This document is a set of Q&A related to a federal contract opportunity for a 75/20 Tons Bridge Crane. The key details are:

The project requires replacing the electrical feeder wire and conduit from the main switchgear to the 75-ton crane, including electrical disconnects. No upgrade to the existing main switchgear is needed. The new electrical disconnect will be installed at the crane floor level, not the gallery level. The contract solicitation is for a 75/20 Tons Bridge Crane, issued as a Request for Quote (RFQ) by the International Boundary and Water Commission, U.S. Section. This is a 100% Small Business Set-Aside with a NAICS code of 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing. Offers will be evaluated based on technical acceptability, technical approach, and past performance, with award going to the Lowest Price Technically Acceptable offeror. Quotes are due by June 10, 2024 at 3:00 pm MST and must be submitted via email.

View the file

Other files for this federal contract opportunity

Other files attached to 75/20 Tons Bridge Crane, newest first.
File Type Posted
Q-A - 2.docx DOCX document
75-20 TONS All Crane Drawings.pdf PDF
Falcon PP Infrastructure Drawings.pdf PDF
75-20 TONS Crane Motors Information.pdf PDF
75-20 TON Crane Pictures.pdf PDF
75_20 TON Overhead Crane.pdf PDF
75_20 Ton Crane Building Structure.pdf PDF
Q-A.docx DOCX document
7130-USIBWC-FalconPowerPlantCraneAssessment-5Dec2023.pdf PDF
75_20 TON Crane Pictures.pdf PDF
CLIN Structure.docx DOCX document
SOW Bridge Crane Upgrade.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A -1 20245201008 75/20 Crane

Can you confirm that the no upgrade or changes are required to the existing main switchgear? No upgrade required in current Switchgear, The project requires replace electrical feeder wire and conduit from Switchgear all way to 75 TONS Crane including electrical disconnects using National Electric Safety Codes Standards (NESC).

Can you confirm that the intent of “new electrical panel” is for a lockable disconnect at the gallery level? The disconnect will be installed at the erection floor (Crane Floor).

Can you confirm the project is expecting a completely new run of conduit from the main switchgear to the gallery level and then to the crane runway level? The project requires replace electrical feeder wire and conduit from Switchgear all way to 75 TONS Crane including electrical disconnects using as reference latest National Electric Safety Codes Standards (NESC).