20240621_016-118386_SpecialProvisions.pdf
PDF 4 MB Posted
- Solicitation number
- 2024-IFB-065
- Issued by
- Cook County, Illinois
About this file
This document is a set of Special Provisions for a pedestrian signal improvement project prepared by Hampton, Lenzini and Renwick, Inc. for the Village of Schaumburg, located at the intersection of IL Route 72 (Higgins Road) and National Parkway in Cook County, Illinois. The project involves removing existing concrete and paver sidewalks, asphalt paths, and concrete curb and gutter, and constructing new concrete and brick paver sidewalks and paths, combination concrete curb and gutter, installing pedestrian traffic signal equipment on an existing traffic signal, adding pavement markings, and restoring the construction area. The work requires contractors to be prequalified in Electrical and Pavement Markings categories, with the project expected to be completed by June 21, 2024.
The special provisions detail technical specifications for various aspects of the project, including sodding, traffic control, detectable warnings, pedestrian signal posts, electric cable, accessible pedestrian signals, and decorative crosswalk markings. The project will use specific materials like Vitrified Polymer Composite detectable warning tiles, LED pedestrian signal heads, and a specialized three-color Methyl Methacrylate (MMA) marking system to create a faux brick-look crosswalk pattern. Utility coordination is required with multiple agencies including West Shore Pipeline, Wide Open West, ComEd, Comcast, and the Village of Schaumburg. The contractor will be responsible for maintaining the traffic signal installation and will need to have personnel with specific certifications, including IMSA/IPSI Traffic Signal Technician Level II certification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pedestrian_Signal_Improvements_-_National_and_Higgins_(IL-72).pdf | ||
| 20240621_016-118386_PlanSet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SPECIFICATIONS
IL ROUTE 72 (HIGGINS ROAD) AT NATIONAL PARKWAY
INTERSECTION PEDESTRIAN IMPROVEMENTS
Village of Schaumburg, Cook County, Illinois
Prepared for:
By:
June 21, 2024
IL Route 72 (Higgins Road) at National Parkway Intersection Pedestrian Improvements
Village of Schaumburg June 21 2024
SP-1
Contents
LOCATION OF PROJECT
DESCRIPTION OF PROJECT
CONTRACT QUANTITIES
PREQUALIFICATION OF BIDDERS
STATUS OF UTILITIES (D-1)
SODDING
COMBINATION CURB AND GUTTER REMOVAL
TRAFFIC CONTROL AND PROTECTION (SPECIAL)
DETECTABLE WARNINGS (SPECIAL)
CONCRETE UNDERLAYMENT REMOVAL
ASPHALT PATH REMOVAL
PAVER BRICK REMOVAL
CONCRETE UNDERLAYMENT
PAVER BRICKS
PORTLAND CEMENT CONCRETE SIDEWALK
TRAFFIC SIGNAL GENERAL REQUIREMENTS
RE-OPTIMIZE TRAFFIC SIGNAL SYSTEM
ELECTRIC METER
UNDERGROUND RACEWAYS
ROD AND CLEAN EXISTING CONDUIT
ELECTRIC CABLE
PEDESTRIAN SIGNAL POST
CONCRETE FOUNDATION
LIGHT EMITTING DIODE (LED) PEDESTRIAN SIGNAL HEAD
ACCESSIBLE PEDESTRIAN SIGNALS
MODIFY EXISTING CONTROLLER CABINET
REMOVE EXISTING TRAFFIC SIGNAL EQUIPMENT
PEDESTRIAN ENHANCEMENT CROSSWALKS-“S” PATTERN
SP-2
SPECIAL PROVISIONS
The following Special Provisions, the Illinois Department of Transportation (IDOT) “Standard Specifications for Road and Bridge Construction”, adopted January 1, 2022 (Standard Specifications), the latest edition of the “Illinois Manual of Uniform Traffic Control Devices for Streets and Highways” in effect as of the date of this invitation for bids, the IDOT Supplemental Specifications and Recurring Special Provisions, adopted January 1, 2024, as indicated on the included check sheet, and the latest version of the IDOT Highway Standards shall be incorporated herein and made part of the proposed improvements. In case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern. Where any reference is made to contacting or coordinating with IDOT, the Department, or variations of such reference, the contact shall be considered as the Village of Schaumburg Transportation Department.
LOCATION OF PROJECT
This work is located at the intersection of Illinois Route 72 (Higgins Road) and National Parkway in the Village of Schaumburg, Cook County, Illinois.
DESCRIPTION OF PROJECT
The project consists of removal of existing concrete and paver sidewalk, asphalt path, and concrete curb and gutter, and construction of new concrete and brick paver sidewalks and paths, combination concrete curb and gutter, installation of pedestrian traffic signal equipment on an existing traffic signal, pavement markings, and restoration of the construction area.
CONTRACT QUANTITIES
No extra compensation will be allowed due to changes in quantities unless approved in writing by the Village before performing the work.
PREQUALIFICATION OF BIDDERS
Prequalification of bidders in accordance with Section 102 of the Standard Specifications shall be required of all bidders on this project.
The Contractor will be required to meet Prequalification Codes 14, Electrical, and 27, Pavement Markings.
STATUS OF UTILITIES (D-1)
Effective: June 1, 2016 Utility companies and/or municipal owners located within the construction limits of this project have provided the following information in regard to their facilities and the proposed improvements. The tables below contain a description of specific conflicts to be resolved and/or facilities which will require some action on the part of the Department’s contractor to proceed with work. Each table entry includes an identification of the action necessary and, if applicable, the estimated duration required for the resolution.
