2024-LGR-0156 JA Redacted.pdf
PDF 369 KB Posted
- Solicitation number
- 2024-LGR-0156
- Issued by
-
Library of Congress
About this file
This document contains a justification and approval for a sole-source contract and a related federal contract opportunity notice. The Library of Congress seeks to award sole-source contracts to Kodak and ORWO for various black-and-white and color motion picture film stocks to be used in the preservation of films in the Library's collection. The film stocks required include black-and-white print, duplicating negative, and master positive stocks, as well as color print and intermediate stocks, all in 35mm gauge. The period of performance is one base year and one option year for amounts below the simplified acquisition threshold. As Kodak and ORWO are the only two producers of the needed film stocks, this acquisition must be sole-sourced to ensure the Library's motion picture preservation work can continue and films are protected from deterioration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024-LGR-0156 SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and Approval Sole-Source Justification
Plan ID Number: 2024-LGR-0156
Form Updated 4/14/2023
Justification & Approval Sole-Source Justification
As a legislative branch agency, the Library is subject to the competition and advertising requirements of 41 U.S.C. § 6101. Like the Competition in
Contracting Act and the FAR, 41 U.S.C. § 6101 does not require competition when a contracting officer certifies that only one source or brand-name item is available, when dictated by public exigency, or when otherwise authorized by law.
This document sets forth the justification and approval for award of a contract or order by means providing for other than full and open competition per 41 U.S.C. § 6101, LCR 7-210, and, as applicable, FAR 6.302, FAR 13.106-1, FAR 8.405, and FAR 16.505. Contracting without competition shall not be justified on the basis of a lack of advance planning or concerns related to availability of funds.
This form shall be used to support instances where competition will be limited to a single source, a limited number of sources, including where a brand name product is required.
Part 1 – Identification
1. Contracting Agency and Activity:
Library of Congress
RCS, NAVCC
Packard Campus
Film Preservation Laboratory
2. Nature of Action Being Approved Contract (or modification)
LoC or Leg Branch Order (or modification)
GSA Schedule or GWAC: Identify Schedule/Contract
Other: Identify
Plan ID Number: 2024-LGR-0156
Contractor (or Brand Name): Kodak and ORWO
Estimated Value (Base and all options):
Base Year: 04/01/2024 – 03/31/2025
Option Year: 04/01/2025 – 03/31/2026
3. Description of Supplies or Services Required to Meet Library Needs
Describe the supplies or services that are required to meet the Library’s minimum needs and the delivery schedule required to meet those needs. Do not focus on a description of the program.
The Library requires the following supplies or services:
• Black-and-white fine grain print film stock, 35mm gauge
• Black-and-white fine grain duplicating negative film stock, 35mm gauge
• Black-and-white fine grain master positive film stock, 35mm gauge
• Color-print film stock, 35mm gauge
• Color-intermediate film stock, 35mm gauge
This is a sole-source requirement. Only Kodak and ORWO may provide these items.
For Other than Full and Open Competition
Plan ID Number:
Form Updated 4/14/2023
Part 2 – Program Office Justification & Approval
4. Authority for Contracting Without Competition
Over $250,000 For this requirement over $250,000, under FAR part 6, the basis for contracting without providing for full and open competition is:
There is only one responsible source and no other supplies or services will satisfy Library requirements.
41 U.S.C. § 6101(b)(2)(C); FAR 6.302-1.
Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. FAR 6.302-1(b)(1).
Source controls copyrights, patents, raw materials, or secret processes cannot be acquired otherwise, or similar circumstances. FAR 6.302-
1(b)(2).
Other exception identified in FAR 6.302-1: Identify the exception
There is such unusual & compelling urgency that the Government would be seriously injured if competition is not limited.
41 U.S.C. § 6101(b)(2)(B); FAR 6.302-2. Option years are not permitted.
Source is expressly authorized or required by statute (e.g., AbilityOne, UNICOR, GPO, GSA Public Buildings Service, Appropriations Act, etc.) per 41 U.S.C. § 6101(b)(1) and FAR 6.302-5: Identify the authority
Other basis authorized in 41 U.S.C. § 6101(b) or FAR part 6.302: Identify the exception
Library’s needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. FAR 6.302-1(c).
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
IT Standard Data Sheet)
Up to and including $250,000 For this requirement up to $250,000, using simplified acquisition procedures under FAR part 13, the basis for contracting without providing for full and open competition is:
Only one responsible source is reasonably available to meet Library requirements. 41 U.S.C. § 6101(b); FAR 13.106-1.
