This document contains drawings for the Patton Hall Boiler Replacement project at Fort Valley State University in Fort Valley, Georgia. The project involves the demolition and replacement of the existing boiler system for Patton Hall. The drawings provide details on the mechanical, plumbing, and electrical work required, including the installation of new heating pumps, a new boiler, and associated piping and controls.
The project is being bid through Fort Valley State University, with bids due by 2:00 PM on Thursday, May 16, 2024. The work will be awarded to a qualified contractor to complete the boiler replacement. The document does not provide information on pricing, funding sources, or any set-asides for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
M2.0
SHEET NO. TITLE
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
M0.0
FORT VALLEY, GEORGIA 31030
1005 STATE UNIVERSITY DR.
FORT VALLEY STATE UNIVERSITY
P2.0 LARGE SCALE - MECHANICAL ROOM - DEMOLITION & NEW WORK - PLUMBING
PATTON HALL BOILER REPLACEMENT
ABBREVIATIONS, LEGEND, & SCHEDULES - HVAC
LARGE SCALE - BASEMENT MECH/BOILER ROOM - DEMOLITION & NEW WORK - HVAC
04.05.24 100% CONSTRUCTION DOCUMENTS
PROJECT No. FVSUB 042024
P:\21124\21124m00.dgn
DATE PLOTTED
DGN FILE
05-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\21124\21124m00.dgn
AS SHOWN
WSH
LTF
WSH
F O
R T
V A
L L
E Y G
E O
R G
IA
S T
A
E
U N
IV
E R
S
IT
Y
D
F O
L L
S
A
IV
E R
S
IT
Y
P A
T T
O
H
L
B
IL
P L
A C
E M
E N
T
04.05.24
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
C
N S T
R U
C T
IO
C U
M E
N T S
21124
P R
O J E o F
V S
U B
M0.0
CHS CHR
HWS HWR
CR
D
SPF
HTWS HTWR
DTS DTR
CHILLED WATER SUPPLY CHILLED WATER RETURN
HEATING WATER SUPPLY HEATING WATER RETURN
CONDENSER WATER SUPPLY CONDENSER WATER RETURN
CONDENSATE DRAIN
FIRE PROTECTION MAIN STANDPIPE
HIGH TEMP. SUPPLY HIGH TEMP. RETURN
DUAL TEMP. SUPPLY DUAL TEMP. RETURN
R REFRIGERANT PIPING
RL REFRIGERANT LIQUID
CS
RS REFRIGERANT SUCTION
RG REFRIGERANT HOT GAS
HIGH PRESSURE STEAM
LOW PRESSURE STEAM
(15 PSIG. MAX)
CR CONDENSATE RETURN (LP)
PUMPED CONDENSATE
50#
STEAM
(PRESSURE INDICATED)
SOLENOID VALVE RELIEF VALVE
GATE VALVE WITH
3/4" HOSE END
NEEDLE VALVE
OS&Y GATE VALVE .
GAS COCK
AUTOMATIC AIR VENTAAV
GAUGE WITH COCK
BOILER DRAIN PIPE TEST PLUG
FLEX. PIPE CONN. BACKFLOW PREVENTER
MANUAL AIR VENT
STRAINER
ELBOW UP ELBOW DOWN
BRANCH OUT BOTTOM BRANCH OUT TOP
TEE OUT BOTTOM TEE OUT TOP
SCREWED UNION FLANGED UNION
PIPE CAP BLIND FLANGE
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALANCE VALVE
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
SCREWED & FLANGED
GLOBE VALVE
CHECK VALVE
2-WAY CONTROL VALVE
CONTROL VALVE
PLAN VIEW
ECCENTRIC REDUCER
GAUGE COCK
3-WAY MIXING
VALVE IN VALVE BOX
CONTROL VALVE
HPS
THERMOMETER IN WELL
SEPARABLE SOCKET WELL
LPS
PLUG VALVE
PCR
CONNECT TO EXISTING
SUMMER WINTER
DESIGN CONDITIONS
OUTSIDE
INSIDE
95 F DB / 78 F WB 25 F DB
72 F DB75 F DB / 55% RH
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
?F DEGREES FAHRENHEIT
?C DEGREES CENTIGRADE
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
MARK REMARKS
SCHEDULES - HVAC
LEGEND, &
ABBREVIATIONS,
MARK SERVICE TYPE GPM
FT.H O
MAX. MIN.
