2025_05_14 _ Released for Bid Drawings.pdf
PDF 11 MB Posted
- Attached to
- Jackson County 4H Extension Building Roof
- Solicitation number
- PE-67800-NONST-2025-000000018
- Issued by
- Jefferson County, Georgia
About this file
The document is a set of construction bid drawings for the Jackson County 4H Building Re-Roof project located at 164 Four Fifty Seven Drive in Jefferson, Georgia, prepared by Precision Planning, Inc. The project involves a comprehensive roof replacement for the 4H building, with two primary scopes: a base bid for the main roof (low slope) and an add alternate for the low roof (steep pitched) area. The work includes removing existing roofing and insulation down to the existing structure, installing new rigid insulation and cover board, and applying a new fully adhered TPO (base bid) or PVC (add alternate) roof system. The project also requires extending the new roof membrane over parapet walls, replacing edge metal, and addressing various roof penetrations and equipment.
The construction documents specify compliance with multiple building codes, including the 2018 International Building Code with Georgia Amendments and various other national standards. The building is classified as a Business (B) occupancy with a Type IIB unprotected construction, standing 24'-4" tall over two stories. The project will be executed in a fully occupied and operational building, necessitating careful coordination with the owner's operations. Contractors are required to have a valid Georgia State General Contracting License and must provide specific immigration compliance documentation. The estimated roof areas are 11,372 square feet for the main roof and 7,045 square feet for the add alternate portion, with the work to be performed in accordance with manufacturer recommendations to ensure full warranty coverage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 250050 _ 2025_05_14 _ Released for Bid Sp.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CS
C O
V
ER
S H
EE
T
1. DO NOT SCALE DRAWINGS. USE ALL WRITTEN DIMENSIONS ONLY. CONTRACTOR TO SUBMIT ANY DISCREPANCIES TO THE ARCHITECT FOR
CLARIFICATION.
2. THESE DRAWINGS HAVE BEEN DEVELOPED FROM EXISTING DRAWINGS, SITE VISITS AND OWNER INPUT. THE CONTRACTOR SHALL VERIFY THAT THESE DRAWINGS CORRESPOND TO EXISTING FIELD CONDITIONS. BEFORE PROCEEDING WITH CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY INCONSISTENCIES BEFORE PROCEEDING WITH WORK.
3. ALL WORK SHALL BE IN COMPLIANCE WITH THE BUILDING CODES, RECOGNIZED INDUSTRY STANDARDS, CRAFTSMANSHIP STANDARDS IN
THE AREA, AND ALL MANUFACTURER'S RECOMMENDATIONS.
4. PROVIDE SEPARATION BETWEEN ALL DISSIMILAR METALS.
5. DAMAGE TO THE EXISTING SITE AND BUILDING SHALL BE REPAIRED. ALL REPAIRS SHALL BE APPROVED BY OWNER. ALL REPAIRS SHALL BE
PERFORMED AS PART OF THIS CONTRACT WITHOUT ADDITIONAL COST TO OWNER.
6. THE CONTRACTOR SHALL VERIFY LOCATION OF EXISTING UTILITIES BEFORE COMMENCING WORK. CARE SHALL BE TAKEN TO PROTECT ALL
UTILITIES WHICH ARE TO REMAIN.
7. THE CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY CONSTRUCTION, SHORING, SUPPORT AND ALL STAGING, SCHEDULING, MATERIAL DELIVERIES AND OTHER ITEMS THAT AFFECT THE SEQUENCE OF CONSTRUCTION OR SCHEDULING THE CONSTRUCTION PROJECT.
8. THE SITE SHALL BE KEPT IN A CLEAN AND ORDERLY MANNER AT ALL TIMES. THE CONTRACTOR A SHALL BE RESPONSIBLE FOR DISPOSING
OF DEBRIS IN A CONSISTENT AND LEGAL MANNER.
9. THE CONTRACTOR SHALL PROVIDE ADEQUATE BRACING AND SHORING FOR ALL WORK DURING THE CONSTRUCTION PERIOD.
10. ALL BIDDING CONTRACTORS SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID. ALL BIDDERS SHALL BE FAMILIAR WITH THE SITE AND ALL
EXISTING CONDITIONS.
11. IN THE EVENT THE OWNER, THE OWNER'S CONTRACTORS OR SUBCONTRACTORS, OR ANYONE FOR WHICH THE OWNER IS LEGALLY LIABLE MAKES OR PERMITS TO BE MADE ANY CHANGES TO THE CONSTRUCTION DOCUMENTS PREPARED BY PRECISION PLANNING, INC.
RELATING TO THIS PROJECT WITHOUT OBTAINING PRECISION PLANNING, INC.'S PRIOR WRITTEN CONSENT, THE OWNER SHALL ASSUME FULL RESPONSIBILITY FOR THE RESULTS OF SUCH CHANGES. THEREFORE THE OWNER AGREES TO WAIVE ANY CLAIM AGAINST PRECISION PLANNING, INC. AND TO RELEASE PRECISION PLANNING, INC. FROM ANY LIABILITY ARISING DIRECTLY OR INDIRECTLY FROM
SUCH CHANGES.
12. WHERE A DETAIL, TYPICAL DETAIL, SECTION, TYPICAL SECTION OR AS NOTED IS INDICATED FOR ONE CONDITION, IT SHALL APPLY FOR ALL
LIKE OR SIMILAR CONDITIONS UNLESS NOTED OTHERWISE.
13. FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND INSTALLATION.
14. ACCESS TO BUILDING AND WORKING TIMES SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER.
15. ALL MATERIALS USED FOR CONSTRUCTION SHALL BE NEW.
16. REMOVE ONLY THOSE PORTIONS OF EXISTING CONSTRUCTION NECESSARY TO ACCOMMODATE THE NEW WORK. PROVIDE PATCHING OF
EXISTING ASSEMBLIES AS REQUIRED. NEW PATCHING MATERIALS SHALL MATCH EXISTING.
17. ENSURE SAFE PASSAGE OF THE PUBLIC AROUND CONSTRUCTION AREAS. ERECT TEMPORARY FENCING / BARRICADES AROUND
CONSTRUCTION AREA AS REQUIRED TO PROTECT THE PUBLIC FROM SAFETY HAZARDS.
18. CONDUCT DEBRIS REMOVAL OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH AND DAMAGE TO ROADS, STREETS, CURBS, CURB INLETS, DRAINS, WALKS, WALKWAYS, LANDSCAPING AND OTHER ADJACENT FACILITIES. ALL DAMAGE SHALL BE REPAIRED AT
CONTRACTOR'S EXPENSE.
