2024_05_14_FVSU PattonHallBoiler_Addn_2.pdf

PDF 77 KB Posted

Attached to
FVSU Patton Hall Boiler Replacement
Solicitation number
PE-53300-RFP-2024-000000019
Issued by
Paulding County, Georgia

About this file

This document is an addendum to a solicitation for the FVSUB 042024 Patton Hall Boiler Replacement project located in Fort Valley, Georgia. The project involves the construction of a boiler replacement at Patton Hall. Bids must be physically submitted by 2:30 PM on Thursday, May 23, 2024 to the Wilson Roberts Facilities Management Building in Fort Valley, Georgia, at which time the bids will be publicly opened and announced.

The addendum modifies the original bid documents dated April 05, 2024, including changes to the bid requirements and invitation to bid, as well as an addition to the HVAC control system specifications to include Controls by Control Concepts LLC. There are no details provided on pricing terms, set asides, incumbents, funding requirements, or other salient commercial information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Valley State University FVSUB 042024 Patton Hall Boiler Replacement

NBP #21124

ADDENDUM NO. 2

A1 - 1

This Addendum forms part of the Contract Documents and modifies the original bidding documents dated April 05, 2024. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do may subject the bidder to disqualification.

The contract documents are herein amended under the date of May 15, 2024 as follows:

AMENDMENT TO THE BID DOCUMENTS

1. BID REQUIREMENTS and INVITATION TO BID shall read:

The Owner will receive sealed bids from Contractors in Wilson Roberts Facilities Management Building 1 Toomer Circle Fort Valley, GA 31030 . Bids must be physically on the table in the Bid Room by 2:30 PM o’clock, at the time legally prevailing in Atlanta, Georgia on Thursday, May 23, 2024 , for the construction of FVSUB 042024 Patton Hall Boiler Replacement located in Fort Valley , Georgia. At the time and place noted above, the bids will be publicly opened and announced.

AMENDMENTS TO THE SPECIFICATIONS

1. SECTION 23 0923 - DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

A. Add Paragraph 2.10 as follows:

2.10 Controls by Control Concepts LLC. Contact Robert Blain (770) 296-3236 cell or rblain@intreo.com

END OF ADDENDUM

File details come from the government source that posted it. Updated .