EFF.%2
MANUFACTURERS
REMARKS
DYNAMIC
BELL & GOSSETT
RPM
HP
CONDENSING HOT WATER BOILER SCHEDULE
MBH
INPUT
BOILER
MBH
OUTPUT
EFFICIENCY
MIN.
PRESSURE
OPERATING
GPM VOLT/PHASE
BLR-1 120/1600 585 45
HP-1
HP-2
TACOPATTERSON
HEATING PUMP SCHEDULE
3597.5%
BLDG HW
BLDG HW
VIL
VIL
48.3
48.3
1.5x1.5x7C
1.5x1.5x7C 1.5x1.5x7.25
1.5x1.5x7.25 1.5x1.5x6.25
1.5x1.5x6.25
MARK REMARKS
ELECTRIC UNIT HEATER SCHEDULE
UH-1
MBH
CAP.
CFM
NOM.
F
EAT
GPM F
EWT
P.D.
MAX.
TYPE
HORIZONTAL 25 700 60 1.7 180 0.5
P:\21124\21124m20.dgn
DGN FILE
05-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\21124\21124m20.dgn
AS SHOWN
WSH
LTF
WSH
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
F O
L L
A
IV
E R
S
IT
Y
P A
T T
IL
P L
A C
E M
E N
T
04.05.24
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
N S T
R U
C T
C U
M E
N T S
21124
P R
O J E
F
V S
U B
BOILER ROOM
PASSAGE
SERVICE
ROOM
MECHANICAL
ROOM
MACHINE
ELEV
BOILER ROOM
PASSAGE
SERVICE
ROOM
MECHANICAL
ROOM
MACHINE
ELEV
CD
EXISTING
TRANSFORMER
EXISTING ELECTRICAL
JUNCTION BOX TO REMAIN
1"
DUCT TO REMAIN
EXISTING RA
AHU-1
ACP-1
CP-1
C H S
C H
R
C H
R
OA LOUVER
EXISTING
OAD
AP
MVD
36/30
20/12
CONDUIT
EXISTING
DUCT TO REMAIN
EXISTING 48/48 OA
3"
CHS
CHR
SUPPORTED FROM WALL
3" CHW (STACKED) &
D
1"
2" ƒ"
2•"
SUMP PUMP
EXISTING
UP TO 2nd FLOOR
EXISTING 2" HWR/S
EXISTING 2" CHW
UP TO 1st FLOOR
C D
1"
FEED TANK
EXISTING CHW
EXPANSION TANK
EXISTING CHW
HOUSEKEEPING PAD
EXISTING
3"
FILTER
HC
AX
CC
FAN
UP TO 1st FLOOR
EXISTING 24/24
2" ƒ"
2•"
TO PLENUM; FD @ FLOOR
EXISTING 48/24 UP
CD
HOUSEKEEPING PAD
EXISTING
1" CD
AHU-1
48/30
CP-1
A
ENCLOSURE
FIBER
MDP
M2.0
SCALE:
= 1'-0
4 0 2 4 8
EXISTING TO REMAIN
DEMOLITION
NEW WORK
POINT OF CONNECTION
MECHANICAL/BOILER ROOM - DEMOLITION - HVAC
LARGE SCALE -
SCALE:
= 1'-0
4 0 2 4 8
MECHANICAL/BOILER ROOM - NEW WORK - HVAC
LARGE SCALE -
CD
EXISTING
TRANSFORMER
EXISTING ELECTRICAL
JUNCTION BOX TO REMAIN
1"
DUCT TO REMAIN
EXISTING RA
AHU-1
B-1
ACP-1
CP-1
C H S
C H
R
C H
R
UH-1
N N
OA LOUVER
EXISTING
OAD
AP
MVD
36/30
20/12
CONDUIT
EXISTING
DUCT TO REMAIN
EXISTING 48/48 OA
3"
CHS
CHR
SUPPORTED FROM WALL
3" CHW (STACKED) &
D
1"
2" ƒ"
2•"
2" ƒ"
SUMP PUMP
EXISTING
1•"
2" 2"
UP TO 2nd FLOOR
EXISTING 2" HWR/S
EXISTING 2" CHW
