2024-780_Required_Equip___Operator_Form.pdf

PDF 531 KB Posted

Attached to
DNR RFB Hubbard Co Sheep Ranch Rd Graveling
Solicitation number
2000015794
Issued by
Hubbard County, Minnesota

About this file

This document is a Required Equipment & Operator Experience Form related to a state and local contract opportunity for the Hubbard County Sheep Ranch Road Graveling project, Solicitation # 2024-780. The project involves the labor, equipment, aggregate, tools, transportation, and incidentals necessary to supply, deliver, place, compact, and shape approximately 300 cubic yards of pit-run gravel and 2,000 cubic yards of MNDOT Class 5 gravel at a location within the Paul Bunyan State Forest. Contractors must list all equipment, including graders and dozers, they will provide and the experience of their operators. Any changes to the listed equipment must be approved. Responses must be submitted electronically through the Swift Portal by the due date, and the award will be made to the lowest responsible vendor meeting the specifications.

The project requires unit pricing to include all costs such as labor, materials, tools, transportation, equipment, taxes, etc. A direct pay permit does not apply. The state reserves the right to award items separately, by grouping, or by total, whichever is deemed most advantageous. Contractors must comply with all solicitation requirements, and failure to do so may result in their response being considered non-responsive and rejected.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hubbard County Sheep Ranch Road Graveling 1 of 1 Required Equipment & Operator Experience Form Solicitation # 2024-780 5/8/24

REQUIRED EQUIPMENT AND OPERATOR EXPERIENCE FORM

Hubbard County Sheep Ranch Road Graveling

Hubbard County/Near Lake George

Solicitation # 2024-780

VERSION: ORIGINAL

Refer to Specifications & Terms, Section 7, for full equipment required and operator experience specifications for this project. List ALL equipment items you will provide for this project.

EQUIPMENT

GRADER UNIT(S)

Make and Model Year Flywheel

Horsepower Wheel

Base (in) Blade

Length (ft) Slope Meter

Rent or Own

DOZER(S)

Make and Model Year Horsepower Blade

Length (ft) Slope Meter

Rent or Own

OPERATOR EXPERIENCE

Name Position Years of

Experience Type of Work

Any changes or additions to this listed equipment may be made if they meet all required equipment specifications and an updated form is supplied to the Business Office and Project Supervisor.

I understand that falsification, in any way, of the facts or conditions I have represented herein constitutes a false statement for which penalties under the law apply and which will be just cause for forfeit of contract. (Any change requires an updated form.)

Signature of Contractor Title Date

File details come from the government source that posted it. Updated .