINATED WITH OTHER PORTIONS
OF THE WORK.
f. REQUESTED SUBSTITUTION PROVIDES SPECIFIED WARRANTY.
g. IF REQUESTED SUBSTITUTION INVOLVES MORE THAN ONE CONTRACTOR, REQUESTED SUBSTITUTION HAS BEEN COORDINATED WITH OTHER PORTIONS
OF THE WORK, IS UNIFORM AND CONSISTENT, IS COMPATIBLE WITH OTHER
PRODUCTS, AND IS ACCEPTABLE TO ALL CONTRACTORS INVOLVED.
B. SUBSTITUTIONS FOR CONVENIENCE: ARCHITECT WILL CONSIDER REQUESTS FOR
SUBSTITUTION, WHEN THE FOLLOWING CONDITIONS HAVE BEEN SATISFIED, AND IF
RECEIVED WITHIN 60 DAYS AFTER THE NOTICE TO PROCEED. REQUESTS RECEIVED
AFTER THAT TIME MAY BE CONSIDERED OR REJECTED AT DISCRETION OF ARCHITECT. IF
THE FOLLOWING CONDITIONS ARE NOT SATISFIED, ARCHITECT WILL RETURN REQUESTS
WITHOUT ACTION, EXCEPT TO RECORD NONCOMPLIANCE WITH THESE REQUIREMENTS:
1. REQUESTED SUBSTITUTION OFFERS OWNER A SUBSTANTIAL ADVANTAGE IN COST,
TIME, ENERGY CONSERVATION, OR OTHER CONSIDERATIONS, AFTER DEDUCTING
ADDITIONAL RESPONSIBILITIES OWNER MUST ASSUME. OWNER'S ADDITIONAL
RESPONSIBILITIES MAY INCLUDE COMPENSATION TO ARCHITECT FOR REDESIGN
AND EVALUATION SERVICES, INCREASED COST OF OTHER CONSTRUCTION BY
OWNER, AND SIMILAR CONSIDERATIONS.
INTERIOR RENOVATION PHASE PROCEDURES
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 3
2. REQUESTED SUBSTITUTION DOES NOT REQUIRE EXTENSIVE REVISIONS TO THE
CONTRACT DOCUMENTS.
3. REQUESTED SUBSTITUTION IS CONSISTENT WITH THE CONTRACT DOCUMENTS AND
WILL PRODUCE INDICATED RESULTS.
4. SUBSTITUTION REQUEST IS FULLY DOCUMENTED AND PROPERLY SUBMITTED.
5. REQUESTED SUBSTITUTION WILL NOT ADVERSELY AFFECT CONTRACTOR'S
CONSTRUCTION SCHEDULE.
6. REQUESTED SUBSTITUTION HAS RECEIVED NECESSARY APPROVALS OF
AUTHORITIES HAVING JURISDICTION.
7. REQUESTED SUBSTITUTION IS COMPATIBLE WITH OTHER PORTIONS OF THE WORK.
8. REQUESTED SUBSTITUTION HAS BEEN COORDINATED WITH OTHER PORTIONS OF
THE WORK.
9. REQUESTED SUBSTITUTION PROVIDES SPECIFIED WARRANTY.
10. IF REQUESTED SUBSTITUTION INVOLVES MORE THAN ONE CONTRACTOR,
REQUESTED SUBSTITUTION HAS BEEN COORDINATED WITH OTHER PORTIONS OF
THE WORK, IS UNIFORM AND CONSISTENT, IS COMPATIBLE WITH OTHER PRODUCTS,
AND IS ACCEPTABLE TO ALL CONTRACTORS INVOLVED.
PROJECT: SECTION: 01 26 20
CAMPBELL STATION INN WEATHER DELAYS
INTERIOR RENOVATION PHASE
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 1
PART 1 - GENERAL
1.1 EXTENSIONS OF CONTRACT TIME
IF THE BASIS EXISTS FOR AN EXTENSION OF TIME IN ACCORDANCE WITH PARAGRAPH 8.3 OF
THE GENERAL CONDITIONS, AN EXTENSION OF TIME ON THE BASIS OF WEATHER MAY BE
GRANTED ONLY FOR THE NUMBER OF WEATHER DELAY DAYS IN EXCESS OF THE NUMBER OF
DAYS LISTED AS THE STANDARD BASELINE FOR THAT MONTH.
1.2 STANDARD BASELINE FOR AVERAGE CLIMATIC RANGE
A. A STANDARD BASELINE OF AVERAGE CLIMATIC RANGE FOR THE STATE OF TENNESSEE
HAS BEEN DETERMINED BASED ON WEATHER DATA AVAILABLE FROM THE NATIONAL
OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA).
B. STANDARD BASELINE SHALL BE REGARDED AS THE NORMAL AND ANTICIPATABLE
NUMBER OF CALENDAR DAYS FOR EACH MONTH DURING WHICH CONSTRUCTION
ACTIVITY SHALL BE EXPECTED TO BE PREVENTED AND SUSPENDED BY CAUSE OF
ADVERSE WEATHER. SUSPENSION OF CONSTRUCTION ACTIVITY FOR THE NUMBER OF
DAYS EACH MONTH AS LISTED IN THE STANDARD BASELINE IS INCLUDED IN THE WORK
AND IS NOT ELIGIBLE FOR EXTENSION OF CONTRACT TIME.
C. STANDARD BASELINE IS AS FOLLOWS:
JAN FEB MAR APR MAY JUN JUL AUG SEPT OCT NOV DEC
12 11 8 7 7 6 7 5 4 5 6 11
1.3 ADVERSE WEATHER AND WEATHER DELAY DAYS
A. ADVERSE WEATHER IS DEFINED AS THE OCCURRENCE OF ONE OR MORE OF THE
FOLLOWING CONDITIONS WHICH PREVENTS EXTERIOR CONSTRUCTION ACTIVITY OR
ACCESS TO THE SITE WITHIN TWENTY-FOUR (24) HOURS:
1. PRECIPITATION (RAIN, SNOW OR ICE) IN EXCESS OF ONE-TENTH INCH (0.10") LIQUID
MEASURE.
2. PRECIPITATION (RAIN, SNOW OR ICE) IN EXCESS OF THAT ALLOWED FOR THE DAY’S
CONSTRUCTION ACTIVITY.
3. TEMPERATURES WHICH DO NOT RISE ABOVE 32 DEGREES FAHRENHEIT BY 10:00 A.M.
4. TEMPERATURES WHICH DO NOT RISE ABOVE THAT SPECIFIED FOR THE DAY’S
CONSTRUCTION ACTIVITY BY 10:00 A.M., IF ANY IS SPECIFIED.
5. SUSTAINED WIND IN EXCESS OF TWENTY-FIVE (25) MILES PER HOUR.
6. SUSTAINED WIND IN EXCESS OF THAT ALLOWED FOR THE DAY’S CONSTRUCTION
ACTIVITY.
