20240621_016-118386_PlanSet.pdf
PDF 9 MB Posted
- Solicitation number
- 2024-IFB-065
- Issued by
- Cook County, Illinois
About this file
The document is an engineering plan set prepared by Hampton, Lenzini and Renwick, Inc. for the Village of Schaumburg, Illinois, detailing the Intersection Pedestrian Improvements project at IL Route 72 (Higgins Road) and National Parkway. The comprehensive 30-sheet plan set includes detailed engineering drawings, alignment plans, traffic signal plans, sidewalk corner details, highway standards, and construction details. The project involves upgrading pedestrian signals, installing new crosswalks, modifying existing traffic infrastructure, and improving intersection accessibility. Key quantities include 1,533 square feet of pedestrian enhancement crosswalks, 8 accessible pedestrian signals, 550 linear feet of pedestrian signal posts, and various pavement markings, sidewalk, and curb work.
The project is funded and will be executed by the Village of Schaumburg, with engineering design by Hampton, Lenzini and Renwick, Inc. The plan set indicates the work will conform to Illinois Department of Transportation (IDOT) standards, with a projected construction start in September. The engineering plans detail precise measurements, elevation changes, and infrastructure modifications, including traffic signal upgrades, conduit installations, and pedestrian accessibility improvements. The project involves modifying existing right-of-way, installing new signage, and ensuring compliance with current transportation and accessibility guidelines. The total project scope encompasses improvements to approximately 100 linear feet of roadway and intersection area, with a focus on enhancing pedestrian safety and accessibility at the IL Route 72 and National Parkway intersection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF SHEETS
SHEET NO.
HIGHWAY STANDARDS
DESCRIPTION
LOCATION MAP
50'
50'
50'
50'
10' 20' 30'
100'
100'
100'
100'
100' 200' 300'
1''= 20'
1''= 30'
1''= 40'
1''= 50'
1''= 10'
1''= 100'
FULL SIZE PLANS HAVE BEEN PREPARED USING STANDARD
ON REDUCED PLANS, THE ABOVE SCALES MAY BE USED.
ENGINEERING SCALES. REDUCED SIZED PLANS WILL NOT
CONFORM TO STANDARD SCALES. IN MAKING MEASUREMENTS
DATE:
EXPIRES: DATE :
www.hlrengineering.com
Environmental Services
ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
184.000959
Hampton, Lenzini and Renwick, Inc.
Civil Engineers Structural Engineers
Land Surveyors
380 SHEPARD DRIVE
ELGIN, ILLINOIS 60123
847.697.6700
SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
COVER SHEET
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
REFERENCES: _________________None
18.0009
180009-sht-Cover72National.dgn
PROJECT NUMBER :
ENGINEERING PLANS
COOK COUNTY
VILLAGE OF SCHAUMBURG
T O
W N S
H
IP
N O
R T H
800-892-0123
11-30-25 6/21/2024
SS
None
04-29-24
RANGE 10 EAST
VILLAGE OF SCHAUMBURG
Schaumburg, IL. 60193-7806
714 S. Plum Grove Road
Department of Engineering and Public Works
SCALE: 1"=600'
LOCATION
PROJECT
IL RTE 72 (HIGGINS RD) AT NATIONAL PKWY
16/21/2024
INTERSECTION PEDESTRIAN IMPROVEMENTS
NATIONAL PARKWAY
IL ROUTE 72 (HIGGINS ROAD) AND
18.0009.331
880006-01
857001-01
701901-09
701801-06
701701-10
701427-05
701426-09
701106-02
701101-05
606001-08
424011-04
424006-05
424001-11
280001-07
TRAFFIC SIGNAL MOUNTING DETAILS
STANDARD PHASE DESIGNATION DIAGRAMS AND PHASE SEQUENCES
TRAFFIC CONTROL DEVICES
SIDEWALK, CORNER OR CROSSWALK CLOSURE
URBAN LANE CLOSURE, MULTILANE INTERSECTION
LANE CLOSURE, MULTILANE, INTERMITTENT OR MOVING OPERATIONS, FOR SPEEDS =MPH
LANE CLOSURE, MULTILANE, INTERMITTENT OR MOVING OPERATIONS, FOR SPEEDS =MPH
OFF-ROAD OPERATIONS, MULTILANE, MORE THAN 15' AWAY
OFF-ROAD OPERATIONS, MULTILANE, 15' TO 24" FROM PAVEMENT EDGE
CONCRETE CURB TYPE B AND COMBINATION CONCRETE CURB AND GUTTER
CORNER PARALLEL CURB RAMPS FOR SIDEWALKS
DIAGONAL CURB RAMPS FOR SIDEWALKS
PERPENDICULAR CURB RAMPS FOR SIDEWALKS
TEMPORARY EROSION CONTROL SYSTEMS
CONSTRUCTION DETAILS
DISTRICT ONE TYPICAL PAVEMENT MARKINGS
HIGHWAY STANDARDS
TRAFFIC SIGNAL SCHEDULE OF QUANTITIES
CABLE PLAN, PHASE DESIGNATION DIAGRAM, & EVP SEQUENCE
TRAFFIC SIGNAL PLAN
IDOT DISTRICT 1 TRAFFIC SIGNAL STANDARDS
INTERSECTION CORNER DETAILS
PROPOSED PLAN
ALIGNMENT PLAN
GENERAL NOTES AND SUMMARY OF QUANTITIES
COVER SHEET
18-28
14-15
7-13
5-6
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
ELGIN . SPRINGFIELD . CRYSTAL LAKE . MT CARMEL
SI
O
NILLI FO
ET
A
T S
062-073388
HALAN
NICHOLAS A.