UP TO 1st FLOOR
H W
R
H W
S
C D
1"
FEED TANK
EXISTING CHW
EXPANSION TANK
EXISTING CHW
HOUSEKEEPING PAD
EXISTING
3"
FILTER
HC
AX
CC
FAN
UP TO 1st FLOOR
EXISTING 24/24
2"
2•"2" ƒ"
2•"
TO PLENUM; FD @ FLOOR
EXISTING 48/24 UP
CD
HOUSEKEEPING PAD
EXISTING
1" CD
AHU-1
48/30
2"
NEW WORK - HVAC
DEMOLITION &
MECH/BOILER ROOM -
LARGE SCALE -
CP-1
A
ENCLOSURE
FIBER
REMOVE EXISTING HP-1 STARTER
REMOVE EXISTING HP-2 STARTER
EXPANSION TANK
REMOVE EXISTING HEATING
CHEMICAL FEED TANK
REMOVE EXISTING HW
PAD TO REMAIN
EXISTING CONCRETE
BLR-1
2"
2"
HP-1
HP-2
UH-1
AIR SEPERATOR
TANGENTIAL
2" ƒ"
H W
S
H W
R
HWR
HWS
ACP
2"
BYPASS CHEMICAL FEEDER
HEATING WATER
EXPANSION TANK
HEATING WATER
MDP
THE NEW VFDS. MAKE ALL FINAL CONNECTIONS TO EACH PUMP THRU THE VFDS.
THE CIRCUIT TO SUPPLY EACH DISCONNECT. THE DISCONNECTS SHALL BE CONNECTED ON THE LINE SIDE OF
30A/3P FUSED DISCONNECTS, ONE FOR EACH PUMP. PROVIDE A WIREWAY ABOVE THE DISCONNECTS AND TAP
AND PROVIDE NEW. EXTEND EXISTING CONDUIT AS REQUIRED AND PROVIDE 4#10 AWG COPPER. PROVIDE TWO
THIS BREAKER SHALL BE REUSED TO SERVE THE NEW PUMPS HP-1 AND HP-2. REMOVE EXISTING CONDUCTORS
EXISTING PUMPS HP-1 AND HP-2 ARE SERVED FROM A 20A/3P CIRCUIT BREAKER LOCATED IN PANEL MDP.
REMOVE EXISTING BOILER CONTROL WIRES. MAKE ALL FINAL CONNECTIONS TO NEW BOILER CONTROLS.
CONDUCTORS IN 1/2" CONDUIT BACK TO EXISTING CIRCUIT BREAKER IN PANEL MDP LABELED FOR BOILER CONTROLS.
PROVIDE NEW 30A/2P NONFUSED, LOCKABLE DISCONNECT FOR BOILER CONTROLS. ROUTE NEW #12 AWG COPPER
CONDUIT BACK TO PANEL A. PROVIDE A NEW 20A/1P CIRCUIT BREAKER MATCHING EXISTING PANEL AIC RATING.
BACK TO NEAREST DATA ROOM AND TERMINATE ON EXISTING COPPER PATCH PANEL. ROUTE #12 AWG COPPER, 1/2"
PROVIDE NEW 120 VOLT CIRCUIT AND CAT 6 DATA CABLE FOR NEW BAS CONTROL PANEL. ROUTE CAT 6 CABLE
REMOVE ALL EXISTING LIGHTING FROM THIS SPACE.
NEW LIGHTS. PROVIDE A NEW LIGHT SWITCH AT THE ENTRANCE TO THIS AREA.
FIXTURES TO FULLY LIGHT SERVICE AREAS. EXTEND EXISTING LIGHTING CIRCUIT IN THIS AREA TO SERVE THE
PROVIDE SIX NEW ACUITY CLX-L48-4000LM-SEF LED LIGHT FIXTURES IN THIS SPACE. EVENLY SPACE NEW LIGHT
CONDUIT TO SERVE NEW UNIT HEATER UH-1. PROVIDE NEW CONDUCTORS AND EXTEND CONDUIT AS REQUIRED.