19. CURRENTLY TAGGED AND FULLY CHARGED PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED BY CONTRACTOR AND KEPT READILY
ACCESSIBLE DURING ALL CONSTRUCTION ACTIVITIES.
20. WORK SHALL BE IN COMPLIANCE WITH NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION
OPERATIONS CURRENT ADDITION.
21. MAINTAIN ACCESS FOR EMERGENCY VEHICLES AND PERSONNEL DURING DEMOLITION AND CONSTRUCTION ACTIVITIES.
22. CONTRACTORS ARE REQUIRED TO HAVE A VALID GEORGIA STATE GENERAL CONTRACTING LICENSE FOR COMMERCIAL PROJECTS. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE REQUIRED TO PROVIDE THE GEORGIA SECURITY AND IMMIGRATION COMPLIANCE
ACT AFFIDAVIT AND THE RESIDENCY STATUS AFFIDAVIT.
23. THE ARCHITECT DOES NOT GUARANTEE THE PERFORMANCE OF THE PROJECT IN ANY RESPECT OTHER THAN THE ARCHITECTURAL WORK
PERFORMED WHICH MEETS THE STANDARDS OF PROFESSIONAL CARE.
24. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PROVIDING NECESSARY SAFETY MEASURES REQUIRED TO PROTECT THE GENERAL
PUBLIC FROM DEMOLITION AND CONSTRUCTION WORK FOR THE DURATION OF THE PROJECT.
27. CONTRACTOR SHALL BE AWARE THAT HOISTING EQUIPMENT AND CRANES, ETC. WILL NOT BE ABLE TO BE POSITIONED IMMEDIATELY NEXT TO THE BUILDING DUE TO EXISTING SITE ELEMENTS AND EXISTING EQUIPMENT LOCATIONS. CONTRACTOR SHALL PROVIDE HOISTING, RIGGING, CRANES, ETC. THAT ARE REQUIRED TO SAFELY MOVE EQUIPMENT AND MATERIALS FROM THE ROOF TO GRADE AND EQUIPMENT
AND MATERIALS ONTO THE ROOF FROM GRADE AT NO ADDITIONAL COST TO THE OWNER.
28. IF ANY SERVICES TO BUILDING REQUIRE INTERRUPTION FOR ANY REASON, PROPER NOTICE MUST BE GIVEN TO THE OWNER PRIOR TO
SCHEDULING OF THIS WORK.
CONSTRUCTION DOCUMENTS FOR:
164 FOUR FIFTY SEVEN DRIVE
BUILDING RE-ROOF
JACKSON COUNTY 4H
JEFFERSON, GEORGIA 30549
INTERIOR ELEVATION1 A5.2
XXX
MATCH LINE
101A
PLAN KEYNOTESA
A
PX
E1
A5.2
A5.2
PROPERTY LINE
BREAK LINE
REVISION NUMBER
ELEVATION LINE
COLUMN REFERENCE
EXTERIOR FINISH TYPE
WINDOW REFERENCE
PARTITION TYPE
DOOR REFERENCE
DETAIL REFERENCE
SECTION REFERENCE
EXTERIOR ELEVATION
DRAWING TITLE
ENLARGED PLAN DETAIL
ROOM NAME & NUMBER
XX
AX.X SCALE 1/X" = 1'-0"
N
X
AX.X
X
AX.X
INTERNATIONAL BUILDING CODE (IBC):
2018 EDITION WITH GEORGIA AMENDMENTS - 2020, 2022, 2024 AND 2025
NATIONAL ELECTRICAL CODE (NFPA):
2023 EDITION
INTERNATIONAL FUEL GAS (ICC):
2018 EDITION WITH GEORGIA AMENDMENTS - 2020 AND 2022
INTERNATIONAL MECHANICAL CODE (IMC):
2018 EDITION WITH GEORGIA AMENDMENTS - 2020 AND 2024
INTERNATIONAL PLUMBING CODE (IPC):
2018 EDITION WITH GEORGIA AMENDMENTS - 2020, 2022, 2023 AND 2024
INTERNATIONAL ENERGY CONSERVATION CODE:
2015 EDITION WITH GEORGIA SUPPLEMENTS AND AMENDMENTS - 2020, 2022 AND 2023
INTERNATIONAL EXISTING BUILDING CODE:
2018 EDITION WITH GEORGIA AMENDMENTS - 2021
FIRE CODES:
INTERNATIONAL FIRE CODE (IFC):
2018 EDITION WITH 2020 AMENDMENTS
NFPA 101 LIFE SAFETY CODE:
2018 EDITION
US DEPARTMENT OF JUSTICE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN:
2010 EDITION
OCGA TITLE 25 AND 30 AND CHAPTER 120 OF FIRE COMMISSIONER'S RULES AND
REGULATIONS.
THE FOLLOWING CODES SHALL GOVERN THIS PROJECT FOR 2025
SHEET TITLE
COVER SHEETCS
SHEET
OWNER:
ARCHITECT: PRECISION PLANNING, INC.
400 PIKE BOULEVARD
LAWRENCEVILLE, GEORGIA 30046
770-338-8000
CONTACT: LANCE DAVIS, ARCHITECT OF RECORD
PROJECT NAME: JACKSON COUNTY 4H BUILDING RE-ROOF
PROJECT ADDRESS: 164 FOUR FIFTY SEVEN DRIVE,
JEFFERSON, GA 30549
OCCUPANCY: BUSINESS, B
CONSTRUCTION TYPE (IBC): IIB UNPROTECTED
BUILDING HEIGHT: 24'-4" (2 STORIES)
ARCHITECTURAL
A3.1 ROOF PLAN
THIS PROJECT GENERALLY CONSISTS OF THE FOLLOWING:
BASE BID:
4H BUILDING MAIN ROOF (LOW SLOPE) AREA:
REMOVE EXISTING ROOFING AND INSULATION ASSEMBLY DOWN TO THE EXISTING STRUCTURE
INSTALL NEW RIGID INSULATION AND COVER BOARD
INSTALL NEW TPO ROOF SYSTEM FULLY ADHERED
EXTEND NEW TPO ROOF MEMBRANE UP AND OVER PARAPET WALLS
REPLACE EDGE METAL ON ALL PARAPET WALLS
ADD ALTERNATE:
4H BUILDING LOW ROOF (STEEP PITCHED) AREA:
REMOVE EXISTING ROOFING AND INSULATION ASSEMBLY DOWN TO THE EXISTING STRUCTURE
INSTALL NEW RIGID INSULATION AND COVER BOARD
INSTALL NEW PVC ROOF SYSTEM FULLY ADHERED
THIS BUILDING IS A FULLY OCCUPIED AND OPERATIONAL. SCHEDULING THE WORK WILL HAVE TO BE COORDINATED WITH
OWNER'S OPERATIONS.