UTILITIES TO BE ADJUSTED
Conflicts noted below have been identified by following the suggested staging plan included in the contract.
The company has been notified of all conflicts and will be required to obtain the necessary permits to complete their work; in some instances resolution will be a function of the construction staging. The responsible agency must relocate or complete new installations as noted in the action column; this work has been deemed necessary to be complete for the Department’s contractor to then work in the stage under which the item has been listed.
SP-3
No conflicts to be resolved.
Contact West Shore Pipeline 24 hours in advance of any work within 25 feet of the high pressure liquid petroleum pipeline along the south side of IL72 (Higgins Road).
UTILITIES TO BE WATCHED AND PROTECTED
The areas of concern noted below have been identified by following the suggested staging plan included for the contract. The information provided is not a comprehensive list of all remaining utilities, but those which during coordination were identified as ones which might require the Department’s contractor to take into consideration when making the determination of the means and methods that would be required to construct the proposed improvement. In some instances the contractor will be responsible to notify the owner in advance of the work to take place so necessary staffing on the owners part can be secured.
The following contact information is what was used during the preparation of the plans as provided by the owner of the facility.
Agency/Company Responsible to Resolve Conflict
Name of contact Address Phone E-mail address
West Shore Pipe Line
William O’Malley
3400 S Badger Rd, Arlington Heights, IL 60005
847-439-womalley@buckeye.com
Wide Open West Paul Flinkow 630-536-
Paul.Flinkow@wowinc.com
ComEd Public Relocation Department
630-437-
Comcast Martha Gieras 224-229-
Martha.Gieras@comcast.com
Village of Schaumburg
Kristin Bilar 714 S. Plum Grove Road, Schaumburg, IL 60193
847-923-
Kbilar@villageofschaumburg.com
The above represents the best information available to the Department and is included for the convenience of the bidder. The days required for conflict resolution should be taken into account in the bid as this information has also been factored into the timeline identified for the project when setting the completion date. The applicable portions of the Standard Specifications for Road and Bridge Construction shall apply.
Estimated duration of time provided in the action column for the first conflicts identified will begin on the date of the executed contract regardless of the status of the utility relocations. The responsible agencies will be working toward resolving subsequent conflicts in conjunction with contractor activities in the number of days noted.
The estimated relocation dates must be part of the progress schedule submitted by the contractor. A utility kickoff meeting will be scheduled between the Department, the Department’s contractor and the utility companies. The Department’s contractor is responsible for contacting J.U.L.I.E. prior to any and all excavation work.
SP-4
SODDING
Sod: Add the following to Article 1081.03:
Sod shall be cleanly cut, either by hand or machine, to a minimum uniform thickness of 1" but of not more than 2", to a uniform width of 18", and in strips of not less than 3'-0" nor more than 6'-0" in length. Edges of sod shall be straight.
Sodding Time: Add the following to Article 252.04:
Sod shall be delivered to the site within 24 hours of harvest at the sod nursery. All sod installation shall be complete within 36 hours of harvest from the sod nursery. The Contractor shall submit a ticket from the sod nursery clearly stating the date and time of day that harvest took place.
Transportation: Add the following to Article 252.05:
Care shall be taken to retain the native soil on the roots during the process of stripping, transporting, and placing sod. Sod shall be cut and transported only when moisture conditions are favorable for correct handling, and shall be protected by a suitable canvas or other wind-resistant material while in transit.
Dumping of sod from vehicles on the areas of delivery will not be permitted. Sod shall be delivered within 24 hours from time of cutting. Sod which has been damaged in transit or in handling, including drying out, shall be rejected and removed from the site immediately.
Placing Sod: Delete paragraph 1 of Article 252.06 and substitute the following:
Sod shall be of type specified, laid smoothly, edge to edge in close contact on the prepared surface, with joints staggered. Sod shall be pressed into setting bed immediately by tamping or rolling with approved equipment to eliminate air pockets and to produce an even surface. Where grades are such that the flow of water will be over sodded areas and onto paved areas, after compaction, the sod shall be placed flush with the pavement or drainage structures.
Inspection: Add the following to article 252.11:
Sod shall have been grown on a well-drained, fertile, sandy loam (not peat) soil. Sod shall be cut or stripped from living thickly matted turns of firmly rooted specified turf type. The consistency of adherent soil shall be such that it will not break, crumble, or tear during handling and placing of the sod.
Maintenance of Sodded Areas: Add the following to Article 252:
Maintenance of sodded areas by the Contractor shall consist of watering, weeding, 3 mowings, repair of erosion, spraying the sodded areas to keep them free of insects and diseases, and re-sodding as necessary to establish a uniform stand of turf. The Contractor shall provide general care for sodded areas until the time of knitting, or a period of not less than 6 weeks. Prior to acceptance, sodded areas shall be mowed at least 3 times by the Contractor to maintain healthy vigorous growth. At no time shall the turf be mowed shorter than 2” nor the average height allowed to become more than 4”. Debris encountered during the mowing and/or overseeding operation shall be removed and disposed in accordance with Article 250.05.
Damage to the seeded areas, such as ruts or wheel tracks more than 2” in depth, shall be repaired by the Contractor to the satisfaction of the Engineer. If noxious weeds start growth which threatens to smother the species grass, they shall be removed or sprayed as directed by the Engineer, and the vacant spots filled with new sod, if necessary. All necessary weed control applications and re-sodding are included in the cost for sodding.
Method of Measurement: Add the following to Article 252.12:
SP-5
Payment for maintenance of sodded areas shall be included in the Contract Unit Price of SODDING or
SODDING, SALT TOLERANT.