REMOVE ALL ELECTRICAL ASSOCIATED WITH UNIT HEATER BEING REMOVED. REUSE EXISTING CIRCUIT BREAKER AND
2"
HP-1 VFD
HP-2 VFD
2"
TURN OVER TO OWNER
& HP-2 STACKED;
REMOVE EXISTING HP-1
LINE LEGEND
NOTES:(THIS SHEET ONLY)
ƒ"
EXISTING MASONRY FLUE AND PROVIDE NEW 4"{ FLUE CAP ON TOP OF NEW FLUE.
ROUTE NEW 4"{ FLUE UP TO ROOF THRU EXISTING MASONRY FLUE. REMOVE EXISTING FLUE CAP ON TOP OF 7
BOILER B-1
EXISTING
REMOVE
P:\21124\21124p20.dgn
DGN FILE
05-APR-2024
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\21124\21124p20.dgn
AS SHOWN
WHD
WHD
F O
L L
E Y G
E O
R
S T
A
IV
E R
S
F O
L L
A
IV
E R
S
IT
Y
P A
T T
IL
P L
A C
E M
E N
T
LTF
04.05.24
COA Expiration: 6.30.2024
COA#PEF000774
NBP Engineers, Inc.
N S T
R U
C T
C U
M E
N T S
21124
P R
O J E
F
V S
U B
BOILER ROOM
PASSAGE
SERVICE
ROOM
MECHANICAL
ROOM
MACHINE
ELEV
BOILER ROOM
PASSAGE
SERVICE
ROOM
MECHANICAL
ROOM
MACHINE
ELEV
TRANSFORMER
EXISTING
JUNCTION BOX TO REMAIN
EXISTING ELECTRICAL
AHU-1
ACP-1
CP-1
OA LOUVER
EXISTING
CP-1
SUMP PUMP
EXISTING
FEED TANK
EXISTING CHW
EXPANSION TANK
EXISTING CHW
FILTER
HC
AX
CC
FAN
AHU-1
PANEL
ELEVATOR
A
FIBER ENCLOSURE
DISCONNECT
BOILER
1"
MAKE-UP ASSY
EXISTING BOILER
EX2"G
P2.0
SCALE:
= 1'-0
4 0 2 4 8
NOTES:(THIS SHEET ONLY)
SCALE:
= 1'-0
4 0 2 4 8
TRANSFORMER
EXISTING
JUNCTION BOX TO REMAIN
EXISTING ELECTRICAL
AHU-1
B-1
ACP-1
CP-1
UH-1
N N
OA LOUVER
EXISTING
CP-1
SUMP PUMP
EXISTING
FEED TANK
EXISTING CHW
EXPANSION TANK
EXISTING CHW
FILTER
HC
AX
CC
FAN
AHU-1
BOILER B-1
REMOVE EXISTING
PANEL
ELEVATOR
A
FIBER ENCLOSURE
DISCONNECT
BOILER
MECHANICAL/BOILER ROOM - DEMOLITION - PLUMBING
LARGE SCALE - BASEMENT
MECHANICAL/BOILER ROOM - NEW WORK - PLUMBING
LARGE SCALE - BASEMENT
NEW WORK - PLUMBING
DEMOLITION &
MECH/BOILER ROOM -
LARGE SCALE -
1"
MAKE-UP ASSY
EXISTING BOILER
CHECK VALVE
INCREASER
FLOOR DRAIN (FD)
CLEANOUT (CO) VENT THRU ROOF
SOIL, WASTE
VENT
G GAS (LOW PRESSURE)GAS COCK
GATE VALVE
GLOBE VALVE
UNION
HUB DRAIN
VALVE IN VALVE BOX
HIGH PRESSURE GAS
BELOW FLOOR
ABOVE CEILING
NOT TO SCALE
HPG
NTS
THRUST BLOCK
EXISTING TO REMAIN
EXISTING TO BE REMOVED
LEGEND
BALL VALVE
T
THERMOMETER
AQUASTAT LIMIT OF DEMOLITION
N.F.W.H. NON-FREEZE WALL HYDRANT
ABOVE FINISHED GRADE
TEST PLUG
STRAINER
PRESSURE REDUCING VALVE COLD WATER
HOT WATER (120 )
HOT WATER RETURN
BF
AC
AFG
VTR
CPHB
BALANCER (CIRCUIT SETTER)
FLOW INDICATOR
HOSE BIBB (HB)
SILL COCK (SC)
NEW TO EXISTING
POINT OF CONNECTION
HOSE BIBB
CHROME PLATED
COMPRESSED AIRCA
COMPRESSED AIR OUTLETCA
FIXTURES.