7. STANDING SNOW IN EXCESS OF ONE INCH (1.00").
B. ADVERSE WEATHER MAY INCLUDE, IF APPROPRIATE, “DRY-OUT” DAYS WHEN THE
FOLLOWING CONDITION IS MET:
1. ONLY IF THERE IS A HINDRANCE TO REGULARLY SCHEDULED WORK, SUCH AS A
REQUIRED PERIOD OF DRY WEATHER PRIOR TO SPECIFIED WORK.
C. A WEATHER DELAY DAY MAY ONLY BE COUNTED IF ADVERSE WEATHER PREVENTS
CRITICAL PATH WORK ON THE PROJECT FOR FIFTY PERCENT (50%) OR MORE OF THE
CONTRACTOR’S SCHEDULED WORK DAY, INCLUDING A WEEKEND DAY OR HOLIDAY IF
CONTRACTOR HAS SCHEDULED CONSTRUCTION ACTIVITY THAT DAY.
1.4 DOCUMENTATION AND SUBMITTALS
A. SUBMIT DAILY JOBSITE WORK LOGS SHOWING WHICH AND TO WHAT EXTENT
CONSTRUCTION ACTIVITIES HAVE BEEN AFFECTED BY WEATHER ON A MONTHLY BASIS.
B. SUBMIT ACTUAL WEATHER DATA TO SUPPORT CLAIM FOR TIME EXTENSION OBTAINED
FROM NEAREST NOAA WEATHER STATION OR OTHER INDEPENDENTLY VERIFIED
SOURCE APPROVED BY ARCHITECT AT BEGINNING OF PROJECT.
PROJECT: SECTION: 01 26 20
CAMPBELL STATION INN WEATHER DELAYS
INTERIOR RENOVATION PHASE
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 2
C. USE STANDARD BASELINE DATA PROVIDED IN THIS SECTION WHEN DOCUMENTING
ACTUAL DELAYS DUE TO WEATHER IN EXCESS OF THE AVERAGE CLIMATIC RANGE.
D. ORGANIZE CLAIM AND DOCUMENTATION TO FACILITATE EVALUATION ON A BASIS OF
CALENDAR MONTH PERIODS, AND SUBMIT IN ACCORDANCE WITH THE PROCEDURES FOR
CLAIMS ESTABLISHED IN THE GENERAL CONDITIONS.
E. IF AN EXTENSION OF THE CONTRACT TIME IS APPROPRIATE, IT SHALL BE EFFECTED IN
ACCORDANCE WITH THE PROVISIONS OF ARTICLE 7 OF THE GENERAL CONDITIONS, AND
THE APPLICABLE GENERAL REQUIREMENTS AND THE SUPPLEMENTARY CONDITIONS
HERETO.
PROJECT: SECTION: 01 30 00
CAMPBELL STATION INN ADMINISTRATIVE
INTERIOR RENOVATION PHASE REQUIREMENTS
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 1
PART 1 - GENERAL
1.1 PROJECT COORDINATION
A. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL REVIEW OTHER SECTIONS
OF WORK APPLICABLE TO THEIR WORK AND ASCERTAIN REQUIREMENTS IN OTHER
SECTIONS APPLICABLE TO THEIR OWN WORK. EACH SHALL BE HELD RESPONSIBLE FOR
COORDINATION AND INCLUSION OF THE WORK INDICATED AS IF IT WERE IN THE
PARTICULAR SUBCONTRACTOR'S SECTION. THE ARCHITECT SHALL BE ADVISED OF ANY
DISCREPANCIES OR CONFLICTS AT THE EARLIEST MOMENT.
B. ALL SUBCONTRACTORS, SUPPLIERS, ETC., SHALL BE RESPONSIBLE FOR KNOWING WHAT
INFORMATION IS GIVEN ON ALL SHEETS OF THE PLANS AND SPECIFICATIONS
CONCERNING THEIR PARTICULAR WORK. IF AN ITEM OR PIECE OF WORK IS SHOWN ON
THE ARCHITECTURAL AND NOT ON THE MECHANICAL, ELECTRICAL OR STRUCTURAL
DRAWINGS, IT SHALL BE INCLUDED IN THE CONTRACT. THE REVERSE CONDITION SHALL
ALSO APPLY.
1.2 PERSONNEL CONTACT LIST
A. BEFORE THE DATE OF ON-SITE MOBILIZATION, SUBMIT A LIST CONTAINING THE NAMES,
TELEPHONE NUMBERS (MOBILE AND OFFICE), EMAIL ADDRESSES, COMPANY
REPRESENTATION, AND CONSTRUCTION ROLES OF ALL PROJECT PERSONNEL. FOR
EACH CONTRACTOR AND SUBCONTRACTOR, LIST AT LEAST ONE BACKUP CONTACT IN
THE EVENT THE MAIN CONTACT FOR A PARTICULAR COMPANY CANNOT BE REACHED.
KEEP THIS LIST UPDATED AND POSTED ON THE PROJECT SITE IN THE JOB TRAILER.
1.3 PROJECT MEETINGS
A. PRE-CONSTRUCTION MEETING
1. A PRE-CONSTRUCTION CONFERENCE WILL BE SCHEDULED IMMEDIATELY WITH THE
AWARD OF THE CONTRACT.
2. CONTRACTOR SHALL BE PRESENT AND ACCOMPANIED BY THE PROJECT
COORDINATOR, JOB SUPERINTENDENT, AND ALL MAJOR SUBCONTRACTORS.
B. PROGRESS MEETINGS:
1. THE OWNER, THE CONTRACTOR, SUBCONTRACTORS, MATERIAL SUPPLIERS, AND
VENDORS WHOSE PRESENCE IS NECESSARY, MUST ATTEND MEETINGS WHEN
CALLED BY ARCHITECT OR HIS OR HER REPRESENTATIVE FOR THE PURPOSE OF
DISCUSSING THE EXECUTION OF THE WORK.
2. MEETINGS WILL BE HELD WEEKLY OR AS REQUIRED, AT A TIME AND PLACE
DESIGNATED BY THE OWNER AND THE ARCHITECT OR THEIR REPRESENTATIVES.
3. DECISIONS, INSTRUCTIONS, AND INTERPRETATIONS GIVEN BY ARCHITECT OR HIS OR
HER REPRESENTATIVE AT THESE MEETINGS SHALL BE BINDING AND CONCLUSIVE ON
THE CONTRACTOR.
4. PROCEEDINGS OF THESE MEETINGS WILL BE RECORDED AND CONTRACTOR WILL BE
FURNISHED AN ELECTRONIC COPY FOR USE AND FOR DISTRIBUTION TO THE
VARIOUS SUBCONTRACTORS, MATERIAL SUPPLIERS, AND VENDORS INVOLVED.
5. AT EACH MEETING, CONTRACTOR SHALL BE PREPARED TO GIVE CONSTRUCTION
PROGRESS REPORTS, SCHEDULE UPDATES, AND REPORTS ON UPCOMING WORK.