R E
E
NI
G
NE
L
ANOISSEFORP
DE
S
N E
CI
L
GENERAL NOTES
Schaumburg, IL. 60193-7806
714 S. Plum Grove Road
Department of Engineering and Public Works
PAY ITEM DESCRIPTION UNIT QUANTITY
SUMMARY OF QUANTITIES
2SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
GENERAL NOTES AND SUMMARY OF QUANTITIES
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
REFERENCES: _________________None
IL RTE 72 (HIGGINS RD) AT NATIONAL PKWY
18.0009
180009-sht-GN-72National.dgn
NONE6/21/2024 30
(1-800-892-0123) TO HAVE THE LOCATION OF THE EXISTING UTILITES MARKED.
FORTY-EIGHT HOURS BEFORE STARTING EXCAVATION, THE CONTRACTOR WILL CALL J.U.L.I.E.
AT THE CONTRACTOR'S EXPENSE.
OTHERWISE DAMAGED AND JUDGED UNACCEPTABLE BY THE VILLAGE SHALL BE REMOVED AND REPLACED
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR HIS WORK. ANY WORK THAT IS VANDALIZED OR
THIS WORK WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE COST OF THE CONTRACT.
OPERATING CONDITION TEMPORARY OUTLETS AND CONNECTIONS FOR ALL DRAINS, SEWERS, AND CATCH BASINS.
WHEN EXISTING DRAINAGE FACILITIES ARE DISTURBED, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN IN AN
OF THE CONTRACT.
OF DIRT AND DEBRIS. THIS WORK WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE COST
WORKING DAY, PRIOR TO ACCEPTANCE OF THE IMPROVEMENT. ALL DRAINAGE STRUCTURES SHALL BE FREE
THE NATURAL FLOW OF WATER IS OBSTRUCTED, THE MATERIAL SHALL BE REMOVED AT THE CLOSE OF EACH
WHENEVER ANY LOOSE MATERIAL IS DEPOSITED IN THE FLOW LINE OF DRAINAGE STRUCTURES SUCH THAT
ALL ELEVATIONS ARE ON NAVD-88 VERTICAL DATUM AND ILLINOIS STATE PLANE EAST COORDINATES.
SURVEYOR HAS WITNESSED OR OTHERWISE REFERENCED THEIR LOCATIONS.
PROPERTY CORNERS, AND REFERENCE MARKERS UNTIL THE OWNER, HIS AGENT, OR A PROFESSIONAL LAND
THE CONTRACTOR SHALL PROTECT AND CAREFULLY PRESERVE ALL SECTION OR SUBSECTION MONUMENTS, SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER AT THE CONTRACTOR'S EXPENSE.
EVEN THOUGH THEY MAY NOT BE SHOWN ON THE PLANS. ANY UTILITY THAT IS DAMAGED DURING CONSTRUCTION
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL UNDERGROUND AND SURFACE UTILITIES
TO BE DETERMINED IN THE FIELD BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
SEWERS, AND ANY OTHER PUBLIC AND PRIVATE UTILITIES IS APPROXIMATE AND THEIR EXACT LOCATIONS ARE
THE LOCATION ON THE PLANS OF EXISTING DRAINAGE STRUCTURES, STORM SEWERS, WATER MAINS, SANITARY
RELOCATION, ADJUSTMENT, OR PROTECTION IS NECESSARY.
COOPERATE WITH ALL UTILITY OWNERS AS PROVIDED FOR IN THE STANDARD SPECIFICATIONS IF UTILITY
CONSTRUCTION TO DETERMINE THE LOCATION OF ALL UTILITY EQUIPMENT. THE CONTRACTOR SHALL
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE OWNERS OF ALL UTILITIES PRIOR TO
IMPROVEMENTS ARE REQUIRED WITHIN THE DURATION OF THE CONTRACT.
THE CONTRACTOR SHALL COOPERATE WITH THE VILLAGE OF SCHAUMBURG IF ANY MUNICIPAL UTILITY
AS THE LATEST STANDARD OF THE ILLINOIS DEPARTMENT OF TRANSPORTATION.
ANY REFERENCE TO STANDARDS THROUGHOUT THE PLANS OR SPECIAL PROVISIONS SHALL BE INTERPRETED
HIGHWAYS"; THE DETAILS IN THE PLANS, AND THE SPECIAL PROVISIONS INCLUDED IN THE CONTRACT DOCUMENTS.