JACKSON COUNTY BOARD OF COMMISSIONERS
4965 JACKSON PARKWAY
JEFFERSON, GEORGIA 30549
706-387-6475
CONTACT: BARRY VICKERY
A3.2 ROOF DETAILS
A3.3 ROOF DETAILS
TH
ES
E C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
AN
D
P
ER
M
IT
TE
D
R
EP
R O
D U
C
TI
O N
S, IN
W H
O
LE
O R
IN
P
AR
T, A R
E
IN
ST
R
U M
EN
TS
O F
SE
R
VI
C
E
AN
D A
R E
TH
E
SO
LE
P R
O
PE
R
TY
O F
PR
EC
IS
IO
N
PL
AN
N
IN
G
, I N
C . U
N
LE
SS
O
TH
ER
W
IS
E
AG
R
EE
D T
O . T
H
EY
S H
AL
L
N O
T
BE
R
EP
R O
D U
C
ED
O R
C O
N
VE
YE
D
IN
A
N Y
M
AN
N
ER
N O
R A
R E
TH
EY
T O
B E
U
SE
D
FO
R A
N Y
O
TH
ER
P
R O
JE
C
TS
O
TH
ER
TH
AN
T H
AT
S
PE
C
IF
IC
AL
LY
IN
D
IC
AT
ED
H
ER
EI
N W
IT
H
O U
T W
R
IT
TE
N
PE
R
M
IS
SI
O
N F
R O
M A
N D
D U
E C
O M
PE
N
SA
TI
O N
T O
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
AL
L
R
IG
H
TS
R
ES
ER
VE
D
D R
AW
N
D
ES
IG
N
C H
EC
KE
D
SH
EE
T
TI
TL
E
PR
O
JE
C
T
ST
A M
P R
EL
EA
SE
D
ES
C R
IP
TI
O N
N O
D
AT
E pl an ne rs e ng in ee rs a rc hi te ct s s ur ve yo rs
Pi ke
B ou le va rd , L aw re nc ev ille , G a
0.
8.
w w w .p pi .u s
W
EW
M W
T
PP
I
JA
C
K
SO
N C
O U
N T
Y 4H
B U
IL
D
IN
G
R E
-R O
O F
FO
U
R F
IF
TY
S
EV
EN
D
R
IV
E
JE
FF
ER
SO
N
, G A
. 3
FI
LE
N
AM
E
D
AT
E
PR
O
J.
N
U M
BE
R
FI
LE
N U
M
BE
R
/2
8/
A
-0
LA
N
C E
G . D
A V
IS
REGIS
TE
RE
D
A
RC
HIT
ECT
CERT IF
IC
AT
E
N O
STATE
O
F G
EO
RG
IA
-1
4-
D3.1 DEMOLITION ROOF PLAN
A3.4 ROOF PHOTOS
7. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL CONSTRUCTION WASTE AND DEBRIS.
8. EXISTING EQUIPMENT LOCATED NEAR WORK AREAS SHALL BE PROTECTED FROM DUST AND/OR DAMAGE RESULTING FROM DEMOLITION
AND CONSTRUCTION ACTIVITIES.
A3.1A ROOF SLOPE PLAN
AutoCAD SHX Text General Notes
AutoCAD SHX Text Room Name
AutoCAD SHX Text
XX
AutoCAD SHX Text Symbols Legend
AutoCAD SHX Text
DIMENSION LINE TO FINISH ASSEMBLIES
AutoCAD SHX Text
DIMENSION LINE TO COLUMN CENTER LINE
AutoCAD SHX Text
DIMENSION LINE TO FACE OF STUD OR MASONRY
AutoCAD SHX Text N
AutoCAD SHX Text Job North
AutoCAD SHX Text
ORIENTATION MARKER W/ TRUE NORTH
AutoCAD SHX Text Building Codes
AutoCAD SHX Text Drawing Index
AutoCAD SHX Text Project Directory
AutoCAD SHX Text Project Information
AutoCAD SHX Text Project Description
AutoCAD SHX Text 05/14/2025
AutoCAD SHX Text
RELEASED FOR BID
AutoCAD SHX Text General Demolition Notes
R
ID
G E
LI
N
E
EXISTING ROOF ACCESS LADDER
TO REMAIN, PROTECT FROM
DAMAGE REMOVE AND REINSTALL
AS REQUIRED FOR NEW ROOF
INSTALLATION.
EXISTING STANDING SEAM
OVERHANG BELOW TO
REMAIN - PROTECT IN PLACE
SLOPE
SLOPE
D1
D1 D1
D2
D2
D2
D2
D2
D2
D5
D3
D3
D3
D3
D3 D3
D3
D3
D3D3
D3
D4
D4
D4
D4
D4
D4
D4
D4
D4
D4
D4
D7 D7 D7
D7
D7
D7
D7
D7 D7
D7
D6
D6
D6
D6
D6
D6
D6
D10
D8
D8
D8
D8
D8
D8
D9
D9
D9
D9
D11
D10
D10
D6 D10 D10
D10
D10
D10
D10
D10
D10
D10
D10
D10
D10
D10
D10
D10
D10
D1
D4
D4
D4
D4
D11D11
D2
D12
D3
D10
D13
D13
D13
D14 D13
D16
D14
D13
D13
D8
D8
D13
D15D15
D1
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A A
A A
A
A
ADD ALTERNATE #1
ADD ALTERNATE #1
D
EM
O
LI
TI
O
N R
O O
F
PL
A N
D3.1
SCALE 1/8" = 1'-0"
TH
ES
E C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
AN
D
P
ER
M
IT
TE
D
R
EP
R O
D U
C
TI
O N
S, IN
W H
O
LE
O R
IN
P
AR
T, A R
E
IN
ST
R
U M
EN
TS
O F
SE
R
VI
C
E
AN
D A
R E
TH
E
SO
LE
P R
O
PE
R
TY
O F
PR
EC
IS
IO
N
PL
AN
N
IN
G
, I N
C . U
N
LE
SS
O
TH
ER
W
IS
E
AG
R
EE
D T
O . T
H
EY
S H
AL
L
N O
T
BE
R
EP
R O
D U
C
ED
O R
C O
N
VE
YE
D
IN
A
N Y
M
AN
N
ER
N O
R A
R E
TH
EY
T O
B E
U
SE
D
FO
R A
N Y
O
TH
ER
P
R O
JE
C
TS
O
TH
ER
TH
AN
T H
AT
S
PE
C
IF
IC
AL
LY
IN
D
IC
AT
ED
H
ER
EI
N W
IT
H
O U
T W
R
IT
TE
N
PE
R
M
IS
SI
O
N F
R O
M A
N D
D U
E C
O M
PE
N
SA
TI
O N
T O
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
AL
L
R
IG
H
TS
R
ES
ER
VE
D
D R
AW
N
D
ES
IG
N
C H
EC
KE
D
SH
EE
T
TI
TL
E
PR
O
JE
C
T
ST
A M
P R
EL
EA
SE
D
ES
C R
IP
TI
O N
N O
D
AT
E pl an ne rs e ng in ee rs a rc hi te ct s s ur ve yo rs
Pi ke
B ou le va rd , L aw re nc ev ille , G a
0.