Product or service is reasonably available from only one source.
Source controls copyrights, patents or other exclusive licensing arrangements.
Urgent circumstances; only one source can reasonably deliver by required date. Option years are not permitted.
Source is expressly authorized or required by statute: Identify the authority
Library’s needs can only be satisfied by a brand-name product
The Product is listed the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
GSA Schedule Order For this GSA schedule order under FAR part 8, the basis for not competing among GSA schedule-holders and/or specifying a brand name product or item is:
An urgent and compelling need exists, and following GSA procedures would result in unacceptable delays.
FAR 8.405-6(a)(1)(i)(A).
Only one GSA source is capable of fulfilling the requirement at the level of quality required because the supplies or services are unique or highly specialized. FAR 8.405-6(a)(1)(i)(B).
In the interest of economy and efficiency, the new work is a logical follow-on to an original order that was placed competitively among GSA schedule-holders (i.e., the original order was not sole-source or limited-source.) FAR 8.405-6(a)(1)(i)(C).
Library’s needs can only be satisfied by a brand-name product
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
Order Under Multiple Award Indefinite-Delivery Contract or GWAC For this order under FAR subpart 16.5, the basis for contracting without providing for full and open competition is:
The need is so urgent fair opportunity would result in unacceptable delays. 41 U.S.C. § 6101(b)(2)(C) and FAR 16.505(b)(2)(i)(A).
The Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. 41 U.S.C. § 6101(b)(1) and FAR
16.505(b)(2)(i)(B).
A logical follow-on order in the interest of economy and efficiency. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(i)(2)(C).
To satisfy a minimum guarantee. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(D).
Authorized or required by statute. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(E).
The Library’s minimum needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. 41
U.S.C. § 6101(b)(2)(B) and FAR 16.505(a)(4)(i).
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
For Other than Full and Open Competition
Plan ID Number:
Form Updated 4/14/2023
5. Rationale for Contracting Without Competition
In supporting an action not providing for full and open competition, it is not sufficient to demonstrate that the contractor is exceptionally well qualified or even the best qualified, or that the required brand name product is well suited to the Library’s needs. The rationale must demonstrate that no one else, or no other competing product, can satisfactorily fulfill the Library’s requirement. Do not focus on the importance of the requirement; the issue is the rationale for not competing.
In supporting urgency, address the following What are the unexpected facts or the unpredictable events that led to this situation? When is the required delivery or performance start date? Why this date? What specific harm to the Government will occur if the delivery is not made or performance not begun as scheduled? (Note that expiration of funds is not sufficient harm to justify not competing.) Demonstrate that the contract is only for items and quantities urgently needed until a competitive procurement action can be developed, or that a separate competitive follow-on is not practical.
In supporting a brand name justification, the brand name or feature must be essential to the Library’s requirements, and market research indicates that other company’s similar products or products with similar features cannot meet or be modified to meet the Library’s needs.
We are authorized to limit competition on the basis of the citation in section 4 because:
The Library of Congress (Library) requires contract support to purchase black-and-white motion-picture laboratory film safety stock for use in the preservation of motion-picture films belonging to the Library’s collection. These film stocks are made by only two manufacturers worldwide: 1.
Eastman-Kodak and 2. ORWO. Consequently, this acquisition must be sole-source.
This requirement seeks to purchase various black-and-white motion picture film stocks that are used by the Library’s Motion Picture Film
Preservation Laboratory during the preservation of the Library’s motion pictures. Without these film stocks, not only would the Motion Picture Film
Preservation Laboratory be unable to preserve films belonging to Library’s collection, but it would also risk the possibility of losing these films to deterioration.
6. Actions to Overcome Barriers to Competition Before Subsequent Contract Is Required
State what actions, if any, the program office can take to overcome barriers to competition before contracting for this requirement again, such as:
using action to provide time to develop specifications for a competitive procurement by a certain date; licensing copyrights or patents so other contractors may use the works; or breaking the requirement into parts that may be purchased competitively. If this is a one-time requirement, explain that action to increase future competition is not needed. If the source is expressly required by statute, state “Source is statutory.”
To increase competition, we will:
The Library has verified that, at this time, Kodak and ORWO are the only two producers of the required film stocks. The Library will continually check to see if new manufacturers of the product emerge.
7. Program Office Certification
I certify that the description of the Government’s minimum needs, schedule requirements, and technical information that provide the basis for this justification are accurate and complete.
File details come from the government source that posted it. Updated .