COMBINATION CURB AND GUTTER REMOVAL
Add the following requirements to Section 440 of the Standard Specifications.
The Contractor shall use care to protect existing pavement next to curb and gutter removal. Any damage to the existing pavement shall be repaired to clean and straight lines with materials to match the existing pavement section at no additional cost to the contract.
TRAFFIC CONTROL AND PROTECTION (SPECIAL)
All streets shall remain open to all lanes of traffic at all times, except temporary lane closures will be allowed when construction operations require, as directed by the engineer. Up to one traffic lane may be closed during the hours of 9:00 a.m. and 3:00 p.m. on weekdays and all traffic lanes shall remain open overnight, on weekends, and on legal holidays.
Special attention is called to Article 107.09, Article 105.03(b), and Division 700 of the Standard Specifications and the following Highway Standards, Details, Quality Standard for Work Zone Traffic Control Devices, Recurring Special Provisions and Special Provisions contained herein, relating to traffic control.
IDOT Highway Standards:
701101-05 Off-Road Operations, Multilane, 15’ to 24” from Pavement Edge 701106-02 Off-Road Operations, Multilane, More Than 15’ Away 701426-09 Lane Closure, Multilane, Intermittent or Moving Operations, for Speeds >=45 mph 701427-05 Lane Closure, Multilane, Intermittent or Moving Operations, for Speeds <=40 mph 701701-10 Urban Lane Closure, Multilane Intersection 701801-06 Sidewalk, Corner, or Crosswalk Closure 701901-08 Traffic Control Devices
Local Roads and Streets Recurring Special Provisions:
LRS3 Work Zone Traffic Control Surveillance LRS4 Flaggers in Work Zones
The Contractor shall contact the Village of Schaumburg Director of Transportation (847) 923-3859, at least 72 hours in advance of beginning work.
DETECTABLE WARNINGS (SPECIAL)
General. This item consists of installing detectable warnings in compliance with the latest Americans with Disabilities Act (ADA) guidelines at the locations shown on the plans. The detectable warning panels will be either rectangular or radius shaped. When radius panels are installed at locations shown on the plans or as directed by the engineer, the edge along the back of curb shall be consistent with the radius of the curb and the ends of adjacent panels shall align with one another. Panels will be cut if necessary to conform to the configurations shown on the plans or as directed by the engineer.
Products: The Vitrified Polymer Composite (VPC) Cast In Place Detectable/Tactile Warning Surface Tile specified is based on Armor-Tile manufactured by Engineered Plastics Inc. (800-682-2525). Tiles shall be Dark Grey conforming to Federal Color No. 36118. Color shall be homogeneous throughout the tile.
Method of Measurement: Detectable Warnings (Special), will be measured for payment per square foot of
SP-6
panel.
Basis of Payment: This item will be paid for at the Contract Unit Price per square foot for DETECTABLE WARNINGS (SPECIAL) which price shall include all materials, labor, and equipment necessary to complete the work as described.
CONCRETE UNDERLAYMENT REMOVAL
General. This item consists of removing the Portland Cement Concrete and banding for paver bricks. All concrete underlayment shall be completely removed and disposed of in accordance with Section 440 of the Standard Specifications.
Method of Measurement: Concrete Underlayment Removal, will be measured for payment per square foot of concrete underlayment including edging band.
Basis of Payment: Concrete Underlayment Removal will be paid for at the Contract Unit Price per square foot for CONCRETE UNDERLAYMENT REMOVAL which price shall include all labor, and equipment necessary to complete the work as described.
ASPHALT PATH REMOVAL
General. This work consists of removing and disposing of variable thickness asphalt pavement from areas of sidewalks/multi-use paths. The work shall be in accordance with the applicable portions of Section 440 of the Standard Specifications.
Basis of Payment: This work shall be paid for at the Contract Unit Price per square foot for ASPHALT PATH REMOVAL, which price shall include all materials, labor, and equipment necessary to complete the work as described.
PAVER BRICK REMOVAL
General. This work consists of carefully removing the existing paver bricks and storing them for later re-use on this project.
Removal: The Contractor shall use care to avoid damage while removing the paver bricks. All paver bricks that are intact and in satisfactory condition, as determined by the Engineer prior to removal, shall be removed and safely stored by the Contractor until such time as they are re-installed at the site. All paver bricks damaged by the Contractor due to his removal or storage operations shall be replaced by the Contractor at no additional cost to the contract.
Method of Measurement: Paver Brick Removal will be measured for payment in square feet of paver bricks in place.
Basis of Payment: This work shall be paid for at the Contract Unit Price per square foot for PAVER BRICK REMOVAL, which price shall include all materials, labor, and equipment necessary to complete the work as described. Concrete underlayment and bands removal will be measured and paid for separately
SP-7
CONCRETE UNDERLAYMENT
General. This item consists of placing Portland Cement Concrete as a base and banding for paver bricks.
Thickness of the Portland Cement Concrete and of the Aggregate Base Course, Type B are shown on the plan details. At locations where the plans indicate concrete bands, the Contractor shall extend the limits of the concrete underlayments to include the proposed concrete bands. The top of the concrete bands shall be set at the finished grade of the paver field, adjacent walk, or landscape bed as directed by the Engineer. The top part of the concrete bands shall be finished similar to concrete sidewalks. Additional depth of concrete for bands shall be incidental to underlayment cost. All concrete underlayment work shall be constructed in accordance with Sections 351 and 423 of the Standard Specifications.