8.
w w .p pi .u s
W
EW
M W
T
PP
I
JA
C
K
SO
N C
O U
N T
Y 4H
B U
IL
D
IN
G
R E
-R O
O F
FO
U
R F
IF
TY
S
EV
EN
D
R
IV
E
JE
FF
ER
SO
N
, G A
. 3
FI
LE
N
AM
E
D
AT
E
PR
O
J.
N
U M
BE
R
FI
LE
N U
M
BE
R
/2
8/
A
-0
LA
N
C E
G . D
A V
IS
REGIS
TE
RE
D
A
RC
HIT
ECT
CERT IF
IC
AT
E
N O
STATE
O
F G
EO
RG
IA
-1
4-
REMOVE ENTIRE ROOFING SYSTEM TO INCLUDE INSULATION, FLASHING AND ACCESSORIES TO THE CORE PLANK BELOW. BUILDING WILL BE BE OCCUPIED DURING CONSTRUCTION, SO ONLY REMOVE WHAT PORTION OF ROOFING THAT CAN BE REPLACED AND DRIED IN DURING A SINGLE DAY. ENSURE THERE IS NO WATER INFILTRATION INTO THE BUILDING AT ANY TIME. IF WATER DAMAGE DOES OCCUR, DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. - IT IS ASSUMED THAT THE EXISTING ROOF SYSTEM DOES NOT UTILIZE LIGHT WEIGHT INSULATING CONCRETE. IF LIGHT WEIGHT INSULATING
CONCRETE IS DISCOVERED CONTACT THE ARCHITECT FOR FURTHER DIRECTION.
EXISTING ROOF TOP UNIT TO REMAIN. CARE SHALL BE TAKEN TO PROTECT UNIT DURING CONSTRUCTION. IF PORTIONS OF THE EXISTING CURB ARE FOUND TO BE DETERIORATED AND IN NEED OF REPAIR NOTIFY THE ARCHITECT TO RECEIVE WRITTEN DIRECTION. -RAISE CURB AS REQUIRED TO ACHIEVE MANUFACTURERS
MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY COVERAGE.
EXISTING EXHAUST FAN TO BE REMOVED AND DISPOSED OF INCLUDING CURB AND ACCESSORIES IN ITS
ENTIRETY.
REMOVE AND DISPOSE OF EXISTING EDGE METAL AND ACCESSORIES IF REQUIRED REMOVE AND DISPOSE
OF DETERIORATED WOOD BLOCKING.
EXISTING ANTENNA TO REMAIN PROVIDE A NEW CURB AT THE HEIGHT REQUIRED TO ACHIEVE
MANUFACTURERS MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY
COVERAGE. PROVIDE NEW PITCH POCKET IN CURB. SPECIAL CARE SHALL BE TAKEN TO NOT DAMAGE THE
ANTENNA. -REFER TO DETAIL 8/A3.4.
EXISTING PIPE PENETRATION TO REMAIN. SPECIAL CARE SHALL BE TAKEN TO NOT DAMAGE VENT, AND TO PREVENT DEBRIS FROM ENTERING VENT DURING DEMOLITION OR NEW CONSTRUCTION. IF VENT IS DAMAGED IT SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. -EXISTING PENETRATION FLASHING TO BE REMOVED AND REPLACED TO CREATE A WEATHER TIGHT SEAL WITH NEW
ROOFING CONSTRUCTION.
EXISTING ROOF CURB TO BE REMOVED IN ITS ENTIRETY, REFER TO NEW CONSTRUCTION FOR INFILL DETAIL.
EXISTING ROOF PENETRATION TO REMAIN. SPECIAL CARE SHALL BE TAKEN TO NOT DAMAGE DURING DEMOLITION OR NEW CONSTRUCTION. IF EQUIPMENT IS DAMAGED IT SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. RAISE PENETRATION AS REQUIRED TO ACHIEVE MANUFACTURERS MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY COVERAGE. -EXISTING PENETRATION FLASHING TO BE REMOVED AND REPLACED TO CREATE A WEATHER TIGHT SEAL WITH NEW
ROOFING CONSTRUCTION.
EXISTING EXHAUST FAN TO REMAIN, CARE SHALL BE TAKEN TO PROTECT FAN DURING CONSTRUCTION.
EXISTING ROOF TOP UNIT TO REMAIN. CARE SHALL BE TAKEN TO PROTECT UNIT DURING CONSTRUCTION. IF PORTIONS OF THE EXISTING CURB ARE FOUND TO BE DETERIORATED AND IN NEED OF REPAIR NOTIFY THE ARCHITECT TO RECEIVE WRITTEN DIRECTION. -RAISE CURB AS REQUIRED TO ACHIEVE MANUFACTURERS
MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY COVERAGE.
EXISTING ROOF PENETRATION TO BE REMOVED. REFER TO NEW CONSTRUCTION FOR INFILL DETAIL.
EXISTING ROOF TOP UNIT SHALL BE REMOVED IN ITS ENTIRETY, INCLUDING THE CURB AND ACCESSORIES.
REMOVE THE GAS LINES BACK TO THE POINT OF CONNECTION AT THE UNIT UPSTREAM. REFER TO NEW
CONSTRUCTION FOR INFILL DETAIL.
EXISTING METAL COVER TO BE REMOVED AND DISPOSED OF. PROVIDE NEW PENETRATION FLASHING AS
REQUIRED BY THE ROOFING SYSTEM MANUFACTURER TO PROVIDE FULL WARRANTY COVERAGE.