1.4 CONSTRUCTION SCHEDULE
A. AT THE PRE-CONSTRUCTION MEETING AND EVERY PROGRESS MEETING, SUBMIT AN
UPDATED GANTT-CHART STYLE CONSTRUCTION SCHEDULE WITH EVERY MAJOR
CONSTRUCTION ACTIVITY LISTED ON A SEPARATE LINE. IDENTIFY THE CRITICAL PATH
AND FLOAT TIMES.
1.5 SUBMITTAL SCHEDULE AND LOG
A. WITHIN FOURTEEN CALENDAR DAYS AFTER NOTICE TO PROCEED, THE CONTRACTOR
SHALL SUBMIT TO THE ARCHITECT A SUBMITTAL SCHEDULE. LIST SUBMITTALS IN
PROJECT: SECTION: 01 30 00
CAMPBELL STATION INN ADMINISTRATIVE
INTERIOR RENOVATION PHASE REQUIREMENTS
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 2
CHRONOLOGICAL ORDER BY CONSTRUCTION SCHEDULE. MAINTAIN SUBMITTAL LOG
SIMILAR TO AIA G712 THROUGHOUT THE CONSTRUCTION PROCESS AND FILL IN THE
FORM INFORMATION AS IT BECOMES AVAILABLE. KEEP AN UPDATED COPY OF THIS LOG
AND ALL SUBMITTALS IN ORDERLY FASHION ON THE PROJECT SITE.
1.6 PROJECT RECORD DOCUMENTS
A. AS THE WORK PROGRESSES, KEEP A COMPLETE AND ACCURATE RECORD OF CHANGES
OR DEVIATIONS FROM THE CONTRACT DOCUMENTS AND THE SHOP DRAWINGS,
INDICATING THE WORK AS ACTUALLY INSTALLED. CHANGES SHALL BE NEATLY AND
CORRECTLY SHOWN ON THE RESPECTIVE PORTION OF THE AFFECTED DOCUMENT,
USING BLACKLINE OR BLUELINE PRINTS OF THE DRAWINGS AFFECTED, OR THE
SPECIFICATIONS, WITH APPROPRIATE SUPPLEMENTARY NOTES. GIVE PARTICULAR
ATTENTION TO CONCEALED WORK WHICH WOULD BE DIFFICULT TO MEASURE AND
RECORD AT A LATER DATE. THIS RECORD SET OF DRAWINGS, SHOP DRAWINGS, AND
SPECIFICATIONS SHALL BE KEPT AT THE JOB SITE FOR OBSERVATION BY THE
ARCHITECT, OWNER, OR THEIR REPRESENTATIVES. THESE RECORD DOCUMENTS SHALL
BE SUBMITTED AT PROJECT CLOSEOUT.
PROJECT: SECTION: 01 33 00
CAMPBELL STATION INN SUBMITTAL
INTERIOR RENOVATION PHASE PROCEDURES
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 1
PART 1 - GENERAL
1.1 SUBMITTALS
A. CONTRACTORS SHALL SUBMIT SHOP DRAWINGS, PRODUCT DATA AND SAMPLES, AND ALL
OTHER ITEMS REQUIRED FOR REVIEW IN ACCORDANCE WITH THIS SECTION AND
RELATED REQUIREMENTS IN THE GENERAL CONDITIONS AND PARAGRAPH 1.2 WITH
REASONABLE PROMPTNESS.
B. SUBCONTRACTORS SHALL MAKE SUBMITTALS PROMPTLY SO AS TO CAUSE NO DELAY IN
THE WORK OR IN THE WORK OF ANY OTHER SUBCONTRACTOR.
C. SUBMITTALS SHALL CONTAIN
1. THE DATE OF SUBMISSION AND THE DATES OF ANY PREVIOUS SUBMISSIONS.
2. THE PROJECT TITLE AND NUMBER.
3. CONTRACTOR IDENTIFICATION.
4. THE NAMES OF
a. CONTRACTOR
b. SUPPLIER
c. MANUFACTURER
5. IDENTIFICATION OF THE PRODUCT, WITH THE SPECIFICATION SECTION NUMBER, AND
LOCATIONS AT WHICH MATERIALS AND/OR EQUIPMENT ARE TO BE INSTALLED.
6. DETAILS SHALL BE IDENTIFIED BY REFERENCE TO SHEET AND DETAIL, SCHEDULE OR
ROOM NUMBERS SHOWN ON CONTRACT DRAWINGS.
7. FIELD DIMENSIONS, CLEARLY IDENTIFIED AS SUCH, MADE BY THE CONTRACTOR OR
SUBCONTRACTOR.
8. RELATION TO ADJACENT OR CRITICAL FEATURES OF THE WORK OR MATERIALS.
9. APPLICABLE STANDARDS, SUCH AS ASTM OR FEDERAL SPECIFICATION NUMBERS.
10. IDENTIFICATION OF DEVIATION FROM CONTRACT DOCUMENTS.
11. IDENTIFICATION OF REVISIONS ON RESUBMITTALS.
12. AN 8" X 8" BLANK SPACE FOR CONTRACTOR AND ARCHITECT/ENGINEER STAMPS.
13. FIVE COMPLETE COPIES.
14. CONTRACTOR'S APPROVAL STAMP.
1.2 STANDARDS OF PRODUCT APPROVAL
A. THE NAMING OF PRODUCTS AND/OR MATERIALS IS DONE FOR THE EXPRESS PURPOSE
OF ESTABLISHING A BASIS OF DURABILITY, EFFICIENCY, APPEARANCE AND
SIMPLIFICATION OF MAINTENANCE, AND NOT FOR THE PURPOSE OF LIMITING
COMPETITION. OTHER MANUFACTURER'S MATERIALS OR ARTICLES MAY BE USED
PROVIDING THE MATERIAL OR ARTICLE IS PRESENTED TO AND APPROVED BY THE
OWNER AND ARCHITECT SUBJECT TO CONDITIONS HEREINAFTER DESCRIBED.
B. STANDARDS: WHENEVER PRODUCTS ARE SPECIFIED AND ARE FOLLOWED BY A LIST OF
NAMED "STANDARDS" IT IS DONE FOR THE EXPRESSED PURPOSE OF ESTABLISHING THE
PRODUCTS ON WHICH THE BIDDER'S PROPOSAL SHALL BE BASED FOR THAT PARTICULAR
SPECIFICATIONS ITEM. THE NAMING OF SAID PRODUCTS SHALL REFER TO THE PRINTED
SPECIFICATIONS OR DRAWINGS OF THE MANUFACTURERS OR PRODUCTS LISTED IN THE
"STANDARDS" AND SHALL BE MADE COMPLETELY A PART OF THESE SPECIFICATIONS AS
THOUGH REPEATED HEREIN AND WHICH SHALL BE ALTERED AS REQUIRED TO CONFORM
TO ANY AND ALL SPECIAL PROVISIONS CALLED FOR AND SPECIFIED FOR EACH PRODUCT
ITEM. WHERE TWO OR MORE ITEMS ARE LISTED AS "STANDARDS" THE SELECTION IS THE
CONTRACTOR'S OPTION.