Method of Measurement: Concrete Underlayment, will be measured for payment per square foot of concrete underlayment and bands, in place, including all earthwork and grading, surface preparation, aggregate base, Portland Cement Concrete, tie bars, dowels, reinforcement, and joint material as required and directed by the Engineer.
Basis of Payment: Concrete Underlayment will be paid for at the Contract Unit Price per square foot for CONCRETE UNDERLAYMENT which price shall include all materials, labor, and equipment necessary to complete the work as described.
PAVER BRICKS
General. The Contractor shall provide all labor and materials necessary to install a sand bedding system, paver bricks as indicated on the drawings and application of joint sand stabilizer. The Contractor shall submit product literature and specifications to the Engineer for approval prior to the installation of any material.
Material: The paver bricks shall include re-used materials. The used pavers shall be those described under the pay item Paver Brick Removal. The aggregate base course shall conform to Article 351 of the Standard Specifications. The materials and installation of the sand bedding system shall be approved by the Engineer.
The joint sand shall consist of a natural or manufactured sand conforming to ASTM C-33 for fine aggregates.
Sand must be free from clay, organic matter, and other deleterious material. Mason sand will not be permitted.
The joint sand stabilizer shall be SB-1370, Surebond Safebond Ecology Sealer & Joint Sand Stabilizer.
Installation: The paver bricks shall be installed after any adjacent P.C.C. sidewalks have been installed and the forms removed. The Contractor shall then grade and compact the subgrade to the satisfaction of the Engineer. The aggregate base course shall be installed to the width and depth as shown on the plans and then compacted. Once the base course has been installed and compacted the Contractor shall place the concrete underlayment which shall be paid for separately. When approval is given by the Engineer, Contractor shall then place the sand bedding system on the concrete underlayment. The paver bricks shall be installed according to the pattern shown on the plans. Once installed, the paver bricks shall be compacted with a plate compactor outfitted with a rubber pad meeting the requirements of Section 1101.04 of the Standard Specifications. After the first pass spread a thin, uniform layer of joint sand over the top of the paver bricks and compact pavers again. Sweep additional sand into joints until they are full to within 1/16" from the bevel edge of paver or the joint surface. All excess material shall be removed from the paver brick surface and surrounding area as directed by the Engineer.
After all excess sand has been removed from the paver brick surface, the joint sand stabilizer shall be liberally and evenly applied as to coat the pavers and joints by using a low pressure regulated sprayer not to exceed 25 pounds per square inch. The joint sand stabilizer shall be applied at a coverage rate of
SP-8
approximately 120 SF per gallon. The excess material shall be simultaneously drawn off the surface with a soft squeegee to ensure that all joints are adequately coated and that no surplus material is left on the surface. The application of the joint sand stabilizer shall be organized in such a manner so that the operation is carried out in each area before the stabilizer has a chance to dry by doing suitable increments at a time. The work shall be undertaken when the weather is appropriate and shall cease when inclement weather, including rain or strong winds, will affect the stabilizing operation. Joint sand stabilizer shall not be applied if temperatures will fall below 45° Fahrenheit during the application or curing time of the stabilizer.
If the pavement has become saturated with water, work shall not commence until the joint sand has dried out sufficiently to allow for proper penetration of the stabilizer. In extremely dry, hot conditions, when midday temperatures rise above 90° Fahrenheit, it may be necessary to adjust the application methods to retard drying and facilitate the proper spreading of the stabilizer. If these circumstances apply, consult with the Engineer before proceeding with stabilization operation. All areas treated with sand joint stabilizer shall be protected from rain or moisture until stabilizer is dry and should not be trafficked for a minimum of 24 hours after completion of the stabilization operation.
Method of Measurement: Paver Bricks will be measured for payment in square feet of paver bricks in place.
Basis of Payment: This work shall be paid for at the Contract Unit Price per square foot for PAVER BRICKS, RE-USED, which price shall include all labor, and equipment necessary to complete the work as described.
Aggregate base course, sand bedding, edging, and joint sand stabilizer shall be included in the Unit Price for PAVER BRICKS. Concrete underlayment will be measured and paid for separately.
PORTLAND CEMENT CONCRETE SIDEWALK
Revise Article 424.12 of the Standard Specifications to read:
424.12 Method of Measurement. This work will be measured for payment in place and the area computed in square feet. Curb ramps, including side curbs and side flares, will be measured for payment as sidewalk.
No deduction will be made for detectable warnings located within the ramp.
Detectable warnings will be measured for payment in place and the area computed in square feet.
Earth excavation required to bring the sidewalk to proposed lines and grades will be included in the work but will not be measured for payment.
Revise the last paragraph of Article 424.13 of the Standard Specifications to read:
The cost of earth excavation shall be included in the cost of the PCC Sidewalk.
TRAFFIC SIGNAL GENERAL REQUIREMENTS
Effective: May 22, 2002 Revised: March 1, 2024
800.01TS
These Traffic Signal Special Provisions and the "District One Standard Traffic Signal Design Details” supplement the requirements of the State of Illinois “Standard Specifications for Road and Bridge Construction.” The intent of these Special Provisions is to prescribe the materials and construction methods commonly used for traffic signal installations.
All material furnished shall be new unless otherwise noted herein. Traffic signal construction and maintenance work shall be performed by personnel holding current International Municipal Signal
SP-9
Association (IMSA)/Illinois Public Service Institute (IPSI) Traffic Signal Technician Level II certification. A copy of the certification shall be immediately available upon request of the Engineer. The work to be done under the Contract consists of furnishing, installing, and maintaining all traffic signal work and items as specified in the plans and as specified herein in a manner acceptable and approved by the Engineer.