REMOVE AND DISPOSE OF SCUPPER, DOWNSPOUT AND CONDUCTOR HEAD. PROVIDE NEW ALUMINUM
SCUPPER, DOWNSPOUT AND CONDUCTOR HEAD AFTER NEW ROOF SYSTEM IS INSTALLED.
REMOVE AND DISPOSE OF EXISTING METAL AWNING PANELS. PROVIDE NEW ALUMINUM PANELS - REFER TO
DETAIL 4/A3.1
EXISTING GUTTER AND DOWNSPOUTS TO REMAIN, CARE SHALL BE TAKEN TO PROTECT THEM DURING
CONSTRUCTION.
REMOVE AND DISPOSE OF DOWNSPOUT AND CONDUCTOR HEAD. INFILL EXISTING SCUPPER TO PROVIDE A
WEATHER TIGHT SEAL, AND ALLOW FOR FULL WARRANTY COVERAGE.
D1
D2
D3
1. ALL EXISTING PIPE SUPPORTS SHALL BE REMOVED AND REPLACED WITH NEW REFER TO DETAIL 5/A3.2.
2. ALL WOOD BLOCKING ASSOCIATED WITH EXISTING ROOF AND PARAPET SYSTEM IS SCHEDULED TO REMAIN. IF EXISTING WOOD BLOCKING IS FOUND TO BE DETERIORATED IT SHALL BE REPLACED WITH NEW PRESSURE TREATED WOOD BLOCKING PER THE UNIT PRICE ESTABLISHED DURING BID. -REFER TO
THE SPECIFICATIONS.
3. ALL PIPING AND CONDUIT THAT IS DAMAGED DURING DEMOLITION WORK SHALL BE REPLACED AT NO
EXPENSE TO THE OWNER.
4. THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION. COORDINATE ALL CONSTRUCTION
ACTIVITIES WITH OWNER TO MINIMIZE IMPACT TO THE BUILDINGS OPERATIONS.
5. FOR ALL ROOF TOP EQUIPMENT BEING REMOVED AND DISPOSED OF REMOVE AND DISPOSE OF ALL
ASSOCIATED ELECTRICAL WIRING AND CONDUIT, BACK TO THE POINT OF ORIGIN.
6. PROTECT ALL NATURAL GAS PIPING SCHEDULED TO REMAIN.
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D14
D15
NOTE:
- "A" INDICATES ADD ALTERNATE #1
D16
AutoCAD SHX Text D3.1
AutoCAD SHX Text 007-A3.1
AutoCAD SHX Text Demolition Roof Plan
AutoCAD SHX Text 05/14/2025
AutoCAD SHX Text
RELEASED FOR BID
AutoCAD SHX Text Demolition Roof Plan Keynotes
AutoCAD SHX Text Demolition General Notes
AutoCAD SHX Text Job North
AutoCAD SHX Text N
True North
150'-6" V.I.F.
'-6
" V .I.
F.
12'-6" V.I.F.
'-0
" V .I.
F.
'-6 " V
.I.
F.
0'
-3 " V
.I.
F.
'-9
" V .I.
F.
'-0 " V
.I.
F.
119'-6" V.I.F. 13'-0" V.I.F.18'-0" V.I.F.
55'-0" V.I.F. 22'-0" V.I.F.
150'-6" V.I.F.
16'-0" V.I.F. 57'-6" V.I.F.
'-0
" V .I.
F.
15'-6" V.I.F.
R
ID
G E
LI
N
E
SLOPE
SLOPE
12 12
TYP.
TYP.
TYP.
TYP.
TYP.
TYP.
6 6
7 7
8 8
A3.1
A3.1
9 9 9
ADD ALTERNATE #1
ADD ALTERNATE #1
TYP.
TYP.
A
A
A
A
A
A
A
A A
A
A
A
A
A
A
3'-7" V.I.F.
4" V.I.F.
3' -0
" V .I.
F.
5'-0" V.I.F.
8' -0
" V .I.
F.
REMOVE AND DISPOSE OF EXISTING
METAL PANELS. PROVIDE NEW
PRE-FINISHED ALUMINUM PANELS,
SIZE, SHAPE AND COLOR TO MATCH
EXISTING. VERIFY SIZES PRIOR TO
BIDDING
EXISTING ROOF PARAPET WALL
2X6 PT WOOD FRAMING
MEMBERS
3/4" PT PLYWOOD DECKING
A3.1
1' -0
" T
YP
SP
AC
IN
G
NOTE:
OPENING SIZES VARY.
CONTRACTOR SHALL VERIFY
OPENING SIZES PRIOR TO BID.
OPENING WIDTH VARIES
1'-0" TYP.
SPACING
EXISTING CONCRETE CORE
PLANK ROOF PANELS
3/4" PT PLYWOOD DECKING
FASTEN TO 2X6 WOOD
FRAMING
2X6 PT WOOD FRAMING
ANCHOR CONNECTION INTO
EXISTING CORE PLANK
PANELS
SIMPSON STRONG TIE
OPTI-MESH ACRYLIC
ANCHOR SCREEN TUBE
R O
O F
PL
A
N
A3.1
SCALE 1/8" = 1'-0"
1. APPROXIMATE AREA OF MAIN ROOF PORTION IS 11,372 S.F. AND 7,045 S.F.
FOR THE ADD ALTERNATE PORTION.
2. ALL ROOF PENETRATIONS, EQUIPMENT AND CONDITIONS MAY NOT BE
INDICATED ON ROOF PLAN. ROOF PLAN WAS PREPARED FROM FIELD
PHOTOS AND SITE VISITS.
3. ALL ROOF PENETRATIONS SHALL BE INSTALLED BY THE ROOFER AND
SHALL BE WATERTIGHT AND SHALL NOT VOID ROOF WARRANTY.
4. PROVIDE ROOF CRICKETS ON HIGH SIDE OF EQUIPMENT AS REQUIRED
FOR WARRANTY COVERAGE.
5. ALL ROOF DETAILS SHALL BE APPROVED BY THE ROOF SYSTEM
MANUFACTURER FOR WARRANTY COVERAGE.
6. ALL ROOF TOP EQUIPMENT SHALL BE LEVEL.
7. RAISE EXISTING ROOF TOP EQUIPMENT AS REQUIRED TO OBTAIN PROPER
FLASHING HEIGHT AND COMPLIANCE WITH MANUFACTURER
REQUIREMENTS FOR WARRANTY COVERAGE.