LATEST EDITION OF THE "ILLINOIS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND
THE SUPPLEMENTAL SPECIFICATIONS AND RECURRING SPECIAL PROVISIONS", ADOPTED JANUARY 1, 2024; THE
CONSTRUCTION", ADOPTED JANUARY 1, 2022, (HEREINAFTER REFERRED TO AS THE STANDARD SPECIFICATIONS);
ALL WORK SHALL BE IN ACCORDANCE WITH THE "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
ELGIN . SPRINGFIELD . CRYSTAL LAKE . MT CARMEL
Z0033044
Z0013798
X8780012
X8760200
X7010216
X4240800
X0324599
X1400367
X0327980
89502376
89502210
89502200
88102717
87900200
87301900
87301225
87301215
85000200
81028200
78009024
78009012
78009008
78009006
78009004
72800100
72000100
67100100
60605000
44000600
44000500
44000155
42400200
40603340
35101400
28000500
28000400
25200110
21101615
20200100
PEDESTRIAN ENHANCEMENT CROSSWALKS - "S PATTERN"
PAVER BRICKS - RE-USED
PAVER BRICK REMOVAL
CONCRETE UNDERLAYMENT REMOVAL
CONCRETE UNDERLAYMENT
ASPHALT PATH REMOVAL
RE-OPTIMIZE TRAFFIC SIGNAL SYSTEM LEVEL 1
CONSTRUCTION LAYOUT
CONCRETE FOUNDATION, TYPE A 12-INCH DIAMETER
ACCESSIBLE PEDESTRIAN SIGNALS
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
DETECTABLE WARNINGS (SPECIAL)
ROD AND CLEAN EXISTING CONDUIT
PEDESTRIAN SIGNAL POST, 10 FT.
PAVEMENT MARKING REMOVAL - WATER BLASTING
REBUILD EXISTING HANDHOLE
MODIFY EXISTING CONTROLLER CABINET
MODIFY EXISTING CONTROLLER
PEDESTRIAN SIGNAL HEAD, LED, 1-FACE, BRACKET MOUNTED WITH COUNTDOWN TIMER
DRILL EXISTING HANDHOLE
ELECTRIC CABLE IN CONDUIT, EQUIPMENT GROUNDING CONDUCTOR, NO. 6 1C
ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 3C
ELECTRIC CABLE IN CONDUIT, SIGNAL NO. 14 2C
MAINTENANCE OF EXISTING TRAFFIC SIGNAL INSTALLATION
UNDERGROUND CONDUIT, GALVANIZED STEEL, 2" DIA.
MODIFIED URETHANE PAVEMENT MARKING - LINE 24"
MODIFIED URETHANE PAVEMENT MARKING - LINE 12"
MODIFIED URETHANE PAVEMENT MARKING - LINE 8"
MODIFIED URETHANE PAVEMENT MARKING - LINE 6"
MODIFIED URETHANE PAVEMENT MARKING - LINE 4"
TELESCOPING STEEL SIGN SUPPORT
SIGN PANEL - TYPE 1
MOBILIZATION
COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24
SIDEWALK REMOVAL
COMBINATION CURB AND GUTTER REMOVAL
HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2"
PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH
HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N70
AGGREGATE BASE COURSE, TYPE B
INLET AND PIPE PROTECTION
PERIMETER EROSION BARRIER
SODDING, SALT TOLERANT
TOPSOIL FURNISH AND PLACE, 4"
EARTH EXCAVATION
SQ FT
SQ FT
SQ FT
SQ FT
SQ FT
SQ FT
EACH
L SUM
FOOT
EACH
LSUM
SQ FT
FOOT
EACH
SQ FT
EACH
EACH
EACH
EACH
EACH
FOOT
FOOT
FOOT
EACH
FOOT
FOOT
FOOT
FOOT
FOOT
FOOT
FOOT
SQ FT
L SUM
FOOT
SQ FT
FOOT
SQ YD
SQ FT
TON
TON
EACH
FOOT
SQ YD
SQ YD
CU YD
WV
H
WV
P O
T
S ta
.0
P C
S ta
.9
P I
S ta
.6
P T
S ta
.0
450+00
455+00
PROP. CURVE ROUTE_72_3
PI STA. = 454+81.64
R = 8,500.00'
T = 318.66'
L = 637.02'
E = 5.97'
P.C. STA. = 451+62.98
P.T. STA. = 458+00.00
E
,0
,5
.4
N
,9
,2
.2
7 E =1,061,119.36
N =1,957,182.21
E =1,061,433.44
N =1,957,128.41
E =1,061,750.67
N =1,957,098.27
VILLAGE OF SCHAUMBURG
Schaumburg, IL. 60193-7806
714 S. Plum Grove Road
Department of Engineering and Public Works
0 20 80
SCALE IN FEET
N A T
IO
N A L
P
A R
K W
A Y
IL RTE 72 (HIGGINS ROAD)
3SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
ALIGNMENT PLAN
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
180009-sht-align.dgn
NONE6/21/2024 30
BM 1
BENCHMARKS
BM 2
ELEV. = 739.433
E = 1,061,205.502
N = 1,957,055.232
METAL DISK IN CONCRETE
VILLAGE OF SCHAUMBURG BENCHMARK
BM 1
ELEV. = 735.422
E = 1,061,076.319
N = 1,957,272.454
CULVERT END SECTION
CUT CROSS IN CONCRETE
BM 2
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
ELGIN . SPRINGFIELD . CRYSTAL LAKE . MT CARMEL
H
H
H
H
P
H
H
H
H
P
WV
WV
8'
8'
5'
22.67'
10'
10'
VILLAGE OF SCHAUMBURG
Schaumburg, IL. 60193-7806
714 S. Plum Grove Road
Department of Engineering and Public Works
0 10 40
SCALE IN FEET
IL RTE 72 (HIGGINS ROAD)
N A T
IO
N A L
P
A R
K W
A Y
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
IL RTE 72 (HIGGINS ROAD)
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
N A T
IO
N A L
P
A R
K W
A Y
REMOVAL PLAN PROPOSED PLAN
4SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
REMOVAL PLAN AND PROPOSED PLAN
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:JAM
NAH
JAM
180009-sht-Plan1.dgn
NONE6/21/2024 30
REMOVAL LEGEND
CONCRETE UNDERLAYMENT
PROPOSED PLAN LEGEND
PC CONCRETE SIDEWALK, 5-INCH
PC CONCRETE SIDEWALK, 5-INCH
SIDE CURB
SIDE CURB
SIDE CURB
PC CONCRETE SIDEWALK, 5-INCH
DEPRESSED CURB (TYP.)