Definitions of Terms.
Add the following to Section 101 of the Standard Specifications:
101.56 Manufacturer. Company that sells a particular type of product directly to the Contractor or the Vendor.
101.57 Vendor. Company that supplies, represents, and provides technical support for
IDOT District One approved traffic signal controllers and other related equipment. The Vendor shall be located within IDOT District One and shall:
(1) Be full service with on-site facilities to assemble, test and troubleshoot traffic signal controllers and cabinet assemblies.
(2) Maintain an inventory of IDOT District One approved controllers and cabinets.
(3) Be staffed with permanent sales and technical personnel able to provide traffic signal controller and cabinet expertise and support.
(4) Have technical staff that hold current IMSA/IPSI Traffic Signal Technician Level III certification and shall attend traffic signal turn-ons as well as cabinet and/or controller modifications.
Submittals.
Revise Article 801.05 of the Standard Specifications to read:
“All material approval requests shall be submitted electronically following District guidelines unless directed otherwise by the Engineer. Submittal requirements shall include, but not limited to the following:
(1) All material approval requests shall be made prior to or no later than the date of the preconstruction meeting. A list of major traffic signal items can be found in Article 801.05.
Material or equipment which is similar or identical shall be the product of the same manufacturer, unless necessary for system continuity. Traffic signal materials and equipment shall bear the U.L. label whenever such labeling is available.
(2) Product data and shop drawings shall be assembled by pay item. Only the top sheet of each pay item submittal will be stamped by the Department with the review status, except shop drawings for mast arm pole assemblies and the like will be stamped with the review status on each sheet.
(3) Original manufacturer published product data and shop drawing sheets with legible dimensions and details shall be submitted for review.
(4) When hard copy submittals are necessary, four (4) complete copies of the manufacturer’s descriptive literatures and technical data for the traffic signal materials shall be submitted. For hard copy or electronic submittals, the descriptive literature and technical data shall be adequate for determining whether the materials meet the requirements of the plans and
SP-10
specifications. If the literature contains more than one item, the Contractor shall indicate which item or items will be furnished.
(5) When hard copy submittals are necessary for structural elements, four (4) complete copies of the shop drawings for the mast arm assemblies and poles, and the combination mast arm assemblies and poles showing, in detail, the fabrication thereof and the certified mill analyses of the materials used in the fabrication, anchor rods, and reinforcing materials shall be submitted.
(6) Partial or incomplete submittals will be returned without review.
(7) Certain non-standard mast arm poles and special structural elements will require additional review from IDOT’s Central Office. Examples include ornamental/decorative, non-standard length mast arm pole assemblies and monotube structures.
(8) The Contract number or Permit number, project location/limits, and corresponding pay code number must be on each sheet of correspondence, material approval, and mast arm poles and assemblies drawings.
(9) Where certifications and/or warranties are specified, the information submitted for approval shall include certifications and warranties. Certifications involving inspections and/or tests of material shall be complete with all test data, dates, and times.
(10) After the Engineer reviews the submittals for conformance with the design concept of the project, the Engineer will stamp the drawings indicating their status as ‘Approved’, ‘Approved- As-Noted’, ‘Disapproved’, or ‘Incomplete’. Since the Engineer's review is for conformance with the design concept only, it is the Contractor's responsibility to coordinate the various items into a working system as specified. The Contractor shall not be relieved from responsibility for errors or omissions in the shop, working, layout drawings, or other documents by the Department's approval thereof. The Contractor must still be in full compliance with Contract and specification requirements.
(11) The Contractor shall secure approved materials in a timely manner to assure construction schedules are not delayed.
(12) All submitted items reviewed and marked ‘APPROVED AS NOTED’, ‘DISAPPROVED’, or ‘INCOMPLETE’ are to be resubmitted in their entirety, unless otherwise indicated within the submittal comments, with a disposition of previous comments to verify Contract compliance at no additional cost to the Contract.
(13) Exceptions to and deviations from the requirements of the Contract Documents will not be allowed. It is the Contractor’s responsibility to note any deviations from Contract requirements at the time of submittal and to make any requests for deviations in writing to the Engineer. In general, substitutions will not be acceptable. Requests for substitutions must demonstrate that the proposed substitution is superior to the material or equipment required by the Contract Documents. No exceptions, deviations or substitutions will be permitted without the approval of the Engineer.
(14) The Contractor shall not order major equipment such as mast arm assemblies prior to
Engineer approval of the Contractor marked proposed traffic signal equipment locations to assure proper placement of Contract required traffic signal displays, push buttons and other
SP-11
facilities. Field adjustments may require changes in proposed mast arm length and other coordination.
(15) Revised cabinet wiring diagrams shall be submitted whenever any wiring modifications are made to the traffic signal cabinet.”
Marking Proposed Locations.
Revise “Marking Proposed Locations for Highway Lighting System” of Article 801.09 to read “Marking Proposed Locations for Highway Lighting System and Traffic Signals.”
Add the following to Article 801.09 of the Standard Specifications:
“It shall be the Contractor's responsibility to verify all dimensions and conditions existing in the field prior to ordering materials and beginning construction. This shall include locating the mast arm foundations and verifying the mast arms lengths.”
Inspection of Electrical Systems.
Add the following to Article 801.10 of the Standard Specifications:
(c) All cabinets, including temporary traffic signal cabinets, shall be assembled by an approved Vendor in District One. The Department reserves the right to request any controller and cabinet to be tested at the Vendor’s facility prior to field installation at no extra cost to the Contract.