C. REQUEST FOR AND APPROVAL OF SUBSTITUTIONS FOR "STANDARDS" SPECIFIED
PRODUCTS SHALL BE IN ACCORDANCE WITH SECTION 012500 OF THESE SPECIFICATIONS.
D. APPROVED EQUAL: WHEREVER PRODUCTS ARE SPECIFIED DESCRIBING PROPRIETARY
ITEMS, MODEL NUMBERS, CATALOG NUMBERS, OR “AS APPROVED EQUAL” TO A SPECIFIC
MANUFACTURER, ESTABLISHING PROOF OF THE EQUALITY OF THE PRODUCTS TO THAT
SPECIFIED SHALL BE THE RESPONSIBILITY OF THE BIDDER, IN ACCORDANCE WITH
SECTION 012500 OF THESE SPECIFICATIONS. APPROVAL AND DETERMINATION OF
INTERIOR RENOVATION PHASE PROCEDURES
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 2
EQUALITY OF ALL PRODUCTS IS VESTED IN THE ARCHITECT WHOSE DECISION SHALL BE
FINAL AND BINDING UPON ALL CONCERNED. SHOULD USE OF A PRODUCT BE DENIED BY
THE ARCHITECT AS NOT BEING EQUAL TO THAT SPECIFIED, THE CONTRACTOR SHALL
USE EITHER THE PRODUCT SPECIFIED OR ONE OF EQUAL QUALITY AS APPROVED BY THE
ARCHITECT AT NO ADDITIONAL OR EXTRA COST TO THE OWNER.
E. AGENCY OR ASSOCIATION: WHEN PRODUCTS ARE SPECIFIED IN ACCORDANCE WITH
FEDERAL SPECIFICATIONS. AMERICAN STANDARDS, ASTM STANDARDS OR OTHER
RECOGNIZED ASSOCIATION STANDARDS, THE CONTRACTOR SHALL PRESENT PROOF
FROM THE MANUFACTURER CERTIFYING THAT THE PRODUCT COMPLIES WITH THE
PARTICULAR REFERENCED STANDARD. WHERE REQUESTED OR SPECIFIED,
SUPPORTING TEST DATA SHALL BE SUBMITTED TO SUBSTANTIATE COMPLIANCE.
1.3 CONTRACTOR'S RESPONSIBILITIES
A. REVIEW SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PRIOR TO SUBMISSION.
B. VERIFY
1. FIELD MEASUREMENTS.
2. FIELD CONSTRUCTION CRITERIA.
3. CATALOG NUMBERS AND SIMILAR DATA.
4. CONFORMANCE WITH SPECIFICATIONS AND DRAWINGS.
5. ALL DIMENSIONS AND QUANTITIES.
C. COORDINATE EACH SUBMITTAL WITH REQUIREMENTS OF THE WORK AND OF THE
CONTRACT DOCUMENTS.
D. NOTIFY THE ARCHITECT/ENGINEER IN WRITING, AT TIME OF SUBMISSION, OF ANY
DEVIATIONS IN THE SUBMITTALS FROM REQUIREMENTS OF THE CONTRACT DOCUMENTS.
E. STAMP "APPROVED" OR "APPROVED AS NOTED", SIGN, AND DATE SUBMISSION.
F. BEGIN NO FABRICATION OR WORK WHICH REQUIRES SUBMITTALS UNTIL RETURN OF
SUBMITTALS WITH ARCHITECT/ENGINEER APPROVAL.
G. FAILURE OF THE CONTRACTOR TO FULFILL THESE RESPONSIBILITIES WILL RESULT IN THE
SUBMITTAL(S) BEING RETURNED TO THE CONTRACTOR, UNCHECKED BY THE ARCHITECT,
FOR PROPER HANDLING.
1.4 QUALITY ASSURANCE
A. PRODUCT LITERATURE SHALL PERMIT THE ARCHITECT AND ENGINEERS TO DETERMINE
WHICH MATERIALS, EQUIPMENT, AND SYSTEMS WILL BE ACCEPTED IN THE PROJECT AND
SHALL CONSIST OF BROCHURES, CATALOG CUTS, OR OTHER DATA SUFFICIENT TO
CLEARLY IDENTIFY SUBJECT ITEMS; OPTIONAL FEATURES TO BE UTILIZED;
PERFORMANCE CHARACTERISTICS; LIMITATIONS; PHYSICAL DIMENSION; CONFORMANCE
WITH STANDARDS, CODES, FIRE RATINGS, ACOUSTICAL RATINGS, APPEARANCE
CHARACTERISTIC, AND ANY OTHER PERTINENT DATA TO IDENTIFY IT AS EITHER ITEM
SPECIFIED OR AS EQUAL TO THAT SPECIFIED. STATEMENTS SUCH AS "AS SPECIFIED"
WILL NOT SUFFICE.
B. SHOP DRAWINGS
1. SHOP DRAWINGS FACILITATE INTEGRATION, COORDINATION, AND PROGRESS OF THE
WORK AND ARE NOT TO BE CONSIDERED CONTRACT DOCUMENTS.
2. THE ARCHITECT AND ENGINEERS WILL REVIEW SHOP DRAWINGS FOR GENERAL
DESIGN REQUIREMENTS ONLY.
3. VARIATIONS FROM CONTRACT DOCUMENTS SO MINOR AS TO INVOLVE NO CHANGE IN
CONTRACT AMOUNT MAY BE ACCEPTED IF ACCEPTANCE IS IN THE OWNER'S
INTEREST, AS DETERMINED BY THE ARCHITECT. DO NOT CONSTRUE THE
ARCHITECT'S REVIEW AS ALLOWING THE FOLLOWING:
a. VARIATION FROM CONTRACT DOCUMENTS, EXCEPT AS SPECIFICALLY
AUTHORIZED OR REQUESTED BY THE ARCHITECT.
INTERIOR RENOVATION PHASE PROCEDURES
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 3
b. RELIEVING THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS IN DETAILS OR
DIMENSIONS.
c. DEPARTURES FROM ADDITIONAL DETAILS OR INSTRUCTION PREVIOUSLY
FURNISHED BY THE ARCHITECT.
d. RELIEVING THE CONTRACTOR OF RESPONSIBILITY FOR INTEGRATING AND
COORDINATING VARIOUS TRADES AND SEPARATE CONTRACTS.
C. SAMPLES: REVIEW OF SAMPLES SHALL PERMIT THE ARCHITECT AND ENGINEERS TO
PHYSICALLY VERIFY CONFORMANCE OF MATERIALS, PRODUCTS, FIXTURES, OR DEVICES
WITH CONTRACT DOCUMENTS EITHER BY INSPECTION OR TESTING.