LINE, 24" WHITE (TYP.)
MODIFIED URETHANE PAVEMENT MARKING
LIQUID PETROLEUM PIPELINE
EXISTING HIGH PRESSURE
SIDE CURB (TYP.)
RE-USED
PAVER BRICKS
LINE, BICYCLE WHITE (TYP.) SEE TC-13
MODIFIED URETHANE PAVEMENT MARKING
BENCHMARK. DO NO DISTURB.
EXISTING VILLAGE OF SCHAUMBURG
PERIMETER EROSION BARRIER
4" TOPSOIL AND SOD
ASPHALT SURFACE, VARIABLE DEPTH
DETECTABLE WARNING TILES
ROUTES WHERE POSSIBLE.
CLOSED AT ANY GIVEN TIME. PROVIDE ALTERNATE PEDESTRIAN
A MAXIMUM OF TWO CORNERS OF THE INTERSECTION SHALL BE4.
SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE CONTRACT.
ALL DAMAGE TO EXISTING PAVEMENT OR TRAFFIC SIGNALS
PAVEMENT TO REMAIN, UNDERGROUND CONDUITS, AND CABLES.
CONTRACTOR SHALL USE CARE TO AVOID DAMAGE TO EXISTING3.
TRAFFIC SIGNAL BEFORE STARTING ANY WORK.
CONTRACTOR SHALL TAKE MAINTENANCE OF THE EXISTING3.
CONFLICT WITH PROPOSED MARKINGS PRIOR TO RE-STRIPING.
REMOVE EXISTING STOP BARS AND PAVEMENT MARKINGS IN2.
FULL SIDEWALK PANEL, OR AS DIRECTED BY THE ENGINEER.
REPLACE PCC SIDEWALK TO THE NEAREST EXISTING1.
NOTES
PAID FOR AS PCC SIDEWALK, 5"
SIDE CURBS WILL BE MEASURED AND
SHEETS FOR ADDITIONAL INFORMATION
SEE SIDEWALK CORNER DETAILS PLAN
INLET PROTECTION
& GUTTER REMOVAL
COMBINATION CONCRETE CURB
ASPHALT SURFACE REMOVAL, 1•"
BRICK PAVER REMOVAL
CONCRETE UNDERLAYMENT AND
ASPHALT PATH REMOVAL
CONCRETE SIDEWALK REMOVAL
ASPHALT SURFACE, 2-INCH MARKING LINE, 12" WHITE (TYP.)
MODIFIED URETHANE PAVEMENT
STA. 451+36.20
STA. 452+52.39
ON 6" AGGREGATE BASE COURSE, TY B
ASPHALT SURFACE, 2-INCH
LINE, 6" WHITE (TYP.)
MODIFIED URETHANE PAVEMENT MARKING
LINE, 8" WHITE (TYP.)
MODIFIED URETHANE PAVEMENT MARKING
"S" PATTERN
CROSSWALKS- 910 SQ FT.
PEDESTRIAN ENHANCEMENT
LINE, 8" WHITE (TYP.)
MODIFIED URETHANE PAVEMENT MARKING
"S" PATTERN
CROSSWALKS- 623 SQ FT.
PEDESTRIAN ENHANCEMENT
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
REBUILD EXISTING HANDHOLE
10'
5'
10'
10'
8.26'
10'
10'
VILLAGE OF SCHAUMBURG
Schaumburg, IL. 60193-7806
714 S. Plum Grove Road
Department of Engineering and Public Works
0 10
SCALE IN FEET
IL RTE 72 (HIGGINS ROAD)
N A T
IO
N A L
P
A R
K W
A Y
EXISTING R.O.W.
EXISTING R.O.W.