Maintenance and Responsibility of Traffic Signal and Flashing Beacon Installations.
Replace Article 801.11(b) of the Standard Specifications to read:
(b) Traffic Signals and Flashing Beacons. The Contractor shall be responsible for maintaining the traffic signal/flashing beacon installation in proper operating condition.
(1) General.
a. The Contractor must notify the Area Traffic Signal Maintenance and Operations
Engineer of their intent to begin any physical construction work on the Contract or any portion thereof. This notification must be made a minimum of seven (7) working days prior to the start of construction to allow sufficient time for inspection of the existing traffic signal installation(s) and transfer of maintenance to the Contractor. The Department will attempt to fulfill the Contractor’s inspection date request(s); however, workload and other conditions may prevent the Department from accommodating specific dates or times. The Contractor shall not be entitled to any other compensation if the requested inspection date(s) cannot be scheduled by the Department.
b. Full maintenance responsibility shall start upon the successful completion of a maintenance transfer inspection, or as directed by the Engineer. If the Contractor begins any physical work on the Contract or any portion thereof prior to a traffic signal inspection, maintenance of the traffic signal installation(s) will be transferred to the Contractor without an inspection. The Contractor will become responsible for repairing or replacing all equipment that is not operating properly or is damaged at the time of transfer at no cost to the owner of the traffic signal equipment. Final repairs or replacement of damaged equipment must meet the approval of the Engineer prior to or at the time of final inspection, otherwise the traffic signal installation will not be accepted.
SP-12
c. All traffic signals within the limits of the Contract or those which have the item
"MAINTENANCE OF EXISTING TRAFFIC SIGNAL INSTALLATION,”
“TEMPORARY TRAFFIC SIGNAL INSTALLATION”, “TEMPORARY BRIDGE
TRAFFIC SIGNAL INSTALLATION”, “TEMPORARY PORTABLE BRIDGE
TRAFFIC SIGNAL INSTALLATION”, and/or “MAINTENANCE OF EXISTING FLASHING BEACON INSTALLATION” shall become the full responsibility of the Contractor. Maintenance responsibility shall end upon issuance of final acceptance by the Engineer.
d. The Contractor shall have electricians with IMSA/IPSI Traffic Signal Technician
Level II certification on staff to provide signal maintenance. A copy of the certification shall be immediately available upon request by the Engineer.
e. This item shall include maintenance of all traffic signal equipment and other connected and related equipment such as flashing beacons, emergency vehicle preemption (EVP) equipment, master controllers, network switches, uninterruptable power supply (UPS) and batteries, pan-tilt-zoom (PTZ) cameras, vehicle detection, handholes, lighted signs, telephone service installations, cellular modems, radios, communication cables, and other traffic signal equipment. All conduit and related equipment to adjacent intersections shall be maintained to the far back handhole, or as directed by the Engineer. If adjacent intersections are part of Contract work, then maintenance of all conduit and related equipment shall be included in this item.
f. Regional transit, County, and other agencies may also have equipment connected to existing traffic signal or peripheral equipment such as network switches and transit signal priority (TSP, SCP, and BRT) servers, radios, and other devices, where maintenance shall be coordinated with the owner.
g. Maintenance shall not include automatic traffic enforcement equipment such as red light enforcement cameras, detectors, or peripheral equipment. This equipment is operated and maintained by others and shall be deactivated while on Contractor maintenance.
h. The energy charges for the operation of the traffic signal installation shall be paid for by the Contractor.
(2) Maintenance.
a. The Contractor shall inspect all traffic signal equipment and appurtenances every two (2) weeks to ensure they are functioning properly. Signal heads shall be properly adjusted, including plumb, and tightly mounted. All controller cabinets, signal posts, and controller pedestals shall be tight on their foundations and in alignment. Deficient equipment shall be repaired or replaced as necessary. The Contractor shall check signal system communications and phone lines to assure proper operation. This item includes, as routine maintenance, all portions of EVP equipment. The Contractor shall always maintain enough materials and equipment in stock to provide effective temporary and permanent repairs. The Contractor shall supply a detailed maintenance log monthly that includes dates, locations, names of electricians performing the required checks and inspections, and any other information requested by the Engineer. The Contractor shall attend
SP-13
any additional inspections as requested by the Engineer. The Contractor shall check the controllers, relays, and detectors after receiving complaints or calls to ascertain that they are functioning properly and make all necessary repairs and replacement.
b. The Contractor is advised that the existing and/or temporary traffic signal installation must remain in operation during all construction stages, except for the most essential down time. Any shutdown of the traffic signal installation which exceeds fifteen (15) minutes must have prior approval from the Engineer.
Approval to shut down the traffic signal installation will only be granted during the period extending from 9:00 a.m. to 3:00 p.m. on weekdays. Shutdowns shall not be allowed during inclement weather or holiday periods.
c. The Contractor shall provide immediate corrective action when any part(s) of the signal fail to function properly. Two far side heads facing each approach shall be considered the minimum acceptable signal operation pending permanent repairs.