1. REVIEW OF SAMPLES WILL BE ONLY FOR CHARACTERISTICS OR USES NAMED IN
SUCH REVIEW AND SHALL NOT BE TAKEN TO CHANGE OR MODIFY ANY CONTRACT
REQUIREMENT, EXCEPT AS SPECIFICALLY AUTHORIZED OR REQUESTED BY THE
ARCHITECT.
2. SAMPLES SHALL SET STANDARDS FOR ITEMS OR CHARACTERISTICS OF WHICH
SAMPLES ARE REPRESENTATIVE AND AFTER SAMPLE HAS BEEN REVIEW, NO
FURTHER CHANGE IN BRAND, MAKE, OR QUALITY WILL BE PERMITTED.
PROJECT: SECTION: 01 35 16
CAMPBELL STATION INN ALTERATION
INTERIOR RENOVATION PHASE PROJECT
PROJECT #2307 PROCEDURES
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 1
PART 1 - GENERAL
1.1 SUMMARY - SECTION INCLUDES
A. DEFINITIONS.
B. HISTORIC SIGNIFICANCE.
C. RESTORATION PROCEDURES.
D. HISTORIC ARTIFACTS.
E. SALVAGED MATERIALS.
F. ALTERATIONS.
G. HAZARDOUS MATERIAL PROCEDURES.
1.2 DEFINITIONS
A. MATCH EXISTING: PROVIDE NEW MATERIALS TO MATCH THE EXISTING, IN PLACE
MATERIAL IN ALL ASPECTS AS CLOSELY AS POSSIBLE. EXISTING MATERIALS ARE THOSE
WHICH ARE VISIBLE IN WHOLE OR IN PART IN THE BUILDING.
B. MATCH ORIGINAL: PROVIDE NEW MATERIALS TO MATCH THE ORIGINAL MATERIAL IN ALL
ASPECTS AS CLOSELY AS POSSIBLE. ORIGINAL MATERIALS ARE THOSE WHICH WERE
ORIGINALLY INSTALLED IN THE BUILDING AT THE TIME OF ITS COMPLETION, PRIOR TO
PREVIOUS ALTERATIONS, AND WHICH MAY PREDATE EXISTING MATERIALS.
C. PRESERVATION: THE PROCESS OF APPLYING MEASURES TO SUSTAIN THE EXISTING
FORM, INTEGRITY, AND MATERIAL OF A BUILDING OR STRUCTURE AND THE EXISTING
FORM AND VEGETATIVE COVER OF A SITE.
D. RECONSTRUCTION: THE ACT OF REPRODUCING BY NEW CONSTRUCTION THE EXACT
FORM AND DETAIL OF A VANISHED BUILDING, STRUCTURE, OR OBJECT, OR A PART
THEREOF, AS IT APPEARED AT A SPECIFIC PERIOD OF TIME.
E. REHABILITATION: THE PROCESS OF RETURNING A BUILDING OR STRUCTURE TO A
USEFUL STATE THROUGH REPAIRS OR ALTERATIONS, WHICH MAKE POSSIBLE AN
EFFICIENT CONTEMPORARY USE WHILE PRESERVING THOSE PORTIONS AND FEATURES
WHICH ARE SIGNIFICANT TO ITS HISTORIC, ARCHITECTURAL AND CULTURAL VALUES.
F. RESTORATION: THE PROCESS OF ACCURATELY RECOVERING THE FORM AND DETAILS
OF A PROPERTY AS IT APPEARED ORIGINALLY OR AT A TIME OF HISTORIC SIGNIFICANCE.
1.3 QUALITY ASSURANCE
A. HISTORIC SIGNIFICANCE
1. THE EXISTING BUILDING IS AN HISTORIC STRUCTURE LISTED ON THE NATIONAL
REGISTER OF HISTORIC PLACES.
2. DUE TO THE UNIQUE HISTORIC SIGNIFICANCE OF THE BUILDING, SPECIAL
PROCEDURES AND PRECAUTIONS MUST BE USED IN SELECTIVE DEMOLITION,
RENOVATION AND RESTORATION.
3. EXISTING COMPONENTS ARE TO BE EITHER RENOVATED OR RESTORED AS NOTED.
B. RESTORATION PROCEDURES
1. PRESERVE EXISTING MATERIALS, FINISHES, AND PROFILES.
2. BLEND NEW AND EXISTING WORK TO PROVIDE SMOOTH TRANSITIONS AND UNIFORM
APPEARANCE.
3. CEASE WORK, NOTIFY ARCHITECT/ENGINEER, AND AWAIT INSTRUCTIONS IF
MATERIALS OR CONDITIONS ENCOUNTERED AT THE SITE ARE NOT AS INDICATED BY
INTERIOR RENOVATION PHASE PROJECT
PROJECT #2307 PROCEDURES
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 2
THE CONTRACT DOCUMENTS OR IF STRUCTURE IS IN DANGER OF MOVEMENT OR
COLLAPSE. SHORE ADEQUATELY.
C. HISTORIC ARTIFACTS: IF ARTIFACTS OF A HISTORIC NATURE ARE ENCOUNTERED DURING
THE WORK:
1. CEASE WORK IN THE AFFECTED AREA IMMEDIATELY.
2. PROTECT ARTIFACTS FROM DAMAGE.
3. NOTIFY OWNER AND ARCHITECT/ENGINEER AND AWAIT INSTRUCTIONS.
4. SALVAGE OR DISPOSE OF ARTIFACTS AS DIRECTED BY THE OWNER.
D. SALVAGED MATERIALS
1. THE CONTRACTOR SHALL REMOVE AND STORE FOR REUSE MATERIALS AND
COMPONENTS SCHEDULED FOR REUSE.
2. THE CONTRACTOR SHALL REMOVE AND THE OWNER WILL TAKE POSSESSION OF
DECORATIVE HISTORIC COMPONENTS SUCH AS DOORS AND INTERIOR MOULDINGS,
ETC., NOT SCHEDULED FOR REUSE.
PART 2 - PRODUCTS
2.1 NEW MATERIALS
A. PROVIDE NEW MATERIALS TO MATCH EXISTING ADJACENT MATERIALS OR ORIGINAL
MATERIALS FOR CLOSING OF OPENINGS, REPAIRS, AND RECONSTRUCTIONS WHERE
SUITABLE SALVAGED MATERIALS DO NOT EXIST, ARE INSUFFICIENT IN QUANTITY, OR
WHERE REUSE IS NOT PERMITTED.
B. RETAIN SAMPLES OF EXISTING AND ORIGINAL MATERIALS ON SITE FOR COMPARISON
PURPOSES.
C. MATCH EXISTING MATERIALS IN MATERIAL, TYPE, SIZE, QUALITY, COLOR, FINISH, AND
OTHER ATTRIBUTES.
