This is a reporting template spreadsheet for Independent Evaluator (IE) assessments of electrical corporation Wildfire Mitigation Plan (WMP) initiatives. The template consists of five tabs: Overview, Catalog of Initiatives, Data Requests, SME Interviews, and List of Failed-to-Fund Initiatives. The document provides a structured format for tracking and evaluating various WMP initiatives, including their descriptions, targets, progress, validation methods, and financial details.

The example initiative shown demonstrates the tracking of a pole replacement program with a target of 14,850 poles. The initiative had an actual completion of 15,850 poles with a 97.50% sample validation rate based on 400 inspections. While the physical target was exceeded, the program was underspent at $1.435 million versus a planned $2.507 million budget (43% under budget). The initiative failed to meet its risk reduction goals as poles were replaced in lower-risk areas, resulting in only 30% of intended risk mitigation.

View the file

Other files

File Type Posted
Bid_Packet.pdf PDF
RFQ_5PA4K00178.01_-_Redding_Training_Center_-_Fire_Props_2.pdf PDF
STD_204.pdf PDF
std1000.pdf PDF
Bidder_Instructions.pdf PDF
2023Mar6Form74R3_(7).pdf PDF
Darfur_Certification_CAL_FIRE-720_.pdf PDF
gspd05-106.pdf PDF
2024_IE_ARC_Outline.pdf PDF
2024_IE_Sample_size_calculator.xlsx XLSX spreadsheet
2024-12_Meeting_Notice_Independent_Evaluator_RFQ.pdf PDF
2024_IE_RFQ_Attachments_B_to_E.xlsx XLSX spreadsheet
2024_IE_RFQ.pdf PDF
2024_IE_RFQ_Attachment_A.docx DOCX document
2024_IE_RFQ_Q_A_Summary.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1 - Overview tab IE ARC Attachments

Independent Evaluator:

Electrical Corporation:

Legends

Tab 1Overview Tab - Instructions and overview
Tab 2Catalog of Initiatives - Initiative review and funding compliance of all initiatives
Tab 3Data Requests - Comprehensive list of documents reviewed
Tab 4SME Interviews - Summary of interviews conducted
Tab 5List of Failed-to-Fund Initiatives - All initiatives funded less than 100%

Tab 2 - Catalog of Initiatives Catalog of Initiatives

Independent Evaluator:

Electrical Corporation:
WMP CategoryInitiative Tracking IDWMP Section NumberInitiative NameInitiative TypeWMP - Initiative DescriptionWMP - Initiative TargetEC-Claimed Progress (Q4 QDR)EC-Claimed Progress (EC ARC)EC-Claimed Progress
Kopunova, Sara: Number of "actuals" from which samples are selectedEC-Claimed Initiative StatusTarget Not Met - RationaleSample Size (#)Sample Validation Rate (%)Verification MethodInitiative Validation Rate (%)IE Finding on InitiativeWMP - Planned Spend ($)EC-Claimed Actual Spend ($)Variance (%)Funding discrepancy - findingFunding discrepancy - detailSatisfied Risk Reduction Goal - findingSatisfied Risk Reduction Goal - detail
Grid Design Operations and MaintenanceWMP.9728.1.2.1Pole replacementFocus & field verifiableReplace 14850 poles14,85015,85015,84015,850Target metN/A40097.50%Field inspection
SAP notification (DR064)104%Initiative validated$ 2,507,000.00$ 1,435,000.00-43%UnderspendDue to fewer resource hours charging to the program than initially anticipated in 2021, resulting in lower costs incurredNoPoles were replaced in lower-risk areas, reducing overall risk mitigation<-- Example
Grid Design Operations and MaintenanceWMP.5508.1.5Lightning arrestor replacementFocus & non-field verifiableReplace 2216 arrestors2,2161,5001,4901,490Target not metInitiative faced delays in permit processing due to staff turnover12083%Field inspection
SAP work order (DR082)56%Initiative not validated$ 3,407,000.00$ 4,000,888.0015%OverspendDue to lower remediations, driven by a lower find rate and execution limitations due to internal exceptionsNoEC did not meet its target by >30% and did not meet its intended risk reduction<-- Example
Vegetation Management and InspectionsVM-048.2.3QA/QC for vegetation management inspectionsNon-focus & non-field verifiableInspect 35 lines miles for vegetation35353535Target metN/A35100%QA/QC documentation (DR034)
SME interview (SME02)100%Initiative validated$ 3,150,987.00$ 3,149,987.000%No discrepancyN/AYesN/A<-- Example

Tab 3 - Data Requests Data Requests

Independent Evaluator:

Electrical Corporation:
Date SentDate Response ReceivedSection / InitiativeData Request NumberList of Documents Received
5/1/245/3/248.1.2.1 - GH-01DRU 13535DRU13535 Redacted Attachments (ZIP)
DRU13535 Audit Independent<-- Example

Tab 4 - SME Interviews SME Interviews

Independent Evaluator:

Electrical Corporation:
Interview dateSection / InitiativeSME interview numberPositions interviewedSummary of interview
5/1/248.1.2.1 - GH-01SME001Director of Wildfire MitigationOverview of funding verification with slide presentation covering financial assumptions; cost model assmption; major elements of cost models; planning order fields; and overview of 2023 spend high-level drivers<-- Example

Tab 5 - List of "Fail-to-Fund" List of Failed-to-Fund Initiatives

Independent Evaluator:

Electrical Corporation:
WMP CategoryWMP Section NumberWMP Page NumberInitiative Tracking ID

Kopunova, Sara: Kopunova, Sara:

If applicable since some commitments occur outside of initiativesInitiative NameWMP - Planned Spend ($)EC-Claimed Actual Spend ($)Variance (%)
Grid Design Operations and Maintenance8.1.2.387SH-01Pole replacement$ 10,000.00$ 9,000.0010%<-- Example