2024_IE_Reporting_Template.xlsx

XLSX spreadsheet 87 KB Posted

Attached to
P2024205 Crocker Meadows Wildlife Area Permit for Excess Vegetation Disposal
Solicitation number
0000033649
Issued by
Sacramento County, San Diego City, California

About this file

This is an Independent Evaluator (IE) reporting template spreadsheet for electrical corporation Wildfire Mitigation Plan (WMP) initiative tracking and validation. The template consists of five tabs: Overview, Catalog of Initiatives, Data Requests, SME Interviews, and List of Failed-to-Fund Initiatives. The document includes a detailed example of pole replacement initiative WMP.972, which had a target of replacing 14,850 poles and achieved 15,850 replacements, exceeding the original goal by approximately 6.7%.

The financial aspects show a planned spend of $2,507,000 with actual spend of $1,435,000, resulting in a 43% underspend due to fewer resource hours charged to the program than initially anticipated in 2021. Despite exceeding the quantity target, the initiative did not meet its intended risk reduction goals, as poles were replaced in lower-risk areas, resulting in only 30% of the planned risk mitigation. The validation process included field inspection of 400 samples with a 97.50% sample validation rate, leading to an overall initiative validation rate of 104%.

View the file

Other files

File Type Posted
24-270_Q_and_A.pdf PDF
24-270_Addendum__1_Letter.pdf PDF
24-270_SB_Solicitation.pdf PDF
2024_IE_RFQ_Attachments_B_to_E.xlsx XLSX spreadsheet
2024_IE_Sample_size_calculator.xlsx XLSX spreadsheet
2024_IE_RFQ_Attachment_A.docx DOCX document
2024_IE_RFQ.pdf PDF
2024_IE_ARC_Outline.pdf PDF
2024-12_Meeting_Notice_Independent_Evaluator_RFQ.pdf PDF
2024_IE_RFQ_Q_A_Summary.pdf PDF
RFP_P_DRR24051_Solicitation_Link.docx DOCX document
24-272_Addendum__1_Letter.pdf PDF
24-272_IFB_W_Adden__2.pdf PDF
24-272_Addendum__2_Letter.pdf PDF
24-272_IFB.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1 - Overview tab IE ARC Attachments

Independent Evaluator:

Electrical Corporation:

Legends

Tab 1Overview Tab - Instructions and overview
Tab 2Catalog of Initiatives - Initiative review and funding compliance of all initiatives
Tab 3Data Requests - Comprehensive list of documents reviewed
Tab 4SME Interviews - Summary of interviews conducted
Tab 5List of Failed-to-Fund Initiatives - All initiatives funded less than 100%

Tab 2 - Catalog of Initiatives Catalog of Initiatives

Independent Evaluator:

Electrical Corporation:
WMP CategoryInitiative Tracking IDWMP Section NumberInitiative NameInitiative TypeWMP - Initiative DescriptionWMP - Initiative TargetEC-Claimed Progress (Q4 QDR)EC-Claimed Progress (EC ARC)EC-Claimed Progress
Kopunova, Sara: Number of "actuals" from which samples are selectedEC-Claimed Initiative StatusTarget Not Met - RationaleSample Size (#)Sample Validation Rate (%)Verification MethodInitiative Validation Rate (%)IE Finding on InitiativeWMP - Planned Spend ($)EC-Claimed Actual Spend ($)Variance (%)Funding discrepancy - findingFunding discrepancy - detailSatisfied Risk Reduction Goal - findingSatisfied Risk Reduction Goal - detail
Grid Design Operations and MaintenanceWMP.9728.1.2.1Pole replacementFocus & field verifiableReplace 14850 poles14,85015,85015,84015,850Target metN/A40097.50%Field inspection
SAP notification (DR064)104%Initiative validated$ 2,507,000.00$ 1,435,000.00-43%UnderspendDue to fewer resource hours charging to the program than initially anticipated in 2021, resulting in lower costs incurredNoPoles were replaced in lower-risk areas, reducing overall risk mitigation<-- Example
Grid Design Operations and MaintenanceWMP.5508.1.5Lightning arrestor replacementFocus & non-field verifiableReplace 2216 arrestors2,2161,5001,4901,490Target not metInitiative faced delays in permit processing due to staff turnover12083%Field inspection
SAP work order (DR082)56%Initiative not validated$ 3,407,000.00$ 4,000,888.0015%OverspendDue to lower remediations, driven by a lower find rate and execution limitations due to internal exceptionsNoEC did not meet its target by >30% and did not meet its intended risk reduction<-- Example
Vegetation Management and InspectionsVM-048.2.3QA/QC for vegetation management inspectionsNon-focus & non-field verifiableInspect 35 lines miles for vegetation35353535Target metN/A35100%QA/QC documentation (DR034)
SME interview (SME02)100%Initiative validated$ 3,150,987.00$ 3,149,987.000%No discrepancyN/AYesN/A<-- Example

Tab 3 - Data Requests Data Requests

Independent Evaluator:

Electrical Corporation:
Date SentDate Response ReceivedSection / InitiativeData Request NumberList of Documents Received
5/1/245/3/248.1.2.1 - GH-01DRU 13535DRU13535 Redacted Attachments (ZIP)
DRU13535 Audit Independent<-- Example

Tab 4 - SME Interviews SME Interviews

Independent Evaluator:

Electrical Corporation:
Interview dateSection / InitiativeSME interview numberPositions interviewedSummary of interview
5/1/248.1.2.1 - GH-01SME001Director of Wildfire MitigationOverview of funding verification with slide presentation covering financial assumptions; cost model assmption; major elements of cost models; planning order fields; and overview of 2023 spend high-level drivers<-- Example

Tab 5 - List of "Fail-to-Fund" List of Failed-to-Fund Initiatives

Independent Evaluator:

Electrical Corporation:
WMP CategoryWMP Section NumberWMP Page NumberInitiative Tracking ID

Kopunova, Sara: Kopunova, Sara:

If applicable since some commitments occur outside of initiativesInitiative NameWMP - Planned Spend ($)EC-Claimed Actual Spend ($)Variance (%)
Grid Design Operations and Maintenance8.1.2.387SH-01Pole replacement$ 10,000.00$ 9,000.0010%<-- Example