D. REUSED MATERIALS.
E. CLEAN AND PREPARE SALVAGED MATERIALS FOR REUSE.
F. DO NOT USE MATERIALS WITH OBJECTIONABLE CHIPS, CRACKS, SPLITS, DENTS,
SCRATCHES, OR OTHER DEFECTS.
G. REPAIR OPERABLE ITEMS TO FUNCTION PROPERLY.
PART 3 - EXECUTION
3.1 PREPARATION
A. TEST MATERIALS TO BE USED IN REPAIRS FOR COMPATIBILITY WITH EXISTING
MATERIALS; DO NOT USE INCOMPATIBLE MATERIALS.
B. CUT, MOVE, OR REMOVE ITEMS TO PROVIDE ACCESS FOR ALTERATIONS AND
RESTORATION WORK. REPLACE AND RESTORE UPON COMPLETION.
C. PROTECT EXISTING MATERIALS AND SURFACES FROM DAMAGE BY CONSTRUCTION
OPERATIONS.
3.2 ALTERATIONS
A. COORDINATE ALTERATIONS AND RENOVATIONS TO EXPEDITE COMPLETION.
B. MINIMIZE DAMAGE TO EXISTING MATERIALS AND SURFACES; PROVIDE MEANS FOR
RESTORING PRODUCTS AND FINISHES TO THEIR ORIGINAL OR SPECIFIED NEW
CONDITION.
INTERIOR RENOVATION PHASE PROJECT
PROJECT #2307 PROCEDURES
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 3
C. REMOVE UNSUITABLE MATERIALS NOT MARKED FOR SALVAGE.
D. REMOVE DEBRIS AND ABANDONED ITEMS FROM AREAS OF WORK AND FROM CONCEALED
SPACES.
E. REFINISH VISIBLE SURFACES TO SPECIFIED CONDITION, WITH NEAT TRANSITION TO
ADJACENT SURFACES.
F. INSTALL PRODUCTS AND FINISH SURFACES AS SPECIFIED IN INDIVIDUAL SECTIONS, OR
WHERE NO SPECIFICATION SECTION EXISTS, TO MATCH EXISTING.
G. FINISH PATCHES TO PROVIDE UNIFORM COLOR AND TEXTURE OVER ENTIRE SURFACE,
WITH REPAIRS NOT DISCERNIBLE FROM NORMAL VIEWING DISTANCE. IF FINISH CANNOT
BE MATCHED, REFINISH ENTIRE SURFACE TO NEAREST INTERSECTIONS.
H. REWORK FINISHED SURFACES TO SMOOTH PLANE, WITHOUT BREAKS, STEPS, OR
BULKHEADS:
1. WHERE NEW WORK ABUTS OR ALIGNS WITH EXISTING, PROVIDE SMOOTH AND EVEN
TRANSITION.
2. WHERE A CHANGE IN PLANE OF 1/4 INCH (6 MM) OR MORE OCCURS, SUBMIT
RECOMMENDATION TO ARCHITECT/ENGINEER FOR TRANSITION.
I. WHERE ALTERATIONS EXPOSE MECHANICAL AND ELECTRICAL COMPONENTS WHICH
WERE PREVIOUSLY CONCEALED AND ARE SCHEDULED TO BE REUSED, REWORK TO BE
CONCEALED IN COMPLETED WORK.
3.3 HAZARDOUS MATERIAL PROCEDURES - IF HAZARDOUS OR SUSPECTED HAZARDOUS
MATERIALS ARE ENCOUNTERED:
A. STOP WORK IN AFFECTED AREA IMMEDIATELY.
B. NOTIFY OWNER AND ARCHITECT/ENGINEER AND AWAIT INSTRUCTIONS.
C. PREVENT DAMAGE TO MATERIALS.
D. PREVENT HUMAN CONTACT.
E. OWNER WILL ARRANGE FOR ABATEMENT OR REMOVAL OF HAZARDOUS MATERIALS
UNDER A SEPARATE CONTRACT.
PROJECT: SECTION: 01 40 00
CAMPBELL STATION INN QUALITY
INTERIOR RENOVATION PHASE REQUIREMENTS
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 1
PART 1 - GENERAL
1.1 WORK INCLUDED
A. THE WORK INCLUDES, BUT IS NOT NECESSARILY LIMITED TO, SERVICES PROVIDED BY
THE CONTRACTOR'S CONSTRUCTION SUPERINTENDENT IN COOPERATION WITH THE
CONTRACTOR'S QUALITY-CONTROL DEPARTMENT TO PROVIDE CONTROLS AND
ASSURANCE THAT THE MATERIALS AND WORKMANSHIP MEET THE MINIMUM STANDARDS
BY CODE, AND THE CONTRACT DRAWINGS AND SPECIFICATIONS.
B. QUALITY ASSURANCE: THE TESTING LABORATORY WILL BE QUALIFIED TO THE OWNER'S
APPROVAL IN ACCORDANCE WITH ASTM E-329, LATEST EDITION.
1.2 TESTING REQUIREMENTS
A. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE QUALITY CONTROL.
QUALITY CONTROL SHALL CONSIST OF, BUT NOT BE LIMITED TO:
1. ENGINEERING DESIGN BY VENDORS REQUIRED TO INCORPORATE THEIR WORK.
2. MATERIALS AND PARTS DELIVERED TO OR MANUFACTURED AT THE SITE AND
INCORPORATED INTO THE SITE OR STRUCTURES.
3. CONSTRUCTION METHODS AND SEQUENCE.
B. FAILURE OF MATERIALS AND EQUIPMENT TESTED OR INSPECTED:
1. THE CONTRACTOR SHALL BE CHARGED FOR RETESTING AND REINSPECTION
RESULTING FROM THE CONTRACTOR'S NONCOMPLIANCE WITH THE CONTRACT AS
EVIDENCED BY TESTS AND INSPECTIONS BY THE OWNER'S TESTING AGENCY.
2. PREVIOUS ACCEPTANCE MAY BE WITHDRAWN AND MATERIAL OR EQUIPMENT OF
WHICH TESTED SAMPLES ARE REPRESENTATIVE MAY BE SUBJECT TO REMOVAL AND
REPLACEMENT BY THE CONTRACTOR AT HIS EXPENSE WITH MATERIAL OR
EQUIPMENT MEETING SPECIFICATION REQUIREMENTS.
3. THE ARCHITECT MAY REFUSE CONSIDERATION OF FURTHER SAMPLES OF SAME
BRAND OR MAKE FOR TESTING.
4. AT THE OWNER'S DISCRETION, DEFECTIVE MATERIAL AND EQUIPMENT MAY BE
PERMITTED TO REMAIN IN PLACE SUBJECT TO ADJUSTMENT OF CONTRACT SUM.