A
B
C
D
E F
H
J
K
L M
N
O
P
QS
T
U
V
W
X
A
B
C
D
E
F
G
H
I
J
5SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
SIDEWALK CORNER DETAILS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:JAM
NAH
JAM
180009-sht-Plan2.dgn
NONE6/21/2024 30
I
Y
738.16
737.99
737.22
737.19
736.98
737.04
737.14
737.08
737.17
737.89
737.88
737.38
737.34
737.50
737.40
OFFSETSTATION
737.44
737.58
738.15
738.26
STA. 451+45.17 95.11 RT
STA. 451+40.31 84.57 RT
STA. 451+39.73 83.31 RT
STA. 451+49.39 80.38 RT
STA. 451+54.25 90.93 RT
STA. 451+55.70 90.85 RT
STA. 451+56.44 104.64 RT
STA. 451+37.42 102.20 RT
ELEVATION
STA. 452+66.66 101.12 RT
STA. 452+65.38 96.29 RT
STA. 452+63.47 95.78 RT
STA. 452+60.83 95.72 RT
STA. 452+70.53 79.70 RT
STA. 452+75.67 83.09 RT
OFFSETSTATION ELEVATION
739.58
739.48
738.95
738.85
738.78
738.84
739.03
738.97
739.03
739.03
738.31
738.22
738.30
STA. 451+51.90 106.74 RT
STA. 451+50.76 107.26 RT
STA. 451+50.14 105.91 RT
STA. 451+41.06 110.09 RT
738.21
738.19
K
738.94
Z
B1
D1
A1
C1
E1
STA. 451+58.79 109.75 RT
STA. 451+54.25 111.85 RT
STA. 451+64.93 125.38 RT
STA. 451+60.21 126.95 RT
STA. 451+69.23 141.59 RT
STA. 451+64.42 142.62 RT
STA. 451+72.12 155.61 RT
STA. 451+67.31 156.63 RT
738.43
738.48
738.43
738.48
738.29
738.34
IL RTE 72 (HIGGINS ROAD)
N A T
IO
N A L
P
A R
K W
A Y
.2
1.5%
.0
150' RADIUS
6.1%
1.8%
1.1%
1.0%
.2
1.
1.
E1
D1
C1
B1
A1
Z
Y
X
W
V
U
T
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
R
STA. 451+60.05 79.78 RT
STA. 451+64.47 100.39 RT
STA 451+72.42 99.96 RT
STA. 451+69.46 90.11 RT
STA. 451+66.36 90.27 RT
STA. 451+63.94 90.40 RT
STA. 451+48.61 75.42 RT
STA. 451+37.63 70.03 RT
STA. 451+38.05 72.70 RT
STA. 451+75.21 99.81 RT
737.27
L
1.0%
.5
.9
.9
1.0
STA. 452+69.19 77.03 RT
STA. 452+69.81 76.15 RT 739.04
STA. 452+64.38 85.56 RT
STA. 451+48.16 72.43 RT
SEE SHEETS 3 AND 4 FOR CENTERLINE INFORMATION.
WITH IDOT STANDARD 606001-07.
DEPRESSED CURB ADJACENT TO CURB RAMP ACCESSIBLE TO THE DISABLED SHALL BE IN ACCORDANCE
NOTES
6.4
1.2%
1.7
.9
.9
0.9%
.6
0.5
1.6
1.7
.0
1.6%
M
N
S
R
O
P Q
STA. 452+69.18 112.90 RT
STA. 452+92.37 120.46 RT
STA. 452+91.92 112.76 RT
STA. 452+78.94 111.43 RT
STA. 452+68.45 107.96 RT
STA. 452+76.92 94.55 RT
STA. 452+78.22 106.48 RT
739.48
740.00
740.21
739.78
740.75
740.62
739.58
1.0%
2.5%
7.4%
7.8%
.3
1.
1.
1.
.0
.0
1.
2%
2%
G
1.9%
(EXIST.)
T
1.2%
.3
739.67STA. 452+70.39 122.82 RT
STA. 452+71.59 132.75 RT
STA. 452+79.64 131.82 RT
STA. 452+79.30 121.79 RT
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
ELGIN . SPRINGFIELD . CRYSTAL LAKE . MT CARMEL
.0
2.0%
2.0%
.0
739.08U
T
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
STA. 452+77.46 99.52 RT
U
1.
.0
1.2%
ELEV=739.49
REBUILD EXISTING HH
42 RCPE
N OF 2E
9'
8.5'
10.05'
5'
6.91'
10'
6'
'6
VILLAGE OF SCHAUMBURG
Schaumburg, IL. 60193-7806
714 S. Plum Grove Road
Department of Engineering and Public Works
0 10
SCALE IN FEET
IL RTE 72 (HIGGINS ROAD)
N
A T
IO
N A L
P
A R
K W
A Y
EXISTING R.O.W.
6SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
SIDEWALK CORNER DETAILS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:JAM
NAH
JAM
180009-sht-Plan3.dgn
NONE6/21/2024 30
N A T
IO
N A L
P
A R
K W
A Y
IL RTE 72 (HIGGINS ROAD)
B
C
D
E
F
G
H
I J
K L
M
N
O
P Q
R
S
T
U
V
W
A
C
G
J
K
L
M
N
O
P
Q R
S
T
U V
Y
D
738.20
737.98
737.94
738.43
737.83
737.79
738.29
737.40
737.36
737.86
737.35
737.31
737.76
736.96
737.10
OFFSETSTATION ELEVATION
736.74
STA. 451+15.34 65.23 LT
STA. 451+16.30 65.47 LT
STA. 451+15.63 72.51 LT
STA. 451+16.05 81.28 LT
STA. 451+16.29 86.27 LT
STA. 451+16.69 94.76 LT
STA. 451+17.69 94.72 LT
STA. 451+17.92 99.71 LT
STA. 451+26.91 99.28 LT
STA. 451+26.68 94.29 LT
STA. 451+36.43 93.83 LT
STA. 451+38.93 93.20 LT
STA. 451+25.77 85.82 LT
STA. 451+33.48 85.46 LT
STA. 451+35.83 84.38 LT
STA. 451+25.54 80.83 LT
STA. 451+30.89 80.58 LT
STA. 451+33.07 79.22 LT
STA. 451+25.30 75.83 LT
737.20
736.70
737.20
736.99
737.08
737.21
737.21
736.98
737.25
737.21
737.30
737.09
737.30
737.11
736.99
737.30
737.12
736.90
737.08
OFFSETSTATION ELEVATION
736.88
737.46
737.55
737.60
737.69
STA. 451+27.51 75.73 LT 737.00
737.04
736.91
737.72
737.81
737.72
737.81
B
E
F
I
H
X
W
STA. 452+47.43 75.44 LT
STA. 452+48.00 75.13 LT
STA. 452+41.50 76.21 LT
STA. 452+41.64 79.43 LT
STA. 452+41.04 79.94 LT
STA. 452+33.16 84.75 LT
STA. 452+35.74 85.66 LT
STA. 452+36.08 85.21 LT
STA. 452+32.80 90.26 LT
STA. 452+32.55 90.73 LT
STA. 452+26.30 101.08 LT
STA. 452+25.12 107.90 LT
STA. 452+22.74 121.68 LT
STA. 452+35.36 117.54 LT
STA. 452+40.36 118.35 LT
STA. 452+37.74 103.19 LT
STA. 452+42.86 104.01 LT
STA. 452+39.69 91.35 LT
STA. 452+44.69 92.13 LT
STA. 452+40.49 86.41 LT
STA. 452+45.50 87.20 LT
STA. 452+46.65 80.24 LT 737.88
A
736.45
Z
Z
Y
X
W
V
U
T
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
STA. 452+34.94 90.60 LT 737.36
Y
1.
0.0%
2.8%
5.7%
0.0%
Y
X
W
V
U
T
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
STA. 451+16.81 76.24 LT 736.90
X
STA. 451+05.70 57.53 LT
7.5%
1.
.0
1.
1.8%
1.
1.
1.
0.9%
1.8%
2%
SEE SHEETS 3 AND 4 FOR CENTERLINE INFORMATION.
WITH IDOT STANDARD 606001-07.
DEPRESSED CURB ADJACENT TO CURB RAMP ACCESSIBLE TO THE DISABLED SHALL BE IN ACCORDANCE
NOTES
STA. 452+29.80 90.34 LT
STA. 452+48.21 72.10 LT
1.5
2.6
1.5
STA. 451+15.80 62.11 LT
STA. 451+30.89 75.93 LT
STA. 451+24.81 68.95 LT
1.
1.
1.
0.0%
0.0%
7.5%
.0
1.8%
1.
1.
1.8%
1.9
.8
2%
2%
STA. 452+52.56 70.30 LT
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
ELGIN . SPRINGFIELD . CRYSTAL LAKE . MT CARMEL
2.0%
.0
2.0%
.0
714 S. Plum Grove Road
Department of Engineering and Public Works
7SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
STANDARD TRAFFIC SIGNAL DESIGN DETAILS
IDOT DISTRICT 1
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
180009-sht-D1Standards.dgn
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
8SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
STANDARD TRAFFIC SIGNAL DESIGN DETAILS
IDOT DISTRICT 1
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
9SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
STANDARD TRAFFIC SIGNAL DESIGN DETAILS
IDOT DISTRICT 1
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
10SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
STANDARD TRAFFIC SIGNAL DESIGN DETAILS
IDOT DISTRICT 1
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
11SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
STANDARD TRAFFIC SIGNAL DESIGN DETAILS
IDOT DISTRICT 1
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
12SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
STANDARD TRAFFIC SIGNAL DESIGN DETAILS
IDOT DISTRICT 1
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
13SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
STANDARD TRAFFIC SIGNAL DESIGN DETAILS
IDOT DISTRICT 1
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
450+00
H
H
H
H
P
VILLAGE OF SCHAUMBURG
Schaumburg, IL. 60193-7806
714 S. Plum Grove Road
Department of Engineering and Public Works
ECON 84
TS 21955
0 10 40
SCALE IN FEET
14SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
TRAFFIC SIGNAL PLAN
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
180009-sht-TS1-72National.dgn
NONE6/21/2024 30
244'-E-2"
5'-E-2•"
40'-E-2"
67'-E-4"
80'-E-3•"
62'-E-3"
30'-E-2" 95'-E-2"
51'-E-2•"
16'-E-2"
92'-E-3"
83'-E-3•"
26'-E-2•"
5'-E-(2)5"
25'-E-1•"
22'-E-2"
M A
M A
46' MA
46' MA
TO PLUM GROVE ROAD
EXISTING INTERCONNECT
DRILL EXISTING HANDHOLE (2)
IL RTE 72 (HIGGINS ROAD)
N A T
IO
N A L
P
A R
K W
A Y
39'-UC-2"
47'-E-5"
72'-E-5"
14'-E-1‚"
APPROX. STA. 452+38.6; 91.7' LT
PEDESTRIAN POST, 10'APPROX. STA. 451+25.5; 80.8' LT
PEDESTRIAN POST, 10'
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
EXISTING R.O.W.