8. PREVENT MATERIALS FROM ENTERING AND CLOGGING EXISTING ROOF
DRAINS.
9. MAIN ROOF STRUCTURE IS FLAT CORE PLANK. TAPERED INSULATION WILL
BE REQUIRED. IT IS ASSUMED THAT THE EXISTING ROOF SYSTEM DOES
NOT UTILIZE LIGHT WEIGHT INSULATING CONCRETE. IF LIGHT WEIGHT
INSULATING CONCRETE IS DISCOVERED CONTACT THE ARCHITECT FOR
FURTHER DIRECTION.
10. ADD ALTERNATE #1 ROOF STRUCTURE IS SLOPED CORE PLANK. TAPERED
INSULATION WILL NOT BE REQUIRED.
11. EXTEND ALL CONDENSATE PIPING TO THE NEAREST DOWNSPOUT
LOCATION.
TH
ES
E C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
AN
D
P
ER
M
IT
TE
D
R
EP
R O
D U
C
TI
O N
S, IN
W H
O
LE
O R
IN
P
AR
T, A R
E
IN
ST
R
U M
EN
TS
O F
SE
R
VI
C
E
AN
D A
R E
TH
E
SO
LE
P R
O
PE
R
TY
O F
PR
EC
IS
IO
N
PL
AN
N
IN
G
, I N
C . U
N
LE
SS
O
TH
ER
W
IS
E
AG
R
EE
D T
O . T
H
EY
S H
AL
L
N O
T
BE
R
EP
R O
D U
C
ED
O R
C O
N
VE
YE
D
IN
A
N Y
M
AN
N
ER
N O
R A
R E
TH
EY
T O
B E
U
SE
D
FO
R A
N Y
O
TH
ER
P
R O
JE
C
TS
O
TH
ER
TH
AN
T H
AT
S
PE
C
IF
IC
AL
LY
IN
D
IC
AT
ED
H
ER
EI
N W
IT
H
O U
T W
R
IT
TE
N
PE
R
M
IS
SI
O
N F
R O
M A
N D
D U
E C
O M
PE
N
SA
TI
O N
T O
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
AL
L
R
IG
H
TS
R
ES
ER
VE
D
D R
AW
N
D
ES
IG
N
C H
EC
KE
D
SH
EE
T
TI
TL
E
PR
O
JE
C
T
ST
A M
P R
EL
EA
SE
D
ES
C R
IP
TI
O N
N O
D
AT
E pl an ne rs e ng in ee rs a rc hi te ct s s ur ve yo rs
Pi ke
B ou le va rd , L aw re nc ev ille , G a
0.
8.
w w .p pi .u s
W
EW
M W
T
PP
I
JA
C
K
SO
N C
O U
N T
Y 4H
B U
IL
D
IN
G
R E
-R O
O F
FO
U
R F
IF
TY
S
EV
EN
D
R
IV
E
JE
FF
ER
SO
N
, G A
. 3
FI
LE
N
AM
E
D
AT
E
PR
O
J.
N
U M
BE
R
FI
LE
N U
M
BE
R
/2
8/
A
-0
LA
N
C E
G . D
A V
IS
REGIS
TE
RE
D
A
RC
HIT
ECT
CERT IF
IC
AT
E
N O
STATE
O
F G
EO
RG
IA
-1
4-
NEW TPO ROOFING SYSTEM INSTALLED PER ROOFING MANUFACTURER'S RECOMMENDATIONS - REFER
TO ROOFING SPECIFICATIONS, AND DETAILS 1/A3.2.
EXISTING EXHAUST FAN TO BE REMAIN. RAISE CURB AS REQUIRED TO ACHIEVE MANUFACTURERS MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY COVERAGE. SPECIAL CARE SHALL BE TAKEN TO NOT DAMAGE EQUIPMENT DURING DEMOLITION OR NEW CONSTRUCTION. IF EQUIPMENT IS DAMAGED IT SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. NEW FLASHING TO BE INSTALLED TO CREATE A WEATHER TIGHT SEAL WITH NEW ROOFING
CONSTRUCTION.
NEW PRE-FINISHED ALUMINUM EDGE METAL, COLOR SHALL MATCH EXISTING. PRESSURE TREATED WOOD BLOCKING SHALL BE PROVIDED IF REQUIRED PER THE UNIT PRICE ESTABLISHED DURING BID.
-REFER TO THE SPECIFICATIONS.
NEW WALK PADS PER THE ROOFING MANUFACTURER'S RECOMMENDATIONS. -REFER TO DETAIL 2/A3.2.
EXISTING ROOF PENETRATION TO REMAIN. RAISE CURB AS REQUIRED TO ACHIEVE MANUFACTURERS MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY COVERAGE. PROVIDE ADDITIONAL PRESSURE TREATED WOOD BLOCKING TO ADJUST HEIGHT AS REQUIRED TO ACHIEVE ROOFING MANUFACTURERS MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND WARRANTY
COVERAGE.
EXISTING PIPE PENETRATION TO REMAIN. SPECIAL CARE SHALL BE TAKEN TO NOT DAMAGE VENT DURING DEMOLITION OR NEW CONSTRUCTION. IF EQUIPMENT IS DAMAGED IT SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. RAISE PENETRATION AS REQUIRED TO ACHIEVE
MANUFACTURERS MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY
COVERAGE. -EXISTING PENETRATION FLASHING TO BE REMOVED AND REPLACED TO CREATE A
WEATHER TIGHT SEAL WITH NEW ROOFING CONSTRUCTION. -REFER TO DETAIL 7/A3.2.
EXISTING ROOF EQUIPMENT TO REMAIN RAISE PENETRATION AS REQUIRED TO ACHIEVE
MANUFACTURERS MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY
COVERAGE. SPECIAL CARE SHALL BE TAKEN TO NOT DAMAGE EQUIPMENT DURING DEMOLITION OR NEW CONSTRUCTION. IF EQUIPMENT IS DAMAGED IT SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. EXISTING FLASHING TO BE REMOVED AND REPLACED TO CREATE A WEATHER
TIGHT SEAL WITH NEW ROOFING CONSTRUCTION.
EXISTING RTU TO REMAIN RAISE PENETRATION AS REQUIRED TO ACHIEVE MANUFACTURERS MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY COVERAGE. SPECIAL CARE
SHALL BE TAKEN TO NOT DAMAGE EQUIPMENT DURING DEMOLITION OR NEW CONSTRUCTION. IF
EQUIPMENT IS DAMAGED IT SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE OWNER. EXISTING FLASHING TO BE REMOVED AND REPLACED TO CREATE A WEATHER TIGHT SEAL WITH
NEW ROOFING CONSTRUCTION.