C. PAYMENT FOR TESTING
1. INSPECTIONS AND TESTS REQUIRED TO ESTABLISH COMPLIANCE WITH THE
CONTRACT DOCUMENTS WILL BE MADE BY A PREQUALIFIED, INDEPENDENT TESTING
AGENCY SELECTED BY THE OWNER. THE COST OF THE SERVICES OF SUCH AGENCY
WILL BE PAID BY THE OWNER.
2. INSPECTIONS OR TESTS REQUIRED BY CODES OR ORDINANCES, OR BY A PLAN
APPROVAL AUTHORITY, AND MADE BY A LEGALLY CONSTITUTED AUTHORITY SHALL
BE THE RESPONSIBILITY OF, AND PAID FOR BY, THE CONTRACTOR. INSPECTION OR
TESTING PERFORMED EXCLUSIVELY FOR THE CONTRACTOR'S CONVENIENCE SHALL
BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
3. THE INDEPENDENT AGENCY EMPLOYED BY THE OWNER SHALL PREPARE THE TEST
REPORTS, LOGS AND CERTIFICATES APPLICABLE TO THE SPECIFIC INSPECTIONS
AND TEST AND PROMPTLY DELIVER THE SPECIFIED NUMBER OF COPIES OF SAME TO
THE DESIGNATED PARTIES.
1.3 STANDARD AND INDUSTRY SPECIFICATIONS
A. MATERIAL OR OPERATIONS SPECIFIED BY REFERENCE TO THE PUBLISHED
SPECIFICATIONS OF A MANUFACTURER, TESTING AGENCY, SOCIETY, ASSOCIATION, OF A
MANUFACTURER, TESTING AGENCY, SOCIETY, ASSOCIATION, OR OTHER PUBLISHED
STANDARDS SHALL COMPLY WITH THE REQUIREMENTS IN THE LATEST REVISION
THEREOF AND AMENDMENTS OR SUPPLEMENTS THERETO IN EFFECT ON THE DATE OF
INVITATION TO BIDDERS.
B. DISCREPANCIES BETWEEN REFERENCED STANDARDS AND CONTRACT DOCUMENTS
SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR INTERPRETATION.
INTERIOR RENOVATION PHASE REQUIREMENTS
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 2
MATERIAL OR WORK SPECIFIED BY REFERENCE TO CONFORM TO A STANDARD, CODE,
LAW, OR REGULATION SHALL BE GOVERNED BY CONTRACT DRAWINGS AND
SPECIFICATION WHEN THEY EXCEED THE REQUIREMENTS OF SUCH REFERENCES;
REFERENCED STANDARDS SHALL GOVERN WHEN THEY ARE MORE STRINGENT.
1.4 MANUFACTURER'S DIRECTIONS
A. MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE UTILIZED AS
DIRECTED BY THE MANUFACTURERS UNLESS HEREIN SPECIFIED TO THE CONTRARY.
DISCREPANCY BETWEEN AN INSTALLATION REQUIRED BY THE CONTRACT DRAWINGS
AND SPECIFICATIONS AND THE MANUFACTURER'S INSTRUCTIONS AND
RECOMMENDATIONS SHALL BE RESOLVED BY THE ARCHITECT IN WRITING BEFORE THE
WORK MAY PROCEED.
1.5 MOCKUPS
A. BEFORE INSTALLING PORTIONS OF THE WORK REQUIRING MOCKUPS, BUILD MOCKUPS
FOR EACH FORM OF CONSTRUCTION AND FINISH REQUIRED TO COMPLY WITH THE
FOLLOWING REQUIREMENTS, USING MATERIALS INDICATED FOR THE COMPLETED WORK:
1. BUILD MOCKUPS IN LOCATION AND OF SIZE AS DIRECTED BY ARCHITECT.
2. NOTIFY ARCHITECT THREE DAYS IN ADVANCE OF DATES AND TIMES WHEN MOCKUPS
WILL BE CONSTRUCTED.
3. THE MOCK UP SHALL BE CONSTRUCTED AND SUPERVISED BY WORKERS THAT WILL
BE EMPLOYED FOR THE CONSTRUCTION OF THE FINAL WORK.
4. DEMONSTRATE THE PROPOSED RANGE OF AESTHETIC EFFECTS AND
WORKMANSHIP.
5. OBTAIN ARCHITECT'S AND OWNER’S APPROVAL OF MOCKUPS BEFORE STARTING
WORK, FABRICATION, OR CONSTRUCTION.
6. ALLOW SEVEN DAYS FOR INITIAL REVIEW AND EACH RE-REVIEW OF EACH MOCKUP.
AT EXTERIOR WORK, ALLOW TIME FOR MOCK-UP TO DRY AND CURE BEFORE REVIEW
PERIOD BEGINS.
7. MAINTAIN MOCKUPS DURING CONSTRUCTION IN AN UNDISTURBED CONDITION AS A
STANDARD FOR JUDGING THE COMPLETED WORK.
8. DEMOLISH AND REMOVE MOCKUPS ONLY WHEN DIRECTED BY ARCHITECT.
9. IF MULTIPLE MOCK-UPS ARE REQUIRED, DO NOT REMOVE INITIAL MOCK-UPS UNTIL A
FINAL MOCK-UP IS APPROVED
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS AND RISKS ASSOCIATED
WITH MOCK-UPS INTEGRATED INTO THE PROJECT WHICH MAY BE DISAPPROVED,
AND SHALL REMOVE DISAPPROVED MOCK-UPS INTEGRATED INTO THE
CONSTRUCTION.
PART 2 - PRODUCTS
NOT USED.
PART 3 - EXECUTION
3.1 FIELD QUALITY CONTROL
A. THE CONTROL OF THE FIELD OPERATION WILL BE REQUIRED AS FOLLOWS:
1. REVIEW DOCUMENTS AND SHOP DRAWINGS, CODES, PROCEDURES, PREPARATIONS,
WORKMANSHIP QUALIFICATION, AND APPROVED MATERIALS.
2. OBSERVE SURFACES AND AREAS TO RECEIVE CONSTRUCTION, WORKERS, AND
OPERATION'S METHODS AND INSTALLATION PRACTICES.
3. CONTROL PERSONALLY, OR THROUGH FOREMAN OR OTHER APPROPRIATE
SUPERVISORS TO ENSURE THAT INSTALLATION IS PROPERLY CONTROLLED AND
QUALITY IS MAINTAINED.
4. ENSURE THAT SCHEDULED TESTS ARE MADE AFTER CONTRACTOR HAS
DETERMINED THAT CONSTRUCTION IS READY FOR TESTING.
5. ENSURE CODE REQUIRED CODE INSPECTIONS ARE MADE BEFORE WORK IS
COVERED AND KEEP COPIES OF PAPERWORK ON FILE.