A
A
A
A
A
MATCHLINE B SEE SHEET 15
M A
T C
H L I N
E
A
S
E E
T
MATCHLINE C SEE SHEET 15
EX. 16' POST
EX. 16' POST
EX. 16' POST
EX. 16' POST
(4 REQUIRED)
30" x 30"
R10-15
AND CLEANED AT THE DIRECTION OF THE ENGINEER.
ALL EXISTING CONDUITS WHERE NEW CABLE IS BEING INSTALLED SHALL BE RODDED
IN THE UNIT COST OF ACCESSIBLE PEDESTRIAN SIGNALS.
OR AS DIRECTED BY THE ENGINEER. COST OF BRACKET EXTENSIONS SHALL BE INCLUDED
PEDESTRIAN PUSH-BUTTON BRACKET EXTENSIONS SHALL BE INSTALLED AS NEEDED
ALL PEDESTRIAN PUSH-BUTTONS SHALL BE ACCESSIBLE PEDESTRIAN SIGNALS.
NOTES
APPROX. STA. 452+47.0; 81.3' LT
PEDESTRIAN POST, 10'
26'-UC-2"
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
ELGIN . SPRINGFIELD . CRYSTAL LAKE . MT CARMEL
APS
APS
APS
APS
APS
APS
APS
APS
T S
S
H T
N
O
15'-E-2•"
DRILL EXISTING HANDHOLE (2)
APPROX. STA. 451+15.6; 72.8' LT
PEDESTRIAN POST, 10'
16'-UC-2"
3'-UC-2"
DRILL EXISTING HANDHOLE (1)
APPROX. STA. 452+66.8; 99.7' RT
PEDESTRIAN POST, 10'
19'-UC-2"
714 S. Plum Grove Road
Department of Engineering and Public Works
ECON 84
TS 21955
0 10 40
SCALE IN FEET
15SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
TRAFFIC SIGNAL PLAN
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
REFERENCES: _________________
180009-sht-TS2-72National.dgn
NONE6/21/2024 30
224'-E-1‚"
262'-E-1‚"
N A T
IO
N A L
P
A R
K W
A Y
IL RTE 72 (HIGGINS ROAD)
N A T
IO
N A L
P
A R
K W
A Y
EXISTING R.O.W.
EXISTING R.O.W.
E X I S
T I
G
R .O .W
E X I S
T I
.W
E X I S
T I
.W
E X I S
T I
.W
MATCHLINE B SEE SHEET 14
MATCHLINE C SEE SHEET 14
M A
T C
H L I
E E
T
TO MEACHAM ROAD
EXISTING INTERCONNECT
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
ELGIN . SPRINGFIELD . CRYSTAL LAKE . MT CARMEL
NONE
T S
S
H T
N
O
455+00
NO SCALE
CABLE PLAN
VILLAGE OF SCHAUMBURG
Schaumburg, IL. 60193-7806
714 S. Plum Grove Road
Department of Engineering and Public Works
ECON 84
TS 21955
(HIGGINS RD)
IL RTE 72
N A T
IO
N A L
P
K W
Y
1#6
2#6
1#6
R
Y
G
Y
G
R
Y
G
Y
G
P
R
Y
G
Y
G
R
Y
G
Y
G
3 #
Y
R
G
M
MEACHAM ROAD
EX. INTERCONNECT TO
EX. TRACER CABLE
PLUM GROVE ROAD
EX. INTERCONNECT TO
EX. TRACER CABLE
R Y GR Y G
RYG
YG
P
R Y G
3#20
R Y G
Y G
YR G5
M
R
Y
G
Y
G
R
Y
G
Y
G
77 7
R
Y
G
Y
G
R
Y
G
Y
G
Y
R
G
5RYG
3#20
RYG
YG
Y RG
RYG RYG
R Y G
Y G 7
P M
P
M
EXISTING CONTROLLER SEQUENCE
PEDESTRIAN PHASE
OVERLAP
PROTECTED PHASE
PROTECTED/PERMITTED PHASE
LEGEND:
OL
1+ 8 =D
7+ 6 =C
5+ 4 =B
3+ 2 =A
LETTER
OVERLAP
PHASE
PERMISSIVE
PHASE
PROTECTED
PHASE DESIGNATION:
RIGHT TURN OVERLAP
4 7
OL
B
D
OL
OL
C
A
OL
N A
T I O
N
P K
W Y
(HIGGINS RD)
IL RTE 72
N A
T I O
N
W Y
(HIGGINS RD)
IL RTE 72
C
D
C
D
CD
CD
C
D
C D
C
D
3 2 2 3
P
P
16SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
AND EMERGENCY VEHICLE PREEMPTION SEQUENCE
CABLE PLAN, PHASE DESIGNATION DIAGRAM,
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
180009-Sht_Cable72National.dgn
NONE6/21/2024 30
PROPOSED CONTROLLER SEQUENCE
4 7
OL
B
D
OL
OL
C
A
OL
N A
T I O
N
W Y
(HIGGINS RD)
IL RTE 72
PREEMPTION SEQUENCE
EMERGENCY VEHICLE
P
ELECTRICAL SERVICE REQUIREMENTS
TRAFFIC SIGNAL
CONTROLLER
WATTAGE
UNIT
SIGNAL HEAD
4-SECTION
5-SECTION
PROGRAMMABLE 3-SECTION
4-SECTION
5-SECTION
PEDESTRIAN SIGNAL
MASTER CONTROLLER
UPS
DETECTION RADAR OR VIDEO
BLANK-OUT SIGN
NETWORK SWITCH
CELLULAR MODEM
WATTAGE
TOTAL
TOTAL UPS SIZING
UPS CHARGING
BATTERY HEATER MAT
CABINET HEATER
FLASHER
LED STREET NAME SIGN
LUMINAIRE