INFILL EXISTING PENETRATION IN THE EXISTING CORE PLANK ROOF PANELS - REFER TO DETAILS 2/A3.1
AND 3/A3.1.
NEW PRE-FINISHED ALUMINUM SCUPPER DOWNSPOUT AND CONDUCTOR HEAD. -REFER TO
SPECIFICATIONS
EXISTING ANTENNA TO REMAIN PROVIDE A NEW CURB AT THE HEIGHT REQUIRED TO ACHIEVE
MANUFACTURERS MINIMUM HEIGHT REQUIREMENTS FOR PROPER FLASHING, AND FULL WARRANTY
COVERAGE. PROVIDE NEW PITCH POCKET IN CURB. SPECIAL CARE SHALL BE TAKEN TO NOT DAMAGE
THE ANTENNA. -REFER TO DETAIL 8/A3.4.
NEW PVC ROOFING SYSTEM INSTALLED PER ROOFING MANUFACTURER'S RECOMMENDATIONS - REFER
TO ROOFING SPECIFICATIONS, AND DETAILS 1A/A3.2.
A3.1
SCALE 1/2" = 1'-0"
A3.1
SCALE 3/4" = 1'-0"
A3.1
SCALE 1/2" = 1'-0"
NOTE:
- "A" INDICATES ADD ALTERNATE #1
AutoCAD SHX Text A3.1
AutoCAD SHX Text 007-A3.1
AutoCAD SHX Text Roof Plan
AutoCAD SHX Text Roof Notes
AutoCAD SHX Text 05/14/2025
AutoCAD SHX Text
RELEASED FOR BID
AutoCAD SHX Text Roof Plan Keynotes
AutoCAD SHX Text Typ. Existing Canopy Section
AutoCAD SHX Text Typ. Opening Infill Plan
AutoCAD SHX Text Typ. Opening Infill Section
AutoCAD SHX Text Job North
AutoCAD SHX Text N
1/4" = 1'-0"
SLOPE
1/ 4"
'-0
SL
O
PE
1/2" = 1'-0"
SLOPE
1/2
1' -0"
SLO
PE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/ 4"
'-0
SL
O
PE
1/
4"
'-0
SL
O
PE
1/2" = 1'-0"
SLOPE
1/2" = 1'-0"
SLOPE
1/2" = 1'-0"
SLOPE
1/2
1' -0"
SLO
PE
1/2" = 1'-0"
SLOPE
1/2
1' -0"
SLO
PE
1/2" = 1'-0"
SLOPE
1/2" = 1'-0"
SLOPE
1/2" = 1'-0"
SLOPE
1/2" = 1'-0"
SLOPE
1/2" = 1'-0"
SLOPE
1/2" = 1'-0"
SLOPE
EXISTING
SLOPE
EXISTING
SLOPE
ADD ALTERNATE #1
ADD ALTERNATE #1
1/ 4"
'-0
SL
O
PE
R
ID
G E
LI
N
E
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/ 4"
'-0
SL
O
PE
EXISTING
SLOPE
EXISTING
SLOPE
R O
O F
SL
O
PE
P
LA
N
A3.1A
SCALE 1/8" = 1'-0"
TH
ES
E C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
AN
D
P
ER
M
IT
TE
D
R
EP
R O
D U
C
TI
O N
S, IN
W H
O
LE
O R
IN
P
AR
T, A R
E
IN
ST
R
U M
EN
TS
O F
SE
R
VI
C
E
AN
D A
R E
TH
E
SO
LE
P R
O
PE
R
TY
O F
PR
EC
IS
IO
N
PL
AN
N
IN
G
, I N
C . U
N
LE
SS
O
TH
ER
W
IS
E
AG
R
EE
D T
O . T
H
EY
S H
AL
L
N O
T
BE
R
EP
R O
D U
C
ED
O R
C O
N
VE
YE
D
IN
A
N Y
M
AN
N
ER
N O
R A
R E
TH
EY
T O
B E
U
SE
D
FO
R A
N Y
O
TH
ER
P
R O
JE
C
TS
O
TH
ER
TH
AN
T H
AT
S
PE
C
IF
IC
AL
LY
IN
D
IC
AT
ED
H
ER
EI
N W
IT
H
O U
T W
R
IT
TE
N
PE
R
M
IS
SI
O
N F
R O
M A
N D
D U
E C
O M
PE
N
SA
TI
O N
T O
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
AL
L
R
IG
H
TS
R
ES
ER
VE
D
D R
AW
N
D
ES
IG
N
C H
EC
KE
D
SH
EE
T
TI
TL
E
PR
O
JE
C
T
ST
A M
P R
EL
EA
SE
D
ES
C R
IP
TI
O N
N O
D
AT
E pl an ne rs e ng in ee rs a rc hi te ct s s ur ve yo rs
Pi ke
B ou le va rd , L aw re nc ev ille , G a
0.
8.
w w .p pi .u s
W
EW
M W
T
PP
I
JA
C
K
SO
N C
O U
N T
Y 4H
B U
IL
D
IN
G
R E
-R O
O F
FO
U
R F
IF
TY
S
EV
EN
D
R
IV
E
JE
FF
ER
SO
N
, G A
. 3
FI
LE
N
AM
E
D
AT
E
PR
O
J.
N
U M
BE
R
FI
LE
N U
M
BE
R
/2
8/
A
-0
LA
N
C E
G . D
A V
IS
REGIS
TE
RE
D
A
RC
HIT
ECT
CERT IF
IC
AT
E
N O
STATE
O
F G
EO
RG
IA
-1
4-
NOTE:
ROOF CRICKETS ARE NOT SHOWN ON THIS PLAN.
HOWEVER, THEY SHALL BE PROVIDED ON THE HIGH
SIDE OF ROOF MOUNTED EQUIPMENT AS REQUIRED
TO ENSURE FULL WARRANTY COVERAGE.
CRICKETS SHALL HAVE A 1/2" PER FOOT SLOPE.
AutoCAD SHX Text A3.1A
AutoCAD SHX Text 007-A3.1A
AutoCAD SHX Text Roof Slope Plan
AutoCAD SHX Text 05/14/2025
AutoCAD SHX Text
RELEASED FOR BID
AutoCAD SHX Text Job North
AutoCAD SHX Text N
R O
O F
PH
O
TO
S
A3.4 NOT TO SCALE
A3.4 NOT TO SCALE
EXISTING ROOF LADDER TO BE
REMOVED AND REINSTALLED
IF REQUIRED FOR NEW ROOF
INSTALLATION.