INTERIOR RENOVATION PHASE REQUIREMENTS
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 3
B. OBSERVATIONS
1. THE GENERAL CONTRACTOR SHALL CONTACT THE ARCHITECT TO PERFORM
OBSERVATIONS AT THE FOLLOWING MILESTONES. THE CONTRACTOR SHALL GIVE
AT LEAST 24 HOURS NOTICE AND SHALL ALLOW SUFFICIENT TIME FOR POTENTIAL
CORRECTIONS PRIOR TO COVERING OF WORK WITH CONCRETE, ETC.
a. FOUNDATION PREPARATION AFTER REINFORCEMENT IS IN PLACE AND BEFORE
CONCRETE IS POURED.
b. SLAB PREPARATION AFTER VAPOR BARRIER, INSULATION, AND
REINFORCEMENT IS IN PLACE AND BEFORE CONCRETE IS POURED.
3.2 JOB CONDITIONS
A. FURNISH PROMPTLY WITHOUT ADDITIONAL CHARGE, ACCESS, REASONABLE FACILITIES,
LABOR, AND MATERIALS NECESSARY FOR SAFE, CONVENIENT TESTS AND INSPECTIONS
WHETHER REQUIRED ON OR OFF JOBSITE. TESTING SHALL INCLUDE THE CHECKOUT OF
UTILITIES, OPERATION OF SYSTEMS AND EQUIPMENT FOR READINESS, AND THE
DIRECTING OF INITIAL START-UP AND TESTING OF EQUIPMENT IN THE PRESENCE OF THE
OWNER'S MAINTENANCE PERSONNEL.
3.3 TESTING PROCEDURES
A. CONCRETE TESTING
1. THE CONTRACTOR WILL MAKE ARRANGEMENTS WITH THE OWNER'S INDEPENDENT
LABORATORY FOR MAKING STRENGTH TESTS. THE LABORATORY REPRESENTATIVE
WILL TAKE THE SAMPLES AND FILL MOLDS; THE CONTRACTOR SHALL COOPERATE
WITH THE LABORATORY REPRESENTATIVE AND SHALL STORE ALL TEST SPECIMENS
AT THE SITE OF THE WORK IN ACCORDANCE WITH ASTM-C-31, "MAKING AND CURING
CONCRETE COMPRESSION AND FLEXURE SPECIMENS IN THE FIELD." THE
INFORMATION REQUIRED ON EACH TEST SHALL INCLUDE AIR CONTENT AND SLUMP
AS WELL AS COMPRESSIVE STRENGTH. COPIES OF THE REPORTS SHALL BE
FORWARDED TO THE ARCHITECT, THE CONTRACTOR AND THE READY-MIX
PRODUCER.
2. PER ASTM C 39 AND ASTM C 31 STRENGTH TESTS WILL BE TAKEN AS FOLLOWS: NOT
LESS THAN ONE STRENGTH TEST PER POUR WHEN THE POUR IS LESS THAN 50
CUBIC YARDS; NOT LESS THAN TWO STRENGTH TESTS PER POUR WHEN THE POUR
IS MORE THAN 50 CUBIC YARDS; TWO (2) SEVEN (7) DAY AND TWO (2) TWENTY EIGHT
(28) DAY COMPRESSIVE STRENGTH CYLINDERS SHALL COMPRISE ONE (1) TEST OF
STRENGTH.
3. WHERE THERE IS A QUESTION AS TO THE QUALITY OF THE CONCRETE IN THE
STRUCTURE BECAUSE OF STRENGTH-TEST FAILURES, APPROVAL OR DIRECTION
MAY BE GIVEN BY THE ARCHITECT TO HAVE ALTERNATE STRENGTH TESTS MADE ON
SPECIMENS SECURED FROM THE INSTALLED MATERIAL IN ACCORDANCE WITH ASTM
METHOD OF TEST C-42.
4. SLUMP: ASTM C 143/C 143M; ONE TEST AT POINT OF PLACEMENT FOR EACH
COMPOSITE SAMPLE, BUT NOT LESS THAN ONE TEST FOR EACH DAY'S POUR OF
EACH CONCRETE MIXTURE. PERFORM ADDITIONAL TESTS WHEN CONCRETE
CONSISTENCY APPEARS TO CHANGE.
5. AIR CONTENT: ASTM C 231, PRESSURE METHOD; ONE TEST FOR EACH COMPOSITE
SAMPLE, BUT NOT LESS THAN ONE TEST FOR EACH DAY'S POUR OF EACH
CONCRETE MIXTURE.
6. CONCRETE TEMPERATURE: ASTM C 1064/C 1064M; ONE TEST HOURLY WHEN AIR
TEMPERATURE IS 40 DEG F (4.4 DEG C) AND BELOW AND WHEN IT IS 80 DEG F (27
DEG C) AND ABOVE, AND ONE TEST FOR EACH COMPOSITE SAMPLE.
7. TEST RESULTS SHALL BE REPORTED IN WRITING TO ARCHITECT, CONCRETE
MANUFACTURER, AND CONTRACTOR WITHIN 48 HOURS OF TESTING. REPORTS OF
COMPRESSIVE-STRENGTH TESTS SHALL CONTAIN PROJECT IDENTIFICATION NAME
AND NUMBER, DATE OF CONCRETE PLACEMENT, NAME OF CONCRETE TESTING AND
INSPECTING AGENCY, LOCATION OF CONCRETE BATCH IN WORK, DESIGN
COMPRESSIVE STRENGTH AT 28 DAYS, CONCRETE MIXTURE PROPORTIONS AND
MATERIALS, COMPRESSIVE BREAKING STRENGTH, AND TYPE OF BREAK FOR BOTH 7-
AND 28-DAY TESTS.
INTERIOR RENOVATION PHASE REQUIREMENTS
PROJECT #2307
BREWER INGRAM FULLER ARCHITECTS INC. PAGE: 4
8. NONDESTRUCTIVE TESTING: IMPACT HAMMER, SONOSCOPE, OR OTHER
NONDESTRUCTIVE DEVICE MAY BE PERMITTED BY ARCHITECT BUT WILL NOT BE
USED AS SOLE BASIS FOR APPROVAL OR REJECTION OF CONCRETE.
9. ADDITIONAL TESTS: TESTING AND INSPECTING AGENCY SHALL MAKE ADDITIONAL
TESTS OF CONCRETE WHEN TEST RESULTS INDICATE THAT SLUMP, AIR
ENTRAINMENT, COMPRESSIVE STRENGTHS, OR OTHER REQUIREMENTS HAVE NOT
BEEN MET, AS DIRECTED BY ARCHITECT.
10. CONCRETE WILL BE CONSIDERED DEFECTIVE IF IT DOES NOT PASS TESTS AND
INSPECTIONS.
11. ADDITIONAL TESTING AND INSPECTING, AT CONTRACTOR'S EXPENSE, WILL BE
PERFORMED TO DETERMINE COMPLIANCE OF REPLACED OR ADDITIONAL WORK
WITH SPECIFIED REQUIREMENTS.
B. TESTING FOR EARTHWORK
1. CONTRACTOR SHALL MAKE…