SEE ARCHITECTURAL PLANS FOR EXACT LOCATION OF ALL PLUMBING
ALL WATER PIPING SHALL BE RUN ABOVE CEILING UNLESS OTHERWISE
NOTED.
ALL VENTS THRU ROOF (VTR) SHALL BE OFFSET A MINIMUM OF 15'-0"
FROM ALL OUTSIDE INTAKES.
-5 PROVIDE HANGER ON ALL HORIZONTAL WATER PIPING INSIDE CHASES
COORDINATE PLUMBING PIPING WITH AIR CONDITIONING DUCTS, EQUIPMENT
AND ELECTRICAL CONDUIT.
GENERAL NOTES:
WITHIN 6" OF SPECIFIED WATER HAMMER ARRESTOR.
NOTE TO CONTRACTOR:
PROVIDE ACCESS TO THE CONCEALED UTILITY.
WORK OR CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER WORK TO
PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK, EXTENSION OF
TO CODE AND AS SHOWN. NOTIFY ARCHITECT OF ANY CONFLICTS OR DISCREPANCIES
NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING
FLUID BEING HANDLED AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT
WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS,
NOTES:
GAS REGULATOR SCHEDULE
NUMBER
REGULATOR
SERVED
EQUIPMENT
LOCATION
EQUIPMENT
INPUT DEMAND
MBH GAS
PRESSURES
INLET/OUTLET
BOILER 600 MBH MECH. ROOM 2psi/10"W.C.
* PIPE RELIEF VENT FULL SIZE TO OUTSIDE. PIPE AWAY FROM INTAKE LOUVERS, ETC.
GR-1
EX2"G
EX2"G-DN
EX 1 ‚"G
GR-1
1 •"G
CEILING AND TEMPORARILY CAP UNTIL FUTURE CONNECTION CAN BE MADE.
REMOVE EXISTING GAS PIPING, VALVE, AND REGULATOR SERVING BOILER. REMOVE 2" GAS PIPING UP TO
AND THEN ROUTE 1 •" GAS DOWN AND CONNECT TO BOILER.
CONNECT NEW 2" GAS PIPING TO EXISTING VALVE. ROUTE NEW 2" PIPING THROUGH NEW GAS REGULATOR, GR-1, MANUFACTURER'S INSTALLATION REQUIREMENTS.
PROVIDE A MINIMUM 10 FEET OF PIPING BETWEEN REGULATOR AND BOILER TO MEET
TURN OVER TO OWNER
& HP-2 STACKED;
REMOVE EXISTING HP-1
REMOVE EXISTING HP-1 STARTER
REMOVE EXISTING HP-2 STARTER
EXPANSION TANK
REMOVE EXISTING HEATING
CHEMICAL FEED TANK
REMOVE EXISTING HW
| 21124aCov |
| 21124m00 |
| References |
| tb, 21124tb.dgn |
| 21124m20 |
| References |
| tb, 21124tb.dgn |
| afp1, 21124aB.dgn |
| afp2, 21124aB.dgn |
| existing, 21124m20.dgn |
| 21124p20 |
| References |
| tb, 21124tb.dgn |
| afp1, 21124aB.dgn |
| afp2, 21124aB.dgn |
| existing, 21124p20.dgn |
| hvac, 21124m20.dgn |
File details come from the government source that posted it. Updated .