When repairs at a signalized intersection require that the controller be disconnected or otherwise removed from normal operation, and power is available, the Contractor shall place the traffic signal installation in flashing operation. The signals shall flash RED for all directions unless a different indication has been specified by the Engineer. The Contractor shall install cones on all lane lines at the stop bar on each approach, R1-1 (36 in. minimum) “STOP” signs at the stop bar on each approach on the right side and on raised medians (where applicable), and black on fluorescent orange “SIGNALS OUT AHEAD” warning signs followed by fluorescent orange W3-1 symbolic stop ahead warning signs on all approaches to the intersection.
d. Temporary replacement of a damaged or knocked down mast arm pole assembly shall require construction of a full or partial span wire signal installation or other method approved by the Engineer to assure signal heads are located overhead and over traveled pavement. Temporary replacement of mast arm mount signals with post mount signals is not permitted.
e. The Contractor shall provide the Engineer with two (2) 24-hour telephone numbers for the maintenance of the traffic signal installation and for emergency calls by the Engineer.
f. Traffic signal equipment which is lost, damaged, or not returned to the Department for any reason shall be replaced with new equipment meeting the requirements of the Standard Specifications and these special provisions.
g. The Contractor shall be fully responsible for the safe and efficient operation of the traffic signals and other equipment noted herein. The Contractor shall respond to all emergency calls from the Department or others within one (1) hour after notification and provide immediate corrective action. When equipment has been damaged or becomes faulty beyond repair, the Contractor shall replace it with new equipment meeting current District One traffic signal specifications. The cost of furnishing and installing the replaced equipment shall be borne by the Contractor at no additional cost to the Contract. The Contractor may institute action to recover damages from a responsible third party. If at any time the Contractor fails to perform all work as specified herein to keep the traffic signal installation in proper operating condition, or if the Engineer cannot contact the Contractor's designated
SP-14
personnel, the Engineer shall have the Department's Electrical Maintenance Contractor perform the maintenance work. The Contractor shall be responsible for all of the Department’s Electrical Maintenance Contractor’s costs and liquidated damages of $1,000 per day per occurrence. The Department's Electrical Maintenance Contractor shall bill the Contractor for the total cost of the work. The Contractor shall pay this bill within thirty (30) days of the date of receipt of the invoice or the cost of such work will be deducted from the amount due the Contractor. The Contractor shall allow the Electrical Maintenance Contractor to inspect the traffic signal installation that has been transferred to the Contractor for maintenance. Final replacement of damaged equipment must meet the approval of the Engineer prior to or at the time of final inspection, otherwise the traffic signal installation will not be accepted. Cable splices outside the controller cabinet shall not be allowed. The Department may inspect any signalizing device on the Department’s highway system at any time without notification. The Contractor shall not install padlocks on traffic signal cabinets or otherwise restrict the Department’s access to the cabinet or controller.
h. Any proposed activity in the vicinity of a highway-rail grade crossing must adhere to the guidelines set forth in the current edition of the Manual on Uniform Traffic Control Devices (MUTCD) regarding work in temporary traffic control zones in the vicinity of highway-rail grade crossings which states that lane restrictions, flagging, or other operations shall not create conditions where vehicles can be queued across the railroad tracks. If the queuing of vehicles across the tracks cannot be avoided, a uniformed law enforcement officer or flagger shall be provided at the crossing to prevent vehicles from stopping on the tracks, even if automatic warning devices are in place.
i. The Contractor shall be responsible to clear snow, ice, dirt, debris, vegetation, temporary fence, or other condition that obstructs visibility of any traffic signal display or access to traffic signal equipment.
j. The Contractor shall maintain the traffic signal in normal operation during any loss of utility or battery backup power. Temporary power to the traffic signal must meet applicable NEC and OSHA guidelines and may include portable generators and/or replacement batteries. Temporary power shall not be paid for separately but shall be included in the Contract.
(3) Basis of Payment. This work will be paid for at the Contract unit price per each for
MAINTENANCE OF EXISTING TRAFFIC SIGNAL INSTALLATION, TEMPORARY
TRAFFIC SIGNAL INSTALLATION, TEMPORARY BRIDGE TRAFFIC SIGNAL
INSTALLATION, or TEMPORARY PORTABLE BRIDGE TRAFFIC SIGNAL INSTALLATION. Each location will be paid for separately. Maintenance of a flashing beacon shall be paid for at the Contract unit price for MAINTENANCE OF EXISTING FLASHING BEACON INSTALLATION. Each flashing beacon will be paid for separately.
Damage to Traffic Signal System.
Add the following to Article 801.12(b) of the Standard Specifications:
“Any traffic signal control equipment that is damaged and non-repairable or not operating properly from any cause shall be replaced with new equipment meeting current District One traffic signal specifications and provided by the Contractor at no additional cost to the Contract and/or owner of the traffic signal system, all as approved by the Engineer. Final replacement of damaged
SP-15
equipment must meet the approval of the Engineer prior to or at the time of final inspection. Repair or replace any equipment damaged within the time shown in the table below:
ITEM
RESPONSE
TIME
SERVICE
RESTORATION
PERMANENT
REPAIR
(calendar days) Cabinet 1 hour 24 hours 21 days Controllers and Peripheral Equipment 1 hour 4 hours 21 days System Detector Loop 1 hour N/A 7 days All Other Detectors 1 hour N/A 21 days Signal Head and Lenses 1 hour 4 hours 7 days Aviation Red Beacon 1 hour 4 hours 7 days Mast Arm Assembly and Pole 1 hour 4 hours 7 days Traffic Signal Post 1 hour 4 hours 7 days Cable and Conduit 1 hour 4 hours 7 days Interconnect and Telemetry 1 hour 4 hours 7 days Graffiti Removal N/A N/A 7 days Misalignment of Signal Heads 1 hour 4 hours 4 hours Closed Loop Monitoring System 1 hour 24 hours 14 days Post and Poles Plumb Vertically N/A N/A 21 days Controller, Post & Pole Foundations N/A N/A 21 days Complaints, Calls, Controller or System Alarms, Timing, Phasing, Programming
1 hour 4 hours N/A
Patrol Truck Deficiencies N/A 24 hours 24 hours Signal Heads Visibility 1 day 2 days 14 days
Temporary replacement of a damaged or knocked down mast arm pole assembly shall require construction of a full or partial span wire signal installation or other method approved by the Engineer to assure signal heads are located overhead and over traveled pavement. Temporary replacement of mast arm mount signals with post mount signals will not be permitted.