QUANTITYEQUIPMENT TYPE
1 OR 3-SECTION
25 25
TOTAL SERVICE WIRE SIZING
II OR III
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
ELGIN . SPRINGFIELD . CRYSTAL LAKE . MT CARMEL
APS
APS
APS
APS
APS
APS
APS
T S
S
H T
N
O
C
D
P
P
2 3
APS
ENERGY COSTS TO:
VILLAGE OF SCHAUMBURG
ENERGY SUPPLY: CONTACT:
PHONE:
COMPANY:
ACCOUNT NUMBER:
SCHAUMBURG, IL 60196
101 SCHAUMBURG COURT
NEW BUSINESS DEPARTMENT
(866) 639-3532
17470-91006
COMED
---METER NUMBER:
ONTO EXISTING CABINET
ATTACH ELECTRIC METER
(SYSTEM) DETECTORS
INTERSECTION AND SAMPLING
(SYSTEM) DETECTORS
INTERSECTION AND SAMPLING
714 S. Plum Grove Road
Department of Engineering and Public Works
ECON 84
TS 21955
17SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
SCHEDULE OF TRAFFIC SIGNAL QUANTITIES
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
180009-Sht_Qty72National.dgn
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
Civil & Structural Engineers . Land Surveyors . Environmental Services
ELGIN . SPRINGFIELD . CRYSTAL LAKE . MT CARMEL
T S
S
H T
N
O
SCHEDULE OF QUANTITIES
714 S. Plum Grove Road
Department of Engineering and Public Works
18SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
180009-Sht-Standards-72National.dgn
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
19SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
20SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
21SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
22SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
23SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
24SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
25SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
26SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
27SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
28SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
IDOT HIGHWAY STANDARDS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
714 S. Plum Grove Road
Department of Engineering and Public Works
29SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
TYPICAL PAVEMENT MARKINGS
IDOT DISTRICT 1
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
NOT TO SCALE
PAVER BRICK CONCRETE EDGE BAND
12" WIDE
CONCRETE EDGE BAND
PAVER CROSS-SECTION DETAIL (TYPICAL)
PAVER LAYOUT DETAIL
CURB AND GUTTER
12" x 12" CHARCOAL PAVER (TYP.)
12" x 12" CONCRETE PAVER (TYP.)
6" x 12" CONCRETE PAVER (TYP.)
6" x 6" BROWN PAVER (TYP.)
DETECTABLE WARNINGS
NORTHWEST CORNER
UNDERLAYMENT
4" PCC
BASE
3/4" SAND LEVELING
AND GUTTER
DEPRESSED CURB
SUB-GRADE
COMPACTED
GRANULAR BASE
4" COMPACTED
DOMES
TRUNCATED
TRANSITIONS INTO SIDE CURB
CONCRETE EDGE BAND
VILLAGE OF SCHAUMBURG
Schaumburg, IL. 60193-7806
714 S. Plum Grove Road
Department of Engineering and Public Works
30SCALE:
NUMBER
SHEET
SHEETS
TOTAL
DESCRIPTIONDATENO.DESCRIPTIONDATENO.
REVISIONS
CONSTRUCTION DETAILS
DRAWN:
CHECKED:
DESIGNED:
DATE:
FILE:
PROJECT NUMBER:NAH
JAM
NAH
NONE6/21/2024 30
Hampton, Lenzini and Renwick, Inc.
www.hlrengineering.com
184.000959 ILLINOIS PROFESSIONAL DESIGN FIRM LS / PE / SE CORPORATION
| 001 |
| 002 |
| 003 |
| 004 |
| 005 |
| 006 |
| 007 |
| 008 |
| 009 |
| 010 |
| 011 |
| 012 |
| 013 |
| 014 |
| 015 |
| 016 |
| 017 |
| 018 |
| 019 |
| 020 |
| 021 |
| 022 |
| 023 |
| 024 |
| 025 |
| 026 |
| 027 |
| 028 |
| 029 |
| 030 |
File details come from the government source that posted it. Updated .