EXISTING ROOF AND EDGE METAL
ON PARAPET TO BE REMOVED AND
REPLACED
A3.4 NOT TO SCALE
A3.4 NOT TO SCALE
A3.4 NOT TO SCALE
A3.4 NOT TO SCALE
EXISTING EDGE METAL TO
BE REMOVED AND
REPLACED WITH NEW
PRE-FINISHED ALUMINUM
EDGE METAL.
EXISTING ANTENNA TO REMAIN.
PROVIDE NEW CURB WITH A
PITCH POCKET. CURB HEIGHT
SHALL BE AS REQUIRED TO
ACHIEVE MANUFACTURER'S MIN.
HEIGHT REQUIREMENT FOR
PROPER FLASHING AND FULL
WARRANTY COVERAGE.
REMOVE AND REPLACE
EXISTING SCUPPER
CONDUCTOR HEAD AND
DOWNSPOUT, TYP.
REMOVE EXISTING METAL
PANELS AND FLASHING
MATERIALS FROM PARAPET
AND REPLACE WITH NEW TO
MATCH EXISTING
EXISTING ROOF TOP CURB
AND EQUIPMENT TO BE
REMOVED AND INFILLED
PRIOR TO NEW ROOF
INSTALLATION, REFER TO
DETAILS 2 AND 3/A3.1
-PART OF ADD ALTERNATE #01
A3.4 NOT TO SCALE
REMOVE EXISTING PIPE
SUPPORTS THROUGHOUT
ENTIRE ROOF AND REPLACE
WITH NEW SUPPORTS PER
DETAIL 6/A3.2
TH
ES
E C
O N
ST
R
U C
TI
O
N D
O C
U M
EN
TS
AN
D
P
ER
M
IT
TE
D
R
EP
R O
D U
C
TI
O N
S, IN
W H
O
LE
O R
IN
P
AR
T, A R
E
IN
ST
R
U M
EN
TS
O F
SE
R
VI
C
E
AN
D A
R E
TH
E
SO
LE
P R
O
PE
R
TY
O F
PR
EC
IS
IO
N
PL
AN
N
IN
G
, I N
C . U
N
LE
SS
O
TH
ER
W
IS
E
AG
R
EE
D T
O . T
H
EY
S H
AL
L
N O
T
BE
R
EP
R O
D U
C
ED
O R
C O
N
VE
YE
D
IN
A
N Y
M
AN
N
ER
N O
R A
R E
TH
EY
T O
B E
U
SE
D
FO
R A
N Y
O
TH
ER
P
R O
JE
C
TS
O
TH
ER
TH
AN
T H
AT
S
PE
C
IF
IC
AL
LY
IN
D
IC
AT
ED
H
ER
EI
N W
IT
H
O U
T W
R
IT
TE
N
PE
R
M
IS
SI
O
N F
R O
M A
N D
D U
E C
O M
PE
N
SA
TI
O N
T O
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
PR
EC
IS
IO
N P
LA
N
N
IN
G , I
N C
AL
L
R
IG
H
TS
R
ES
ER
VE
D
D R
AW
N
D
ES
IG
N
C H
EC
KE
D
SH
EE
T
TI
TL
E
PR
O
JE
C
T
ST
A M
P R
EL
EA
SE
D
ES
C R
IP
TI
O N
N O
D
AT
E pl an ne rs e ng in ee rs a rc hi te ct s s ur ve yo rs
Pi ke
B ou le va rd , L aw re nc ev ille , G a
0.
8.
w w .p pi .u s
W
EW
M W
T
PP
I
JA
C
K
SO
N C
O U
N T
Y 4H
B U
IL
D
IN
G
R E
-R O
O F
FO
U
R F
IF
TY
S
EV
EN
D
R
IV
E
JE
FF
ER
SO
N
, G A
. 3
FI
LE
N
AM
E
D
AT
E
PR
O
J.
N
U M
BE
R
FI
LE
N U
M
BE
R
/2
8/
A
-0
LA
N
C E
G . D
A V
IS
REGIS
TE
RE
D
A
RC
HIT
ECT
CERT I F
IC
AT
E
N O
STATE
O
F G
EO
RG
IA
-1
4-
REMOVE EXISTING SCUPPER IN
ITS ENTIRETY AND PROVIDE
NEW PREFINISHED ALUMINUM
SCUPPER (TYPICAL)
A3.4 NOT TO SCALE
EXISTING ROOF EQUIPMENT
TO BE REMOVED COMPLETELY
IDENTIFIED WITH AN X ALSO
REFER TO DEMO ROOF PLAN
FOR LOCATIONS
EXISTING ROOF TOP
EQUIPMENT TO REMAIN.
RAISE CURBS AS REQUIRED
TO ACHIEVE
MANUFACTURER'S MIN.
HEIGHT REQUIREMENT FOR
PROPER FLASHING AND FULL
WARRANTY COVERAGE.
REMOVE AND DISPOSE OF METAL PIPE
COVER. FLASH EXISTING PENETRATION
AS REQUIRED TO CREATE A WEATHER
TIGHT SEAL AND PROVIDE FULLY
WARRANTY COVERAGE.
A3.4 NOT TO SCALE
REMOVE AND DISPOSE OF
ROOF TOP EQUIPMENT.
PATCH PENETRATION AS
SHOWN ON NEW WORK
PLANS.
AutoCAD SHX Text A3.4
AutoCAD SHX Text 053-A3.4
AutoCAD SHX Text Roof Detail
AutoCAD SHX Text Roof Detail
AutoCAD SHX Text Roof Detail
AutoCAD SHX Text Roof Detail
AutoCAD SHX Text Roof Detail
AutoCAD SHX Text Roof Detail
AutoCAD SHX Text Roof Detail
AutoCAD SHX Text 05/14/2025
AutoCAD SHX Text
RELEASED FOR BID
AutoCAD SHX Text Roof Detail
Roof Detail
| 01 CS |
| Plot |
| 02 D3.1 |
| 30 x 42 |
| 03 A3.1 |
| 30 x 42 |
| 04 A3.1A |
| 30 x 42 |
| 05 A3.2 |
| 06 A3.3 |
| 07 A3.4 |
| 30 x 42 |
File details come from the government source that posted it. Updated .