Replacement of any equipment for any reason shall be reported to the Area Traffic Signal Maintenance and Operations Engineer in writing within 24 hours. Permanent and temporary replacement of the controller and/or cabinet shall require inspection and testing by the Vendor.
Automatic Traffic Enforcement equipment, such as red light enforcement cameras, detectors, and peripheral equipment, that is damaged or not operating properly from any cause, shall be the responsibility of the municipality or the automatic traffic enforcement company per Permit agreement.”
Traffic Signal Inspection (TURN-ON).
Revise Article 801.15(b) of the Standard Specifications to read:
“Turn-on. It is the intent to have all electric work completed and equipment field tested by the Contractor and/or Vendor prior to the Department’s “turn-on” field inspection. If in the event the Engineer determines work is not complete and the inspection will require more than two (2) hours to complete, the inspection shall be canceled, and the Contractor will be required to reschedule at
SP-16
another date. The maintenance of the traffic signals will not be accepted until all punch list work is corrected and re-inspected.
When the Contractor requests a turn-on and inspection of the completed traffic signal installation(s), the request must be made to the Area Traffic Signal Maintenance and Operations Engineer a minimum of seven (7) working days prior to the time of the requested inspection. The Department will attempt to fulfill the Contractor’s turn-on and inspection date request(s); however, workload and other conditions may prevent the Department from accommodating specific dates or times. The Contractor shall not be entitled to any other compensation if the requested turn-on and inspection date(s) cannot be scheduled by the Department. The Department will not grant a field inspection until written or electronic notification is provided from the Contractor that the equipment has been field tested and the intersection is operating according to Contract requirements. The Contractor must invite local fire department personnel to the turn-on when emergency vehicle preemption (EVP) is included in the project. When the Contract includes the item RE-OPTIMIZE TRAFFIC SIGNAL SYSTEM, OPTIMIZE TRAFFIC SIGNAL SYSTEM, and/or TEMPORARY TRAFFIC SIGNAL TIMING, the Contractor must notify the SCAT Consultant of the turn-on/detour implementation schedule, as well as stage changes and phase changes during construction.
The Contractor must have all traffic signal work completed and the electrical service installation connected by the utility company prior to requesting an inspection and turn-on of the traffic signal installation. The Contractor shall be responsible to provide a police officer to assist with traffic control at the time of testing.
The Contractor shall provide a representative from the Vendor who is knowledgeable of the cabinet design and controller functions to attend the traffic signal inspection for both permanent and temporary traffic signal turn-ons.
Upon demonstration that the signals are operating and all work is completed in accordance with the Contract and to the satisfaction of the Engineer, the Engineer will then allow the signals to be placed in continuous operation. The signals shall continue to be maintained by the Contractor until final acceptance.
The Department requires the following Final Project Documentation from the Contractor at traffic signal turn-ons in electronic format in addition to hard copies where noted. An electronic media device shall be submitted with separate folders corresponding to each numbered title below. The electronic media device shall be labeled with date, project location, company, and Contract or Permit number. Electronic record drawings and material approvals shall be submitted prior to traffic signal turn-on for review by the Department as described in the Record Drawings section herein.
Final Project Documentation:
(1) Record Drawings. Electronically produced signal plans of record with field revisions marked in red. Two (2) hard copies of 11 in. x 17 in. record drawings shall also be provided.
(2) Field Testing. Written notification from the Contractor and the Vendor of satisfactory field testing with corresponding material performance measurements, such as for detector loops and fiber optic systems (see Article 801.13).
(3) Material Approvals. Material approval documentation.
(4) Manuals. Operation and service manuals of the signal controller and associated control equipment.
SP-17
(5) Cabinet Wiring Diagram and Cable Logs. Five (5) hard copies of 11 in. x 17 in. cabinet wiring diagrams shall be provided along with electronic PDF and DGN files of the cabinet wiring diagram. Five (5) hard copies of the cable logs and electronic Excel files shall be provided with cable #, number of conductors and spares, connected device/signal head and intersection location.
(6) Warrantees and Guarantees. All manufacturer and Contractor warrantees and guarantees required by Article 801.14.
(7) GPS Coordinates. GPS coordinates of traffic signal equipment as described in the Record Drawings section herein.
Acceptance of the traffic signal equipment by the Department shall be based upon inspection results at the traffic signal “turn-on”, completeness of the required documentation, and successful operation during a minimum 72 hour “burn-in” period following activation of traffic signal equipment.
If approved, traffic signal acceptance shall be verbal at the final inspection followed by written correspondence from the Engineer. The Contractor shall be responsible for all traffic signal equipment and associated maintenance thereof until Departmental acceptance is granted.
All equipment and/or parts to keep the traffic signal installation operating shall be furnished by the Contractor. No spare traffic signal equipment is available from the Department.
All punch list work shall be completed within two (2) weeks after the turn-on. The Contractor shall notify the Area Traffic Signal Maintenance and Operations Engineer to schedule an inspection of all punch list work. Failure to meet these time constraints shall result in liquidated damage charges of $500 per month per incident.
All cost of work and materials required to comply with the requirements herein shall be included in the pay item bid prices, under which the subject materials and signal equipment are paid, and no additional compensation will be allowed.